  The various components of this projects includes:
   Identification of Slum Pockets
   Conduction of Socio-economic and Biometric
    survey of the beneficiaries
   Conduction of Total Station/ Plane table survey
    of the slum area.
   Preparation of Base map using GIS and Satellite
    Images.
   MIS and GIS integration
   Preparation of architectural Layouts of the Slum
    area for its development
   Preparation of DPR
INNOVATION IN RAY REQUIRED
 All the Socio-economic, biometric and total
  station survey data are currently being
  integrated offline which will be later on
  submitted to the governing authority.
 Such data shall be made available to
  WAPCOS field offices by preparing an online
  module of the same.
 This will also ensure that the status on the
  work done by WAPCOS in RAY projects can
  be easily retrieved and produced before the
  clients.
UPDATE ON PREPARATION OF SLUM FREE CITY
  PLAN OF ACTION.
     GIS Mapping: The whole GIS-MIS component
      shall be available on our WAPCOS site. The
      various components of GIS which are completed
      are as follows:
       i.     Preparation of City Base Map.
       ii.    Slum Marking using Satellite Images.
       iii.   Digitization of DP maps, Village/ Cadastral maps
              and their rectification.
       iv.    Road Digitization.
       v.     Marking of important Landmarks.
STATUS ON PREPARATION OF SLUM FREE CITY
                         PLAN OF ACTION
SLUM DETAILS                       SLUMS COVERED

            No. of huts                        No. Of Slums


                           Less than                           Less Than
        2                  100                    1            100
   5                       Between     2                       Between
                15
                           100-500                             100-500
   10                      Between                             Between
                           500-1500                   2        500-1500
                           Above           1                   Above
                           1500                                1500




SLUMS DETAILS (WRT. NO. OF HUTS)
SLUM FREE CITY PLAN OF ACTION
UPDATE ON PREPARATION OF INNOVATIVE PILOT
  PROJECTS.
     Status on Pilot projects prepared
       i.    Pilot Projects for Ambedkar Nagar, Bhola Nagar and
             Gandhinagar Pocket is on the verge of completion.
       ii.   Clearing the reservation of Garden and Cementry
             encroached by Slum, Development of Roads, water
             supply lines & Drainage Lines, provision for
             STP, Primary health care center, Electric Sub-
             Station and school is included in the pilot project.
COMMUNITY MEETING AT SLUM
During community meetings information such as the objective of the
scheme, the contribution of the beneficiaries in the project, the type of
houses to be built if sanctioned, their area etc. are discussed.
CONDUCTION OF TOTAL STATION SURVEY
The total station survey is carried out in order to confirm the no. of huts
present in the slum including tracing their exact location. This data is later on
merged with the satellite images so as to propose a Slum development
scheme
DPR PREPARATION
SLUM LOCATIONS
AMBEDKAR NAGAR SLUM POCKET
DEVELOPMENT PLAN FOR AMBEDKAR NAGAR
            SLUM POCKET




                           Data        Slum Layout
        Total Station
           Survey       Verification
FLOOR PLAN
AMENITIES PROVIDED

 No. of Tenements = 2048
 Plot reserved for cemetery and Garden
  released
 32 Nos. of buildings with 64 tenements each

 Plot allotted for Primary School, Primary
  health center
 92 Beneficiaries from Anna Nagar will be
  relocated in Ambedkar Nagar Pocket.
MIS-GIS INTEGRATION
After completion of the total station and the biometric survey, the data is
integrated with the GIS base map prepared. Thus, the data of each and
every beneficiary can be retrieved as and when required.
Thank you

More Related Content

What's hot

Radburn city, vikas rathore
Radburn city, vikas rathoreRadburn city, vikas rathore
Radburn city, vikas rathore
Vikas Rathore
 
Gandhinagar- Town Planning
Gandhinagar- Town PlanningGandhinagar- Town Planning
Gandhinagar- Town Planning
Andhra University
 
Bus terminal+commercial complex+isbt+india ppt show
Bus terminal+commercial complex+isbt+india ppt showBus terminal+commercial complex+isbt+india ppt show
Bus terminal+commercial complex+isbt+india ppt show
kiranightly
 

What's hot (20)

Ved tranzcube plaza, Vadodara
Ved tranzcube plaza, VadodaraVed tranzcube plaza, Vadodara
Ved tranzcube plaza, Vadodara
 
River front development
River front developmentRiver front development
River front development
 
Radburn city, vikas rathore
Radburn city, vikas rathoreRadburn city, vikas rathore
Radburn city, vikas rathore
 
Gandhinagar- Town Planning
Gandhinagar- Town PlanningGandhinagar- Town Planning
Gandhinagar- Town Planning
 
Town plan auroville
Town plan aurovilleTown plan auroville
Town plan auroville
 
CITY PLANNING OF AHMEDABAD
CITY PLANNING OF AHMEDABADCITY PLANNING OF AHMEDABAD
CITY PLANNING OF AHMEDABAD
 
WORLI KOLIWADA
WORLI KOLIWADAWORLI KOLIWADA
WORLI KOLIWADA
 
Brasilia town planning
Brasilia town planningBrasilia town planning
Brasilia town planning
 
Union station
Union stationUnion station
Union station
 
Transit hub
Transit hub Transit hub
Transit hub
 
Isbt, kashmiri gate, delhi_a case study
Isbt, kashmiri gate, delhi_a case studyIsbt, kashmiri gate, delhi_a case study
Isbt, kashmiri gate, delhi_a case study
 
Varanasi Riverfront Development
Varanasi Riverfront DevelopmentVaranasi Riverfront Development
Varanasi Riverfront Development
 
Jamshedpur- Planning History
Jamshedpur- Planning HistoryJamshedpur- Planning History
Jamshedpur- Planning History
 
A Slum Redevelopment Project
A Slum Redevelopment ProjectA Slum Redevelopment Project
A Slum Redevelopment Project
 
ARANYA HOUSING CASE STUDY
ARANYA HOUSING CASE STUDYARANYA HOUSING CASE STUDY
ARANYA HOUSING CASE STUDY
 
Bus terminal+commercial complex+isbt+india ppt show
Bus terminal+commercial complex+isbt+india ppt showBus terminal+commercial complex+isbt+india ppt show
Bus terminal+commercial complex+isbt+india ppt show
 
Aranya Low Cost Housing
Aranya Low Cost HousingAranya Low Cost Housing
Aranya Low Cost Housing
 
Vidyadhar nagar
Vidyadhar nagarVidyadhar nagar
Vidyadhar nagar
 
Madurai temple town.pptx
Madurai temple town.pptxMadurai temple town.pptx
Madurai temple town.pptx
 
Isbt kashmere gate 2
Isbt kashmere gate 2Isbt kashmere gate 2
Isbt kashmere gate 2
 

Similar to Ray presentation

Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
negromaestrong
 
Enabling Integrated Planning through Town & Country Planning Act in India
Enabling Integrated Planning through Town & Country Planning Act in IndiaEnabling Integrated Planning through Town & Country Planning Act in India
Enabling Integrated Planning through Town & Country Planning Act in India
WRI Ross Center for Sustainable Cities
 
How Does Transportation and Network Planning Address Network Planning Address...
How Does Transportation and Network Planning Address Network Planning Address...How Does Transportation and Network Planning Address Network Planning Address...
How Does Transportation and Network Planning Address Network Planning Address...
Congress for the New Urbanism
 
CAD Operator_EDWARD AFFUL-PACKSON CV
CAD Operator_EDWARD AFFUL-PACKSON CV CAD Operator_EDWARD AFFUL-PACKSON CV
CAD Operator_EDWARD AFFUL-PACKSON CV
Edward Afful-Packson
 

Similar to Ray presentation (20)

PRESENTATION-SBM
PRESENTATION-SBMPRESENTATION-SBM
PRESENTATION-SBM
 
12DPRpreparationmodule.pdf
12DPRpreparationmodule.pdf12DPRpreparationmodule.pdf
12DPRpreparationmodule.pdf
 
DIEDERICKS E lync
DIEDERICKS E lyncDIEDERICKS E lync
DIEDERICKS E lync
 
GIS BASED SURVEY FOR SMART VILLAGE
GIS BASED SURVEY FOR SMART VILLAGEGIS BASED SURVEY FOR SMART VILLAGE
GIS BASED SURVEY FOR SMART VILLAGE
 
Ar6017 urban housing unit 03 no copy
Ar6017 urban housing unit 03 no copyAr6017 urban housing unit 03 no copy
Ar6017 urban housing unit 03 no copy
 
Sabawon presentation final
Sabawon presentation finalSabawon presentation final
Sabawon presentation final
 
shishir_cv
shishir_cvshishir_cv
shishir_cv
 
003_work profile_3
003_work profile_3003_work profile_3
003_work profile_3
 
mohamed saber c.v
mohamed saber c.vmohamed saber c.v
mohamed saber c.v
 
mohamed saber c.v
mohamed saber c.vmohamed saber c.v
mohamed saber c.v
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Enabling Integrated Planning through Town & Country Planning Act in India
Enabling Integrated Planning through Town & Country Planning Act in IndiaEnabling Integrated Planning through Town & Country Planning Act in India
Enabling Integrated Planning through Town & Country Planning Act in India
 
How Does Transportation and Network Planning Address Network Planning Address...
How Does Transportation and Network Planning Address Network Planning Address...How Does Transportation and Network Planning Address Network Planning Address...
How Does Transportation and Network Planning Address Network Planning Address...
 
Development Plan- Planning Intervention (CRITICAL ANALYSIS OF MASTER PLAN CA...
Development Plan- Planning Intervention (CRITICAL ANALYSIS OF MASTER PLAN  CA...Development Plan- Planning Intervention (CRITICAL ANALYSIS OF MASTER PLAN  CA...
Development Plan- Planning Intervention (CRITICAL ANALYSIS OF MASTER PLAN CA...
 
CAD Operator_EDWARD AFFUL-PACKSON CV
CAD Operator_EDWARD AFFUL-PACKSON CV CAD Operator_EDWARD AFFUL-PACKSON CV
CAD Operator_EDWARD AFFUL-PACKSON CV
 
Draft Development Plan 2021 (Review) AUDA - D Thara, IAS
Draft Development Plan 2021 (Review) AUDA - D Thara, IASDraft Development Plan 2021 (Review) AUDA - D Thara, IAS
Draft Development Plan 2021 (Review) AUDA - D Thara, IAS
 
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Surabaya(Indonesia)
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Surabaya(Indonesia)[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Surabaya(Indonesia)
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Surabaya(Indonesia)
 
SMART CITY MISSION.pdf
SMART CITY MISSION.pdfSMART CITY MISSION.pdf
SMART CITY MISSION.pdf
 
Federal Capital Territory Administration
Federal  Capital Territory AdministrationFederal  Capital Territory Administration
Federal Capital Territory Administration
 
THE 2013 MINISTERIAL PLATFORM MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...
THE 2013 MINISTERIAL PLATFORM  MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...THE 2013 MINISTERIAL PLATFORM  MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...
THE 2013 MINISTERIAL PLATFORM MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...
 

Ray presentation

  • 1. PRESENTATION ON PREPARATION OF SLUM FREE CITY UNDER RAJIV AWAS YOJANA IN MIRA BHAYANDAR MUNICIPAL CORPORATION Date: 23/11/2012
  • 2. RAJIV AWAS YOJANA (RAY) The various components of this projects includes:  Identification of Slum Pockets  Conduction of Socio-economic and Biometric survey of the beneficiaries  Conduction of Total Station/ Plane table survey of the slum area.  Preparation of Base map using GIS and Satellite Images.  MIS and GIS integration  Preparation of architectural Layouts of the Slum area for its development  Preparation of DPR
  • 3. INNOVATION IN RAY REQUIRED  All the Socio-economic, biometric and total station survey data are currently being integrated offline which will be later on submitted to the governing authority.  Such data shall be made available to WAPCOS field offices by preparing an online module of the same.  This will also ensure that the status on the work done by WAPCOS in RAY projects can be easily retrieved and produced before the clients.
  • 4. UPDATE ON PREPARATION OF SLUM FREE CITY PLAN OF ACTION.  GIS Mapping: The whole GIS-MIS component shall be available on our WAPCOS site. The various components of GIS which are completed are as follows: i. Preparation of City Base Map. ii. Slum Marking using Satellite Images. iii. Digitization of DP maps, Village/ Cadastral maps and their rectification. iv. Road Digitization. v. Marking of important Landmarks.
  • 5. STATUS ON PREPARATION OF SLUM FREE CITY PLAN OF ACTION
  • 6. SLUM DETAILS SLUMS COVERED No. of huts No. Of Slums Less than Less Than 2 100 1 100 5 Between 2 Between 15 100-500 100-500 10 Between Between 500-1500 2 500-1500 Above 1 Above 1500 1500 SLUMS DETAILS (WRT. NO. OF HUTS)
  • 7. SLUM FREE CITY PLAN OF ACTION
  • 8. UPDATE ON PREPARATION OF INNOVATIVE PILOT PROJECTS.  Status on Pilot projects prepared i. Pilot Projects for Ambedkar Nagar, Bhola Nagar and Gandhinagar Pocket is on the verge of completion. ii. Clearing the reservation of Garden and Cementry encroached by Slum, Development of Roads, water supply lines & Drainage Lines, provision for STP, Primary health care center, Electric Sub- Station and school is included in the pilot project.
  • 9. COMMUNITY MEETING AT SLUM During community meetings information such as the objective of the scheme, the contribution of the beneficiaries in the project, the type of houses to be built if sanctioned, their area etc. are discussed.
  • 10. CONDUCTION OF TOTAL STATION SURVEY The total station survey is carried out in order to confirm the no. of huts present in the slum including tracing their exact location. This data is later on merged with the satellite images so as to propose a Slum development scheme
  • 14. DEVELOPMENT PLAN FOR AMBEDKAR NAGAR SLUM POCKET Data Slum Layout Total Station Survey Verification
  • 16. AMENITIES PROVIDED  No. of Tenements = 2048  Plot reserved for cemetery and Garden released  32 Nos. of buildings with 64 tenements each  Plot allotted for Primary School, Primary health center  92 Beneficiaries from Anna Nagar will be relocated in Ambedkar Nagar Pocket.
  • 17. MIS-GIS INTEGRATION After completion of the total station and the biometric survey, the data is integrated with the GIS base map prepared. Thus, the data of each and every beneficiary can be retrieved as and when required.