Using Maximo to Avoid the Consequences of
Missing Preventive Maintenance
Jacquie Chischillie
Technical Sales Engineer, Projetech, Inc.
Regulations and Regulators
Procurement Mgmt.

Maximo

Maximo
Enterprise
Asset
Management

Service Management

What is the objective
of
MRO Collaboration
PM
Optimization
Partner

Engineering
Failure

Tasks

Metrics

Planning/
Scheduling
Operations

Inventory
Optimization
Materials

Codes
Failure Criticality
Job Plans
Assets

Visual

PMs completed
PM vs CM vs EM
Downtime

Schedule Compliance

Stock outs

Time to Close

Cycle Counts

Scheduler
Priority
Escalations

M-Spec
Standardization
Kitting
Manage the Process / Measure the Process
• Key Performance Indicators to measure Business Performance.
Maintenance Effectiveness KPI’s

Maintenance Efficiency and other KPI’s



Mean time between failure (MTBF)



PM compliance



Mean time between repair (MTBR)



% Corrective maintenance



Overall Equipment Effectiveness (OEE)



Maintenance overtime



Time to complete EM work



Inventory stock outs (Service level)



Budget compliance



Safety, i.e., Lost time
Maximo for
RCM

m
oo ns
rer tio
Sto era
Op

Pre
Ma ve
int ntiv
en
an e
ce

Critical
Spares

Job
Plans
Receiving

re
pa s
S rt
Pa

Compliance

RCM
Maximo

Inventory
Metrics

MTBF

MTTR
Condition
Monitoring

Purchasing
/ PR

Cost
Heirarchy
Assets

Data

Failure
Modes
Data Analysis from Maximo Downloads
PM/EM/CM Work Reported
450

399

400

350

324

Work Orders

300

310

277
PM

239

250

237

EM

CM

194

200

Linear (PM)
Linear (EM)

150

116

110

Linear (CM)

100

64

52
50

8

20

19

22

JAN

FEB

40

24

20

14

APR

MAY

33

25
2

13

4

0
DEC

MAR

Month

JUN

JUL
Working with Maximo Start Centers
Planning vs. Scheduling

How work is to be performed
Vs.
When work is performed
How To build an Accurate Job Plan
• Job plan must specify
–
–
–
–
–
–
–
–
–
–

Tasks
Parts lists
Duration
The transportation time to and from the work site should be included in the work plan if
that is used to schedule the work or track labor hours.
Child work orders
Attachments
Safety
Hazards
Precautions
LOTO

– Write a job plan for Changing

a Tire
Process Workflow in Maximo
How Maximo uses Priority
• Maximo uses a
numerical value to
indicate priority for
Work Orders, Assets and
Locations
• Maximo uses these
values to generate a
calculated priority to
help schedule competing
work orders

PRIORITY
EQPRIORITY
PRIORITY + EQPRIORITY

2 * PRIORITY * EQPRIORITY
PRIORITY + 2 * EQPRIORITY
Condition Monitoring
• Continuous meter
• Gauge
• Characteristic
Predetermined Job Plan for Meter Exceeding Limit.
Item Master Catalog
• Item Number
• Vendor information
• Item Description
– Classifications
Item Classification
Item Master Catalog
• Item Number
• Vendor information
• Item Description
– Classifications

Correct description:

Battery; Alkaline; D
Materials Management
Forecasting Work
•
•
•
•
•

Accommodate forced outages
Reorder PM schedule
Ensure labor, parts and tool availability
Manage backlog
Pull work forward

• Forecast both time based and
condition based work
PM Work Forecast
Scheduling
Resource Load Balancing
Reporting
Now it is easy to :
• Create Ad-hoc reports on the spot
• Create Chronologically scheduled reports
• Email reports to anyone, anywhere directly
from the system

• Download reports to PDF, CSV or XLS
Ad-hoc Reporting
Tool
Discussion

jchischillie@Projetech.com

info@Projetech.com

Using Maximo EAM to Avoid the Consequences of Missing PM Work