This document summarizes the negative impacts of a government "stormwater drain" project in Pune, India. The project aimed to reduce flooding by constricting and concreting natural freshwater streams. However, it destroyed the streams' ability to recharge groundwater and increased flooding risk. It was found to be based on fraudulent data and aims to benefit private real estate interests over citizens and the environment. The project has led to a destroyed water table, increased pollution, crime rates and health issues for citizens. Photos show the destruction of green spaces and growth of illegal slums where streams once flowed. The document criticizes the government for poor planning, excluding citizens, destroying the environment, and aiding illegal activities at the
A Review on Integrated River Basin Management and Development Master Plan of ...
ย
Smart Projects for Smart Cities: The Government Way (Updated to Nov 2015)
1. Smart Projects for Smart Cities: โจ
The government way
The Devnadi Case Study
2. โข 23 Basins in Pune with 360 Km nallas on natural fresh water streams said to
cause floods
โข Freshwater streams labeled as โstormwater drainsโ to create a drain project
โข Reducing the width to upto a tenth of their original, concreting the freshwater
streams and replacing their freshwater with sewage said to be the solution to
rid these streams of floods in the Storm-water drain project DPR
โข Three Phase Project with First Phase costing 388 crores created to rid Pune of
floods created by PMC and funded by JNNURM
โข When JNNURM reduces funds sanctioned three basins from Phase I dropped
saying they were less critical
Governmentโs project
5. 388 Crores to control non-existent floods, 0 crores for existing floods
The Project
6. โข Most of the city roads do not have road side drains. Increasing paved areas
and development is causing water to flow on the roads. The total length of
roadside drains was 55 kms up to year 2006. The corporation has added
another 100 kms. of drains.
โข July 25, 2005 experienced unusually high rainfall of 102.30 mm, inundating
many areas of Pune. Another day of heavy rainfall was June 5, 1976, with total
daily rainfall 120 mm
โข The number and extent of flooded areas is increasing in recent years. This has
caused widespread disruption of traffic, damages to vehicles, loss of man-
hours and damage to roads.
PMCโs Justification of the Project
7. โข The PMC has no records of any floods in any Nalla
โข In their own admission flooding is due to release in excess of 45,000 cusecs
from the Khadakwasla Dam into the Mutha river by irrigation department
โข No Nallas in flood locations along the river
โข Unbelievable rainfall intensity shown in DPR to justify project
Flood Facts
12. โข Why it has failed to protect the width of the streams and rivers as per the DP/Survey Maps
โข Why it has failed to check the tenement density per Ha as per Town Planning norms
โข Why it has failed to make roads with drains
โข How do natural streams, which in most cases are far from roads, flood the roads
โข How one day of rain, which caused floods in the Mutha due to release of water from
Khadakwasla, is used to justify a project with an overall outlay of over 1,000 crores that
promises to destroy the cityโs natural fresh water streams and its groundwater recharge
โข How will constricting and cementing natural streams rid the city of flooding when world over
creating unpaved corridors with tree cover are used to control floods
What PMC does not explain: Whose interest is it?
13. โข 66 Crores of tax money wasted on a Devnadi alone in private interest to
steal the green belt and water stream
โข Project aimed to continuously waste more money in private interest to
destroy all natural streams in Pune and in every urban centre under
JNNURM
โข Approximately 90 crores worth of wetland and green belt stolen from the
public in Devnadi alone
โข Water table for entire Baner (aprox 10 sq Km) destroyed (aprox annual cost of
replacing the services 5X the current annual supply of water by tanker
mafia)
What has this Cost the Citizens?
14. โข Pollution of the ground water and spread of water borne disease by laying
sewage lines in the stream (Aprox 44 crores per year in purified drinking
water costs for Baner alone + medical expenses to treat water borne
disease and mosquito borne disease)
โข Crime, failure of the Development Plan by promoting slums to grab the land of
the river (Cost to mental health, peace and well being for entire Baner;
crime rate up in Baner by more than 100% in last 5 years)
โข Risk of damage by flooding increased at least 60 fold as the stream is
channelized, constricted and flow changed to 1/60 of its avg. width
โข Biodiversity and lungs of the Baner area destroyed by removing the trees and
vegetation from the green belt and the river
Costs to the Citizens
15. โข The next few slides present transformation of sections of a natural stream to a
gutter, real estate and slums by the government
โข The pictures represent what is happening to every fresh water stream due to
corruption and indifference of the government
The Historical Evidence
16. Basin L & M of the Project, Viman Nagar, Kharadi: โจ
Notice all the streams marked for concretisation
23. Photo of the same section with groundwater being released to form fresh water stream before this part was channelized
Jan 2011
24. Photo of the same section after it was channelized. The stream can no longer collect
and transport water. Notice the waterlogging outside the channels.
Jul 2011
25. Same section Mar 2012
Same section July 2014
Natural stream being destroyed โจ
in the name of โstorm water drainsโ โจ
to pave way for real estate
27. Section of Baner DPR showing the actual fresh water stream and the proposed channel; โจ
Notice that the DPR alters the path and width of the stream
28. G121-122 August 2011
Natural stream being destroyed โจ
in the name of โstorm water drainsโ โจ
to pave way for real estate
29. Jan 2013 Jan 2013
Jan 2013
Mar 2013
Same location
49. Wells have gone dry as there is no recharge of the ground water as the Devnadi is concretized
50. โข Planning purposeless projects based on fraudulent data and premises
โข Excluding the citizens and their participation
โข Destroying the environment that they should protect
โข Perjury by misrepresenting facts before court
โข Aiding and encouraging illegalities while harassing the legal projects
โข Demonstrating habitual contempt of law, justice and court orders
โข Forgetting that they are the servants of the citizens and accountable to them
Bad Governance