TUUL SELBE RIVER IMPROVEMENT
1. 1. MEDIA 2. FORUM 3. EXPO 4. AWARDS
FEASIBILITY STUDY AND DESIGN FOR THE
TUUL, SELBE RIVER ENVIRONMENTAL
UPGARDING
2015
НMAYOR’S OFFICE OF MUNICIPALITY OF ULAANBAATAR
2. CONTENT
1. RATIFICATIONS FOR FEASIBILITY
STUDY AND DESIGN PREPARATION
2. TUUL RIVER BASIN, SCOPE OF THE
PROJECT
3. ISSUES ENCOUNTERED
4. PLANNING PRINCIPLES GOALS,
PURPOSE
5. MEASURES TO BE TAKEN
6. BENEFITS
Translated by Tsend Bayarsaikhan 976-88115842,
Bayarbbb@yahoo.com
WORLD TOTAL WATER RESERVE
Million cubic km
Ocean, sea
Glacier
Glacier river
water
Pure
drinking
water
Mongolia’s total water
reserve
%
3. LEGAL DOCUMENTS
• 2012 budgetary law of Mongolia
• Work order “Feasibility study and design preparation of Tuul and Selbe
river environmental upgrading” approved by Capital city governor and
Ulaanbaatar Mayor
• Tripartite contract for “Feasibility study and design preparation of Tuul
and Selbe river environmental upgrading” work №ТСГ.ЗТ/2012
• “Ulaanbaatar Development Master plan up to 2020 and development
directions towards 2030
Translated by Tsend Bayarsaikhan 976-88115842,
Bayarbbb@yahoo.com
4. Scope of the project
Scope of the project
Names
Of the sub
basins
Catchment
area
кm2
River flow type
1 Upper Tuul 2 682.80 Seasonal/ permanent
2 Terelj 1 278.89 Seasonal/ permanent
3 Khul, Selbe,
Uliastay
3 325.77 Non seasonal/ temporary
4 Bukhug 1 674.30 Non seasonal/ temporary
5 Altanbulag 3 492.37 Seasonal/ permanent
Total 12 454.13 Seasonal permanent-3
Тemporary-2
Төслийн хүрээнд хамруулан авч үзсэн дэд сав газрууд
Province and Capital city 2010
1000 per
2020
1000 per
2030
1000 per
Capital city 1133.9 1393.5 1578.0
Tuv (central) province 25.479 70.5 81.5
Total project basin are
a
1159.4 1398.0 1659.5
Òөслийí ñàâ ãàçðûí õ¿í àì /ìÿí.õ¿í/
5. Towns, villages
others
2010 2020 2030 2010 2020 2030 2010 2020 2030
Drinking water Non-drinking consumption Total consumption
Ulaanbaatar city 131585 212210 302304
/97.46%
180420 293594 361118 311980 505804 663422
/95.1%/
Water consumpt
ion of Zuunmod
city
915 1783 2400
/0.77%/
768 2304 3456 1683 4087 5856
/0.8%/
Aerocity /In Khu
shigt Valley/
- 4579 5240
/1.69/
- 6239 6089 - 10817 11329
/1.6%/
Water consumpt
ion of “Soums”
47 87 250
/0.08%/
5195 14042 16850 5242 14129 17100
/2.5%/
Total 132547 218659 310194
/100%/
186383 316179 387513 318930 534838 697707
/100%/
Total Water consumption projection of project basin , м3/ a day
3. ISSUES ENCOUNTERED
Mongolia is classified as country with very scarce water reserve. The key reasons
for that are: severe continental dry climate at the highlands on the Central Asia,
has very limited water reserve, a rare rainfall with very high level of evaporation
and most of the bigger rivers actually has outgoing flows.
The total water consumption on the project basin will be increased 2.2 in 2030 compared to year of
2010, whereas the drinking and household water consumption will be increased by 2.34 times
6. 3. ISSUES ENCOUNTERED
Surface water pollution of Ulaanbaatar and its vicinity
As WHO is named the most polluted seven cities Tuul river listed in 5th.
3000 population of the Altanbulag Soum of Tuv province and 182000 of
livestock, 2000 population of Undurshireet Soum are unable to get the
drinking water from Tuul river.
7. In the section marked in red or from BIO bridge down to
Altanbulag bridge only the untreated water from Central
treatment Plant is solely making the flow.
Flow /Тuul river/ Flood hazard
3. ISSUES ENCOUNTERED
Currently 90 percent of the city flood protection facility are in bad shape
and in case of the FLOOD its not able to protect or prevent from flooding
for which any parts of the city are seriously flooded during summer season
which result huge sum of economic losses.
8. 4. PLANNING STRATEGIC GOALS
• Strategic goal 1:
“To enhance the underground or surface water reserve while maintaining
the Basin ecosystem’s balance and restoring the network of rivers with
permanent flow”
• Strategic goal 2:
“Fully supply the regions need for pure and quality water while
eliminating the river pollution ”
• Strategic goal 3:
“To establish a system of rational and economical use of water”
• Strategic goal 4:
“To create conditions to protect from Flood hazard”
• Strategic goal 5:
“To create amenity areas for proper recreation, outing and tourism along
the river basins”
Translated by Tsend Bayarsaikhan 976-88115842,
Bayarbbb@yahoo.com
9. Tuul river
Тоlgoit river
Selbe river
Ulyastai river
Bayan
river
5. MEASURES TO BE TAKEN
Budget: 60,03 million USD
Translated by Tsend Bayarsaikhan 976-88115842,
Bayarbbb@yahoo.com
10. Creation of amenity areas for proper recreation, outing and tourism
along the river basins of Tuul, Selbe and other inflowing rivers
Translated by Tsend Bayarsaikhan 976-88115842,
Bayarbbb@yahoo.com
11. The general plan of Tuul river upgrading
Tuul river
Translated by Tsend Bayarsaikhan 976-88115842,
Bayarbbb@yahoo.com
12. The General plan of Selbe river upgrading
Translated by Tsend Bayarsaikhan 976-88115842,
Bayarbbb@yahoo.com
13. The General plan of Dund river upgrading
Translated by Tsend Bayarsaikhan 976-88115842,
Bayarbbb@yahoo.com
14. The General plan of Ulyastai river upgrading
Translated by Tsend Bayarsaikhan 976-88115842,
Bayarbbb@yahoo.com
15. The General plan of Tolgoit river upgrading
Translated by Tsend Bayarsaikhan 976-88115842,
Bayarbbb@yahoo.com
16. The General plan of Bayan river upgrading
Translated by Tsend Bayarsaikhan 976-88115842,
Bayarbbb@yahoo.com
17. Direct benefits
CITY INFRA-
STRUCTURE
DEVELOPME
NT
PERMANENT
WATER
SOURCE
GUARENTEED
RIVER
NORMAL
BASIN
STORED
- To ensure the flood safety
conditions
- To prevent river water pollution and
improve the water quality
- To prevent sand and gravel entry
into waters and reduce the unwanted
accumulation of sand and gravel
- To create an aqua spots and spots
near the river
- To ensure the supply of drinking
and household water
- Efficient and rational distribution of
the household water
- To adjust the flood and normal
flow
- Construction of the HIghway
- Improvement of the bridges in line
with highway construction
- To improve the planning of
construction alongside of the river
basin
In-direct benefits
TO DEEPEN
THE
COOPERATIO
NS
UTILIZE THE
SAND AND
GRAVEL
EXTRACTED
FROM
RIVERS
PREVENT
RIVER
FROM
DRYING OFF
- To make an analysis on the reasons
for drying off and take counter
measures
- To restore the river’s ecosystem
- To enhance the land use in River
basin areas
- To make use of the Sand and gravel
that side product of the river
improvement
- To make an economic gains from the
use of sand and gravel
- To deepen the foreign cooperation
by exchanging the personnel and
technology
- Mongolians to get a capacity to
improve the river basins on its own
18. Social benefits
CREATION OF
ENVIRONMENT
FOR PROPER
GROWTH AND
EDUCATION
TO IMPROVE
THE QUALITY
OF LIVING
CONDITION
RESTORING THE
WILD NATURE
CREATEION OF
SYMBOL
- As Tuul river represents the Gate
way and FACEnot only to
Ulaanbaatar city and for Mongolia
in whole, Tuul will be named as
Symbolic river
- To improve the quality of living
condition and health of the city
residents
- To improve the water quality and
restore the environment
- To create an environment for healthy
growth and mindful spending of the
free times
- To improve the knowledge on
environmental importance
- To create an environment for the
proper growth and decent education
for the children and youth
Economic benefits
INTENSIFICATI
ON AND
DEVELOPMEN
T OF CITY
ECONOMY
CREATION OF
NEW PLACES
FOR TOURISM,
SPORT AND
RECREATION
CREATION OF
NEW JOBS
AND
INCREASE OF
REVENUE
- To make an analysis on the reasons for
drying off and take counter measures
- To restore the river’s ecosystem
- To enhance the land use in River basin
areas
- New creation of recreational and
tourism places and make best use of
them
- To make use of the Natural beauty
- To intensify regional economy by
creating an attractive Spots
- To increase the foreign currency
reserve by wisely attracting the foreign
investment
- To develop road and infrastructure
- Use of High technology