SlideShare a Scribd company logo
1 of 21
Bidding Data Sheet (BDS) STANDARD BIDDING DOCUMENTS Procurement of Goods -  PART 1 Bidding Procedures
GENERAL ,[object Object]
General ITB Clause Reference A. General ITB 1.1 The Purchaser is:  [insert  complete  name] ITB 1.1 The name and identification number of the ICB are:  [insert name and identification number] The number, identification and names of the lots comprising this ICB are:  [insert number; list the lots and related Goods]   ITB 2.1 The Borrower is:  [insert the name of Borrower, as indicated in the Loan Agreement of the Project]   ITB 2.1 The name of the Project is:  [insert the name of the Project]   ITB 4.3-4.4 A list of debarred firms  is available at http://www.worldbank.org/debarr
CONTENTS OF BIDDING DOCUMENTS ,[object Object]
Contents of Bidding Documents ITB Clause Reference B. Contents of Bidding Documents ITB 7.1 For  Clarification of bid purposes  only, the Purchaser’s address is: Attention:  [insert name and room number of Project Officer] Address:  [insert street name and number]   [insert floor and room number, if applicable] City:  [insert name of city or town] ZIP Code:  [insert postal (ZIP) code, if applicable] Country:  [insert name of country] ] Telephone:  [insert telephone number   including country and city codes] Facsimile number:  [insert fax number   including country and city codes] Electronic mail address:  [insert e-mail address of Project Officer]
PREPARATION OF BIDS ,[object Object]
Preparation of Bids ITB Clause Reference C. Preparation of Bids ITB 10.1 The language of the bid is:  [Insert “English” or” Spanish” or “French”].  [In Countries that the Bank has agreed with the Borrower that in addition to one internationally used language, bids may be also issued in the language of the Borrower's country (or the language used nation-wide in the Borrower's country for commercial transactions), the following text shall be added: “ In addition to the above indicated language, these Bidding Documents have been issued in [insert the language of the Borrower's country or the language used nation-wide in the Borrower's Country for commercial transactions].  Bidders are permitted, at their choice, to submit their bids in one of the two languages above indicated.  Bidders shall not submit bids in more than one language. The Contract to be signed with the winning Bidder shall be written in the language in which the Bid was submitted, which will be the language that shall govern the contractual relations between the Purchaser and the winning Bidder. A Bidder shall not sign a translated version of its Contract”].
Preparation of Bids ITB Clause Reference C. Preparation of Bids ITB 11.1 (h) The Bidder shall submit the following additional documents in its bid:  [insert list of documents, if any] ITB 13.1 Alternative Bids  [insert “shall be” or “shall not be”]  considered.  [If alternatives shall be considered, insert: “ A bidder may submit an alternative bid only with a bid for the base case. The Purchaser shall   only consider the alternative bids offered by the Bidder whose bid for the base case was determined to be the lowest-evaluated bid.”  or  “ A bidder may submit an alternative bid with or without a bid for the base case.  T he Purchaser shall consider bids offered for alternatives as specified in the Technical Specifications of Section VI, Schedule of Requirements  All bids received, for the base case, as well as alternative bids meeting the specified requirements, shall be evaluated on their own merits in accordance with the same procedures, as specified in the ITB 36.”]
Preparation of Bids ITB Clause Reference C. Preparation of Bids ITB 14.5 The Incoterms edition is:  [insert year of edition i.e.   “Incoterms 1990” or “Incoterms 2000”].  ITB 14.6 (b) (i) and  (c) (iii) Place of Destination:  [insert named Place of destination as per Incoterm used]   ITB 14.6 (a) (iii);(b)(ii) and (c)(v) “ Final destination (Project Site)”:  [insert name of location where the Goods are to be actually used]   ITB 14.6 (b) (iii) In addition to the CIP price specified in ITB 14.6 (b)(i), the price of the Goods manufactured outside the Purchaser’s Country shall be quoted:  [insert appropriate Incoterm, other than CIP]   ITB 14.7 The prices quoted by the Bidder  [insert “shall “or “shall not”]  be adjustable. If prices shall be adjustable, the methodology is specified in Section III Evaluation and Qualification Criteria. ITB 14.8 Prices quoted for each lot shall correspond at least to  [insert figure]  % of the items specified for each lot. Prices quoted for each item of a lot shall correspond at least to  [insert figure]  percent of the quantities specified for this item of a lot.
Preparation of Bids ITB Clause Reference C. Preparation of Bids ITB 15.1  The Bidder  [insert “is” or “is not”’]  required to quote in the currency of the Purchaser’s Country the portion of the bid price that corresponds to expenditures incurred in that currency.  ITB 18.3 Period of time the Goods are expected to be functioning (for the purpose of spare parts):  [insert duration ]   ITB 19.1 (a) Manufacturer’s authorization is:  [insert “required” or “not required”] ITB 19.1 (b) After sales service is:  [insert “required” or “not required”] ITB 20.1 The bid validity period shall be  [insert number]  days.
Preparation of Bids ITB Clause Reference C. Preparation of Bids ITB 21.1 ,[object Object],[object Object],[object Object],[object Object],ITB 21.2 The amount of the Bid Security shall be:  [insert amount] ITB 21.7 If the Bidder incurs any of the actions prescribed in subparagraphs (a) or (b) of this provision, the Borrower will declare the Bidder ineligible to be awarded contracts by the Purchaser for a period of ______ years. ITB 22.1 In addition to the original of the bid, the number of copies is:  [insert number]
SUBMISSION AND OPENING OF BIDS ,[object Object]
Submission and Opening of Bids ITB Clause Reference D. Submission and Opening of Bids ITB 23.1 Bidders  [insert “shall” or “shall not”]  have the option of submitting their bids electronically.  ITB 23.1 (b) If bidders shall have the option of submitting their bids electronically, the electronic bidding submission procedures shall be:  [insert a description of the electronic bidding submission procedures]   ITB 23.2 (c) The inner and outer envelopes shall bear the following additional identification marks:  [insert the name and/or number that must appear on the bid envelope to identify this specific bidding process].
Submission and Opening of Bids ITB Clause Reference D. Submission and Opening of Bids ITB 24.1  For bid submission purposes, the Purchaser’s address is: Attention:  [insert full name of person, if applicable, or insert name of the Project Officer] Address:  [insert street name and number] Floor-Room number:  [insert floor and room number, if applicable] [important to avoid delays or misplacement of bids] City:  [insert name of city or town] ZIP Code:  [insert postal (ZIP) code, if applicable] Country:  [insert name of country] The deadline for the submission of bids is: Date:  [insert day, month, and year, i.e. 15 June, 2001] Time:  [insert time, and identify if a.m. or p.m., i.e. 10:30 a.m.]
Submission and Opening of Bids ITB Clause Reference D. Submission and Opening of Bids ITB 27.1 The bid opening shall take place at: Street Address:  [insert street address and number] Floor/ Room number:  [insert floor and room number, if applicable] City:  [insert name of city or town] Country:  [insert name of country] Date:  [insert day, month, and year, i.e. 15 June, 2001] Time:  [insert time, and identify if a.m. or p.m. i.e. 10:30 a.m.]   ITB 27.1 If electronic bid submission is permitted in accordance with ITB sub-clause 23.1, the specific bid opening procedures shall be:  [insert description of the procedures]
EVALUATION AND COMPARISON OF BIDS ,[object Object]
Evaluation and Comparison of Bids ITB Clause Reference E. Evaluation and Comparison of Bids ITB 34.1 Bid prices expressed in different currencies shall be converted in:  [insert the name of the currency]   The source of exchange rate shall be:  [ insert the name of the source]  The date for the exchange rate shall be  [insert day, month and year] ITB 35.1 Domestic preference  [insert “shall” or “shall not”]  be a bid evaluation factor. [If domestic preference shall be a bid-evaluation factor, the methodology for calculating the margin of preference and the criteria for its application shall be as specified in Section III, Evaluation and Qualification Criteria.]
Evaluation and Comparison of Bids ITB Clause Reference E. Evaluation and Comparison of Bids ITB 36.3(a) Evaluation will be done for…….. [Select Items or  Lots] Note:  [Select one of the two sample clauses below as appropriate Bids will be evaluated for each item and the Contract will comprise the item(s) awarded to the successful Bidder. Or Bids will be evaluated lot by lot. If a Price Schedule shows items listed but not priced, their prices shall be assumed to be included in the prices of other items.  An item not listed in the Price Schedule shall be assumed to be not included in the bid, and provided that the bid is substantially responsive, the average price of the  item quoted by substantially responsive bidders will be added to the bid price and the equivalent total cost of the bid so determined will be used for price comparison.]
Evaluation and Comparison of Bids ITB Clause Reference E. Evaluation and Comparison of Bids ITB 36.3(d) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Evaluation and Comparison of Bids ITB Clause Reference E. Evaluation and Comparison of Bids ITB 36.6 Bidders  [insert “shall “or “shall not”]  be allowed to quote separate prices for one or more lots.  [refer to Section III  Evaluation and Qualification Criteria, for the evaluation methodology, if appropriate]
 

More Related Content

What's hot

Cp 2 selection of contractor - pq and post q
Cp 2 selection of contractor - pq and post qCp 2 selection of contractor - pq and post q
Cp 2 selection of contractor - pq and post qumes manandhar
 
Tender processing
Tender processingTender processing
Tender processingdnyandev_d
 
Tendering and Procurement - Basic Principles
Tendering and Procurement   - Basic PrinciplesTendering and Procurement   - Basic Principles
Tendering and Procurement - Basic PrinciplesSHKLaw
 
Mechanisms to implement wind energy projects “egyptian experience”
Mechanisms to implement wind energy projects “egyptian experience”Mechanisms to implement wind energy projects “egyptian experience”
Mechanisms to implement wind energy projects “egyptian experience”RCREEE
 
Bid Submission and Evaluation
Bid Submission and EvaluationBid Submission and Evaluation
Bid Submission and EvaluationAkshathaBhandary
 
The Basics of Tendering & Bidding
The Basics of Tendering & BiddingThe Basics of Tendering & Bidding
The Basics of Tendering & BiddingMoatasem Mabrouk
 
Sbd procurement of goods section iii evaluation and qualification criteria
Sbd procurement of goods   section iii evaluation and qualification criteriaSbd procurement of goods   section iii evaluation and qualification criteria
Sbd procurement of goods section iii evaluation and qualification criteriaJoy Irman
 
Tender and tender document
Tender and tender documentTender and tender document
Tender and tender documentAkshataFarakate
 
Tendering procedures
Tendering proceduresTendering procedures
Tendering proceduresRotich Kimaru
 
Tender Writing – Understanding the Tendering Process
Tender Writing – Understanding the Tendering ProcessTender Writing – Understanding the Tendering Process
Tender Writing – Understanding the Tendering ProcessRed Tape Busters
 
Adb procurement guidelines icb-c1
Adb procurement guidelines   icb-c1Adb procurement guidelines   icb-c1
Adb procurement guidelines icb-c1Joy Irman
 
Breakfast for the Mind: Issues with Procurement & Tendering
Breakfast for the Mind: Issues with Procurement & TenderingBreakfast for the Mind: Issues with Procurement & Tendering
Breakfast for the Mind: Issues with Procurement & TenderingNow Dentons
 
Tender and Bidding in Construction Projects
Tender and Bidding in Construction ProjectsTender and Bidding in Construction Projects
Tender and Bidding in Construction ProjectsIJERA Editor
 

What's hot (20)

Tender Evaluation
Tender EvaluationTender Evaluation
Tender Evaluation
 
Cp 2 selection of contractor - pq and post q
Cp 2 selection of contractor - pq and post qCp 2 selection of contractor - pq and post q
Cp 2 selection of contractor - pq and post q
 
Tender processing
Tender processingTender processing
Tender processing
 
Tendering and Procurement - Basic Principles
Tendering and Procurement   - Basic PrinciplesTendering and Procurement   - Basic Principles
Tendering and Procurement - Basic Principles
 
Mechanisms to implement wind energy projects “egyptian experience”
Mechanisms to implement wind energy projects “egyptian experience”Mechanisms to implement wind energy projects “egyptian experience”
Mechanisms to implement wind energy projects “egyptian experience”
 
Bid Submission and Evaluation
Bid Submission and EvaluationBid Submission and Evaluation
Bid Submission and Evaluation
 
3 tender stage
3 tender stage3 tender stage
3 tender stage
 
Tenders, their types and process
Tenders, their types and processTenders, their types and process
Tenders, their types and process
 
The Basics of Tendering & Bidding
The Basics of Tendering & BiddingThe Basics of Tendering & Bidding
The Basics of Tendering & Bidding
 
Construction Bidding Step-by-Step
Construction Bidding Step-by-StepConstruction Bidding Step-by-Step
Construction Bidding Step-by-Step
 
The Basics of Contracting
The Basics of ContractingThe Basics of Contracting
The Basics of Contracting
 
Sbd procurement of goods section iii evaluation and qualification criteria
Sbd procurement of goods   section iii evaluation and qualification criteriaSbd procurement of goods   section iii evaluation and qualification criteria
Sbd procurement of goods section iii evaluation and qualification criteria
 
Tender and tender document
Tender and tender documentTender and tender document
Tender and tender document
 
Tendering procedures
Tendering proceduresTendering procedures
Tendering procedures
 
Tender Writing – Understanding the Tendering Process
Tender Writing – Understanding the Tendering ProcessTender Writing – Understanding the Tendering Process
Tender Writing – Understanding the Tendering Process
 
Adb procurement guidelines icb-c1
Adb procurement guidelines   icb-c1Adb procurement guidelines   icb-c1
Adb procurement guidelines icb-c1
 
Tendering process cvc_guidelines
Tendering process cvc_guidelinesTendering process cvc_guidelines
Tendering process cvc_guidelines
 
Breakfast for the Mind: Issues with Procurement & Tendering
Breakfast for the Mind: Issues with Procurement & TenderingBreakfast for the Mind: Issues with Procurement & Tendering
Breakfast for the Mind: Issues with Procurement & Tendering
 
Tender and Bidding in Construction Projects
Tender and Bidding in Construction ProjectsTender and Bidding in Construction Projects
Tender and Bidding in Construction Projects
 
Tender
TenderTender
Tender
 

Viewers also liked

Jisc RSC Eastern - Tevims RSC bid writing workshop Nov 2013
Jisc RSC Eastern - Tevims RSC bid writing workshop Nov 2013 Jisc RSC Eastern - Tevims RSC bid writing workshop Nov 2013
Jisc RSC Eastern - Tevims RSC bid writing workshop Nov 2013 JISC RSC Eastern
 
Exp Engineering Oil Gas Final
Exp Engineering Oil Gas FinalExp Engineering Oil Gas Final
Exp Engineering Oil Gas FinalLVandiver
 
Direktori inovasi(1)
Direktori inovasi(1)Direktori inovasi(1)
Direktori inovasi(1)mohdnizam882
 
To bid or not to bid (APMP Greater Midwest Chapter Presentation) Bob Lohfeld ...
To bid or not to bid (APMP Greater Midwest Chapter Presentation) Bob Lohfeld ...To bid or not to bid (APMP Greater Midwest Chapter Presentation) Bob Lohfeld ...
To bid or not to bid (APMP Greater Midwest Chapter Presentation) Bob Lohfeld ...Lohfeld Consulting Group
 
4 Overview Of The Oil And Gas Basins Of Colombia
4 Overview Of The Oil And Gas Basins Of Colombia4 Overview Of The Oil And Gas Basins Of Colombia
4 Overview Of The Oil And Gas Basins Of ColombiaDouglas Green
 
Competitive Bid Process
Competitive Bid ProcessCompetitive Bid Process
Competitive Bid Processxulxin2009
 
Oil & Gas technical training courses
Oil & Gas technical training coursesOil & Gas technical training courses
Oil & Gas technical training coursesDasline Sinta
 
The project manager's survival guide to bids, tenders and proposals, by david...
The project manager's survival guide to bids, tenders and proposals, by david...The project manager's survival guide to bids, tenders and proposals, by david...
The project manager's survival guide to bids, tenders and proposals, by david...Association for Project Management
 
A primer on bid management b2 b_egovernance_biswa.prakash@hotmail.com
A primer on bid management b2 b_egovernance_biswa.prakash@hotmail.comA primer on bid management b2 b_egovernance_biswa.prakash@hotmail.com
A primer on bid management b2 b_egovernance_biswa.prakash@hotmail.comBiswa Nayak
 
4 bid management challenges
4 bid management challenges4 bid management challenges
4 bid management challengesVikas Dhandhania
 
The EPCM of writing tenders: How engineers can successfully build compelling ...
The EPCM of writing tenders: How engineers can successfully build compelling ...The EPCM of writing tenders: How engineers can successfully build compelling ...
The EPCM of writing tenders: How engineers can successfully build compelling ...Engineers Australia
 
Oil pipeline 42 inch by 455 km
Oil pipeline 42 inch by  455 kmOil pipeline 42 inch by  455 km
Oil pipeline 42 inch by 455 kmDavid H Moloney
 
Civil Engineering Construction Techniques
Civil Engineering  Construction TechniquesCivil Engineering  Construction Techniques
Civil Engineering Construction TechniquesDavid H Moloney
 
Opportunity Qualification
Opportunity QualificationOpportunity Qualification
Opportunity QualificationJohn Humphries
 
APMP Foundation: Proposal Process Management
APMP Foundation: Proposal Process ManagementAPMP Foundation: Proposal Process Management
APMP Foundation: Proposal Process ManagementBid to Win Ltd
 
Tendering process, Bid Evaluation & Award Process
Tendering process, Bid Evaluation & Award ProcessTendering process, Bid Evaluation & Award Process
Tendering process, Bid Evaluation & Award ProcessPrateek Kashyap
 
Property and Supply Management w/ introduction to R.A. 9184 Government Procur...
Property and Supply Management w/ introduction to R.A. 9184 Government Procur...Property and Supply Management w/ introduction to R.A. 9184 Government Procur...
Property and Supply Management w/ introduction to R.A. 9184 Government Procur...Juan Paolo Somorostro - Aranas, MPA, BSOSM
 
Oil & Gas Plant Construction, Project Execution Plan
Oil & Gas Plant Construction, Project Execution PlanOil & Gas Plant Construction, Project Execution Plan
Oil & Gas Plant Construction, Project Execution PlanDavid H Moloney
 

Viewers also liked (20)

Jisc RSC Eastern - Tevims RSC bid writing workshop Nov 2013
Jisc RSC Eastern - Tevims RSC bid writing workshop Nov 2013 Jisc RSC Eastern - Tevims RSC bid writing workshop Nov 2013
Jisc RSC Eastern - Tevims RSC bid writing workshop Nov 2013
 
Exp Engineering Oil Gas Final
Exp Engineering Oil Gas FinalExp Engineering Oil Gas Final
Exp Engineering Oil Gas Final
 
Direktori inovasi(1)
Direktori inovasi(1)Direktori inovasi(1)
Direktori inovasi(1)
 
ACH 216 Lecture 04b (Bidding) Part 2
ACH 216 Lecture 04b (Bidding) Part 2ACH 216 Lecture 04b (Bidding) Part 2
ACH 216 Lecture 04b (Bidding) Part 2
 
To bid or not to bid (APMP Greater Midwest Chapter Presentation) Bob Lohfeld ...
To bid or not to bid (APMP Greater Midwest Chapter Presentation) Bob Lohfeld ...To bid or not to bid (APMP Greater Midwest Chapter Presentation) Bob Lohfeld ...
To bid or not to bid (APMP Greater Midwest Chapter Presentation) Bob Lohfeld ...
 
4 Overview Of The Oil And Gas Basins Of Colombia
4 Overview Of The Oil And Gas Basins Of Colombia4 Overview Of The Oil And Gas Basins Of Colombia
4 Overview Of The Oil And Gas Basins Of Colombia
 
Competitive Bid Process
Competitive Bid ProcessCompetitive Bid Process
Competitive Bid Process
 
Oil & Gas technical training courses
Oil & Gas technical training coursesOil & Gas technical training courses
Oil & Gas technical training courses
 
The project manager's survival guide to bids, tenders and proposals, by david...
The project manager's survival guide to bids, tenders and proposals, by david...The project manager's survival guide to bids, tenders and proposals, by david...
The project manager's survival guide to bids, tenders and proposals, by david...
 
A primer on bid management b2 b_egovernance_biswa.prakash@hotmail.com
A primer on bid management b2 b_egovernance_biswa.prakash@hotmail.comA primer on bid management b2 b_egovernance_biswa.prakash@hotmail.com
A primer on bid management b2 b_egovernance_biswa.prakash@hotmail.com
 
4 bid management challenges
4 bid management challenges4 bid management challenges
4 bid management challenges
 
The EPCM of writing tenders: How engineers can successfully build compelling ...
The EPCM of writing tenders: How engineers can successfully build compelling ...The EPCM of writing tenders: How engineers can successfully build compelling ...
The EPCM of writing tenders: How engineers can successfully build compelling ...
 
Oil pipeline 42 inch by 455 km
Oil pipeline 42 inch by  455 kmOil pipeline 42 inch by  455 km
Oil pipeline 42 inch by 455 km
 
Civil Engineering Construction Techniques
Civil Engineering  Construction TechniquesCivil Engineering  Construction Techniques
Civil Engineering Construction Techniques
 
Opportunity Qualification
Opportunity QualificationOpportunity Qualification
Opportunity Qualification
 
APMP Foundation: Proposal Process Management
APMP Foundation: Proposal Process ManagementAPMP Foundation: Proposal Process Management
APMP Foundation: Proposal Process Management
 
Tendering process, Bid Evaluation & Award Process
Tendering process, Bid Evaluation & Award ProcessTendering process, Bid Evaluation & Award Process
Tendering process, Bid Evaluation & Award Process
 
Property and Supply Management w/ introduction to R.A. 9184 Government Procur...
Property and Supply Management w/ introduction to R.A. 9184 Government Procur...Property and Supply Management w/ introduction to R.A. 9184 Government Procur...
Property and Supply Management w/ introduction to R.A. 9184 Government Procur...
 
Bid management ppt
Bid management pptBid management ppt
Bid management ppt
 
Oil & Gas Plant Construction, Project Execution Plan
Oil & Gas Plant Construction, Project Execution PlanOil & Gas Plant Construction, Project Execution Plan
Oil & Gas Plant Construction, Project Execution Plan
 

Similar to Sbd procurement of goods section ii bidding data sheets

Sbd procurement of goods section iv bidding forms
Sbd procurement of goods   section iv bidding formsSbd procurement of goods   section iv bidding forms
Sbd procurement of goods section iv bidding formsJoy Irman
 
Application of price adjustment in civil works contract
Application of price adjustment in civil works contractApplication of price adjustment in civil works contract
Application of price adjustment in civil works contractSPIDER Solutions Nigeria
 
SBD - 3 - ICTAD
SBD - 3 - ICTADSBD - 3 - ICTAD
SBD - 3 - ICTADVj NiroSh
 
Two Envelop System.pptx
Two Envelop System.pptxTwo Envelop System.pptx
Two Envelop System.pptxMohamedNiswan
 
Local+purchase+order+lpo+form4
Local+purchase+order+lpo+form4Local+purchase+order+lpo+form4
Local+purchase+order+lpo+form4FadiH
 
Topic 1 - Bidding Documents.pptx
Topic 1 - Bidding Documents.pptxTopic 1 - Bidding Documents.pptx
Topic 1 - Bidding Documents.pptxVanJasperCastillo
 
Procurement of infrastructure projects
Procurement of infrastructure projectsProcurement of infrastructure projects
Procurement of infrastructure projectswil_mia
 
Sbd procurement of goods 2 bid documents
Sbd procurement of goods   2 bid documentsSbd procurement of goods   2 bid documents
Sbd procurement of goods 2 bid documentsJoy Irman
 
1 ITT- PG3.ppt
1 ITT- PG3.ppt1 ITT- PG3.ppt
1 ITT- PG3.pptHumayun29
 
Sbd procurement of goods section vii special conditions
Sbd procurement of goods   section vii special conditionsSbd procurement of goods   section vii special conditions
Sbd procurement of goods section vii special conditionsJoy Irman
 
StandardTenderDocument-14122020.pdf
StandardTenderDocument-14122020.pdfStandardTenderDocument-14122020.pdf
StandardTenderDocument-14122020.pdfPSENTHILMURUGAN2
 
WORKS PROCUREMTN EVALUATION OF BIDS.ppt
WORKS PROCUREMTN EVALUATION OF BIDS.pptWORKS PROCUREMTN EVALUATION OF BIDS.ppt
WORKS PROCUREMTN EVALUATION OF BIDS.pptJaafar47
 
11.05 - 11.15 Asen Antov
11.05 - 11.15 Asen Antov11.05 - 11.15 Asen Antov
11.05 - 11.15 Asen AntovAssen Antov
 

Similar to Sbd procurement of goods section ii bidding data sheets (20)

Sbd procurement of goods section iv bidding forms
Sbd procurement of goods   section iv bidding formsSbd procurement of goods   section iv bidding forms
Sbd procurement of goods section iv bidding forms
 
Application of price adjustment in civil works contract
Application of price adjustment in civil works contractApplication of price adjustment in civil works contract
Application of price adjustment in civil works contract
 
SBD - 3 - ICTAD
SBD - 3 - ICTADSBD - 3 - ICTAD
SBD - 3 - ICTAD
 
Letter of bid
Letter of bidLetter of bid
Letter of bid
 
CIDA SBD 03.pdf
CIDA SBD 03.pdfCIDA SBD 03.pdf
CIDA SBD 03.pdf
 
Two Envelop System.pptx
Two Envelop System.pptxTwo Envelop System.pptx
Two Envelop System.pptx
 
Local+purchase+order+lpo+form4
Local+purchase+order+lpo+form4Local+purchase+order+lpo+form4
Local+purchase+order+lpo+form4
 
Topic 1 - Bidding Documents.pptx
Topic 1 - Bidding Documents.pptxTopic 1 - Bidding Documents.pptx
Topic 1 - Bidding Documents.pptx
 
Procurement of infrastructure projects
Procurement of infrastructure projectsProcurement of infrastructure projects
Procurement of infrastructure projects
 
Sbd procurement of goods 2 bid documents
Sbd procurement of goods   2 bid documentsSbd procurement of goods   2 bid documents
Sbd procurement of goods 2 bid documents
 
Contracts & tenders
Contracts & tendersContracts & tenders
Contracts & tenders
 
Tanmay presentation
Tanmay presentationTanmay presentation
Tanmay presentation
 
1 ITT- PG3.ppt
1 ITT- PG3.ppt1 ITT- PG3.ppt
1 ITT- PG3.ppt
 
Sbd procurement of goods section vii special conditions
Sbd procurement of goods   section vii special conditionsSbd procurement of goods   section vii special conditions
Sbd procurement of goods section vii special conditions
 
Prebid-Part-1-C.pdf
Prebid-Part-1-C.pdfPrebid-Part-1-C.pdf
Prebid-Part-1-C.pdf
 
Chapter -Two (2).pdf
Chapter -Two (2).pdfChapter -Two (2).pdf
Chapter -Two (2).pdf
 
Guidelines For tender.pdf
Guidelines For tender.pdfGuidelines For tender.pdf
Guidelines For tender.pdf
 
StandardTenderDocument-14122020.pdf
StandardTenderDocument-14122020.pdfStandardTenderDocument-14122020.pdf
StandardTenderDocument-14122020.pdf
 
WORKS PROCUREMTN EVALUATION OF BIDS.ppt
WORKS PROCUREMTN EVALUATION OF BIDS.pptWORKS PROCUREMTN EVALUATION OF BIDS.ppt
WORKS PROCUREMTN EVALUATION OF BIDS.ppt
 
11.05 - 11.15 Asen Antov
11.05 - 11.15 Asen Antov11.05 - 11.15 Asen Antov
11.05 - 11.15 Asen Antov
 

More from Joy Irman

Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010Joy Irman
 
Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010Joy Irman
 
Lampiran iv b jasa konsultansi - perorangan
Lampiran iv b   jasa konsultansi - peroranganLampiran iv b   jasa konsultansi - perorangan
Lampiran iv b jasa konsultansi - peroranganJoy Irman
 
Lampiran iv a jasa konsultansi - badan usaha
Lampiran iv a   jasa konsultansi - badan usahaLampiran iv a   jasa konsultansi - badan usaha
Lampiran iv a jasa konsultansi - badan usahaJoy Irman
 
Consulting Services Operation Manual, Asian Development Bank
Consulting Services Operation Manual, Asian Development BankConsulting Services Operation Manual, Asian Development Bank
Consulting Services Operation Manual, Asian Development BankJoy Irman
 
Guidelines for the Use of Consultants under Islamic Development Bank Financing
Guidelines for the Use of Consultants under Islamic Development Bank FinancingGuidelines for the Use of Consultants under Islamic Development Bank Financing
Guidelines for the Use of Consultants under Islamic Development Bank FinancingJoy Irman
 
Guidelines for the Employment of Consultants under Japanese ODA Loans
Guidelines for the Employment of Consultants under Japanese ODA LoansGuidelines for the Employment of Consultants under Japanese ODA Loans
Guidelines for the Employment of Consultants under Japanese ODA LoansJoy Irman
 
Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...
Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...
Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...Joy Irman
 
10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeri
10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeri10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeri
10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeriJoy Irman
 
12 konsep ramah lingkungan
12 konsep ramah lingkungan12 konsep ramah lingkungan
12 konsep ramah lingkunganJoy Irman
 
13 pengadaan secara elektronik
13 pengadaan secara elektronik13 pengadaan secara elektronik
13 pengadaan secara elektronikJoy Irman
 
6 1 persiapan dan perencanaan pengadaan
6 1 persiapan dan perencanaan pengadaan6 1 persiapan dan perencanaan pengadaan
6 1 persiapan dan perencanaan pengadaanJoy Irman
 
3 1 organisasi pengadaan
3 1 organisasi pengadaan3 1 organisasi pengadaan
3 1 organisasi pengadaanJoy Irman
 
4 rencana umum pengadaan barang
4 rencana umum pengadaan barang4 rencana umum pengadaan barang
4 rencana umum pengadaan barangJoy Irman
 
5 2 pelaksanaan swakelola
5 2 pelaksanaan swakelola5 2 pelaksanaan swakelola
5 2 pelaksanaan swakelolaJoy Irman
 
5 1 ketentuan umum swakelola
5 1 ketentuan umum swakelola5 1 ketentuan umum swakelola
5 1 ketentuan umum swakelolaJoy Irman
 
3 7 penyedia barang jasa
3 7 penyedia barang jasa3 7 penyedia barang jasa
3 7 penyedia barang jasaJoy Irman
 
3 6 pejabat penerima hasil pekerjaan
3 6 pejabat penerima hasil pekerjaan3 6 pejabat penerima hasil pekerjaan
3 6 pejabat penerima hasil pekerjaanJoy Irman
 
3 5 ulp pejabat pengadaan
3 5 ulp pejabat pengadaan3 5 ulp pejabat pengadaan
3 5 ulp pejabat pengadaanJoy Irman
 
3 4 pejabat pembuat komitmen
3 4 pejabat pembuat komitmen3 4 pejabat pembuat komitmen
3 4 pejabat pembuat komitmenJoy Irman
 

More from Joy Irman (20)

Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010
 
Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010
 
Lampiran iv b jasa konsultansi - perorangan
Lampiran iv b   jasa konsultansi - peroranganLampiran iv b   jasa konsultansi - perorangan
Lampiran iv b jasa konsultansi - perorangan
 
Lampiran iv a jasa konsultansi - badan usaha
Lampiran iv a   jasa konsultansi - badan usahaLampiran iv a   jasa konsultansi - badan usaha
Lampiran iv a jasa konsultansi - badan usaha
 
Consulting Services Operation Manual, Asian Development Bank
Consulting Services Operation Manual, Asian Development BankConsulting Services Operation Manual, Asian Development Bank
Consulting Services Operation Manual, Asian Development Bank
 
Guidelines for the Use of Consultants under Islamic Development Bank Financing
Guidelines for the Use of Consultants under Islamic Development Bank FinancingGuidelines for the Use of Consultants under Islamic Development Bank Financing
Guidelines for the Use of Consultants under Islamic Development Bank Financing
 
Guidelines for the Employment of Consultants under Japanese ODA Loans
Guidelines for the Employment of Consultants under Japanese ODA LoansGuidelines for the Employment of Consultants under Japanese ODA Loans
Guidelines for the Employment of Consultants under Japanese ODA Loans
 
Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...
Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...
Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...
 
10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeri
10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeri10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeri
10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeri
 
12 konsep ramah lingkungan
12 konsep ramah lingkungan12 konsep ramah lingkungan
12 konsep ramah lingkungan
 
13 pengadaan secara elektronik
13 pengadaan secara elektronik13 pengadaan secara elektronik
13 pengadaan secara elektronik
 
6 1 persiapan dan perencanaan pengadaan
6 1 persiapan dan perencanaan pengadaan6 1 persiapan dan perencanaan pengadaan
6 1 persiapan dan perencanaan pengadaan
 
3 1 organisasi pengadaan
3 1 organisasi pengadaan3 1 organisasi pengadaan
3 1 organisasi pengadaan
 
4 rencana umum pengadaan barang
4 rencana umum pengadaan barang4 rencana umum pengadaan barang
4 rencana umum pengadaan barang
 
5 2 pelaksanaan swakelola
5 2 pelaksanaan swakelola5 2 pelaksanaan swakelola
5 2 pelaksanaan swakelola
 
5 1 ketentuan umum swakelola
5 1 ketentuan umum swakelola5 1 ketentuan umum swakelola
5 1 ketentuan umum swakelola
 
3 7 penyedia barang jasa
3 7 penyedia barang jasa3 7 penyedia barang jasa
3 7 penyedia barang jasa
 
3 6 pejabat penerima hasil pekerjaan
3 6 pejabat penerima hasil pekerjaan3 6 pejabat penerima hasil pekerjaan
3 6 pejabat penerima hasil pekerjaan
 
3 5 ulp pejabat pengadaan
3 5 ulp pejabat pengadaan3 5 ulp pejabat pengadaan
3 5 ulp pejabat pengadaan
 
3 4 pejabat pembuat komitmen
3 4 pejabat pembuat komitmen3 4 pejabat pembuat komitmen
3 4 pejabat pembuat komitmen
 

Recently uploaded

Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncrdollysharma2066
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...ShrutiBose4
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportMintel Group
 

Recently uploaded (20)

Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample Report
 

Sbd procurement of goods section ii bidding data sheets

  • 1. Bidding Data Sheet (BDS) STANDARD BIDDING DOCUMENTS Procurement of Goods - PART 1 Bidding Procedures
  • 2.
  • 3. General ITB Clause Reference A. General ITB 1.1 The Purchaser is: [insert complete name] ITB 1.1 The name and identification number of the ICB are: [insert name and identification number] The number, identification and names of the lots comprising this ICB are: [insert number; list the lots and related Goods] ITB 2.1 The Borrower is: [insert the name of Borrower, as indicated in the Loan Agreement of the Project] ITB 2.1 The name of the Project is: [insert the name of the Project] ITB 4.3-4.4 A list of debarred firms is available at http://www.worldbank.org/debarr
  • 4.
  • 5. Contents of Bidding Documents ITB Clause Reference B. Contents of Bidding Documents ITB 7.1 For Clarification of bid purposes only, the Purchaser’s address is: Attention: [insert name and room number of Project Officer] Address: [insert street name and number] [insert floor and room number, if applicable] City: [insert name of city or town] ZIP Code: [insert postal (ZIP) code, if applicable] Country: [insert name of country] ] Telephone: [insert telephone number including country and city codes] Facsimile number: [insert fax number including country and city codes] Electronic mail address: [insert e-mail address of Project Officer]
  • 6.
  • 7. Preparation of Bids ITB Clause Reference C. Preparation of Bids ITB 10.1 The language of the bid is: [Insert “English” or” Spanish” or “French”]. [In Countries that the Bank has agreed with the Borrower that in addition to one internationally used language, bids may be also issued in the language of the Borrower's country (or the language used nation-wide in the Borrower's country for commercial transactions), the following text shall be added: “ In addition to the above indicated language, these Bidding Documents have been issued in [insert the language of the Borrower's country or the language used nation-wide in the Borrower's Country for commercial transactions]. Bidders are permitted, at their choice, to submit their bids in one of the two languages above indicated. Bidders shall not submit bids in more than one language. The Contract to be signed with the winning Bidder shall be written in the language in which the Bid was submitted, which will be the language that shall govern the contractual relations between the Purchaser and the winning Bidder. A Bidder shall not sign a translated version of its Contract”].
  • 8. Preparation of Bids ITB Clause Reference C. Preparation of Bids ITB 11.1 (h) The Bidder shall submit the following additional documents in its bid: [insert list of documents, if any] ITB 13.1 Alternative Bids [insert “shall be” or “shall not be”] considered. [If alternatives shall be considered, insert: “ A bidder may submit an alternative bid only with a bid for the base case. The Purchaser shall only consider the alternative bids offered by the Bidder whose bid for the base case was determined to be the lowest-evaluated bid.” or “ A bidder may submit an alternative bid with or without a bid for the base case. T he Purchaser shall consider bids offered for alternatives as specified in the Technical Specifications of Section VI, Schedule of Requirements All bids received, for the base case, as well as alternative bids meeting the specified requirements, shall be evaluated on their own merits in accordance with the same procedures, as specified in the ITB 36.”]
  • 9. Preparation of Bids ITB Clause Reference C. Preparation of Bids ITB 14.5 The Incoterms edition is: [insert year of edition i.e. “Incoterms 1990” or “Incoterms 2000”]. ITB 14.6 (b) (i) and (c) (iii) Place of Destination: [insert named Place of destination as per Incoterm used] ITB 14.6 (a) (iii);(b)(ii) and (c)(v) “ Final destination (Project Site)”: [insert name of location where the Goods are to be actually used] ITB 14.6 (b) (iii) In addition to the CIP price specified in ITB 14.6 (b)(i), the price of the Goods manufactured outside the Purchaser’s Country shall be quoted: [insert appropriate Incoterm, other than CIP] ITB 14.7 The prices quoted by the Bidder [insert “shall “or “shall not”] be adjustable. If prices shall be adjustable, the methodology is specified in Section III Evaluation and Qualification Criteria. ITB 14.8 Prices quoted for each lot shall correspond at least to [insert figure] % of the items specified for each lot. Prices quoted for each item of a lot shall correspond at least to [insert figure] percent of the quantities specified for this item of a lot.
  • 10. Preparation of Bids ITB Clause Reference C. Preparation of Bids ITB 15.1 The Bidder [insert “is” or “is not”’] required to quote in the currency of the Purchaser’s Country the portion of the bid price that corresponds to expenditures incurred in that currency. ITB 18.3 Period of time the Goods are expected to be functioning (for the purpose of spare parts): [insert duration ] ITB 19.1 (a) Manufacturer’s authorization is: [insert “required” or “not required”] ITB 19.1 (b) After sales service is: [insert “required” or “not required”] ITB 20.1 The bid validity period shall be [insert number] days.
  • 11.
  • 12.
  • 13. Submission and Opening of Bids ITB Clause Reference D. Submission and Opening of Bids ITB 23.1 Bidders [insert “shall” or “shall not”] have the option of submitting their bids electronically. ITB 23.1 (b) If bidders shall have the option of submitting their bids electronically, the electronic bidding submission procedures shall be: [insert a description of the electronic bidding submission procedures] ITB 23.2 (c) The inner and outer envelopes shall bear the following additional identification marks: [insert the name and/or number that must appear on the bid envelope to identify this specific bidding process].
  • 14. Submission and Opening of Bids ITB Clause Reference D. Submission and Opening of Bids ITB 24.1 For bid submission purposes, the Purchaser’s address is: Attention: [insert full name of person, if applicable, or insert name of the Project Officer] Address: [insert street name and number] Floor-Room number: [insert floor and room number, if applicable] [important to avoid delays or misplacement of bids] City: [insert name of city or town] ZIP Code: [insert postal (ZIP) code, if applicable] Country: [insert name of country] The deadline for the submission of bids is: Date: [insert day, month, and year, i.e. 15 June, 2001] Time: [insert time, and identify if a.m. or p.m., i.e. 10:30 a.m.]
  • 15. Submission and Opening of Bids ITB Clause Reference D. Submission and Opening of Bids ITB 27.1 The bid opening shall take place at: Street Address: [insert street address and number] Floor/ Room number: [insert floor and room number, if applicable] City: [insert name of city or town] Country: [insert name of country] Date: [insert day, month, and year, i.e. 15 June, 2001] Time: [insert time, and identify if a.m. or p.m. i.e. 10:30 a.m.] ITB 27.1 If electronic bid submission is permitted in accordance with ITB sub-clause 23.1, the specific bid opening procedures shall be: [insert description of the procedures]
  • 16.
  • 17. Evaluation and Comparison of Bids ITB Clause Reference E. Evaluation and Comparison of Bids ITB 34.1 Bid prices expressed in different currencies shall be converted in: [insert the name of the currency] The source of exchange rate shall be: [ insert the name of the source] The date for the exchange rate shall be [insert day, month and year] ITB 35.1 Domestic preference [insert “shall” or “shall not”] be a bid evaluation factor. [If domestic preference shall be a bid-evaluation factor, the methodology for calculating the margin of preference and the criteria for its application shall be as specified in Section III, Evaluation and Qualification Criteria.]
  • 18. Evaluation and Comparison of Bids ITB Clause Reference E. Evaluation and Comparison of Bids ITB 36.3(a) Evaluation will be done for…….. [Select Items or Lots] Note: [Select one of the two sample clauses below as appropriate Bids will be evaluated for each item and the Contract will comprise the item(s) awarded to the successful Bidder. Or Bids will be evaluated lot by lot. If a Price Schedule shows items listed but not priced, their prices shall be assumed to be included in the prices of other items. An item not listed in the Price Schedule shall be assumed to be not included in the bid, and provided that the bid is substantially responsive, the average price of the item quoted by substantially responsive bidders will be added to the bid price and the equivalent total cost of the bid so determined will be used for price comparison.]
  • 19.
  • 20. Evaluation and Comparison of Bids ITB Clause Reference E. Evaluation and Comparison of Bids ITB 36.6 Bidders [insert “shall “or “shall not”] be allowed to quote separate prices for one or more lots. [refer to Section III Evaluation and Qualification Criteria, for the evaluation methodology, if appropriate]
  • 21.