Bus management system for final year project. Need any help you can contact us any time we are available 24/7
#Busmanagementsystem #javaproject #finalyearprojecthelp
4. In this phase, we have analyzed the existing
systems and investigated problems associated
with it. We understood the limitations of the
existing system and got a clear idea of the
requirements and need for a new system.
5. After the requirements have been determined, the
necessary specifications for the hardware,
software, people, and data resources, and the
information products that will satisfy the functional
requirements of the proposed system can be
determined.
After that we made a blueprint for the proposed
system
6. HEARDWARE REQUIRMENTS
PC WITH DUAL CORE OR MOREPROCESSOR
1GB RAM ORABOVE
180GB HADR DISK ORABOVE
SOFTWARE REQUIRMENT:
VISUAL STUDIO
MICROSOFT SQLSERVER
OPERATING SYSTEM:
WINDOWS XP, 7, 8,10
7. REGISTERING USER
UPDATING USER
Generating Passengers
Renewing Passengers
Authentication of user
Login
Online Payment
8. Reliability: The application should be
reliable and it should generate all updated
information in correct order.
Availability:Application will be available and
working properly for all the time.
Security.
10. Generates working software quickly and early
during the software life cycle.
This model is more flexible – less costly to
change scope and requirements.
It is easier to test and debug during a smaller
iteration.
In this model customer can respond to each
built.
Lowers initial delivery cost.
15. message shown
from
reservation
reservation
verified
reservation
added
continue
Registered
User
login
Verify
to ticket
availabl
e
Display
tincoktevtenriofietd
available
Update
database
Display
logout or
cloognotuintue
Passenge
r account
database
updated
bill
balance
databas
e
updated
Acces
s
logout
Access
continue
16. • This bus management system which provides
online reservation of bus.
• This system is user friendly and accurate.
• This system is available and efficient in
reservation.
• It has no hidden costs.