SlideShare a Scribd company logo
1 of 49
Download to read offline
INDONESIA
BASIN WATER RESOURCES
MANAGEMENT PLANNING
-the use of RIBASIM in 6 cis basin-
(Cidanau-Cidurian-Ciujung-Cisadane-Ciliwung-Citarum)
Presentation outline
1. About Indonesia
2. IWRM Definition
3. WRM Aspects
4. Legal Basis
5. Basin Boundary
6. Study Area (6 cis)
7. Spatial Planning
8. Five aspects
1. Water Resources Conservation (upstream conservation,
water quality)
2. Water Resources Utilization (Water, Food and Energy)
using HYMOS and RIBASIM
3. Control of Water Destructive Power
4. Water Resources Information System (availability of data)
5. Community Participation
LESSON LEARNED
Location and Geography
Topographical Map of Republic of Indonesia
(Source: BIG/ Geospatial Information Body)
INDONESIA
Geography and Population density
(Source: Centre Bureau Statistic 2014)
the country stretches
1,760 km north to south
5,120 km east to west
1.9 million square kilometer
93,000 square km is water area
17,000 islands,
only 6,000 being occupied
Demography (Geography and Population density)
Population Size and Demographic Indicators
Sumatera
23%
Jawa
61%
Kalimantan
6%
Sulawesi
8%
Papua
2%
Indonesia Population 2010
Sumatera
27%
Jawa
7%
Kalimantan
31%
Sulawesi
10%
Papua
25%
Bigest Islands in Indonesia
Sumatera
25%
Jawa
62%
Kalimantan
5%
Sulawesi
7%
Papua
1%
Indonesia Population 2035
Rainfall
Maps of Annual Rainfall in Indonesia 1981 – 2010
IWRM is a process which
promotes the coordinated
development and
management of water, land
and related resources, in
order to maximize the
resultant economic and social
welfare in an equitable
manner without
compromising the
sustainability of vital
ecosystems.
(GWP, 2000)
Integrated Water Resources Management
according to Indonesia WR Law No. 7/2004
5 aspects
• Water Resources Conservation
• Water Resources Utilization
• Control of Water Destructive Power
• Water Resources Information System
• Community Participation
+ spatial planning and regional development
Law7/2004 has been ruled out by Court order No. 85/PUU-
XI/2013 18 February 2015, referred back to Law 11/1974
Water Resources Management aspects
• Since UU (Law) 7/2014 has been ruled out, for now the legal
basis referred back to UU 11/1974
• PERMEN PUPR 4/2015 (prevously Presidential Regulation
12/2012) – Basin Boundary (131 become 128 Basin In
Indonesia) – 6 cis become 3 basin
• PERMEN PUPR 10/2015 – Plan And Technical Plan Of Water
Management System And Water System (Pola and Rencana)
• PERMEN PUPR 34/2015 – River Basin Organisation
• PERMEN PUPR 17/2017 – Coordination team of Water
Resources Management (basin council)
PERMEN PUPR = Regulation of Minstry Public works and Housing
Legal Basis
River Basin
RIVER BASIN IN INDONESIA
Source: Ministry Regulation PUPR 4/PRT/M/2015
River Basin
Nation boundary
Province boundary
Coastal line
Waterbasin boundary
Waterbasin boundary on
shore
No River Basin Status Total Basin Total DAS
1 River Basin Across Nation 5 306
2 River Basin Across Province 31 896
3 River Basin National Strategic 28 3252
4 River Basin Across District 52 3244
5 River Basin in District 12 279
Total 128 7977
Users of RIBASIM in Indonesia
River Basin Organisation (RBO)
14
STRENGTHENING F
Spatial Planning execution
WR Management
WR Management
(River Basin coverage)
Quantification Zone
WR Strategic
Spatial Planning
(National, Island
Province,District/City)
Population Projection
and Land Use
Integrated planning context
Input from spatial planning
to WRM plan
Input from water
zoning to
spatial planning
Java Spatial model
•Java Spatial Model (integrated Spatial Plan and
IWRM)
•Impact on RTRW (Prov. Spatial Plan) and RDTR
(District Detail Spatial Plan)
•Impact of Land Use and Zoning
•Providing projection of land use in rural and urban
(with consequnces on water demand and emission
pollutant)
•Allocation of space from population and land use
in village level (conversion, land use change)
•Post processing to calculate water demand and
emission pollutant in water dsictrict
•Calculation of water demand in water distrcit,
connect (directly) to RIBASIM
Policy/
Strategy
Planning &
Implementation
POLA
RENCANA
Water Resources Planning
Preliminary basin plan
1:25,000
Detailed Kabupaten/
Kota plan (RTDR)
Direction for zoning
Zoning in spatial planning
Provincial
Kabupaten/Kota
1:125,000
1:50,000
1:5,000
1:1,000
Zoning regulation leading
to permits
Outline of water
zoning areas
1:25,000
Criteria for zoning
(RTRW Kab/Kota)
Kabupaten/Kota
Kabupaten/Kota
Kabupaten/Kota
Java Spatial model
Water Resources Management and Spatial Planning
current water zoning activities
Current trend, urbanisation of Java
Current trend, irrigated paddy losses of Java
Conflict, technical irrigation and spatial plan
Current trend, forest losses of Java
Aspect: conservation (forest and water quality)
Aspect: conservation (upstream catchment), critical land
Aspect: conservation, water quality
8/11/2015
Aspect: water utilization
Water Availability is an important part of WR Management and this is
count by Hydrologycal Analysis using HYMOS
Source diagram: http://www.arup.com
Aspect: water utilization, water availability
Aspect: water utilization, water demand
water allocation using RIBASIM (Supply and Demand - Water Balance)
RIBASIM: River Basin Simulation
Big project in Indonesia using RIBASIM
• BTA (Bilateral Technical Assistance), North of West Java
area, 155 – 1985
• JWRMS (Jabotabek Water Resources Management Study),
Jakarta surrounding, 1991 - 1994
• BWRP (Basin Water Resources Planning), Citarum,
Jratunseluna, Ciujung Ciliman, Serayu Bogowonto, 1996 -
2000
• BWRMP (Basin Water Resources Management Planning),
WISMP phase 1, Jratunseluna and Ciliwung Cisadane, 2002
- 2004
• Institutional Strengthening of IWRM in 6 cis river basin,
2009 – 2013
• BWRMP WISMP phase 2, Sumbawa, Toba Asahan, Saddang,
Pemali Comal, Cisadea Cibareno
RIBASIM: River Basin Simulation
DI Cisadane
(22.089 ha)
DI Ciujung
(15.600ha)
Bandung
18.6
DKI
Jakarta
38.5
Depok
4.1
Bogor
(kab.-kota)
14.1
Tangerang
13.7
DI Jatiluhur
Timur
(83.246 ha)
DI Ciujung
(21.271 ha)
Bekasi
11.1
DI Cidurian
(10.280 ha)
DI Jatiluhur
Barat
(62.564 ha)
Serang,
Cilegon
5.6 DI Jatiluhur
Utara
(90.504 ha)
Saguling
Cirata
Jatiluhur
Lebak,
Pandeglang
2.0
Karawang
Purwakarta
Subang
10.0
Unregulated:
Cisadane
Unregulated:
Pesanggrahan
& Krukut
3
5
0.4
2
Krenceng
2
Unregulated:
Ciujung
2Unregulated:
Cidanau
: Water demand
: Irrigation scheme
: Reservoir existing
: unregulated (source of water)
Remark:
: existing flow
Aspect: water utilization, schematisation of 6 cis
Schematization 6 Ci’s River Basin Territory
• Demand nodes : DMI Water supply ( 78 ), Irrigation (104), fish pond (21)
• Control nodes : Reservoir ( 30) existing (5) : Cipancuh, Sagiling, Cirata Jatiluhur, Krenceng ;
diversions ( 88)
Aspect: water utilization, water districts of 6 cis
Shortage irrigation 2010 in 6 cis
Shortage irrigation 2030 in 6 cis
Shortage DMI (Domestic Municipal Industry) in 6 cis – 2010
Shortage DMI (Domestic Municipal Industry) in 6 cis – 2030
• Training relate to project (classical and on the
job): BTA 155, BWRP, BWRMP, 6 cis
• Independent training (not relate to project)
All training were done in close cooperation with
Central Research of Water Resources
(Puslitbang Sumber Daya Air – Bandung)
RIBASIM Training
Time
horizon
2030
Time
horizon
2050
Average precipitation change 0.3
mm/day
0.5
mm/day
Average precipitation change 3% 5%
Reduction in river runoff when
studying water allocation
3% 5%
Increase in flood flows when
studying flooding issues
3% 5%
Special: Climate change in 6 cis
Overview of climate change assumptions for the 6Cis project area.
Source: IPCC (International Panel Climate Change)
Aspect: Control of water destructive power (flood)
Aspect: Control of water destructive power
Aspect: Control of water destructive power
Data Information of WRAspect: Water Resources Information System
WATER RESOURCES
MANAGEMENT
GOVERNMENT
PRIVATE
SECTOR
COMMUNITY
DEVELOPMENT
PARTNERS
Stakeholder; coordination and communication
• Many parties involved
• Planning Agency coordinates all sector planning
• RBO could facilitate coordination of implementation as secretariate of basin
council (TKPSDA)
COORDINATOR
REGULATOR
USER
(Goverment
Local Goverment)
+ B/BWS (RBO)
DEVELOPER
OPERATOR
PAM, Province PJT/BLU)
B/BWS (TPOP)
(Goverment)
B/BWS (RBO)
Secr. B/BWS (RBO)
(Dewan /TKPSDA)
Stakeholder in Water Resources Management
• Change version from 6.33 to 7
• No limitation nodes
• Special measures in preparing all scenario’s as
“script” (small file which are presenting all
scenario’s)
• Special BWRMP; water district and variable
inflow
RIBASIM, lesson learned
WS TOBA ASAHAN
Water Distrik dan Variable Inflow
Total Net
Sumbawa 555 555 550 255 262
Toba Asahan 1 1 70 52 60
Pemali Comal 32 32 99 98 98
Saddang 24 24 137 61 74
Cisadea Cibareno 74 74 92 92 92
Jumlah DAS
Jumlah Water
Distrik
Tinjauan Ribasim
Wilayah Sungai Keppres
Permen PU 04
2015
Jumlah Variable
Inflow
WS TOBA ASAHAN
Water Distrik dan Variable Inflow
Total Net
Sumbawa 555 555 550 255 262
Toba Asahan 1 1 70 52 60
Pemali Comal 32 32 99 98 98
Saddang 24 24 137 61 74
Cisadea Cibareno 74 74 92 92 92
Jumlah DAS
Jumlah Water
Distrik
Tinjauan Ribasim
Wilayah Sungai Keppres
Permen PU 04
2015
Jumlah Variable
Inflow
Sources:
-Directorate General Water Resources, Ministry of Public Works and Housing
-TA 7189-INO: Institutional Strengthening for Integrated Water Resources
Management (IWRM) in the 6 cis river basin territory – package B – ADB, 2009 -
2013
-Java Water Resources Strategic Study – the World Bank, 2011
-Basin Water Resources Management Planning (BWRMP – WISMP 2), 2014 -
2015
Hendarti (henni)
Water Resources Sp - freelancer
hendartias@gmail.com
+62 811 143834
TERIMAKASIH

More Related Content

What's hot

Usman penegakan hukun tata ruang
Usman penegakan hukun tata ruangUsman penegakan hukun tata ruang
Usman penegakan hukun tata ruang
Yayasan CAPPA
 

What's hot (20)

Sistematika Dokumen Rencana Induk (Master Plan) Air Limbah
Sistematika Dokumen Rencana Induk (Master Plan) Air LimbahSistematika Dokumen Rencana Induk (Master Plan) Air Limbah
Sistematika Dokumen Rencana Induk (Master Plan) Air Limbah
 
Sistematika Dokumen Rencana Induk Sistem Drainase Perkotaan
Sistematika Dokumen Rencana Induk Sistem Drainase PerkotaanSistematika Dokumen Rencana Induk Sistem Drainase Perkotaan
Sistematika Dokumen Rencana Induk Sistem Drainase Perkotaan
 
Pesisir 01 PENGEMBANGAN KAWASAN PESISIR
Pesisir 01 PENGEMBANGAN KAWASAN PESISIRPesisir 01 PENGEMBANGAN KAWASAN PESISIR
Pesisir 01 PENGEMBANGAN KAWASAN PESISIR
 
Buku Panduan Pengembangan Air Minum
Buku Panduan Pengembangan Air MinumBuku Panduan Pengembangan Air Minum
Buku Panduan Pengembangan Air Minum
 
Audit, Pengawasan dan Pengendalian Pemanfaatan Ruang
Audit, Pengawasan dan Pengendalian Pemanfaatan RuangAudit, Pengawasan dan Pengendalian Pemanfaatan Ruang
Audit, Pengawasan dan Pengendalian Pemanfaatan Ruang
 
Kebijakan dan Strategi penanganan drainase perkotaan
Kebijakan dan Strategi penanganan drainase perkotaanKebijakan dan Strategi penanganan drainase perkotaan
Kebijakan dan Strategi penanganan drainase perkotaan
 
Peraturan Pemerintah No. 37 Tahun 2012 tentang Pengelolaan Daerah Aliran Sungai
Peraturan Pemerintah No. 37 Tahun 2012 tentang Pengelolaan Daerah Aliran SungaiPeraturan Pemerintah No. 37 Tahun 2012 tentang Pengelolaan Daerah Aliran Sungai
Peraturan Pemerintah No. 37 Tahun 2012 tentang Pengelolaan Daerah Aliran Sungai
 
Kelembagaan Dalam Pengelolaan Air Limbah
Kelembagaan Dalam Pengelolaan Air LimbahKelembagaan Dalam Pengelolaan Air Limbah
Kelembagaan Dalam Pengelolaan Air Limbah
 
P.102 pedoman penyusunan dokumen lingkungan hidup bagi usaha danatau kegiatan...
P.102 pedoman penyusunan dokumen lingkungan hidup bagi usaha danatau kegiatan...P.102 pedoman penyusunan dokumen lingkungan hidup bagi usaha danatau kegiatan...
P.102 pedoman penyusunan dokumen lingkungan hidup bagi usaha danatau kegiatan...
 
Integrasi tataruang dan pertanahan
Integrasi tataruang dan pertanahanIntegrasi tataruang dan pertanahan
Integrasi tataruang dan pertanahan
 
Proses Pelaksanaan KLHS RTRW dan RPJM di Kabupaten
Proses Pelaksanaan KLHS RTRW dan RPJM di KabupatenProses Pelaksanaan KLHS RTRW dan RPJM di Kabupaten
Proses Pelaksanaan KLHS RTRW dan RPJM di Kabupaten
 
Sistem Pengelolaan Air Limbah Sistem Setempat (SPAL) – Kebijakan dan Strategi...
Sistem Pengelolaan Air Limbah Sistem Setempat (SPAL) – Kebijakan dan Strategi...Sistem Pengelolaan Air Limbah Sistem Setempat (SPAL) – Kebijakan dan Strategi...
Sistem Pengelolaan Air Limbah Sistem Setempat (SPAL) – Kebijakan dan Strategi...
 
Permen PU Nomor 18 Tahun 2007 tentang Penyelenggaraan Pengembangan Sistem Pen...
Permen PU Nomor 18 Tahun 2007 tentang Penyelenggaraan Pengembangan Sistem Pen...Permen PU Nomor 18 Tahun 2007 tentang Penyelenggaraan Pengembangan Sistem Pen...
Permen PU Nomor 18 Tahun 2007 tentang Penyelenggaraan Pengembangan Sistem Pen...
 
Expose fgd klhs rdtr
Expose fgd klhs rdtrExpose fgd klhs rdtr
Expose fgd klhs rdtr
 
Usman penegakan hukun tata ruang
Usman penegakan hukun tata ruangUsman penegakan hukun tata ruang
Usman penegakan hukun tata ruang
 
Peraturan Menteri PU No. 63/PRT/1993 tentang Garis Sempadan Sungai, Daerah Ma...
Peraturan Menteri PU No. 63/PRT/1993 tentang Garis Sempadan Sungai, Daerah Ma...Peraturan Menteri PU No. 63/PRT/1993 tentang Garis Sempadan Sungai, Daerah Ma...
Peraturan Menteri PU No. 63/PRT/1993 tentang Garis Sempadan Sungai, Daerah Ma...
 
Instrumen Lengkap Pengendalian Pemanfaatan Ruang
Instrumen Lengkap Pengendalian Pemanfaatan RuangInstrumen Lengkap Pengendalian Pemanfaatan Ruang
Instrumen Lengkap Pengendalian Pemanfaatan Ruang
 
Paparan Sesditjen ASPI Univ Bosowa Makassar 17 Februari 2023.pptx
Paparan Sesditjen ASPI Univ Bosowa Makassar 17 Februari 2023.pptxPaparan Sesditjen ASPI Univ Bosowa Makassar 17 Februari 2023.pptx
Paparan Sesditjen ASPI Univ Bosowa Makassar 17 Februari 2023.pptx
 
Penyusunan Rencana Induk Sistem Pengelolaan Air Limbah
Penyusunan Rencana Induk Sistem Pengelolaan Air Limbah Penyusunan Rencana Induk Sistem Pengelolaan Air Limbah
Penyusunan Rencana Induk Sistem Pengelolaan Air Limbah
 
Instalasi Pengolahan Lumpur TInja (IPLT) - Tahap Pra Konstruksi (Persiapan)
Instalasi Pengolahan Lumpur TInja (IPLT) - Tahap Pra Konstruksi (Persiapan)Instalasi Pengolahan Lumpur TInja (IPLT) - Tahap Pra Konstruksi (Persiapan)
Instalasi Pengolahan Lumpur TInja (IPLT) - Tahap Pra Konstruksi (Persiapan)
 

Similar to DSD-INT 2017 Basin Water Resources Management Planning in Indonesia - Hendarti

Priority of Water Supply Service for Community in Gresik City, East Java Prov...
Priority of Water Supply Service for Community in Gresik City, East Java Prov...Priority of Water Supply Service for Community in Gresik City, East Java Prov...
Priority of Water Supply Service for Community in Gresik City, East Java Prov...
Agriculture Journal IJOEAR
 
Eagle County Town Hall Meeting
Eagle County Town Hall MeetingEagle County Town Hall Meeting
Eagle County Town Hall Meeting
Walter Davidson
 
Overview of water panning in queensland, kaylene power
Overview of water panning in queensland, kaylene powerOverview of water panning in queensland, kaylene power
Overview of water panning in queensland, kaylene power
International WaterCentre
 
Summit County Town Hall Meeting
Summit County Town Hall MeetingSummit County Town Hall Meeting
Summit County Town Hall Meeting
Walter Davidson
 
Dannielle Gray - Annual Meeting
Dannielle Gray - Annual MeetingDannielle Gray - Annual Meeting
Dannielle Gray - Annual Meeting
AIPRO
 
Overview of water resources and water management in queensland, greg claydon
Overview of water resources and water management in queensland, greg claydonOverview of water resources and water management in queensland, greg claydon
Overview of water resources and water management in queensland, greg claydon
International WaterCentre
 

Similar to DSD-INT 2017 Basin Water Resources Management Planning in Indonesia - Hendarti (20)

SWaRMA_IRBM_Module1_#4, IRBM implementation in nepal challenges and opportuni...
SWaRMA_IRBM_Module1_#4, IRBM implementation in nepal challenges and opportuni...SWaRMA_IRBM_Module1_#4, IRBM implementation in nepal challenges and opportuni...
SWaRMA_IRBM_Module1_#4, IRBM implementation in nepal challenges and opportuni...
 
Priority of Water Supply Service for Community in Gresik City, East Java Prov...
Priority of Water Supply Service for Community in Gresik City, East Java Prov...Priority of Water Supply Service for Community in Gresik City, East Java Prov...
Priority of Water Supply Service for Community in Gresik City, East Java Prov...
 
Najafgarh Jheel (Lake) Revival, Delhi (India)
Najafgarh Jheel (Lake) Revival, Delhi (India)Najafgarh Jheel (Lake) Revival, Delhi (India)
Najafgarh Jheel (Lake) Revival, Delhi (India)
 
DSD-SEA 2018 Software Application in Integrated Water Resources Management in...
DSD-SEA 2018 Software Application in Integrated Water Resources Management in...DSD-SEA 2018 Software Application in Integrated Water Resources Management in...
DSD-SEA 2018 Software Application in Integrated Water Resources Management in...
 
Eagle County Town Hall Meeting
Eagle County Town Hall MeetingEagle County Town Hall Meeting
Eagle County Town Hall Meeting
 
Overview of water panning in queensland, kaylene power
Overview of water panning in queensland, kaylene powerOverview of water panning in queensland, kaylene power
Overview of water panning in queensland, kaylene power
 
Water availability, use and trends in the srepok river catchment (vietnam)
Water availability, use and trends in the srepok river catchment (vietnam)Water availability, use and trends in the srepok river catchment (vietnam)
Water availability, use and trends in the srepok river catchment (vietnam)
 
Regulations and Policy Analysis of Brantas River Basin (Introduction)
Regulations and Policy Analysis of  Brantas River Basin(Introduction)Regulations and Policy Analysis of  Brantas River Basin(Introduction)
Regulations and Policy Analysis of Brantas River Basin (Introduction)
 
Ganges Basin Development Project and Role of Change and Coordination Project
Ganges Basin Development Project and Role of Change and Coordination ProjectGanges Basin Development Project and Role of Change and Coordination Project
Ganges Basin Development Project and Role of Change and Coordination Project
 
A Situational Analysis of the Lakes in Bangalore
A Situational Analysis of the Lakes in BangaloreA Situational Analysis of the Lakes in Bangalore
A Situational Analysis of the Lakes in Bangalore
 
DSD-INT 2015 - The future of computer modeling of coastal wetland - maselhe
DSD-INT 2015 - The future of computer modeling of coastal wetland - maselheDSD-INT 2015 - The future of computer modeling of coastal wetland - maselhe
DSD-INT 2015 - The future of computer modeling of coastal wetland - maselhe
 
Summit County Town Hall Meeting
Summit County Town Hall MeetingSummit County Town Hall Meeting
Summit County Town Hall Meeting
 
Integrated water resources management
Integrated water resources managementIntegrated water resources management
Integrated water resources management
 
Dannielle Gray - Annual Meeting
Dannielle Gray - Annual MeetingDannielle Gray - Annual Meeting
Dannielle Gray - Annual Meeting
 
Hall2D Wednesday 11h00 - Singh
Hall2D Wednesday 11h00 - SinghHall2D Wednesday 11h00 - Singh
Hall2D Wednesday 11h00 - Singh
 
DSD-Kampala 2023 Analytic Tools for Cooperative Water Resources Assessments i...
DSD-Kampala 2023 Analytic Tools for Cooperative Water Resources Assessments i...DSD-Kampala 2023 Analytic Tools for Cooperative Water Resources Assessments i...
DSD-Kampala 2023 Analytic Tools for Cooperative Water Resources Assessments i...
 
Overview of water resources and water management in queensland, greg claydon
Overview of water resources and water management in queensland, greg claydonOverview of water resources and water management in queensland, greg claydon
Overview of water resources and water management in queensland, greg claydon
 
Water Resources Management in Brantas River Basin
Water Resources Management in Brantas River BasinWater Resources Management in Brantas River Basin
Water Resources Management in Brantas River Basin
 
Water & Climate Change in Central India_Vijay Shankar, Samaj Pragati Sahyog_ ...
Water & Climate Change in Central India_Vijay Shankar, Samaj Pragati Sahyog_ ...Water & Climate Change in Central India_Vijay Shankar, Samaj Pragati Sahyog_ ...
Water & Climate Change in Central India_Vijay Shankar, Samaj Pragati Sahyog_ ...
 
IRJET- Assessment of Reservoir Sedimentation using RS and GIS Techniques - A ...
IRJET- Assessment of Reservoir Sedimentation using RS and GIS Techniques - A ...IRJET- Assessment of Reservoir Sedimentation using RS and GIS Techniques - A ...
IRJET- Assessment of Reservoir Sedimentation using RS and GIS Techniques - A ...
 

More from Deltares

More from Deltares (20)

DSD-INT 2023 Hydrology User Days - Intro - Day 3 - Kroon
DSD-INT 2023 Hydrology User Days - Intro - Day 3 - KroonDSD-INT 2023 Hydrology User Days - Intro - Day 3 - Kroon
DSD-INT 2023 Hydrology User Days - Intro - Day 3 - Kroon
 
DSD-INT 2023 Demo EPIC Response Assessment Methodology (ERAM) - Couvin Rodriguez
DSD-INT 2023 Demo EPIC Response Assessment Methodology (ERAM) - Couvin RodriguezDSD-INT 2023 Demo EPIC Response Assessment Methodology (ERAM) - Couvin Rodriguez
DSD-INT 2023 Demo EPIC Response Assessment Methodology (ERAM) - Couvin Rodriguez
 
DSD-INT 2023 Demo Climate Stress Testing Tool (CST Tool) - Taner
DSD-INT 2023 Demo Climate Stress Testing Tool (CST Tool) - TanerDSD-INT 2023 Demo Climate Stress Testing Tool (CST Tool) - Taner
DSD-INT 2023 Demo Climate Stress Testing Tool (CST Tool) - Taner
 
DSD-INT 2023 Demo Climate Resilient Cities Tool (CRC Tool) - Rooze
DSD-INT 2023 Demo Climate Resilient Cities Tool (CRC Tool) - RoozeDSD-INT 2023 Demo Climate Resilient Cities Tool (CRC Tool) - Rooze
DSD-INT 2023 Demo Climate Resilient Cities Tool (CRC Tool) - Rooze
 
DSD-INT 2023 Approaches for assessing multi-hazard risk - Ward
DSD-INT 2023 Approaches for assessing multi-hazard risk - WardDSD-INT 2023 Approaches for assessing multi-hazard risk - Ward
DSD-INT 2023 Approaches for assessing multi-hazard risk - Ward
 
DSD-INT 2023 Dynamic Adaptive Policy Pathways (DAPP) - Theory & Showcase - Wa...
DSD-INT 2023 Dynamic Adaptive Policy Pathways (DAPP) - Theory & Showcase - Wa...DSD-INT 2023 Dynamic Adaptive Policy Pathways (DAPP) - Theory & Showcase - Wa...
DSD-INT 2023 Dynamic Adaptive Policy Pathways (DAPP) - Theory & Showcase - Wa...
 
DSD-INT 2023 Global hydrological modelling to support worldwide water assessm...
DSD-INT 2023 Global hydrological modelling to support worldwide water assessm...DSD-INT 2023 Global hydrological modelling to support worldwide water assessm...
DSD-INT 2023 Global hydrological modelling to support worldwide water assessm...
 
DSD-INT 2023 Modelling implications - IPCC Working Group II - From AR6 to AR7...
DSD-INT 2023 Modelling implications - IPCC Working Group II - From AR6 to AR7...DSD-INT 2023 Modelling implications - IPCC Working Group II - From AR6 to AR7...
DSD-INT 2023 Modelling implications - IPCC Working Group II - From AR6 to AR7...
 
DSD-INT 2023 Knowledge and tools for Climate Adaptation - Jeuken
DSD-INT 2023 Knowledge and tools for Climate Adaptation - JeukenDSD-INT 2023 Knowledge and tools for Climate Adaptation - Jeuken
DSD-INT 2023 Knowledge and tools for Climate Adaptation - Jeuken
 
DSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - Bootsma
DSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - BootsmaDSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - Bootsma
DSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - Bootsma
 
DSD-INT 2023 Create your own MODFLOW 6 sub-variant - Muller
DSD-INT 2023 Create your own MODFLOW 6 sub-variant - MullerDSD-INT 2023 Create your own MODFLOW 6 sub-variant - Muller
DSD-INT 2023 Create your own MODFLOW 6 sub-variant - Muller
 
DSD-INT 2023 Example of unstructured MODFLOW 6 modelling in California - Romero
DSD-INT 2023 Example of unstructured MODFLOW 6 modelling in California - RomeroDSD-INT 2023 Example of unstructured MODFLOW 6 modelling in California - Romero
DSD-INT 2023 Example of unstructured MODFLOW 6 modelling in California - Romero
 
DSD-INT 2023 Challenges and developments in groundwater modeling - Bakker
DSD-INT 2023 Challenges and developments in groundwater modeling - BakkerDSD-INT 2023 Challenges and developments in groundwater modeling - Bakker
DSD-INT 2023 Challenges and developments in groundwater modeling - Bakker
 
DSD-INT 2023 Demo new features iMOD Suite - van Engelen
DSD-INT 2023 Demo new features iMOD Suite - van EngelenDSD-INT 2023 Demo new features iMOD Suite - van Engelen
DSD-INT 2023 Demo new features iMOD Suite - van Engelen
 
DSD-INT 2023 iMOD and new developments - Davids
DSD-INT 2023 iMOD and new developments - DavidsDSD-INT 2023 iMOD and new developments - Davids
DSD-INT 2023 iMOD and new developments - Davids
 
DSD-INT 2023 Recent MODFLOW Developments - Langevin
DSD-INT 2023 Recent MODFLOW Developments - LangevinDSD-INT 2023 Recent MODFLOW Developments - Langevin
DSD-INT 2023 Recent MODFLOW Developments - Langevin
 
DSD-INT 2023 Hydrology User Days - Presentations - Day 2
DSD-INT 2023 Hydrology User Days - Presentations - Day 2DSD-INT 2023 Hydrology User Days - Presentations - Day 2
DSD-INT 2023 Hydrology User Days - Presentations - Day 2
 
DSD-INT 2023 Needs related to user interfaces - Snippen
DSD-INT 2023 Needs related to user interfaces - SnippenDSD-INT 2023 Needs related to user interfaces - Snippen
DSD-INT 2023 Needs related to user interfaces - Snippen
 
DSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - Bootsma
DSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - BootsmaDSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - Bootsma
DSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - Bootsma
 
DSD-INT 2023 Parameterization of a RIBASIM model and the network lumping appr...
DSD-INT 2023 Parameterization of a RIBASIM model and the network lumping appr...DSD-INT 2023 Parameterization of a RIBASIM model and the network lumping appr...
DSD-INT 2023 Parameterization of a RIBASIM model and the network lumping appr...
 

Recently uploaded

Recently uploaded (20)

how-to-download-files-safely-from-the-internet.pdf
how-to-download-files-safely-from-the-internet.pdfhow-to-download-files-safely-from-the-internet.pdf
how-to-download-files-safely-from-the-internet.pdf
 
Microsoft 365 Copilot; An AI tool changing the world of work _PDF.pdf
Microsoft 365 Copilot; An AI tool changing the world of work _PDF.pdfMicrosoft 365 Copilot; An AI tool changing the world of work _PDF.pdf
Microsoft 365 Copilot; An AI tool changing the world of work _PDF.pdf
 
OpenChain Webinar: AboutCode and Beyond - End-to-End SCA
OpenChain Webinar: AboutCode and Beyond - End-to-End SCAOpenChain Webinar: AboutCode and Beyond - End-to-End SCA
OpenChain Webinar: AboutCode and Beyond - End-to-End SCA
 
Crafting the Perfect Measurement Sheet with PLM Integration
Crafting the Perfect Measurement Sheet with PLM IntegrationCrafting the Perfect Measurement Sheet with PLM Integration
Crafting the Perfect Measurement Sheet with PLM Integration
 
What need to be mastered as AI-Powered Java Developers
What need to be mastered as AI-Powered Java DevelopersWhat need to be mastered as AI-Powered Java Developers
What need to be mastered as AI-Powered Java Developers
 
Optimizing Operations by Aligning Resources with Strategic Objectives Using O...
Optimizing Operations by Aligning Resources with Strategic Objectives Using O...Optimizing Operations by Aligning Resources with Strategic Objectives Using O...
Optimizing Operations by Aligning Resources with Strategic Objectives Using O...
 
A Python-based approach to data loading in TM1 - Using Airflow as an ETL for TM1
A Python-based approach to data loading in TM1 - Using Airflow as an ETL for TM1A Python-based approach to data loading in TM1 - Using Airflow as an ETL for TM1
A Python-based approach to data loading in TM1 - Using Airflow as an ETL for TM1
 
AI/ML Infra Meetup | ML explainability in Michelangelo
AI/ML Infra Meetup | ML explainability in MichelangeloAI/ML Infra Meetup | ML explainability in Michelangelo
AI/ML Infra Meetup | ML explainability in Michelangelo
 
Facemoji Keyboard released its 2023 State of Emoji report, outlining the most...
Facemoji Keyboard released its 2023 State of Emoji report, outlining the most...Facemoji Keyboard released its 2023 State of Emoji report, outlining the most...
Facemoji Keyboard released its 2023 State of Emoji report, outlining the most...
 
KLARNA - Language Models and Knowledge Graphs: A Systems Approach
KLARNA -  Language Models and Knowledge Graphs: A Systems ApproachKLARNA -  Language Models and Knowledge Graphs: A Systems Approach
KLARNA - Language Models and Knowledge Graphs: A Systems Approach
 
Malaysia E-Invoice digital signature docpptx
Malaysia E-Invoice digital signature docpptxMalaysia E-Invoice digital signature docpptx
Malaysia E-Invoice digital signature docpptx
 
OpenChain @ LF Japan Executive Briefing - May 2024
OpenChain @ LF Japan Executive Briefing - May 2024OpenChain @ LF Japan Executive Briefing - May 2024
OpenChain @ LF Japan Executive Briefing - May 2024
 
Entropy, Software Quality, and Innovation (presented at Princeton Plasma Phys...
Entropy, Software Quality, and Innovation (presented at Princeton Plasma Phys...Entropy, Software Quality, and Innovation (presented at Princeton Plasma Phys...
Entropy, Software Quality, and Innovation (presented at Princeton Plasma Phys...
 
SQL Injection Introduction and Prevention
SQL Injection Introduction and PreventionSQL Injection Introduction and Prevention
SQL Injection Introduction and Prevention
 
GraphSummit Stockholm - Neo4j - Knowledge Graphs and Product Updates
GraphSummit Stockholm - Neo4j - Knowledge Graphs and Product UpdatesGraphSummit Stockholm - Neo4j - Knowledge Graphs and Product Updates
GraphSummit Stockholm - Neo4j - Knowledge Graphs and Product Updates
 
How to install and activate eGrabber JobGrabber
How to install and activate eGrabber JobGrabberHow to install and activate eGrabber JobGrabber
How to install and activate eGrabber JobGrabber
 
AI/ML Infra Meetup | Perspective on Deep Learning Framework
AI/ML Infra Meetup | Perspective on Deep Learning FrameworkAI/ML Infra Meetup | Perspective on Deep Learning Framework
AI/ML Infra Meetup | Perspective on Deep Learning Framework
 
Odoo vs Shopify: Why Odoo is Best for Ecommerce Website Builder in 2024
Odoo vs Shopify: Why Odoo is Best for Ecommerce Website Builder in 2024Odoo vs Shopify: Why Odoo is Best for Ecommerce Website Builder in 2024
Odoo vs Shopify: Why Odoo is Best for Ecommerce Website Builder in 2024
 
A Guideline to Zendesk to Re:amaze Data Migration
A Guideline to Zendesk to Re:amaze Data MigrationA Guideline to Zendesk to Re:amaze Data Migration
A Guideline to Zendesk to Re:amaze Data Migration
 
AI Hackathon.pptx
AI                        Hackathon.pptxAI                        Hackathon.pptx
AI Hackathon.pptx
 

DSD-INT 2017 Basin Water Resources Management Planning in Indonesia - Hendarti

  • 1. INDONESIA BASIN WATER RESOURCES MANAGEMENT PLANNING -the use of RIBASIM in 6 cis basin- (Cidanau-Cidurian-Ciujung-Cisadane-Ciliwung-Citarum)
  • 2. Presentation outline 1. About Indonesia 2. IWRM Definition 3. WRM Aspects 4. Legal Basis 5. Basin Boundary 6. Study Area (6 cis) 7. Spatial Planning 8. Five aspects 1. Water Resources Conservation (upstream conservation, water quality) 2. Water Resources Utilization (Water, Food and Energy) using HYMOS and RIBASIM 3. Control of Water Destructive Power 4. Water Resources Information System (availability of data) 5. Community Participation LESSON LEARNED
  • 3. Location and Geography Topographical Map of Republic of Indonesia (Source: BIG/ Geospatial Information Body)
  • 4. INDONESIA Geography and Population density (Source: Centre Bureau Statistic 2014) the country stretches 1,760 km north to south 5,120 km east to west 1.9 million square kilometer 93,000 square km is water area 17,000 islands, only 6,000 being occupied Demography (Geography and Population density)
  • 5. Population Size and Demographic Indicators Sumatera 23% Jawa 61% Kalimantan 6% Sulawesi 8% Papua 2% Indonesia Population 2010 Sumatera 27% Jawa 7% Kalimantan 31% Sulawesi 10% Papua 25% Bigest Islands in Indonesia Sumatera 25% Jawa 62% Kalimantan 5% Sulawesi 7% Papua 1% Indonesia Population 2035
  • 6. Rainfall Maps of Annual Rainfall in Indonesia 1981 – 2010
  • 7. IWRM is a process which promotes the coordinated development and management of water, land and related resources, in order to maximize the resultant economic and social welfare in an equitable manner without compromising the sustainability of vital ecosystems. (GWP, 2000) Integrated Water Resources Management
  • 8. according to Indonesia WR Law No. 7/2004 5 aspects • Water Resources Conservation • Water Resources Utilization • Control of Water Destructive Power • Water Resources Information System • Community Participation + spatial planning and regional development Law7/2004 has been ruled out by Court order No. 85/PUU- XI/2013 18 February 2015, referred back to Law 11/1974 Water Resources Management aspects
  • 9. • Since UU (Law) 7/2014 has been ruled out, for now the legal basis referred back to UU 11/1974 • PERMEN PUPR 4/2015 (prevously Presidential Regulation 12/2012) – Basin Boundary (131 become 128 Basin In Indonesia) – 6 cis become 3 basin • PERMEN PUPR 10/2015 – Plan And Technical Plan Of Water Management System And Water System (Pola and Rencana) • PERMEN PUPR 34/2015 – River Basin Organisation • PERMEN PUPR 17/2017 – Coordination team of Water Resources Management (basin council) PERMEN PUPR = Regulation of Minstry Public works and Housing Legal Basis
  • 11. RIVER BASIN IN INDONESIA Source: Ministry Regulation PUPR 4/PRT/M/2015 River Basin Nation boundary Province boundary Coastal line Waterbasin boundary Waterbasin boundary on shore No River Basin Status Total Basin Total DAS 1 River Basin Across Nation 5 306 2 River Basin Across Province 31 896 3 River Basin National Strategic 28 3252 4 River Basin Across District 52 3244 5 River Basin in District 12 279 Total 128 7977
  • 12. Users of RIBASIM in Indonesia
  • 15. Spatial Planning execution WR Management WR Management (River Basin coverage) Quantification Zone WR Strategic Spatial Planning (National, Island Province,District/City) Population Projection and Land Use Integrated planning context Input from spatial planning to WRM plan Input from water zoning to spatial planning
  • 16. Java Spatial model •Java Spatial Model (integrated Spatial Plan and IWRM) •Impact on RTRW (Prov. Spatial Plan) and RDTR (District Detail Spatial Plan) •Impact of Land Use and Zoning •Providing projection of land use in rural and urban (with consequnces on water demand and emission pollutant) •Allocation of space from population and land use in village level (conversion, land use change) •Post processing to calculate water demand and emission pollutant in water dsictrict •Calculation of water demand in water distrcit, connect (directly) to RIBASIM
  • 17. Policy/ Strategy Planning & Implementation POLA RENCANA Water Resources Planning Preliminary basin plan 1:25,000 Detailed Kabupaten/ Kota plan (RTDR) Direction for zoning Zoning in spatial planning Provincial Kabupaten/Kota 1:125,000 1:50,000 1:5,000 1:1,000 Zoning regulation leading to permits Outline of water zoning areas 1:25,000 Criteria for zoning (RTRW Kab/Kota) Kabupaten/Kota Kabupaten/Kota Kabupaten/Kota Java Spatial model Water Resources Management and Spatial Planning current water zoning activities
  • 19. Current trend, irrigated paddy losses of Java
  • 20. Conflict, technical irrigation and spatial plan
  • 21. Current trend, forest losses of Java
  • 22. Aspect: conservation (forest and water quality)
  • 23. Aspect: conservation (upstream catchment), critical land
  • 26. Water Availability is an important part of WR Management and this is count by Hydrologycal Analysis using HYMOS Source diagram: http://www.arup.com Aspect: water utilization, water availability
  • 28. water allocation using RIBASIM (Supply and Demand - Water Balance) RIBASIM: River Basin Simulation
  • 29. Big project in Indonesia using RIBASIM • BTA (Bilateral Technical Assistance), North of West Java area, 155 – 1985 • JWRMS (Jabotabek Water Resources Management Study), Jakarta surrounding, 1991 - 1994 • BWRP (Basin Water Resources Planning), Citarum, Jratunseluna, Ciujung Ciliman, Serayu Bogowonto, 1996 - 2000 • BWRMP (Basin Water Resources Management Planning), WISMP phase 1, Jratunseluna and Ciliwung Cisadane, 2002 - 2004 • Institutional Strengthening of IWRM in 6 cis river basin, 2009 – 2013 • BWRMP WISMP phase 2, Sumbawa, Toba Asahan, Saddang, Pemali Comal, Cisadea Cibareno RIBASIM: River Basin Simulation
  • 30. DI Cisadane (22.089 ha) DI Ciujung (15.600ha) Bandung 18.6 DKI Jakarta 38.5 Depok 4.1 Bogor (kab.-kota) 14.1 Tangerang 13.7 DI Jatiluhur Timur (83.246 ha) DI Ciujung (21.271 ha) Bekasi 11.1 DI Cidurian (10.280 ha) DI Jatiluhur Barat (62.564 ha) Serang, Cilegon 5.6 DI Jatiluhur Utara (90.504 ha) Saguling Cirata Jatiluhur Lebak, Pandeglang 2.0 Karawang Purwakarta Subang 10.0 Unregulated: Cisadane Unregulated: Pesanggrahan & Krukut 3 5 0.4 2 Krenceng 2 Unregulated: Ciujung 2Unregulated: Cidanau : Water demand : Irrigation scheme : Reservoir existing : unregulated (source of water) Remark: : existing flow Aspect: water utilization, schematisation of 6 cis
  • 31. Schematization 6 Ci’s River Basin Territory • Demand nodes : DMI Water supply ( 78 ), Irrigation (104), fish pond (21) • Control nodes : Reservoir ( 30) existing (5) : Cipancuh, Sagiling, Cirata Jatiluhur, Krenceng ; diversions ( 88)
  • 32. Aspect: water utilization, water districts of 6 cis
  • 35. Shortage DMI (Domestic Municipal Industry) in 6 cis – 2010
  • 36. Shortage DMI (Domestic Municipal Industry) in 6 cis – 2030
  • 37. • Training relate to project (classical and on the job): BTA 155, BWRP, BWRMP, 6 cis • Independent training (not relate to project) All training were done in close cooperation with Central Research of Water Resources (Puslitbang Sumber Daya Air – Bandung) RIBASIM Training
  • 38. Time horizon 2030 Time horizon 2050 Average precipitation change 0.3 mm/day 0.5 mm/day Average precipitation change 3% 5% Reduction in river runoff when studying water allocation 3% 5% Increase in flood flows when studying flooding issues 3% 5% Special: Climate change in 6 cis Overview of climate change assumptions for the 6Cis project area. Source: IPCC (International Panel Climate Change)
  • 39. Aspect: Control of water destructive power (flood)
  • 40. Aspect: Control of water destructive power
  • 41. Aspect: Control of water destructive power
  • 42. Data Information of WRAspect: Water Resources Information System
  • 43. WATER RESOURCES MANAGEMENT GOVERNMENT PRIVATE SECTOR COMMUNITY DEVELOPMENT PARTNERS Stakeholder; coordination and communication • Many parties involved • Planning Agency coordinates all sector planning • RBO could facilitate coordination of implementation as secretariate of basin council (TKPSDA)
  • 44. COORDINATOR REGULATOR USER (Goverment Local Goverment) + B/BWS (RBO) DEVELOPER OPERATOR PAM, Province PJT/BLU) B/BWS (TPOP) (Goverment) B/BWS (RBO) Secr. B/BWS (RBO) (Dewan /TKPSDA) Stakeholder in Water Resources Management
  • 45. • Change version from 6.33 to 7 • No limitation nodes • Special measures in preparing all scenario’s as “script” (small file which are presenting all scenario’s) • Special BWRMP; water district and variable inflow RIBASIM, lesson learned
  • 46. WS TOBA ASAHAN Water Distrik dan Variable Inflow Total Net Sumbawa 555 555 550 255 262 Toba Asahan 1 1 70 52 60 Pemali Comal 32 32 99 98 98 Saddang 24 24 137 61 74 Cisadea Cibareno 74 74 92 92 92 Jumlah DAS Jumlah Water Distrik Tinjauan Ribasim Wilayah Sungai Keppres Permen PU 04 2015 Jumlah Variable Inflow
  • 47. WS TOBA ASAHAN Water Distrik dan Variable Inflow Total Net Sumbawa 555 555 550 255 262 Toba Asahan 1 1 70 52 60 Pemali Comal 32 32 99 98 98 Saddang 24 24 137 61 74 Cisadea Cibareno 74 74 92 92 92 Jumlah DAS Jumlah Water Distrik Tinjauan Ribasim Wilayah Sungai Keppres Permen PU 04 2015 Jumlah Variable Inflow
  • 48. Sources: -Directorate General Water Resources, Ministry of Public Works and Housing -TA 7189-INO: Institutional Strengthening for Integrated Water Resources Management (IWRM) in the 6 cis river basin territory – package B – ADB, 2009 - 2013 -Java Water Resources Strategic Study – the World Bank, 2011 -Basin Water Resources Management Planning (BWRMP – WISMP 2), 2014 - 2015
  • 49. Hendarti (henni) Water Resources Sp - freelancer hendartias@gmail.com +62 811 143834 TERIMAKASIH