DESIGN REPORT
19TH
JUNE
2017
Water DistributionSystem(Design Report)
SUBMITTED BY: ALI HABIB
L1F14BSCE0048
SUBMITTED TO: DR. JAVED ANWER AZIZ
i
LETTER OF TRANSMITTAL
Date: 19-June-2017
Dr. Javed Anwar Aziz
Department of Civil Engineering
University of Central Punjab, Lahore
Subject: Repot of “Water Distribution System”.
Respected Sir,
This is the final design report of “Water Distribution System” for Future
Vision Housing Society. This report consists of complete information including each step of
designing, final results (length, Size, type of pipes) and final drawings (Plans). I used EPANET
software to design water distribution system.
I am confident and fully assured that this design will not only fulfill all the basic
requirements of society but also fulfill the water requirement in emergency.
Your sincerely,
Ali Habib
L1F14BSCE0048
1
Table of Contents
LETTER OF TRANSMITTAL................................................................................................... I
CHAPTER 1...............................................................................................................................1
INTRODUCTION......................................................................................................................1
1.1 BRIEF DESCRIPTION OF HOUSING SCHEME......................................................................2
 NAME OF THE SOCIETY ..................................................................................................2
 LOCATION OF SOCIETY...................................................................................................2
 IMPORTANT SALIENT FEATURES....................................................................................2
 LOCTION OF TUBEWELLS...............................................................................................2
 LOCTION OF OVER-HEAD-RESRVIOR (OHR)...................................................................2
 NUMBER AND TYPE OF FACILITIES.................................................................................4
1.2 TOPOGRAPHY OF THE AREA .............................................................................................4
CHAPTER 2...............................................................................................................................5
ASSUMPTIONS.........................................................................................................................5
2.1 DESIGN PERIOD .................................................................................................................6
2.2 PER CAPITA PER DAY WATER CONSUMPTION.................................................................6
2.3 POPULATION FOR DESIGN PURPOSE................................................................................6
2.4 POPULATION AND WATER CONSUMPTION CRITERION..................................................7
 FOR SCHOOL, DISPENSORY ETC.....................................................................................7
2.5 CALCULATIONS OF WATER CONSUMPTION FOR:............................................................7
 PLOTS: ............................................................................................................................7
 APARTMENTS:................................................................................................................7
 FLATS:.............................................................................................................................7
 SCHOOL..........................................................................................................................7
 DISPENSARY: ..................................................................................................................7
 COMMERCIAL AREA.......................................................................................................8
 OPEN SPACES .................................................................................................................8
 For Parks.........................................................................................................................8
 For Grave Yard ...............................................................................................................8
2
 For Water Treatment plant and Disposal Station..........................................................8
2.6 TOTAL WATER CONSUMPTION.........................................................................................9
2.7 AVERAGE DAY W.C: MAXIMUM DAY W.C: PEAK HOURS W.C........................................9
2.8 AVERAGE DAY WATER CONSUMPTION............................................................................9
2.9 MAXIMUM DAY WATER CONSUMPTION.........................................................................9
2.10 PEAK HOUR WATER CONSUMPTION............................................................................9
CHAPTER-3 ........................................................................................................................... 10
DESIGN CIRTERIA................................................................................................................ 10
3.1 DESIGN FLOWS FOR WATER DISTRIBUTION SYSTEM ....................................................11
3.2 DESIGN EQUATION USED:...............................................................................................13
3.3 HEIGHT OF OHR AND CAPACITY OF OHR........................................................................13
 Height of OHR ..............................................................................................................13
 Capacity of OHR ...........................................................................................................13
3.4 NUMBER OF TUBE WELLS INSTALLED.............................................................................14
3.5 TYPES OF PIPE USED IN THE SCHEME .............................................................................14
 Cast Iron Pipes..............................................................................................................14
 Polyethylene (PE) Pipes................................................................................................15
3.6 DIAMETER OF PIPES ........................................................................................................15
3.7 INCREMENT IN PIPE DIAMETER......................................................................................16
3.8 MAXIMUM AND MINIMUM VELOCITY IN W/ S PIPES...................................................16
3.9 PRESSURE IN THE PIPES...................................................................................................16
3.10 COVER ON PIPES..........................................................................................................16
3.11 PLACEMENT OF VALVES..............................................................................................16
 FUNCTION ....................................................................................................................16
3.11 LOCATION OF VALVES.................................................................................................17
3.12 PLACING OF FIRE HYDRANT........................................................................................17
3
 PURPOSE ......................................................................................................................17
 LOCATION.....................................................................................................................17
CHAPTER - 4 ......................................................................................................................... 18
DESIGN OF WATER DISTRIBUTION SYSTEM.................................................................. 18
4.1 EPANET SOFTWARE.........................................................................................................19
 BRIEF INTRODUCTIONOF SOFTWARE..........................................................................19
 SALIENT FEATURES.......................................................................................................19
 LIMITATIONS ................................................................................................................20
4.2 PROCEDURE.....................................................................................................................20
4.3 DESIGN INPUT DATA .......................................................................................................22
 Input data for Nodes....................................................................................................22
 Input data for Pipes......................................................................................................23
4.4 OUTPUT DESIGN DATA....................................................................................................24
 FOR NODES...................................................................................................................24
For Pipes ..................................................................................................................................25
CHAPTER – 5......................................................................................................................... 26
CONCLUSIONS....................................................................................................................... 26
5.1 YOUR VIEWS ON THE DRAWING.....................................................................................27
5.2 SUMMARY .......................................................................................................................27
5.3 FINAL RESULTS.................................................................................................................28
REFERENCES......................................................................................................................... 29
ANNEXURES.......................................................................................................................... 31
1
CHAPTER 1
INTRODUCTION
2
INTRODUCTION
1.1 BRIEF DESCRIPTION OF HOUSING SCHEME
 NAME OF THE SOCIETY
The name of the housing scheme is Future Vision Housing Society.
 LOCATION OF SOCIETY
Society is located on the left side of Jehlum road and Upper Chenab Canal.
 IMPORTANT SALIENT FEATURES
Important salient features of this housing scheme are as follows.
 Water Treatment Plant
 Waste water Disposal System
 Parks
 School
 Commercial Areas
 Apartments
 Flats
 Dispensary
 Grave yard
 Plots
 LOCTION OF TUBEWELLS
In this Housing Society, I provided two tube wells keeping the condition of load
shedding in mind, one of the tube well is working on Electricity and other one is working on
Diesel -engine. The tube wells are located in a park as shown in Fig-1.
 LOCTION OF OVER-HEAD-RESRVIOR (OHR)
In this society, there is an overhead reservoir with height of 19.75 meters from
ground surface level. The basic purpose of this OHR is to provide uniform flow with constant
pressure. OHR is located in the park along with tube wells as shown in Fig-1.
3
FIG-1
4
 NUMBER AND TYPE OF FACILITIES
The facilities provided are as follows.
TYPE NUMBER
Plots 282
Water Treatment Plant 1
Waste water Disposal System 1
Parks 3
School 1
Commercial Areas 4
Apartments 3
Flats 3
Dispensary 1
Grave yard 1
1.2 TOPOGRAPHY OF THE AREA
The topography of Future Vision Housing Society is almost flat. The maximum
reduce level is 100.8 m and minimum reduce level is 98.0 m. As you can see there is very
small difference in level.
West side of the society has more reduce level then the Eastern side of the
society in other words society is slightly sloping towards Upper Chenab Canal and Jehlum
road.
5
CHAPTER 2
ASSUMPTIONS
6
ASSUMPTIONS
2.1 DESIGN PERIOD
The design period of Water Distribution System of “Future Vision Housing Society” is
not fixed. Design Period is related to the population, I am taking for design purpose.
2.2 PER CAPITA PER DAY WATER CONSUMPTION
Per capita per day water consumption can be defined as the quantity of water
consumed by one person in one day.
Per Capita Water Consumption = 300+20Y
Y = Sum of last two digits of roll number
So,
Per Capita Water Consumption = 300+20(4+8)
= 300+20(12) = 540 lpcd
2.3 POPULATION FOR DESIGN PURPOSE
The maximum population gives to me according to my roll number is as follows.
-
Present
Population
Maximum
Population
Persons/Plot 7 12
Persons/Apartment 400 500
Persons/Flat 200 400
7
2.4 POPULATION AND WATER CONSUMPTION CRITERION
 FOR SCHOOL, DISPENSORY ETC.
WATER CONSUMPTION FOR W.C Persons
School 50 (lpcd) 200
Dispensary 60 (lpcd) 50
Commercial area 3 (liter/m2/day) -
Open spaces 8 (liter/m2/day) -
2.5 CALCULATIONS OF WATER CONSUMPTION FOR:
 PLOTS:
Water consumption for plots = 540 lpcd × 12 persons × 282 plots
= 1827360 L/day
 APARTMENTS:
Water consumption for apartments = 540 lpcd × 500 persons × 3 apartments
= 810000 L/day
 FLATS:
Water consumption for flats = 540 lpcd × 400 persons × 3 flats
= 648000 L/day
 SCHOOL
Water consumption for school = 50 lpcd × 200 students
= 10000 L/day
 DISPENSARY:
Water consumption for dispensary = 60 lpcd × 50 patients
= 3000 L/day
8
 COMMERCIAL AREA
Commercial area - 1 on plan = 2.3 cm × 0.6 cm = 23 m × 6 m = 138 m2
Commercial area - 2 on plan = 2.3 cm × 0.6 cm = 23 m × 6 m = 138 m2
Commercial area - 3 on plan = 1.7 cm × 0.8 cm = 17 m × 8 m = 136 m2
Commercial area - 4 on plan =
1.7+1.8
2
cm × 0.6 cm = 17.5 m × 6 m = 140 m2
Total Commercial area = 138 m2 + 138 m2 + 136 m2 + 140 m2 = 552 m2
Water consumption for commercial area = 3 (liter/m2/day) × 552 m2
= 1656 L/day
 OPEN SPACES
Open spaces include Parks, Grave yard, treatment plant and disposal system. There
is small quantity of water required for these places, (watering the plants in parks).
 For Parks
Area of Park-1 = 5.1 cm × 1.3 cm = 51m × 13m = 663 m2
Area of Park-2 = 5.3 cm × 3.1 cm = 53m × 31m = 1643 m2
Area of Park-3 = 3.4 cm ×
2.3+1.8
2
cm = 34m × 20.5m = 697 m2
Total area of parks = 663 m2 + 1643 m2 + 697 m2 = 3003 m2
 For Grave Yard
Area of Grave Yard = 2.4 cm × 1.3 cm = 24m × 13m = 312 m2
 For Water Treatment plant and Disposal Station
Area = 6.1 cm ×
3.1+2.1
2
cm = 61m × 26m = 1586 m2
Total Area of open spaces = Area of Park + Area of Grave Yard + Area of W.T and D.S
= 3003 m2 + 312 m2 + 1586 m2
= 4901 m2
Water consumption for Open Spaces = 8 (liter/m2/day) × 4901 m2
= 39208 L/day
9
2.6 TOTAL WATER CONSUMPTION
Total W. C = W.C for plots + W.C for apartments + W.C for flats + W.C for school +
W.C for dispensary + W.C for commercial area + W.C for open Spaces
= 1827360 + 810000 + 648000 + 10000 + 3000 + 1656 + 39208 L/day
= 3339224 L/day
=
3339224
24 ×60 ×60
L/sec
= 38.648 L/sec
2.7 AVERAGE DAY W.C: MAXIMUM DAY W.C: PEAK HOURS W.C
We are using the criterion given by water and sanitation agency (WASA) which is
given below.
Average day W.C : Max day W.C = 1 : 1.5
Average day W.C : Peak hour W.C = 1 : 2.25
2.8 AVERAGE DAY WATER CONSUMPTION
Average day water consumption = 3339224 L/day = 38.648 L/sec
2.9 MAXIMUM DAY WATER CONSUMPTION
Max. day water consumption = 1.5 × avg. day water consumption
= 1.5 × 3339224 L/day
= 5008836 L/day = 57.972 L/sec
2.10 PEAK HOUR WATER CONSUMPTION
Peak hour water consumption = 2.25 × avg. day water consumption
= 2.25 × 3339224 L/day
= 7513254 L/day = 86.958 L/sec
*NOTE: All the flows are in L/ sec because input data of EPANET software should be in L/ sec
or in L/min.
10
CHAPTER-3
DESIGN CIRTERIA
11
DESIGN CIRTERIA
3.1 DESIGN FLOWS FOR WATER DISTRIBUTION SYSTEM
Node
no
Number of
Houses Parks Flats Apartments Dispensary Commercial
Grave
yard
Open
area
School
1
2 13 1
3 17
4 24
5 6 1 1
6 10 1
7 3 1
8 16
9 12
10 17
11 13
12 16
13 16
14 17 1
15 15
16 12 1
17 17 1
18 12 1
19 6 1 1
20 11 1 2
21 2 1
22 1 1
23 11 1
24 15
Sum 282 3 3 3 1 4 1 1 1
12
Node no
Water Consumption in (liters/day)
Sum(liters/sec)
Houses Parks Flats Apartments Dispensary Commercial
Grave
yard
Open
area
School Sum(liters/day)
1 0 0 0 0 0 0 0 0 0 0 0.000
2 84240 0 0 0 3000 0 0 0 0 87240 1.010
3 110160 0 0 0 0 0 0 0 0 110160 1.275
4 155520 0 0 0 0 0 0 0 0 155520 1.800
5 38880 5304 0 0 0 0 2496 0 0 46680 0.540
6 64800 0 0 270000 0 0 0 0 0 334800 3.875
7 19440 0 0 0 0 0 0 0 10000 29440 0.341
8 103680 0 0 0 0 0 0 0 0 103680 1.200
9 77760 0 0 0 0 0 0 0 0 77760 0.900
10 110160 0 0 0 0 0 0 0 0 110160 1.275
11 84240 0 0 0 0 0 0 0 0 84240 0.975
12 103680 0 0 0 0 0 0 0 0 103680 1.200
13 103680 0 0 0 0 0 0 0 0 103680 1.200
14 110160 0 216000 0 0 0 0 0 0 326160 3.775
15 97200 0 0 0 0 0 0 0 0 97200 1.125
16 77760 13144 0 0 0 0 0 0 0 90904 1.052
17 110160 0 0 0 0 414 0 0 0 110574 1.280
18 77760 0 216000 0 0 0 0 0 0 293760 3.400
19 38880 5576 216000 0 0 0 0 0 0 260456 3.015
20 71280 0 0 270000 0 822 0 0 0 342102 3.960
21 12960 0 0 0 0 420 0 0 0 13380 0.155
22 6480 0 0 0 0 0 0 12688 0 19168 0.222
23 71280 0 0 270000 0 0 0 0 0 341280 3.950
24 97200 0 0 0 0 0 0 0 0 97200 1.125
Sum 1827360 24024 648000 810000 3000 1656 2496 12688 10000 3339224 38.648
13
3.2 DESIGN EQUATION USED:
In EPANET software I used “Hazen William” Equation to find out Head losses.
HL = 𝟏𝟎. 𝟔𝟓 ×
𝐐 𝟏.𝟖𝟓 × 𝐋
𝐂 𝟏.𝟖𝟓 × 𝐃 𝟒.𝟖𝟕
Where,
H = Head loss (m/km)
Q = Discharge (m/sec)
C = Roughness Coefficient
L = Length of pipe (m)
D = Diameter of pipe (m)
3.3 HEIGHT OF OHR AND CAPACITY OF OHR
 Height of OHR
Height of overhead reservoir is 19.75 m from the ground surface and
0.25 m depth is kept in the OHR is kept for settlement of sediments (Silt & clay
etc.)
 Capacity of OHR
We know that.
For electric pump
Capacity of overhead reservoir = 1/6 of the daily avg. W.C.
Capacity of overhead reservoir =
1
6
× 3339224 L/day
= 556537.333 liters
≈ 557 m3
14
For diesel pump
Capacity of overhead reservoir = 1/4 of the daily avg. W.C.
Capacity of overhead reservoir =
1
4
× 3339224 L/day
= 834806 liters
≈ 835 m3
3.4 NUMBER OF TUBE WELLS INSTALLED
In this Housing Society, I provided two tube wells keeping the condition of
load shedding in mind, one of the tube well is working on Electricity and other one is
working on Diesel -engine. The tube wells are located in the central Park of the society.
3.5 TYPES OF PIPE USED IN THE SCHEME
In the Design of Water Distribution System, we Used Two types of pipes
 Cast Iron Pipes
Cast iron pipes used only some specific places, one of the pipe is used to transport
water from Tube well to Over Head Reservoir and second pipe is used to transport water
from Over Head Reservoir to node number 1.
The Hazen Williams coefficient for cast iron pipe is 100.
15
 Polyethylene (PE) Pipes
Except upper mentioned two places all other pipes are Polyethylene (PE) pipes.
Polyethylene pipes have following characteristics
 Easy to install, easy to handle.
 Cheaper in material cost.
 Chemical resistance.
 Corrosion free.
 Smooth inner wall surface.
 Durable, long lasting.
 Expected life is 40 years
The Hazen Williams coefficient for cast iron pipe is 140.
3.6 DIAMETER OF PIPES
In the design of water distribution system, I used pipes of various diameter.
In design, I preferred pipe diameters which are easily available in Pakistan.
The pipe diameters I used in deign are as follows.
 80 mm
 100 mm
16
 150 mm
 200 mm
 250 mm
 300 mm
 350 mm
3.7 INCREMENT IN PIPE DIAMETER
Increment in pipe diameter is generally in multiple of 50 mm.
3.8 MAXIMUM AND MINIMUM VELOCITY IN W/ S PIPES
Generally, in water supply system the velocities should not exceed 1m/sec but the
maximum limit is 2m/sec and velocities should not less, that it causes difficulties to the
residents.
3.9 PRESSURE IN THE PIPES
The pressure in the water distribution system varies with water consumption.
During peak hours, there is minimum pressure in the pipes.
Maximum pressure occurs during low W.C. hours.
In design, maximum pressure in pipes is 20 m at the bottom of over head reservoir
and minimum pressure should be 15m at the farthest points of scheme during peak hours.
3.10 COVER ON PIPES
The term “cover on pipes” can be defined as the clear distance between ground
surface to the pipe.
In design, 1 m or (3 feet – 4 feet) cover on pipes is provided.
The basic purpose of this cover is the safety of the pipes.
3.11 PLACEMENT OF VALVES
 FUNCTION
The functions of different types of vales are as follows
 To regulate the flow
 To regulate the pressure
 To cutting the supply for repairing purposes
17
 To permits the water flow only in one direction
 To drain the sediments from pipes
 To break vacuum and to release entrapped air
3.11 LOCATION OF VALVES
 In design two gate valves are provided at the junction of 4 or 3 pipes and one gate
vale is provided at the junction of 2 pipes.
 One vales provided for each fire hydrant.
 One “Check valve” is provided between OHR and Tube Wells to prevent back flow.
3.12 PLACING OF FIRE HYDRANT
 PURPOSE
 The basic purpose of fire hydrant is to supply
water for firefighting.
 Fire hydrants should have at least 2 hose
outlets and a larger pump outlet.
 Fire hydrant is provided at 1m-2m from the
edge of the road and at least 0.5m high.
 LOCATION
In this design, I provided one fire hydrant near the
school.
18
CHAPTER - 4
DESIGN OF WATER DISTRIBUTION
SYSTEM
19
DESIGN OF WATER DISTRIBUTION
SYSTEM
4.1 EPANET SOFTWARE
 BRIEF INTRODUCTIONOF SOFTWARE
EPANET is a computer program that performs extended period simulation of
hydraulic and water quality behavior within pressurized pipe networks. A network consists
of pipes, nodes (pipe junctions), pumps, valves and storage tanks or reservoirs. EPANET
tracks the flow of water in each pipe, the pressure at each node, the height of water in each
tank.
EPANET is designed to be a research tool for improving our understanding of the movement
and fate of drinking water constituents within distribution systems. It can be used for many
different kinds of applications in distribution systems analysis. Sampling program design,
hydraulic model calibration. EPANET can help assess alternative management strategies for
improving water quality throughout a system. These can include:
 Altering source utilization within multiple source systems,
 Altering pumping and tank filling/emptying schedules,
Running under Windows, EPANET provides an integrated environment for editing network
input data, running hydraulic and water quality simulations, and viewing the results in a
variety of formats. These include color-coded network maps, data tables, time series graphs,
and contour plots.
 SALIENT FEATURES
Full-featured and accurate hydraulic modeling is a prerequisite for doing effective water
quality modeling. EPANET contains a state-of-the-art hydraulic analysis engine that includes
the following capabilities:
 Color-coded network maps.
 Places no limit on the size of the network that can be analyzed
 Computes friction head loss using the Hazen-Williams, Darcy Weisbach, or Chezy-
Manning formulas
 Includes minor head losses for bends, fittings, etc.
 Models constant or variable speed pumps
 Computes pumping energy and cost
 Models various types of valves including shutoff, check, pressure regulating, and
flow control valves
20
 Allows storage tanks to have any shape (i.e., diameter can vary with height)
 Considers multiple demand categories at nodes, each with its own pattern of time
variation
 Models pressure-dependent flow issuing from emitters (sprinkler heads)
 Can base system operation on both simple tank level or timer controls and on
complex rule-based controls.
 LIMITATIONS
EPANET is a good software for the design of water supply but it has some limitations.
 This software is not able to calculate water hammer.
 Can’t simulate pipe bursting.
 This software cannot evaluate the consequences of the presence of air inside
the network.
 Need to be careful with units.
 There is no undo button.
 Dose not include material list.
 This software can’t show Nodes and pipes on scale.
4.2 PROCEDURE
Following are the steps to design water distribution system
1. Get the hard copy of plan (map) of housing society.
2. Draw the pipes on the either one side of the streets such that all the area (plots) are
covered and gave number to each pipe.
3. At the junction point of two or more pipes make a node and named them with
numbering.
4. Now take color pencils and allocate the plots or area to each node by shading the
region.
*note: allocate the full area to one node means that full park area, or full apartment should
be allocated to one node.
5. Now find the discharge at nodes by using water consumption per person, persons
per plot, and number of plots (same for all other allocated types of facilities) and
sum them.
6. Now Launch EPANET.exe.
7. Start New Project.
8. Click View>Options to enter Map Options dialogue box and select the notation tab,
there check all the boxes except the ‘Use transparent text’.
9. Click Project>Analysis Options to open Hydraulic Options dialogue box. Set Units of
Flow to ‘LPS’ (Liters per second).
21
10. In the same box enter the ‘Demand Multiplier value’ 2.25 for peak hourly demand.
11. Back drop the plan (map) of the society, by clicking View>Back drop>load select file.
12. Draw the Nodes at their location as you drawn on hard copy map and label them by
double-clicking on each node and editing its ‘Junction ID’.
13. Now draw the Network links/pipes. The initial point asked by program is the starting
junction of Link.
14. The next step is to introduce a tank (Over Head Reservoir).
15. Connect the tank to (junction-1) with a (link - 31)
16. Now we have to provide information to the software about each node, pipe and tank
by double clicking the element and provide information in properties table.
17. Up till now we provided all the basic data to the software.
18. Save the project.
19. Now click on Project>Run Analysis to start Analysis. A ‘Run Status’ message box will
appear. If Run is unsuccessful then check whether you have not missed any step or
provided wrong data.
20. When Run is successful then click ‘OK’.
21. Make sure at the farthest ends, the pressure in 15 m, if not change the diameter of
pipes and again run analysis if you got pressure near 15 m good enough then
proceed to next step.
22. The next step is to view the results.
23. Report>Full (To generate a report of all results, in Word Format.)
24. Use ‘Map’ tab on ‘Browser’ window for viewing results in color coded form with the
help of ‘Legend’.
25. Use table format by Report>Table. Select whether you want to view results for
‘Network Nodes’ or ‘Network Links’.
22
4.3 DESIGN INPUT DATA
 Input data for Nodes
Node ID ELEVATION BASE DEMAND
- m LPS
Junction-1 100.2 -38.65
Junction-2 100.2 1.01
Junction-3 99.5 1.275
Junction-4 100.2 1.8
Junction-5 100.8 0.54
Junction-6 100.5 3.875
Junction-7 100.3 0.341
Junction-8 100 1.2
Junction-9 100.8 0.9
Junction-10 100.2 1.275
Junction-11 100.5 0.975
Junction-12 100.5 1.2
Junction-13 100.8 1.2
Junction-14 100.45 3.775
Junction-15 100.4 1.125
Junction-16 100 1.052
Junction-17 99.7 1.28
Junction-18 100.2 3.4
Junction-19 99.5 3.015
Junction-20 99.5 3.96
Junction-21 99.4 0.155
Junction-22 98.5 0.222
Junction-23 98.9 3.95
Junction-24 99.5 1.125
OHR 119.75 -
23
 Input data for Pipes
PIPE ID LENGTH
DIAMETER
(Hit and Trial)
HWC
- m mm -
1 167 80 140
2 59 80 140
3 48 80 140
4 49 80 140
5 90 80 140
6 15 80 140
7 166 80 140
8 41 80 140
9 40 80 140
10 43 80 140
11 55 80 140
12 48 150 140
13 17 200 140
14 16 200 140
15 39 150 140
16 23 80 140
17 114 80 140
18 114 80 140
19 114 80 140
20 114 80 140
21 38 100 140
22 108 80 140
23 40 100 140
24 107 80 140
25 36 100 140
26 55 80 140
27 48 80 140
28 34 80 140
29 40 80 140
30 108 80 140
31 20 350 100
24
4.4 OUTPUT DESIGN DATA
 FOR NODES
Node ID ELEVATION BASE DEMAND
DEMAND
(Peak hr.)
HEAD PRESSURE
m LPS LPS m m
Junction-1 100.200 -38.650 -86.963 120.000 19.800
Junction-2 100.200 1.010 2.273 119.800 19.600
Junction-3 99.500 1.275 2.869 116.640 17.140
Junction-4 100.200 1.800 4.050 115.970 15.770
Junction-5 100.800 0.540 1.215 116.310 15.510
Junction-6 100.500 3.875 8.719 117.250 16.750
Junction-7 100.300 0.341 0.767 119.110 18.810
Junction-8 100.000 1.200 2.700 117.570 17.570
Junction-9 100.800 0.900 2.025 117.290 16.490
Junction-10 100.200 1.275 2.869 116.710 16.510
Junction-11 100.500 0.975 2.194 116.390 15.890
Junction-12 100.500 1.200 2.700 116.440 15.940
Junction-13 100.800 1.200 2.700 115.970 15.170
Junction-14 100.450 3.775 8.494 116.410 15.960
Junction-15 100.400 1.125 2.531 116.410 16.010
Junction-16 100.000 1.052 2.367 119.910 19.910
Junction-17 99.700 1.280 2.880 119.350 19.650
Junction-18 100.200 3.400 7.650 115.670 15.470
Junction-19 99.500 3.015 6.784 114.730 15.230
Junction-20 99.500 3.960 8.910 114.830 15.330
Junction-21 99.400 0.155 0.349 114.580 15.180
Junction-22 98.500 0.222 0.500 114.390 15.890
Junction-23 98.900 3.950 8.888 114.340 15.440
Junction-24 99.500 1.125 2.531 114.410 14.910
OHR 119.750 0.000 0.000 120.000 0.250
25
For Pipes
PIPE ID LENGTH DIAMETER HWC FLOW VELOCITY
UNIT
HEADLOSS
m mm LPS m/s m/ km
1 167 80 140 -4.07 0.81 9.34
2 59 80 140 -3.13 0.62 5.72
3 48 80 140 1.54 0.31 1.55
4 49 80 140 -5 0.99 13.63
5 90 80 140 -4.34 0.86 10.51
6 15 80 140 2.3 0.46 3.24
7 166 80 140 -5.04 1 13.87
8 41 80 140 -2.8 0.56 4.66
9 40 80 140 -12.91 2.57 79.06
10 43 80 140 -3.15 0.63 5.79
11 55 80 140 -13.18 2.62 82.18
12 48 150 140 -24.02 1.36 11.68
13 17 200 140 -34.12 1.09 5.51
14 16 200 140 52.84 1.68 12.39
15 39 150 140 30.04 1.7 17.68
16 23 80 140 13.06 2.6 80.77
17 114 80 140 1.13 0.22 0.86
18 114 80 140 7.95 1.58 32.24
19 114 80 140 7.74 1.54 30.64
20 114 80 140 7.61 1.51 29.71
21 38 100 140 16.22 2.06 40.66
22 108 80 140 2.03 0.4 2.56
23 40 100 140 11.49 1.46 21.49
24 107 80 140 2.19 0.44 2.97
25 36 100 140 6.43 0.82 7.33
26 55 80 140 -5.66 1.13 17.15
27 48 80 140 -5.35 1.07 15.48
28 34 80 140 -0.15 0.03 0.02
29 40 80 140 -1.03 0.02 0.73
30 108 80 140 2.7 0.54 4.36
31 20 350 100 -86.96 0.9 3.81
26
CHAPTER – 5
CONCLUSIONS
27
CONCLUSIONS
5.1 YOUR VIEWS ON THE DRAWING
This design work of water distribution system is done with great care and I am
confident that this design will fulfill all the requirements of society without causing any
trouble.
If someone want to improve this work I would like him to work on new software
called WATER-CAD.
In this design, we did not do water quality analysis (chlorination demand) on EPANET
software for society, water distribution system.
5.2 SUMMARY
Number of Junctions 24
Number of OHR 1
Number of Pipes 32
Number of Valves 25
Number of Fire
Hydrants
1
Flow Unit LPS
28
5.3 FINAL RESULTS
PIPE ID LENGTH DIAMETER
m mm
1 167 80
2 59 80
3 48 80
4 49 80
5 90 80
6 15 80
7 166 80
8 41 80
9 40 80
10 43 80
11 55 80
12 48 150
13 17 200
14 16 200
15 39 150
16 23 80
17 114 80
18 114 80
19 114 80
20 114 80
21 38 100
22 108 80
23 40 100
24 107 80
25 36 100
26 55 80
27 48 80
28 34 80
29 40 80
30 108 80
31 20 350
29
REFERENCES
30
REFERENCES
 Analysis and Design of Water Distribution System via EPANET 2.00.12
 http://civilengineerspk.com/water-supply-design
 https://en.wikipedia.org/wiki/EPANET
 https://nepis.epa.gov/Adobe/PDF/P1007WWU.pdf
31
ANNEXURES

More Related Content

What's hot

Case Studies of Water Supply Infrastructures
Case Studies of Water Supply InfrastructuresCase Studies of Water Supply Infrastructures
Case Studies of Water Supply InfrastructuresPrasad Thanthratey
 
Activities used in road construction
Activities used in road constructionActivities used in road construction
Activities used in road constructionAhsan Awan
 
Evolution of planning legislation in india
Evolution of planning legislation in india Evolution of planning legislation in india
Evolution of planning legislation in india Parth Sadaria
 
Sanitary engineering-1-Water treatment and water supply
Sanitary engineering-1-Water treatment and water supply Sanitary engineering-1-Water treatment and water supply
Sanitary engineering-1-Water treatment and water supply Ahmed Salem Seaf
 
History of road in Nepal
History of road in NepalHistory of road in Nepal
History of road in Nepalpnbastola
 
PROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTIONPROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTIONGLA University
 
Planning & Design of Storm water Drainage system for Valsad city
Planning & Design of Storm water Drainage system for Valsad cityPlanning & Design of Storm water Drainage system for Valsad city
Planning & Design of Storm water Drainage system for Valsad cityMona Prajapati
 
Canal of design
Canal of designCanal of design
Canal of designPREMKUMAR
 
Patten of collection systems of sanitation
Patten of collection systems of sanitationPatten of collection systems of sanitation
Patten of collection systems of sanitationlobsang jampa
 
Chapter 6 design of irrigation channel1
Chapter 6 design of irrigation channel1Chapter 6 design of irrigation channel1
Chapter 6 design of irrigation channel1Mulugeta Abera
 
Lacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation EngineeringLacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation EngineeringLatif Hyder Wadho
 
Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...
Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...
Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...Nafisa Nazneen Choudhury
 
Types of joints in rigid pavement
Types of joints in rigid pavementTypes of joints in rigid pavement
Types of joints in rigid pavementBhavya Jaiswal
 
Aggregate impact value test experiment
Aggregate impact value test experimentAggregate impact value test experiment
Aggregate impact value test experimentcharith98
 
Chapter 9 gravity flow water supply system
Chapter 9 gravity flow water supply systemChapter 9 gravity flow water supply system
Chapter 9 gravity flow water supply systemGokul Saud
 
Design of Canal (Kennedy & Lacey Theory) & Diversion Headwork
Design of Canal (Kennedy & Lacey Theory) & Diversion HeadworkDesign of Canal (Kennedy & Lacey Theory) & Diversion Headwork
Design of Canal (Kennedy & Lacey Theory) & Diversion HeadworkRamanuj Jaldhari
 

What's hot (20)

Water resource engineering project list
Water resource engineering project listWater resource engineering project list
Water resource engineering project list
 
Case Studies of Water Supply Infrastructures
Case Studies of Water Supply InfrastructuresCase Studies of Water Supply Infrastructures
Case Studies of Water Supply Infrastructures
 
Activities used in road construction
Activities used in road constructionActivities used in road construction
Activities used in road construction
 
Evolution of planning legislation in india
Evolution of planning legislation in india Evolution of planning legislation in india
Evolution of planning legislation in india
 
Sanitary engineering-1-Water treatment and water supply
Sanitary engineering-1-Water treatment and water supply Sanitary engineering-1-Water treatment and water supply
Sanitary engineering-1-Water treatment and water supply
 
History of road in Nepal
History of road in NepalHistory of road in Nepal
History of road in Nepal
 
river training work
river training workriver training work
river training work
 
PROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTIONPROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTION
 
Planning & Design of Storm water Drainage system for Valsad city
Planning & Design of Storm water Drainage system for Valsad cityPlanning & Design of Storm water Drainage system for Valsad city
Planning & Design of Storm water Drainage system for Valsad city
 
Canal of design
Canal of designCanal of design
Canal of design
 
Patten of collection systems of sanitation
Patten of collection systems of sanitationPatten of collection systems of sanitation
Patten of collection systems of sanitation
 
Chapter 6 design of irrigation channel1
Chapter 6 design of irrigation channel1Chapter 6 design of irrigation channel1
Chapter 6 design of irrigation channel1
 
Lacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation EngineeringLacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation Engineering
 
Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...
Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...
Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...
 
Types of joints in rigid pavement
Types of joints in rigid pavementTypes of joints in rigid pavement
Types of joints in rigid pavement
 
Survey & information in nepal and land pooling practices
Survey & information in nepal and land pooling practicesSurvey & information in nepal and land pooling practices
Survey & information in nepal and land pooling practices
 
Aggregate impact value test experiment
Aggregate impact value test experimentAggregate impact value test experiment
Aggregate impact value test experiment
 
Bombay road plan
Bombay road planBombay road plan
Bombay road plan
 
Chapter 9 gravity flow water supply system
Chapter 9 gravity flow water supply systemChapter 9 gravity flow water supply system
Chapter 9 gravity flow water supply system
 
Design of Canal (Kennedy & Lacey Theory) & Diversion Headwork
Design of Canal (Kennedy & Lacey Theory) & Diversion HeadworkDesign of Canal (Kennedy & Lacey Theory) & Diversion Headwork
Design of Canal (Kennedy & Lacey Theory) & Diversion Headwork
 

Similar to Future Vision Housing Society, Water Distribution System, Design Report

AVD & FDS Proposal
AVD & FDS ProposalAVD & FDS Proposal
AVD & FDS ProposalTeam 02
 
Oregon Rain Garden Guide
Oregon Rain Garden GuideOregon Rain Garden Guide
Oregon Rain Garden GuideSotirakou964
 
Oregon Rain Garden Guide
Oregon Rain Garden GuideOregon Rain Garden Guide
Oregon Rain Garden GuideSotirakou964
 
Seagrass mapping and monitoring along the coast of Crete, Greece
Seagrass mapping and monitoring along the coast of Crete, GreeceSeagrass mapping and monitoring along the coast of Crete, Greece
Seagrass mapping and monitoring along the coast of Crete, GreeceUniversität Salzburg
 
SUSTAINABLE REGENERATION OF URBAN GREEN AREAS IN EGYPT’S DESERT CITIES - Adop...
SUSTAINABLE REGENERATION OF URBAN GREEN AREAS IN EGYPT’S DESERT CITIES - Adop...SUSTAINABLE REGENERATION OF URBAN GREEN AREAS IN EGYPT’S DESERT CITIES - Adop...
SUSTAINABLE REGENERATION OF URBAN GREEN AREAS IN EGYPT’S DESERT CITIES - Adop...Mahmoud Moursy Hussein
 
Seagrass Mapping and Monitoring Along the Coasts of Crete, Greece. MSc Thesis...
Seagrass Mapping and Monitoring Along the Coasts of Crete, Greece. MSc Thesis...Seagrass Mapping and Monitoring Along the Coasts of Crete, Greece. MSc Thesis...
Seagrass Mapping and Monitoring Along the Coasts of Crete, Greece. MSc Thesis...Universität Salzburg
 
Deniz Akman Portfolio 2017
Deniz Akman Portfolio 2017Deniz Akman Portfolio 2017
Deniz Akman Portfolio 2017Deniz Akman
 
Plastic trim-project-report
Plastic trim-project-reportPlastic trim-project-report
Plastic trim-project-reportJayesh Sarode
 
County of Los Angeles Park Design Guidelines
County of Los Angeles Park Design GuidelinesCounty of Los Angeles Park Design Guidelines
County of Los Angeles Park Design GuidelinesPerla Arquieta
 
2. Compendium of IHHLs Design Options for Odisha final (1)
2. Compendium of IHHLs Design Options for Odisha final (1)2. Compendium of IHHLs Design Options for Odisha final (1)
2. Compendium of IHHLs Design Options for Odisha final (1)Niladri Chokrabarti
 
mechenical engineering project
mechenical engineering project mechenical engineering project
mechenical engineering project Ashish Rathore
 
INVESTIGATION INTO SOME OF THE ENGINEERING PROPERTIES OF SOILS FOUND IN MOJO ...
INVESTIGATION INTO SOME OF THE ENGINEERING PROPERTIES OF SOILS FOUND IN MOJO ...INVESTIGATION INTO SOME OF THE ENGINEERING PROPERTIES OF SOILS FOUND IN MOJO ...
INVESTIGATION INTO SOME OF THE ENGINEERING PROPERTIES OF SOILS FOUND IN MOJO ...Mastewal Getahun
 
Gardening Made Easy!
Gardening Made Easy! Gardening Made Easy!
Gardening Made Easy! Piyush885046
 
Gardening made easy!
Gardening made easy!Gardening made easy!
Gardening made easy!StevenMiquel
 
National_Evaluation_NP_Like_Services_in_Aged_Care
National_Evaluation_NP_Like_Services_in_Aged_CareNational_Evaluation_NP_Like_Services_in_Aged_Care
National_Evaluation_NP_Like_Services_in_Aged_CareCatherine Turner
 
internship report on performance of sewage treatment plant
internship report on performance of sewage treatment plantinternship report on performance of sewage treatment plant
internship report on performance of sewage treatment plantAshok Devasani
 

Similar to Future Vision Housing Society, Water Distribution System, Design Report (20)

AVD & FDS Proposal
AVD & FDS ProposalAVD & FDS Proposal
AVD & FDS Proposal
 
Oregon Rain Garden Guide
Oregon Rain Garden GuideOregon Rain Garden Guide
Oregon Rain Garden Guide
 
Oregon Rain Garden Guide
Oregon Rain Garden GuideOregon Rain Garden Guide
Oregon Rain Garden Guide
 
Seagrass mapping and monitoring along the coast of Crete, Greece
Seagrass mapping and monitoring along the coast of Crete, GreeceSeagrass mapping and monitoring along the coast of Crete, Greece
Seagrass mapping and monitoring along the coast of Crete, Greece
 
LFL_Workbook 2010
LFL_Workbook 2010LFL_Workbook 2010
LFL_Workbook 2010
 
SUSTAINABLE REGENERATION OF URBAN GREEN AREAS IN EGYPT’S DESERT CITIES - Adop...
SUSTAINABLE REGENERATION OF URBAN GREEN AREAS IN EGYPT’S DESERT CITIES - Adop...SUSTAINABLE REGENERATION OF URBAN GREEN AREAS IN EGYPT’S DESERT CITIES - Adop...
SUSTAINABLE REGENERATION OF URBAN GREEN AREAS IN EGYPT’S DESERT CITIES - Adop...
 
Seagrass Mapping and Monitoring Along the Coasts of Crete, Greece. MSc Thesis...
Seagrass Mapping and Monitoring Along the Coasts of Crete, Greece. MSc Thesis...Seagrass Mapping and Monitoring Along the Coasts of Crete, Greece. MSc Thesis...
Seagrass Mapping and Monitoring Along the Coasts of Crete, Greece. MSc Thesis...
 
Deniz Akman Portfolio 2017
Deniz Akman Portfolio 2017Deniz Akman Portfolio 2017
Deniz Akman Portfolio 2017
 
Plastic trim-project-report
Plastic trim-project-reportPlastic trim-project-report
Plastic trim-project-report
 
County of Los Angeles Park Design Guidelines
County of Los Angeles Park Design GuidelinesCounty of Los Angeles Park Design Guidelines
County of Los Angeles Park Design Guidelines
 
2. Compendium of IHHLs Design Options for Odisha final (1)
2. Compendium of IHHLs Design Options for Odisha final (1)2. Compendium of IHHLs Design Options for Odisha final (1)
2. Compendium of IHHLs Design Options for Odisha final (1)
 
GI25_TutorialGuide
GI25_TutorialGuideGI25_TutorialGuide
GI25_TutorialGuide
 
GI25_TutorialGuide
GI25_TutorialGuideGI25_TutorialGuide
GI25_TutorialGuide
 
mechenical engineering project
mechenical engineering project mechenical engineering project
mechenical engineering project
 
INVESTIGATION INTO SOME OF THE ENGINEERING PROPERTIES OF SOILS FOUND IN MOJO ...
INVESTIGATION INTO SOME OF THE ENGINEERING PROPERTIES OF SOILS FOUND IN MOJO ...INVESTIGATION INTO SOME OF THE ENGINEERING PROPERTIES OF SOILS FOUND IN MOJO ...
INVESTIGATION INTO SOME OF THE ENGINEERING PROPERTIES OF SOILS FOUND IN MOJO ...
 
Gardening Made Easy!
Gardening Made Easy! Gardening Made Easy!
Gardening Made Easy!
 
Gardening made easy!
Gardening made easy!Gardening made easy!
Gardening made easy!
 
National_Evaluation_NP_Like_Services_in_Aged_Care
National_Evaluation_NP_Like_Services_in_Aged_CareNational_Evaluation_NP_Like_Services_in_Aged_Care
National_Evaluation_NP_Like_Services_in_Aged_Care
 
internship report on performance of sewage treatment plant
internship report on performance of sewage treatment plantinternship report on performance of sewage treatment plant
internship report on performance of sewage treatment plant
 
Progress e trike
Progress e trikeProgress e trike
Progress e trike
 

Recently uploaded

Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxpritamlangde
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxNANDHAKUMARA10
 
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...vershagrag
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptAfnanAhmad53
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesChandrakantDivate1
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Ramkumar k
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxMuhammadAsimMuhammad6
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 

Recently uploaded (20)

Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptx
 
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .ppt
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To Curves
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 

Future Vision Housing Society, Water Distribution System, Design Report

  • 1. DESIGN REPORT 19TH JUNE 2017 Water DistributionSystem(Design Report) SUBMITTED BY: ALI HABIB L1F14BSCE0048 SUBMITTED TO: DR. JAVED ANWER AZIZ
  • 2. i LETTER OF TRANSMITTAL Date: 19-June-2017 Dr. Javed Anwar Aziz Department of Civil Engineering University of Central Punjab, Lahore Subject: Repot of “Water Distribution System”. Respected Sir, This is the final design report of “Water Distribution System” for Future Vision Housing Society. This report consists of complete information including each step of designing, final results (length, Size, type of pipes) and final drawings (Plans). I used EPANET software to design water distribution system. I am confident and fully assured that this design will not only fulfill all the basic requirements of society but also fulfill the water requirement in emergency. Your sincerely, Ali Habib L1F14BSCE0048
  • 3. 1 Table of Contents LETTER OF TRANSMITTAL................................................................................................... I CHAPTER 1...............................................................................................................................1 INTRODUCTION......................................................................................................................1 1.1 BRIEF DESCRIPTION OF HOUSING SCHEME......................................................................2  NAME OF THE SOCIETY ..................................................................................................2  LOCATION OF SOCIETY...................................................................................................2  IMPORTANT SALIENT FEATURES....................................................................................2  LOCTION OF TUBEWELLS...............................................................................................2  LOCTION OF OVER-HEAD-RESRVIOR (OHR)...................................................................2  NUMBER AND TYPE OF FACILITIES.................................................................................4 1.2 TOPOGRAPHY OF THE AREA .............................................................................................4 CHAPTER 2...............................................................................................................................5 ASSUMPTIONS.........................................................................................................................5 2.1 DESIGN PERIOD .................................................................................................................6 2.2 PER CAPITA PER DAY WATER CONSUMPTION.................................................................6 2.3 POPULATION FOR DESIGN PURPOSE................................................................................6 2.4 POPULATION AND WATER CONSUMPTION CRITERION..................................................7  FOR SCHOOL, DISPENSORY ETC.....................................................................................7 2.5 CALCULATIONS OF WATER CONSUMPTION FOR:............................................................7  PLOTS: ............................................................................................................................7  APARTMENTS:................................................................................................................7  FLATS:.............................................................................................................................7  SCHOOL..........................................................................................................................7  DISPENSARY: ..................................................................................................................7  COMMERCIAL AREA.......................................................................................................8  OPEN SPACES .................................................................................................................8  For Parks.........................................................................................................................8  For Grave Yard ...............................................................................................................8
  • 4. 2  For Water Treatment plant and Disposal Station..........................................................8 2.6 TOTAL WATER CONSUMPTION.........................................................................................9 2.7 AVERAGE DAY W.C: MAXIMUM DAY W.C: PEAK HOURS W.C........................................9 2.8 AVERAGE DAY WATER CONSUMPTION............................................................................9 2.9 MAXIMUM DAY WATER CONSUMPTION.........................................................................9 2.10 PEAK HOUR WATER CONSUMPTION............................................................................9 CHAPTER-3 ........................................................................................................................... 10 DESIGN CIRTERIA................................................................................................................ 10 3.1 DESIGN FLOWS FOR WATER DISTRIBUTION SYSTEM ....................................................11 3.2 DESIGN EQUATION USED:...............................................................................................13 3.3 HEIGHT OF OHR AND CAPACITY OF OHR........................................................................13  Height of OHR ..............................................................................................................13  Capacity of OHR ...........................................................................................................13 3.4 NUMBER OF TUBE WELLS INSTALLED.............................................................................14 3.5 TYPES OF PIPE USED IN THE SCHEME .............................................................................14  Cast Iron Pipes..............................................................................................................14  Polyethylene (PE) Pipes................................................................................................15 3.6 DIAMETER OF PIPES ........................................................................................................15 3.7 INCREMENT IN PIPE DIAMETER......................................................................................16 3.8 MAXIMUM AND MINIMUM VELOCITY IN W/ S PIPES...................................................16 3.9 PRESSURE IN THE PIPES...................................................................................................16 3.10 COVER ON PIPES..........................................................................................................16 3.11 PLACEMENT OF VALVES..............................................................................................16  FUNCTION ....................................................................................................................16 3.11 LOCATION OF VALVES.................................................................................................17 3.12 PLACING OF FIRE HYDRANT........................................................................................17
  • 5. 3  PURPOSE ......................................................................................................................17  LOCATION.....................................................................................................................17 CHAPTER - 4 ......................................................................................................................... 18 DESIGN OF WATER DISTRIBUTION SYSTEM.................................................................. 18 4.1 EPANET SOFTWARE.........................................................................................................19  BRIEF INTRODUCTIONOF SOFTWARE..........................................................................19  SALIENT FEATURES.......................................................................................................19  LIMITATIONS ................................................................................................................20 4.2 PROCEDURE.....................................................................................................................20 4.3 DESIGN INPUT DATA .......................................................................................................22  Input data for Nodes....................................................................................................22  Input data for Pipes......................................................................................................23 4.4 OUTPUT DESIGN DATA....................................................................................................24  FOR NODES...................................................................................................................24 For Pipes ..................................................................................................................................25 CHAPTER – 5......................................................................................................................... 26 CONCLUSIONS....................................................................................................................... 26 5.1 YOUR VIEWS ON THE DRAWING.....................................................................................27 5.2 SUMMARY .......................................................................................................................27 5.3 FINAL RESULTS.................................................................................................................28 REFERENCES......................................................................................................................... 29 ANNEXURES.......................................................................................................................... 31
  • 7. 2 INTRODUCTION 1.1 BRIEF DESCRIPTION OF HOUSING SCHEME  NAME OF THE SOCIETY The name of the housing scheme is Future Vision Housing Society.  LOCATION OF SOCIETY Society is located on the left side of Jehlum road and Upper Chenab Canal.  IMPORTANT SALIENT FEATURES Important salient features of this housing scheme are as follows.  Water Treatment Plant  Waste water Disposal System  Parks  School  Commercial Areas  Apartments  Flats  Dispensary  Grave yard  Plots  LOCTION OF TUBEWELLS In this Housing Society, I provided two tube wells keeping the condition of load shedding in mind, one of the tube well is working on Electricity and other one is working on Diesel -engine. The tube wells are located in a park as shown in Fig-1.  LOCTION OF OVER-HEAD-RESRVIOR (OHR) In this society, there is an overhead reservoir with height of 19.75 meters from ground surface level. The basic purpose of this OHR is to provide uniform flow with constant pressure. OHR is located in the park along with tube wells as shown in Fig-1.
  • 9. 4  NUMBER AND TYPE OF FACILITIES The facilities provided are as follows. TYPE NUMBER Plots 282 Water Treatment Plant 1 Waste water Disposal System 1 Parks 3 School 1 Commercial Areas 4 Apartments 3 Flats 3 Dispensary 1 Grave yard 1 1.2 TOPOGRAPHY OF THE AREA The topography of Future Vision Housing Society is almost flat. The maximum reduce level is 100.8 m and minimum reduce level is 98.0 m. As you can see there is very small difference in level. West side of the society has more reduce level then the Eastern side of the society in other words society is slightly sloping towards Upper Chenab Canal and Jehlum road.
  • 11. 6 ASSUMPTIONS 2.1 DESIGN PERIOD The design period of Water Distribution System of “Future Vision Housing Society” is not fixed. Design Period is related to the population, I am taking for design purpose. 2.2 PER CAPITA PER DAY WATER CONSUMPTION Per capita per day water consumption can be defined as the quantity of water consumed by one person in one day. Per Capita Water Consumption = 300+20Y Y = Sum of last two digits of roll number So, Per Capita Water Consumption = 300+20(4+8) = 300+20(12) = 540 lpcd 2.3 POPULATION FOR DESIGN PURPOSE The maximum population gives to me according to my roll number is as follows. - Present Population Maximum Population Persons/Plot 7 12 Persons/Apartment 400 500 Persons/Flat 200 400
  • 12. 7 2.4 POPULATION AND WATER CONSUMPTION CRITERION  FOR SCHOOL, DISPENSORY ETC. WATER CONSUMPTION FOR W.C Persons School 50 (lpcd) 200 Dispensary 60 (lpcd) 50 Commercial area 3 (liter/m2/day) - Open spaces 8 (liter/m2/day) - 2.5 CALCULATIONS OF WATER CONSUMPTION FOR:  PLOTS: Water consumption for plots = 540 lpcd × 12 persons × 282 plots = 1827360 L/day  APARTMENTS: Water consumption for apartments = 540 lpcd × 500 persons × 3 apartments = 810000 L/day  FLATS: Water consumption for flats = 540 lpcd × 400 persons × 3 flats = 648000 L/day  SCHOOL Water consumption for school = 50 lpcd × 200 students = 10000 L/day  DISPENSARY: Water consumption for dispensary = 60 lpcd × 50 patients = 3000 L/day
  • 13. 8  COMMERCIAL AREA Commercial area - 1 on plan = 2.3 cm × 0.6 cm = 23 m × 6 m = 138 m2 Commercial area - 2 on plan = 2.3 cm × 0.6 cm = 23 m × 6 m = 138 m2 Commercial area - 3 on plan = 1.7 cm × 0.8 cm = 17 m × 8 m = 136 m2 Commercial area - 4 on plan = 1.7+1.8 2 cm × 0.6 cm = 17.5 m × 6 m = 140 m2 Total Commercial area = 138 m2 + 138 m2 + 136 m2 + 140 m2 = 552 m2 Water consumption for commercial area = 3 (liter/m2/day) × 552 m2 = 1656 L/day  OPEN SPACES Open spaces include Parks, Grave yard, treatment plant and disposal system. There is small quantity of water required for these places, (watering the plants in parks).  For Parks Area of Park-1 = 5.1 cm × 1.3 cm = 51m × 13m = 663 m2 Area of Park-2 = 5.3 cm × 3.1 cm = 53m × 31m = 1643 m2 Area of Park-3 = 3.4 cm × 2.3+1.8 2 cm = 34m × 20.5m = 697 m2 Total area of parks = 663 m2 + 1643 m2 + 697 m2 = 3003 m2  For Grave Yard Area of Grave Yard = 2.4 cm × 1.3 cm = 24m × 13m = 312 m2  For Water Treatment plant and Disposal Station Area = 6.1 cm × 3.1+2.1 2 cm = 61m × 26m = 1586 m2 Total Area of open spaces = Area of Park + Area of Grave Yard + Area of W.T and D.S = 3003 m2 + 312 m2 + 1586 m2 = 4901 m2 Water consumption for Open Spaces = 8 (liter/m2/day) × 4901 m2 = 39208 L/day
  • 14. 9 2.6 TOTAL WATER CONSUMPTION Total W. C = W.C for plots + W.C for apartments + W.C for flats + W.C for school + W.C for dispensary + W.C for commercial area + W.C for open Spaces = 1827360 + 810000 + 648000 + 10000 + 3000 + 1656 + 39208 L/day = 3339224 L/day = 3339224 24 ×60 ×60 L/sec = 38.648 L/sec 2.7 AVERAGE DAY W.C: MAXIMUM DAY W.C: PEAK HOURS W.C We are using the criterion given by water and sanitation agency (WASA) which is given below. Average day W.C : Max day W.C = 1 : 1.5 Average day W.C : Peak hour W.C = 1 : 2.25 2.8 AVERAGE DAY WATER CONSUMPTION Average day water consumption = 3339224 L/day = 38.648 L/sec 2.9 MAXIMUM DAY WATER CONSUMPTION Max. day water consumption = 1.5 × avg. day water consumption = 1.5 × 3339224 L/day = 5008836 L/day = 57.972 L/sec 2.10 PEAK HOUR WATER CONSUMPTION Peak hour water consumption = 2.25 × avg. day water consumption = 2.25 × 3339224 L/day = 7513254 L/day = 86.958 L/sec *NOTE: All the flows are in L/ sec because input data of EPANET software should be in L/ sec or in L/min.
  • 16. 11 DESIGN CIRTERIA 3.1 DESIGN FLOWS FOR WATER DISTRIBUTION SYSTEM Node no Number of Houses Parks Flats Apartments Dispensary Commercial Grave yard Open area School 1 2 13 1 3 17 4 24 5 6 1 1 6 10 1 7 3 1 8 16 9 12 10 17 11 13 12 16 13 16 14 17 1 15 15 16 12 1 17 17 1 18 12 1 19 6 1 1 20 11 1 2 21 2 1 22 1 1 23 11 1 24 15 Sum 282 3 3 3 1 4 1 1 1
  • 17. 12 Node no Water Consumption in (liters/day) Sum(liters/sec) Houses Parks Flats Apartments Dispensary Commercial Grave yard Open area School Sum(liters/day) 1 0 0 0 0 0 0 0 0 0 0 0.000 2 84240 0 0 0 3000 0 0 0 0 87240 1.010 3 110160 0 0 0 0 0 0 0 0 110160 1.275 4 155520 0 0 0 0 0 0 0 0 155520 1.800 5 38880 5304 0 0 0 0 2496 0 0 46680 0.540 6 64800 0 0 270000 0 0 0 0 0 334800 3.875 7 19440 0 0 0 0 0 0 0 10000 29440 0.341 8 103680 0 0 0 0 0 0 0 0 103680 1.200 9 77760 0 0 0 0 0 0 0 0 77760 0.900 10 110160 0 0 0 0 0 0 0 0 110160 1.275 11 84240 0 0 0 0 0 0 0 0 84240 0.975 12 103680 0 0 0 0 0 0 0 0 103680 1.200 13 103680 0 0 0 0 0 0 0 0 103680 1.200 14 110160 0 216000 0 0 0 0 0 0 326160 3.775 15 97200 0 0 0 0 0 0 0 0 97200 1.125 16 77760 13144 0 0 0 0 0 0 0 90904 1.052 17 110160 0 0 0 0 414 0 0 0 110574 1.280 18 77760 0 216000 0 0 0 0 0 0 293760 3.400 19 38880 5576 216000 0 0 0 0 0 0 260456 3.015 20 71280 0 0 270000 0 822 0 0 0 342102 3.960 21 12960 0 0 0 0 420 0 0 0 13380 0.155 22 6480 0 0 0 0 0 0 12688 0 19168 0.222 23 71280 0 0 270000 0 0 0 0 0 341280 3.950 24 97200 0 0 0 0 0 0 0 0 97200 1.125 Sum 1827360 24024 648000 810000 3000 1656 2496 12688 10000 3339224 38.648
  • 18. 13 3.2 DESIGN EQUATION USED: In EPANET software I used “Hazen William” Equation to find out Head losses. HL = 𝟏𝟎. 𝟔𝟓 × 𝐐 𝟏.𝟖𝟓 × 𝐋 𝐂 𝟏.𝟖𝟓 × 𝐃 𝟒.𝟖𝟕 Where, H = Head loss (m/km) Q = Discharge (m/sec) C = Roughness Coefficient L = Length of pipe (m) D = Diameter of pipe (m) 3.3 HEIGHT OF OHR AND CAPACITY OF OHR  Height of OHR Height of overhead reservoir is 19.75 m from the ground surface and 0.25 m depth is kept in the OHR is kept for settlement of sediments (Silt & clay etc.)  Capacity of OHR We know that. For electric pump Capacity of overhead reservoir = 1/6 of the daily avg. W.C. Capacity of overhead reservoir = 1 6 × 3339224 L/day = 556537.333 liters ≈ 557 m3
  • 19. 14 For diesel pump Capacity of overhead reservoir = 1/4 of the daily avg. W.C. Capacity of overhead reservoir = 1 4 × 3339224 L/day = 834806 liters ≈ 835 m3 3.4 NUMBER OF TUBE WELLS INSTALLED In this Housing Society, I provided two tube wells keeping the condition of load shedding in mind, one of the tube well is working on Electricity and other one is working on Diesel -engine. The tube wells are located in the central Park of the society. 3.5 TYPES OF PIPE USED IN THE SCHEME In the Design of Water Distribution System, we Used Two types of pipes  Cast Iron Pipes Cast iron pipes used only some specific places, one of the pipe is used to transport water from Tube well to Over Head Reservoir and second pipe is used to transport water from Over Head Reservoir to node number 1. The Hazen Williams coefficient for cast iron pipe is 100.
  • 20. 15  Polyethylene (PE) Pipes Except upper mentioned two places all other pipes are Polyethylene (PE) pipes. Polyethylene pipes have following characteristics  Easy to install, easy to handle.  Cheaper in material cost.  Chemical resistance.  Corrosion free.  Smooth inner wall surface.  Durable, long lasting.  Expected life is 40 years The Hazen Williams coefficient for cast iron pipe is 140. 3.6 DIAMETER OF PIPES In the design of water distribution system, I used pipes of various diameter. In design, I preferred pipe diameters which are easily available in Pakistan. The pipe diameters I used in deign are as follows.  80 mm  100 mm
  • 21. 16  150 mm  200 mm  250 mm  300 mm  350 mm 3.7 INCREMENT IN PIPE DIAMETER Increment in pipe diameter is generally in multiple of 50 mm. 3.8 MAXIMUM AND MINIMUM VELOCITY IN W/ S PIPES Generally, in water supply system the velocities should not exceed 1m/sec but the maximum limit is 2m/sec and velocities should not less, that it causes difficulties to the residents. 3.9 PRESSURE IN THE PIPES The pressure in the water distribution system varies with water consumption. During peak hours, there is minimum pressure in the pipes. Maximum pressure occurs during low W.C. hours. In design, maximum pressure in pipes is 20 m at the bottom of over head reservoir and minimum pressure should be 15m at the farthest points of scheme during peak hours. 3.10 COVER ON PIPES The term “cover on pipes” can be defined as the clear distance between ground surface to the pipe. In design, 1 m or (3 feet – 4 feet) cover on pipes is provided. The basic purpose of this cover is the safety of the pipes. 3.11 PLACEMENT OF VALVES  FUNCTION The functions of different types of vales are as follows  To regulate the flow  To regulate the pressure  To cutting the supply for repairing purposes
  • 22. 17  To permits the water flow only in one direction  To drain the sediments from pipes  To break vacuum and to release entrapped air 3.11 LOCATION OF VALVES  In design two gate valves are provided at the junction of 4 or 3 pipes and one gate vale is provided at the junction of 2 pipes.  One vales provided for each fire hydrant.  One “Check valve” is provided between OHR and Tube Wells to prevent back flow. 3.12 PLACING OF FIRE HYDRANT  PURPOSE  The basic purpose of fire hydrant is to supply water for firefighting.  Fire hydrants should have at least 2 hose outlets and a larger pump outlet.  Fire hydrant is provided at 1m-2m from the edge of the road and at least 0.5m high.  LOCATION In this design, I provided one fire hydrant near the school.
  • 23. 18 CHAPTER - 4 DESIGN OF WATER DISTRIBUTION SYSTEM
  • 24. 19 DESIGN OF WATER DISTRIBUTION SYSTEM 4.1 EPANET SOFTWARE  BRIEF INTRODUCTIONOF SOFTWARE EPANET is a computer program that performs extended period simulation of hydraulic and water quality behavior within pressurized pipe networks. A network consists of pipes, nodes (pipe junctions), pumps, valves and storage tanks or reservoirs. EPANET tracks the flow of water in each pipe, the pressure at each node, the height of water in each tank. EPANET is designed to be a research tool for improving our understanding of the movement and fate of drinking water constituents within distribution systems. It can be used for many different kinds of applications in distribution systems analysis. Sampling program design, hydraulic model calibration. EPANET can help assess alternative management strategies for improving water quality throughout a system. These can include:  Altering source utilization within multiple source systems,  Altering pumping and tank filling/emptying schedules, Running under Windows, EPANET provides an integrated environment for editing network input data, running hydraulic and water quality simulations, and viewing the results in a variety of formats. These include color-coded network maps, data tables, time series graphs, and contour plots.  SALIENT FEATURES Full-featured and accurate hydraulic modeling is a prerequisite for doing effective water quality modeling. EPANET contains a state-of-the-art hydraulic analysis engine that includes the following capabilities:  Color-coded network maps.  Places no limit on the size of the network that can be analyzed  Computes friction head loss using the Hazen-Williams, Darcy Weisbach, or Chezy- Manning formulas  Includes minor head losses for bends, fittings, etc.  Models constant or variable speed pumps  Computes pumping energy and cost  Models various types of valves including shutoff, check, pressure regulating, and flow control valves
  • 25. 20  Allows storage tanks to have any shape (i.e., diameter can vary with height)  Considers multiple demand categories at nodes, each with its own pattern of time variation  Models pressure-dependent flow issuing from emitters (sprinkler heads)  Can base system operation on both simple tank level or timer controls and on complex rule-based controls.  LIMITATIONS EPANET is a good software for the design of water supply but it has some limitations.  This software is not able to calculate water hammer.  Can’t simulate pipe bursting.  This software cannot evaluate the consequences of the presence of air inside the network.  Need to be careful with units.  There is no undo button.  Dose not include material list.  This software can’t show Nodes and pipes on scale. 4.2 PROCEDURE Following are the steps to design water distribution system 1. Get the hard copy of plan (map) of housing society. 2. Draw the pipes on the either one side of the streets such that all the area (plots) are covered and gave number to each pipe. 3. At the junction point of two or more pipes make a node and named them with numbering. 4. Now take color pencils and allocate the plots or area to each node by shading the region. *note: allocate the full area to one node means that full park area, or full apartment should be allocated to one node. 5. Now find the discharge at nodes by using water consumption per person, persons per plot, and number of plots (same for all other allocated types of facilities) and sum them. 6. Now Launch EPANET.exe. 7. Start New Project. 8. Click View>Options to enter Map Options dialogue box and select the notation tab, there check all the boxes except the ‘Use transparent text’. 9. Click Project>Analysis Options to open Hydraulic Options dialogue box. Set Units of Flow to ‘LPS’ (Liters per second).
  • 26. 21 10. In the same box enter the ‘Demand Multiplier value’ 2.25 for peak hourly demand. 11. Back drop the plan (map) of the society, by clicking View>Back drop>load select file. 12. Draw the Nodes at their location as you drawn on hard copy map and label them by double-clicking on each node and editing its ‘Junction ID’. 13. Now draw the Network links/pipes. The initial point asked by program is the starting junction of Link. 14. The next step is to introduce a tank (Over Head Reservoir). 15. Connect the tank to (junction-1) with a (link - 31) 16. Now we have to provide information to the software about each node, pipe and tank by double clicking the element and provide information in properties table. 17. Up till now we provided all the basic data to the software. 18. Save the project. 19. Now click on Project>Run Analysis to start Analysis. A ‘Run Status’ message box will appear. If Run is unsuccessful then check whether you have not missed any step or provided wrong data. 20. When Run is successful then click ‘OK’. 21. Make sure at the farthest ends, the pressure in 15 m, if not change the diameter of pipes and again run analysis if you got pressure near 15 m good enough then proceed to next step. 22. The next step is to view the results. 23. Report>Full (To generate a report of all results, in Word Format.) 24. Use ‘Map’ tab on ‘Browser’ window for viewing results in color coded form with the help of ‘Legend’. 25. Use table format by Report>Table. Select whether you want to view results for ‘Network Nodes’ or ‘Network Links’.
  • 27. 22 4.3 DESIGN INPUT DATA  Input data for Nodes Node ID ELEVATION BASE DEMAND - m LPS Junction-1 100.2 -38.65 Junction-2 100.2 1.01 Junction-3 99.5 1.275 Junction-4 100.2 1.8 Junction-5 100.8 0.54 Junction-6 100.5 3.875 Junction-7 100.3 0.341 Junction-8 100 1.2 Junction-9 100.8 0.9 Junction-10 100.2 1.275 Junction-11 100.5 0.975 Junction-12 100.5 1.2 Junction-13 100.8 1.2 Junction-14 100.45 3.775 Junction-15 100.4 1.125 Junction-16 100 1.052 Junction-17 99.7 1.28 Junction-18 100.2 3.4 Junction-19 99.5 3.015 Junction-20 99.5 3.96 Junction-21 99.4 0.155 Junction-22 98.5 0.222 Junction-23 98.9 3.95 Junction-24 99.5 1.125 OHR 119.75 -
  • 28. 23  Input data for Pipes PIPE ID LENGTH DIAMETER (Hit and Trial) HWC - m mm - 1 167 80 140 2 59 80 140 3 48 80 140 4 49 80 140 5 90 80 140 6 15 80 140 7 166 80 140 8 41 80 140 9 40 80 140 10 43 80 140 11 55 80 140 12 48 150 140 13 17 200 140 14 16 200 140 15 39 150 140 16 23 80 140 17 114 80 140 18 114 80 140 19 114 80 140 20 114 80 140 21 38 100 140 22 108 80 140 23 40 100 140 24 107 80 140 25 36 100 140 26 55 80 140 27 48 80 140 28 34 80 140 29 40 80 140 30 108 80 140 31 20 350 100
  • 29. 24 4.4 OUTPUT DESIGN DATA  FOR NODES Node ID ELEVATION BASE DEMAND DEMAND (Peak hr.) HEAD PRESSURE m LPS LPS m m Junction-1 100.200 -38.650 -86.963 120.000 19.800 Junction-2 100.200 1.010 2.273 119.800 19.600 Junction-3 99.500 1.275 2.869 116.640 17.140 Junction-4 100.200 1.800 4.050 115.970 15.770 Junction-5 100.800 0.540 1.215 116.310 15.510 Junction-6 100.500 3.875 8.719 117.250 16.750 Junction-7 100.300 0.341 0.767 119.110 18.810 Junction-8 100.000 1.200 2.700 117.570 17.570 Junction-9 100.800 0.900 2.025 117.290 16.490 Junction-10 100.200 1.275 2.869 116.710 16.510 Junction-11 100.500 0.975 2.194 116.390 15.890 Junction-12 100.500 1.200 2.700 116.440 15.940 Junction-13 100.800 1.200 2.700 115.970 15.170 Junction-14 100.450 3.775 8.494 116.410 15.960 Junction-15 100.400 1.125 2.531 116.410 16.010 Junction-16 100.000 1.052 2.367 119.910 19.910 Junction-17 99.700 1.280 2.880 119.350 19.650 Junction-18 100.200 3.400 7.650 115.670 15.470 Junction-19 99.500 3.015 6.784 114.730 15.230 Junction-20 99.500 3.960 8.910 114.830 15.330 Junction-21 99.400 0.155 0.349 114.580 15.180 Junction-22 98.500 0.222 0.500 114.390 15.890 Junction-23 98.900 3.950 8.888 114.340 15.440 Junction-24 99.500 1.125 2.531 114.410 14.910 OHR 119.750 0.000 0.000 120.000 0.250
  • 30. 25 For Pipes PIPE ID LENGTH DIAMETER HWC FLOW VELOCITY UNIT HEADLOSS m mm LPS m/s m/ km 1 167 80 140 -4.07 0.81 9.34 2 59 80 140 -3.13 0.62 5.72 3 48 80 140 1.54 0.31 1.55 4 49 80 140 -5 0.99 13.63 5 90 80 140 -4.34 0.86 10.51 6 15 80 140 2.3 0.46 3.24 7 166 80 140 -5.04 1 13.87 8 41 80 140 -2.8 0.56 4.66 9 40 80 140 -12.91 2.57 79.06 10 43 80 140 -3.15 0.63 5.79 11 55 80 140 -13.18 2.62 82.18 12 48 150 140 -24.02 1.36 11.68 13 17 200 140 -34.12 1.09 5.51 14 16 200 140 52.84 1.68 12.39 15 39 150 140 30.04 1.7 17.68 16 23 80 140 13.06 2.6 80.77 17 114 80 140 1.13 0.22 0.86 18 114 80 140 7.95 1.58 32.24 19 114 80 140 7.74 1.54 30.64 20 114 80 140 7.61 1.51 29.71 21 38 100 140 16.22 2.06 40.66 22 108 80 140 2.03 0.4 2.56 23 40 100 140 11.49 1.46 21.49 24 107 80 140 2.19 0.44 2.97 25 36 100 140 6.43 0.82 7.33 26 55 80 140 -5.66 1.13 17.15 27 48 80 140 -5.35 1.07 15.48 28 34 80 140 -0.15 0.03 0.02 29 40 80 140 -1.03 0.02 0.73 30 108 80 140 2.7 0.54 4.36 31 20 350 100 -86.96 0.9 3.81
  • 32. 27 CONCLUSIONS 5.1 YOUR VIEWS ON THE DRAWING This design work of water distribution system is done with great care and I am confident that this design will fulfill all the requirements of society without causing any trouble. If someone want to improve this work I would like him to work on new software called WATER-CAD. In this design, we did not do water quality analysis (chlorination demand) on EPANET software for society, water distribution system. 5.2 SUMMARY Number of Junctions 24 Number of OHR 1 Number of Pipes 32 Number of Valves 25 Number of Fire Hydrants 1 Flow Unit LPS
  • 33. 28 5.3 FINAL RESULTS PIPE ID LENGTH DIAMETER m mm 1 167 80 2 59 80 3 48 80 4 49 80 5 90 80 6 15 80 7 166 80 8 41 80 9 40 80 10 43 80 11 55 80 12 48 150 13 17 200 14 16 200 15 39 150 16 23 80 17 114 80 18 114 80 19 114 80 20 114 80 21 38 100 22 108 80 23 40 100 24 107 80 25 36 100 26 55 80 27 48 80 28 34 80 29 40 80 30 108 80 31 20 350
  • 35. 30 REFERENCES  Analysis and Design of Water Distribution System via EPANET 2.00.12  http://civilengineerspk.com/water-supply-design  https://en.wikipedia.org/wiki/EPANET  https://nepis.epa.gov/Adobe/PDF/P1007WWU.pdf