Environmental Consideration in Mechanisation of
Construction Projects.
BY:
AKSHAY R MANOHAR
M.Tech(Construction Technology) CIVIL ENGINEERING DEPT. NMAMIT-NITTE.
Environmental Guidelines for Major
Construction Sites
โ€ข Construction practices that fail to control pollution can
cause damage to waterways and wetlands, kill fish,
upset aquatic ecological systems and wildlife
communities, and result in contamination of land and
groundwater.
โ€ข The risk to the environment is particularly high when
work is done near coastal areas, streams and creeks, or
along a river valley.
โ€ข When construction occurs near built-up areas, poor
practices may result in air and noise pollution which
may cause annoyance and affect the health of
neighbouring communities.
CONTENTS:
1. Purpose and application
2. Pre-construction planning and design
3. Environmental management plan
4. Land disturbance
5. Noise and vibration
6. Waste minimisation
7. Contaminated material and wastes
8. Other environmental issues
9. Inspections, monitoring and audits
1.Purpose and application
โ€ข minimising environmental impact-cost benefit
โ€ข guidelines for undertaking risk assessment
and management
โ€ข Assessment - impact of construction activities
on the environment.
โ€ข suggested best practice environmental
measures to meet the performance objectives
based on available experience.
โ€ข The Guidelines are not universal.
2. Pre-construction planning and
design
โ€ข Integrating environment protection at
planning stage ensures minimal pollution.
โ€ข more cost-effective than establishing controls
โ€ข Risk assessment :Probability, frequency, time
frame.
โ€ข Risk assessment: endangered flora and fauna,
aquatic plant and animals, ground water
recharge areas....
3. ENVIRONMENTAL MANAGEMENT
PLAN
โ€ข Objective: to minimize adverse impact of construction activities on the
environment.
โ€ข The environmental management system establishes quality systems to
ensure consistently high environment outcomes for the project as a
whole. British Standard 7750, which has gained wide international
acceptance, or the soon to be adopted ISO 14000 series should be used.
โ€ข A large construction area is divided into many.
โ€ข Work scheduling
โ€ข Land disturbance
โ€ข Storm water management
โ€ข Special operational precautions and Contingency plans
โ€ข Rehabilitation
โ€ข Maintenance, inspections and surveillance
โ€ข Ongoing risk assessment and management
โ€ข Updating the plan
4. LAND DISTURBANCE
โ€ข Objective: To minimise the quantity of soil lost
during construction due to land-clearing.
โ€ข Schedule well while Design stage.
โ€ข Control measures: a separate division
required.
โ€ข Keep vehicles on specified path...
โ€ข Rehabilitate: Grow some grass.
STORMWATER MANAGEMENT
โ€ข Objective: To minimise the generation of
contaminated storm water.
โ€ข Minimise the quantity of entering.
โ€ข Establish intercept drains.
โ€ข Reduce water velocity.
โ€ข Study-History of soil, rainfall.
DE-WATERING WORK SITES
โ€ข Objective: To ensure that de-watering
operations do not result in turbid water
entering natural waterways.
โ€ข Treat contaminated water pumped into the a
natural waterway to remove sediment if the
turbidity exceeds 30 NTU.
โ€ข Supervise and Monitor.
DUST CONTROL
โ€ข Objective: To ensure there is no health risk or
loss of amenity due to emission of dust to the
environment.
โ€ข Dust prevention strategy: at the project
planning stage.
โ€ข dust suppression measures: water sprying
and intall wind fences...
MANAGEMENT OF STOCKPILES.
โ€ข Objective: To manage soil stockpiles so that
dust and sediment in run-off are minimised.
โ€ข Donโ€™t go for too much stock.
โ€ข Maintain dust & flood free environment.
โ€ข Stabilise stocks if they are stored for longer.
5. NOISE AND VIBRATION
โ€ข Objective: To ensure nuisance from noise and vibration
does not occur.
โ€ข Study it and minimize it.
โ€ข Fit and maintain appropriate mufflers on earth-moving
and other vehicles on the site.
โ€ข Enclose noisy equipment
โ€ข Provide noise attenuation screens, where appropriate.
โ€ข Maintain timings and respect ur neighbours.
โ€ข Plan for no traffic.
6. WASTE MINIMISATION
โ€ข Objective: To minimise the waste load
discharged to the environment.
โ€ข Study it and minimize it.
โ€ข Prioritise them and neutralize it.
โ€ข Have some target and maintain it.
7. CONTAMINATED MATERIAL AND
WASTES
โ€ข Objective: To ensure that all contaminated
material uncovered on a construction site are
excavated and disposed of in an environmentally
responsible manner.
โ€ข Excavate material in a manner which avoids off-
site environmental problems.
โ€ข Seal contaminated material to ensure that there
is no off-site effect now or in the future.
โ€ข Transport odorous wastes in covered vehicles
โ€ข Dispose of contaminated material in a licensed
landfill.
8 OTHER ENVIRONMENTAL ISSUES
โ€ข AIR QUALITY:
โ€ข Objective: To ensure there is no health risk or
loss of amenity due to emission of exhaust
gases to the environment.
โ€ข Well serviced emission controlled, smoke
shouldnโ€™t visible >10 sec.
8. OTHER ENVIRONMENTAL ISSUES
COTINUEโ€ฆโ€ฆโ€ฆ
โ€ข LITTER:
โ€ข Objective: To ensure that all litter is disposed
of in a responsible manner, and is not released
into the environment.
โ€ข Maintain a high quality of housekeeping.
โ€ข Provide bins for construction workers and
staff at locations where they consume food.
โ€ข Conduct ongoing awareness with staff of the
need to avoid littering.
8. OTHER ENVIRONMENTAL ISSUES
COTINUEโ€ฆโ€ฆโ€ฆ
โ€ข STORING FUELS AND CHEMICALS:
โ€ข Objective: To ensure that fuel and chemical
storage is safe, and that any materials that
escape do not cause environmental damage.
โ€ข Minimise fuels and chemicals stored on- site.
โ€ข Install bunds and take other precautions to
reduce the risk of spills.
โ€ข Implement a contingency plan to handle spills.
8. OTHER ENVIRONMENTAL ISSUES
COTINUEโ€ฆโ€ฆโ€ฆ
โ€ข KEEPING ROADS CLEAN:
โ€ข Objective: To ensure that roads are kept clean of
soil.
โ€ข Ensure that the roads are swept at least once a
day on uncontrolled road crossings when
construction vehicles are travelling off the site.
โ€ข Install litter traps lined with filter cloth in all side-
entry pits .
โ€ข Cover all loads of soil being taken off site for
disposal.
8 OTHER ENVIRONMENTAL ISSUES
COTINUEโ€ฆโ€ฆโ€ฆ
โ€ข Protecting infrastructure:
โ€ข In built-up areas, care needs to be taken in
working near existing infrastructure services
such as drainage and sewerage pipes.
โ€ข Appropriate machinery must be used within
concrete channels to avoid damage to
structures.
8. OTHER ENVIRONMENTAL ISSUES
COTINUEโ€ฆโ€ฆโ€ฆ
โ€ข Concrete batching plants:
โ€ข Sometimes very large construction projects
will establish on-site concrete batching plants.
โ€ข Plants need to be designed in accordance with
EPA guidelines13.
โ€ข Constructing a plant which is designed to have
a throughput of greater than 100 tonnes per
week will need an EPA works approval.
โ€ข
INSPECTIONS, MONITORING AND
AUDITING
โ€ข Objective: Conduct checks on significant environmental risks to
ensure that they are adequately managed and control systems are
operating effectively.
โ€ข โ€ข Establish a baseline monitoring program before construction
commences.
โ€ข โ€ข Prepare an inspection, monitoring and auditing program,
designed to match the environmental risks.
โ€ข โ€ข Ensure that remedial action is taken promptly when monitoring,,
inspections or audit results reveal a problem in environment
management.
โ€ข โ€ข Ensure that all monitoring is conducted by a NATA registered
laboratory, either directly, or under supervision.
โ€ข โ€ข Arrange for regular independent audits of environmental
performance and the environmental management system
THANK YOU

More Related Content

What's hot

PROCEDURE FOR MAINTENANCE OF SEWAGE SYSTEM
PROCEDURE FOR MAINTENANCE OF SEWAGE SYSTEMPROCEDURE FOR MAINTENANCE OF SEWAGE SYSTEM
PROCEDURE FOR MAINTENANCE OF SEWAGE SYSTEM
AB MAKASANA
ย 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
Sayyid Ina
ย 

What's hot (20)

1. classification of urban roads 28 jun
1. classification of urban roads 28 jun1. classification of urban roads 28 jun
1. classification of urban roads 28 jun
ย 
Diiferent types of road
Diiferent types of roadDiiferent types of road
Diiferent types of road
ย 
Highway safety for civil engineers
Highway safety for civil engineersHighway safety for civil engineers
Highway safety for civil engineers
ย 
Construction Safety Management
Construction Safety ManagementConstruction Safety Management
Construction Safety Management
ย 
PROCEDURE FOR MAINTENANCE OF SEWAGE SYSTEM
PROCEDURE FOR MAINTENANCE OF SEWAGE SYSTEMPROCEDURE FOR MAINTENANCE OF SEWAGE SYSTEM
PROCEDURE FOR MAINTENANCE OF SEWAGE SYSTEM
ย 
Road Design and Safety
Road Design and SafetyRoad Design and Safety
Road Design and Safety
ย 
Classification of Roads and Road patterns
Classification of Roads and Road patternsClassification of Roads and Road patterns
Classification of Roads and Road patterns
ย 
Road patten
Road pattenRoad patten
Road patten
ย 
Cyclone resistant building design
Cyclone resistant building designCyclone resistant building design
Cyclone resistant building design
ย 
Indian Road Congress (IRC) & National Rural Road Development Agency (NRRDA)
Indian Road Congress (IRC) & National Rural Road Development Agency (NRRDA)Indian Road Congress (IRC) & National Rural Road Development Agency (NRRDA)
Indian Road Congress (IRC) & National Rural Road Development Agency (NRRDA)
ย 
EFFECT OF CONSTRUCTION INDUSTRY ON ENVIRONMENT
EFFECT OF CONSTRUCTION INDUSTRY ON ENVIRONMENTEFFECT OF CONSTRUCTION INDUSTRY ON ENVIRONMENT
EFFECT OF CONSTRUCTION INDUSTRY ON ENVIRONMENT
ย 
Highway Alignment
Highway AlignmentHighway Alignment
Highway Alignment
ย 
Intersection designs ppt
Intersection designs pptIntersection designs ppt
Intersection designs ppt
ย 
Highway unit-1-hand-outs
Highway unit-1-hand-outsHighway unit-1-hand-outs
Highway unit-1-hand-outs
ย 
Highway engineering PPT
Highway engineering PPTHighway engineering PPT
Highway engineering PPT
ย 
SEWERAGE SYSTEMS ppt by mayank oza
SEWERAGE SYSTEMS ppt by mayank ozaSEWERAGE SYSTEMS ppt by mayank oza
SEWERAGE SYSTEMS ppt by mayank oza
ย 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
ย 
Airport engineering
Airport engineering Airport engineering
Airport engineering
ย 
Airpot design
Airpot designAirpot design
Airpot design
ย 
Street furniture
Street furnitureStreet furniture
Street furniture
ย 

Viewers also liked

Construction and construction practices and their effects on the environment
Construction and construction practices and their effects on the environmentConstruction and construction practices and their effects on the environment
Construction and construction practices and their effects on the environment
Caryl Jane Veriรฑa
ย 
Environmental Consideration
Environmental Consideration Environmental Consideration
Environmental Consideration
haroldtaylor1113
ย 
Environmental considerations and technical port design are intertwined
Environmental considerations and technical port design are intertwinedEnvironmental considerations and technical port design are intertwined
Environmental considerations and technical port design are intertwined
Wendy Mah
ย 

Viewers also liked (20)

Environmental Issues Related to Construction Projects
Environmental Issues Related to Construction ProjectsEnvironmental Issues Related to Construction Projects
Environmental Issues Related to Construction Projects
ย 
Dealing with Environmental Issues on the Construction Project, November 16, 2011
Dealing with Environmental Issues on the Construction Project, November 16, 2011Dealing with Environmental Issues on the Construction Project, November 16, 2011
Dealing with Environmental Issues on the Construction Project, November 16, 2011
ย 
Environmental Concerns in Construction Projects- KSPCB Simha
Environmental Concerns in Construction Projects-   KSPCB SimhaEnvironmental Concerns in Construction Projects-   KSPCB Simha
Environmental Concerns in Construction Projects- KSPCB Simha
ย 
CONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENTCONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENT
ย 
Macro Environmental impact on Construction industry
Macro Environmental impact on Construction industryMacro Environmental impact on Construction industry
Macro Environmental impact on Construction industry
ย 
Green building construction for sustainable future
Green building construction for sustainable futureGreen building construction for sustainable future
Green building construction for sustainable future
ย 
Sustainable Development
Sustainable DevelopmentSustainable Development
Sustainable Development
ย 
Descriptive analysis of awareness about land pollution, water pollution, air ...
Descriptive analysis of awareness about land pollution, water pollution, air ...Descriptive analysis of awareness about land pollution, water pollution, air ...
Descriptive analysis of awareness about land pollution, water pollution, air ...
ย 
Environmental problems and solutions
Environmental problems and solutionsEnvironmental problems and solutions
Environmental problems and solutions
ย 
Environmental Awareness Presentation
Environmental Awareness PresentationEnvironmental Awareness Presentation
Environmental Awareness Presentation
ย 
Powerpoint on environmental issues
Powerpoint on environmental issuesPowerpoint on environmental issues
Powerpoint on environmental issues
ย 
Save Environment PPT
Save Environment PPTSave Environment PPT
Save Environment PPT
ย 
Construction and construction practices and their effects on the environment
Construction and construction practices and their effects on the environmentConstruction and construction practices and their effects on the environment
Construction and construction practices and their effects on the environment
ย 
The environmental considerations and barriers involved with developing wind e...
The environmental considerations and barriers involved with developing wind e...The environmental considerations and barriers involved with developing wind e...
The environmental considerations and barriers involved with developing wind e...
ย 
Environmental Consideration
Environmental Consideration Environmental Consideration
Environmental Consideration
ย 
Record of Environmental Consideration for the PCAPP Demilitarization Activi...
Record of Environmental Consideration for the PCAPP Demilitarization Activi...Record of Environmental Consideration for the PCAPP Demilitarization Activi...
Record of Environmental Consideration for the PCAPP Demilitarization Activi...
ย 
Environmental Considerations Affecting Investment Decisions
Environmental Considerations Affecting Investment DecisionsEnvironmental Considerations Affecting Investment Decisions
Environmental Considerations Affecting Investment Decisions
ย 
Environmental considerations and technical port design are intertwined
Environmental considerations and technical port design are intertwinedEnvironmental considerations and technical port design are intertwined
Environmental considerations and technical port design are intertwined
ย 
Env training ppt rev01
Env training ppt rev01Env training ppt rev01
Env training ppt rev01
ย 
Xmas dust presentation
Xmas dust presentationXmas dust presentation
Xmas dust presentation
ย 

Similar to Environmental Considerations in Construction

CET 415 Module IV.pptx
CET 415 Module IV.pptxCET 415 Module IV.pptx
CET 415 Module IV.pptx
FARSANA26
ย 
TBoth_Resume_09.23.2016
TBoth_Resume_09.23.2016TBoth_Resume_09.23.2016
TBoth_Resume_09.23.2016
Travis Both
ย 
Unit V - EIA case studies pertaining to Infrastructure Projects.pptx
Unit V - EIA case studies pertaining to Infrastructure Projects.pptxUnit V - EIA case studies pertaining to Infrastructure Projects.pptx
Unit V - EIA case studies pertaining to Infrastructure Projects.pptx
ssuser65cc68
ย 
LMPP Final Presentation_FINAL1
LMPP Final Presentation_FINAL1LMPP Final Presentation_FINAL1
LMPP Final Presentation_FINAL1
Theodore McNeal
ย 
Road development projects.
Road development projects.Road development projects.
Road development projects.
Abhishek Rajput
ย 
Natural gas
Natural gasNatural gas
Natural gas
Bill Hewitt
ย 
Presentation for safegard septic tank
Presentation for safegard septic tankPresentation for safegard septic tank
Presentation for safegard septic tank
kalyanmaji
ย 

Similar to Environmental Considerations in Construction (20)

Impact of desalination plant
Impact of desalination plantImpact of desalination plant
Impact of desalination plant
ย 
Active landfill
Active landfillActive landfill
Active landfill
ย 
Iee
IeeIee
Iee
ย 
CET 415 Module IV.pptx
CET 415 Module IV.pptxCET 415 Module IV.pptx
CET 415 Module IV.pptx
ย 
Secure landfilling.pptx
Secure landfilling.pptxSecure landfilling.pptx
Secure landfilling.pptx
ย 
EPSC Module 2 Unit 1
EPSC Module 2 Unit 1EPSC Module 2 Unit 1
EPSC Module 2 Unit 1
ย 
EIA of offshore drilling and dredging
EIA of  offshore drilling and dredgingEIA of  offshore drilling and dredging
EIA of offshore drilling and dredging
ย 
Landfill design and operation
Landfill design and operationLandfill design and operation
Landfill design and operation
ย 
17. environmental and safety consideration and choice of materials
17. environmental and safety consideration and choice of materials17. environmental and safety consideration and choice of materials
17. environmental and safety consideration and choice of materials
ย 
TBoth_Resume_09.23.2016
TBoth_Resume_09.23.2016TBoth_Resume_09.23.2016
TBoth_Resume_09.23.2016
ย 
Solid Waste Disposal into Land
Solid Waste Disposal into LandSolid Waste Disposal into Land
Solid Waste Disposal into Land
ย 
Green building
Green buildingGreen building
Green building
ย 
Unit V - EIA case studies pertaining to Infrastructure Projects.pptx
Unit V - EIA case studies pertaining to Infrastructure Projects.pptxUnit V - EIA case studies pertaining to Infrastructure Projects.pptx
Unit V - EIA case studies pertaining to Infrastructure Projects.pptx
ย 
Mitigational measures for Mines
Mitigational measures for MinesMitigational measures for Mines
Mitigational measures for Mines
ย 
EIA for development projects
EIA for development projectsEIA for development projects
EIA for development projects
ย 
NSTP-2-Solid-Waste-Management-Act-of-2000.ppt
NSTP-2-Solid-Waste-Management-Act-of-2000.pptNSTP-2-Solid-Waste-Management-Act-of-2000.ppt
NSTP-2-Solid-Waste-Management-Act-of-2000.ppt
ย 
LMPP Final Presentation_FINAL1
LMPP Final Presentation_FINAL1LMPP Final Presentation_FINAL1
LMPP Final Presentation_FINAL1
ย 
Road development projects.
Road development projects.Road development projects.
Road development projects.
ย 
Natural gas
Natural gasNatural gas
Natural gas
ย 
Presentation for safegard septic tank
Presentation for safegard septic tankPresentation for safegard septic tank
Presentation for safegard septic tank
ย 

Recently uploaded

Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Anamikakaur10
ย 
Call Girls In Bloom Boutique | GK-1 โ˜Ž 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 โ˜Ž 9990224454 High Class Delhi NCR 24 Hour...Call Girls In Bloom Boutique | GK-1 โ˜Ž 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 โ˜Ž 9990224454 High Class Delhi NCR 24 Hour...
rajputriyana310
ย 
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
MOHANI PANDEY
ย 
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
SUHANI PANDEY
ย 
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
MOHANI PANDEY
ย 
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
SUHANI PANDEY
ย 
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
SUHANI PANDEY
ย 

Recently uploaded (20)

Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.
ย 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
ย 
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
ย 
Call Girls In Bloom Boutique | GK-1 โ˜Ž 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 โ˜Ž 9990224454 High Class Delhi NCR 24 Hour...Call Girls In Bloom Boutique | GK-1 โ˜Ž 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 โ˜Ž 9990224454 High Class Delhi NCR 24 Hour...
ย 
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
ย 
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
ย 
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
ย 
Green Marketing
Green MarketingGreen Marketing
Green Marketing
ย 
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
ย 
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
ย 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
ย 
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
ย 
Enhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionEnhancing forest data transparency for climate action
Enhancing forest data transparency for climate action
ย 
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verifiedSector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
ย 
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
ย 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
ย 
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
ย 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
ย 
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts ServicesBOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
ย 
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
ย 

Environmental Considerations in Construction

  • 1. Environmental Consideration in Mechanisation of Construction Projects. BY: AKSHAY R MANOHAR M.Tech(Construction Technology) CIVIL ENGINEERING DEPT. NMAMIT-NITTE.
  • 2. Environmental Guidelines for Major Construction Sites โ€ข Construction practices that fail to control pollution can cause damage to waterways and wetlands, kill fish, upset aquatic ecological systems and wildlife communities, and result in contamination of land and groundwater. โ€ข The risk to the environment is particularly high when work is done near coastal areas, streams and creeks, or along a river valley. โ€ข When construction occurs near built-up areas, poor practices may result in air and noise pollution which may cause annoyance and affect the health of neighbouring communities.
  • 3. CONTENTS: 1. Purpose and application 2. Pre-construction planning and design 3. Environmental management plan 4. Land disturbance 5. Noise and vibration 6. Waste minimisation 7. Contaminated material and wastes 8. Other environmental issues 9. Inspections, monitoring and audits
  • 4. 1.Purpose and application โ€ข minimising environmental impact-cost benefit โ€ข guidelines for undertaking risk assessment and management โ€ข Assessment - impact of construction activities on the environment. โ€ข suggested best practice environmental measures to meet the performance objectives based on available experience. โ€ข The Guidelines are not universal.
  • 5. 2. Pre-construction planning and design โ€ข Integrating environment protection at planning stage ensures minimal pollution. โ€ข more cost-effective than establishing controls โ€ข Risk assessment :Probability, frequency, time frame. โ€ข Risk assessment: endangered flora and fauna, aquatic plant and animals, ground water recharge areas....
  • 6. 3. ENVIRONMENTAL MANAGEMENT PLAN โ€ข Objective: to minimize adverse impact of construction activities on the environment. โ€ข The environmental management system establishes quality systems to ensure consistently high environment outcomes for the project as a whole. British Standard 7750, which has gained wide international acceptance, or the soon to be adopted ISO 14000 series should be used. โ€ข A large construction area is divided into many. โ€ข Work scheduling โ€ข Land disturbance โ€ข Storm water management โ€ข Special operational precautions and Contingency plans โ€ข Rehabilitation โ€ข Maintenance, inspections and surveillance โ€ข Ongoing risk assessment and management โ€ข Updating the plan
  • 7. 4. LAND DISTURBANCE โ€ข Objective: To minimise the quantity of soil lost during construction due to land-clearing. โ€ข Schedule well while Design stage. โ€ข Control measures: a separate division required. โ€ข Keep vehicles on specified path... โ€ข Rehabilitate: Grow some grass.
  • 8. STORMWATER MANAGEMENT โ€ข Objective: To minimise the generation of contaminated storm water. โ€ข Minimise the quantity of entering. โ€ข Establish intercept drains. โ€ข Reduce water velocity. โ€ข Study-History of soil, rainfall.
  • 9. DE-WATERING WORK SITES โ€ข Objective: To ensure that de-watering operations do not result in turbid water entering natural waterways. โ€ข Treat contaminated water pumped into the a natural waterway to remove sediment if the turbidity exceeds 30 NTU. โ€ข Supervise and Monitor.
  • 10. DUST CONTROL โ€ข Objective: To ensure there is no health risk or loss of amenity due to emission of dust to the environment. โ€ข Dust prevention strategy: at the project planning stage. โ€ข dust suppression measures: water sprying and intall wind fences...
  • 11. MANAGEMENT OF STOCKPILES. โ€ข Objective: To manage soil stockpiles so that dust and sediment in run-off are minimised. โ€ข Donโ€™t go for too much stock. โ€ข Maintain dust & flood free environment. โ€ข Stabilise stocks if they are stored for longer.
  • 12. 5. NOISE AND VIBRATION โ€ข Objective: To ensure nuisance from noise and vibration does not occur. โ€ข Study it and minimize it. โ€ข Fit and maintain appropriate mufflers on earth-moving and other vehicles on the site. โ€ข Enclose noisy equipment โ€ข Provide noise attenuation screens, where appropriate. โ€ข Maintain timings and respect ur neighbours. โ€ข Plan for no traffic.
  • 13. 6. WASTE MINIMISATION โ€ข Objective: To minimise the waste load discharged to the environment. โ€ข Study it and minimize it. โ€ข Prioritise them and neutralize it. โ€ข Have some target and maintain it.
  • 14. 7. CONTAMINATED MATERIAL AND WASTES โ€ข Objective: To ensure that all contaminated material uncovered on a construction site are excavated and disposed of in an environmentally responsible manner. โ€ข Excavate material in a manner which avoids off- site environmental problems. โ€ข Seal contaminated material to ensure that there is no off-site effect now or in the future. โ€ข Transport odorous wastes in covered vehicles โ€ข Dispose of contaminated material in a licensed landfill.
  • 15. 8 OTHER ENVIRONMENTAL ISSUES โ€ข AIR QUALITY: โ€ข Objective: To ensure there is no health risk or loss of amenity due to emission of exhaust gases to the environment. โ€ข Well serviced emission controlled, smoke shouldnโ€™t visible >10 sec.
  • 16. 8. OTHER ENVIRONMENTAL ISSUES COTINUEโ€ฆโ€ฆโ€ฆ โ€ข LITTER: โ€ข Objective: To ensure that all litter is disposed of in a responsible manner, and is not released into the environment. โ€ข Maintain a high quality of housekeeping. โ€ข Provide bins for construction workers and staff at locations where they consume food. โ€ข Conduct ongoing awareness with staff of the need to avoid littering.
  • 17. 8. OTHER ENVIRONMENTAL ISSUES COTINUEโ€ฆโ€ฆโ€ฆ โ€ข STORING FUELS AND CHEMICALS: โ€ข Objective: To ensure that fuel and chemical storage is safe, and that any materials that escape do not cause environmental damage. โ€ข Minimise fuels and chemicals stored on- site. โ€ข Install bunds and take other precautions to reduce the risk of spills. โ€ข Implement a contingency plan to handle spills.
  • 18. 8. OTHER ENVIRONMENTAL ISSUES COTINUEโ€ฆโ€ฆโ€ฆ โ€ข KEEPING ROADS CLEAN: โ€ข Objective: To ensure that roads are kept clean of soil. โ€ข Ensure that the roads are swept at least once a day on uncontrolled road crossings when construction vehicles are travelling off the site. โ€ข Install litter traps lined with filter cloth in all side- entry pits . โ€ข Cover all loads of soil being taken off site for disposal.
  • 19. 8 OTHER ENVIRONMENTAL ISSUES COTINUEโ€ฆโ€ฆโ€ฆ โ€ข Protecting infrastructure: โ€ข In built-up areas, care needs to be taken in working near existing infrastructure services such as drainage and sewerage pipes. โ€ข Appropriate machinery must be used within concrete channels to avoid damage to structures.
  • 20. 8. OTHER ENVIRONMENTAL ISSUES COTINUEโ€ฆโ€ฆโ€ฆ โ€ข Concrete batching plants: โ€ข Sometimes very large construction projects will establish on-site concrete batching plants. โ€ข Plants need to be designed in accordance with EPA guidelines13. โ€ข Constructing a plant which is designed to have a throughput of greater than 100 tonnes per week will need an EPA works approval. โ€ข
  • 21. INSPECTIONS, MONITORING AND AUDITING โ€ข Objective: Conduct checks on significant environmental risks to ensure that they are adequately managed and control systems are operating effectively. โ€ข โ€ข Establish a baseline monitoring program before construction commences. โ€ข โ€ข Prepare an inspection, monitoring and auditing program, designed to match the environmental risks. โ€ข โ€ข Ensure that remedial action is taken promptly when monitoring,, inspections or audit results reveal a problem in environment management. โ€ข โ€ข Ensure that all monitoring is conducted by a NATA registered laboratory, either directly, or under supervision. โ€ข โ€ข Arrange for regular independent audits of environmental performance and the environmental management system

Editor's Notes

  1. Nephelomeric turbidity unit-NTU
  2. Environmental protection agency- EPA
  3. AUDIT- systematic examination of books, account, documents of organization to check whether they fairly maintained or notโ€ฆโ€ฆโ€ฆ NATA- national air toxics assement.