Factory Tour Report Dec 3rd, 2009 Prepared by Stephen
1. General Information ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
2. Detailed Job Scope ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
3. Questionares for the Heat Treatment ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
4. Step 1- Check the hardness tester ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Ref: Wrong Hardness Tester which the manufacturing is using   NO CALIBRATION RECORD   Unfortunately the engineers didn't test and calibrate it before   using  it last time either, so got the wrong values.
2. Step 2- Use a reliable tester for the inspection ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Refer: The hardness tester which is used by heat treatment shop, it's  calibrated on Dec 1st, 2009 with the record, and tested by the  hardness standard too. so all values are reliable
Result 1: Inspect Datas for Worm Gears ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Note: 1. Select 20 pcs parts out of total 300 pcs parts at random for inspection. 2. Measure 3 points on top and bottom surface which are 120 deg array around. total 6 points. 3. When consider of some deviation and  test error, all dates should be between HRC 32-35, very fine and even datas
Result 2- Inspect Datas for Worms ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Note: 1. Select 20 pcs parts out of total 300 pcs parts at random for inspection. 2. Measure 3 points on the teeth area for inspection 3. When consider of some deviation and  test error, all dates should be between HRC 32-35, very fine and even datas
Step 3- My conclusion and Suggestions ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Step 4. Some Other Issues 1. Painting: Regarding the part "Housing ROD ROTATOR 3020". I see there remarked that "O-ring Surface shall not be painted" and " all other external surfaces shall be painted..." but the manufacturer didn't apply paint to upper circle surface. I am not sure whether it's necessary. as it's inside another part. 2. I also found some small rust area in no painting surface, have asked them remove it and apply some anti-rust grease before delivery.
Factory Tour Pictures-1
Factory Tour Pictures-2
Factory Tour Pictures-3
Thanks for your attention !

More Related Content

What's hot

The Space Shuttle Disasters
The Space Shuttle DisastersThe Space Shuttle Disasters
The Space Shuttle DisastersDon W. Lewis
 
Failure mode effect_analysis_fmea
Failure mode effect_analysis_fmeaFailure mode effect_analysis_fmea
Failure mode effect_analysis_fmeaJitesh Gaurav
 
When We Tested Nuclear Bombs
When We Tested Nuclear BombsWhen We Tested Nuclear Bombs
When We Tested Nuclear Bombsguimera
 
Six sigma in various industries
Six sigma in various industriesSix sigma in various industries
Six sigma in various industriesAamir chouhan
 
Mẫu hợp đồng mua bán biệt thự biển nghỉ dưỡng vinpearl resort villas
Mẫu hợp đồng mua bán biệt thự biển nghỉ dưỡng vinpearl resort villasMẫu hợp đồng mua bán biệt thự biển nghỉ dưỡng vinpearl resort villas
Mẫu hợp đồng mua bán biệt thự biển nghỉ dưỡng vinpearl resort villasTuấn biệt thự biển
 
Causal Tree Analysis (Root Cause)
Causal Tree Analysis (Root Cause)Causal Tree Analysis (Root Cause)
Causal Tree Analysis (Root Cause)ferbor
 
Design and Analysis of Progressive tool in Sheet metal manufacturing
Design and Analysis of Progressive tool in Sheet metal  manufacturingDesign and Analysis of Progressive tool in Sheet metal  manufacturing
Design and Analysis of Progressive tool in Sheet metal manufacturingvivatechijri
 
Referral Partnership Agreement
Referral Partnership AgreementReferral Partnership Agreement
Referral Partnership AgreementDemand Metric
 
Challenger Space Shuttle
Challenger Space ShuttleChallenger Space Shuttle
Challenger Space ShuttleAnthony Cutler
 
Chernobyl Disaster
Chernobyl DisasterChernobyl Disaster
Chernobyl DisasterDao Tran
 
Manufacturing Cost (2.008x Lecture Slides)
Manufacturing Cost (2.008x Lecture Slides)Manufacturing Cost (2.008x Lecture Slides)
Manufacturing Cost (2.008x Lecture Slides)A. John Hart
 

What's hot (20)

Attribute MSA presentation
Attribute MSA presentationAttribute MSA presentation
Attribute MSA presentation
 
The Space Shuttle Disasters
The Space Shuttle DisastersThe Space Shuttle Disasters
The Space Shuttle Disasters
 
Process fmea
Process fmea Process fmea
Process fmea
 
The Boy in the Striped pyjamas
The Boy in the Striped pyjamasThe Boy in the Striped pyjamas
The Boy in the Striped pyjamas
 
Failure Mode & Effects Analysis (FMEA)
Failure Mode & Effects Analysis (FMEA)Failure Mode & Effects Analysis (FMEA)
Failure Mode & Effects Analysis (FMEA)
 
Failure mode effect_analysis_fmea
Failure mode effect_analysis_fmeaFailure mode effect_analysis_fmea
Failure mode effect_analysis_fmea
 
When We Tested Nuclear Bombs
When We Tested Nuclear BombsWhen We Tested Nuclear Bombs
When We Tested Nuclear Bombs
 
Six sigma in various industries
Six sigma in various industriesSix sigma in various industries
Six sigma in various industries
 
Mẫu hợp đồng mua bán biệt thự biển nghỉ dưỡng vinpearl resort villas
Mẫu hợp đồng mua bán biệt thự biển nghỉ dưỡng vinpearl resort villasMẫu hợp đồng mua bán biệt thự biển nghỉ dưỡng vinpearl resort villas
Mẫu hợp đồng mua bán biệt thự biển nghỉ dưỡng vinpearl resort villas
 
FIRST ARTICLE INSPECTION
FIRST ARTICLE INSPECTIONFIRST ARTICLE INSPECTION
FIRST ARTICLE INSPECTION
 
O ring Seals
O ring SealsO ring Seals
O ring Seals
 
Fukushima daichi disaster
Fukushima daichi disasterFukushima daichi disaster
Fukushima daichi disaster
 
Causal Tree Analysis (Root Cause)
Causal Tree Analysis (Root Cause)Causal Tree Analysis (Root Cause)
Causal Tree Analysis (Root Cause)
 
Design and Analysis of Progressive tool in Sheet metal manufacturing
Design and Analysis of Progressive tool in Sheet metal  manufacturingDesign and Analysis of Progressive tool in Sheet metal  manufacturing
Design and Analysis of Progressive tool in Sheet metal manufacturing
 
Referral Partnership Agreement
Referral Partnership AgreementReferral Partnership Agreement
Referral Partnership Agreement
 
Challenger Space Shuttle
Challenger Space ShuttleChallenger Space Shuttle
Challenger Space Shuttle
 
What are some of the common classes of leaded packages?
What are some of the common classes of leaded packages?What are some of the common classes of leaded packages?
What are some of the common classes of leaded packages?
 
Chernobyl Disaster
Chernobyl DisasterChernobyl Disaster
Chernobyl Disaster
 
Chernobyl Disaster
Chernobyl DisasterChernobyl Disaster
Chernobyl Disaster
 
Manufacturing Cost (2.008x Lecture Slides)
Manufacturing Cost (2.008x Lecture Slides)Manufacturing Cost (2.008x Lecture Slides)
Manufacturing Cost (2.008x Lecture Slides)
 

Viewers also liked

Industrial Visit Report
Industrial Visit ReportIndustrial Visit Report
Industrial Visit ReportBabu Rao
 
A sample on industrial visit report for MBA students by Bilal Khan
A sample on industrial visit report for MBA students by Bilal KhanA sample on industrial visit report for MBA students by Bilal Khan
A sample on industrial visit report for MBA students by Bilal KhanBilal Khan
 
Keynote technical daily report for 050313
Keynote technical daily report for 050313Keynote technical daily report for 050313
Keynote technical daily report for 050313Keynote Capitals Ltd.
 
Lscc fa project 1 getting to know lawson state
Lscc fa project 1 getting to know lawson stateLscc fa project 1 getting to know lawson state
Lscc fa project 1 getting to know lawson statesdavis_lawsonstate_edu
 
2011 10-12 migbank-daily technical-analysis-report
2011 10-12 migbank-daily technical-analysis-report2011 10-12 migbank-daily technical-analysis-report
2011 10-12 migbank-daily technical-analysis-reportMIG BANK
 
changwon MVP, EMDB, SMDB & DB
changwon MVP, EMDB, SMDB & DBchangwon MVP, EMDB, SMDB & DB
changwon MVP, EMDB, SMDB & DBSheikh Imran
 
Checklist internal audit
Checklist internal auditChecklist internal audit
Checklist internal auditAli Khardani
 
MCC PANEL WIRING, GA and BOM Sample
MCC PANEL WIRING, GA and BOM SampleMCC PANEL WIRING, GA and BOM Sample
MCC PANEL WIRING, GA and BOM SampleShashi Kant
 
Industrial visit report
Industrial visit reportIndustrial visit report
Industrial visit reportSambit Biswal
 
6 SWOT Analysis Examples to Help You Write Your Own
6 SWOT Analysis Examples to Help You Write Your Own6 SWOT Analysis Examples to Help You Write Your Own
6 SWOT Analysis Examples to Help You Write Your OwnPalo Alto Software
 

Viewers also liked (12)

Industrial Visit Report
Industrial Visit ReportIndustrial Visit Report
Industrial Visit Report
 
A sample on industrial visit report for MBA students by Bilal Khan
A sample on industrial visit report for MBA students by Bilal KhanA sample on industrial visit report for MBA students by Bilal Khan
A sample on industrial visit report for MBA students by Bilal Khan
 
Keynote technical daily report for 050313
Keynote technical daily report for 050313Keynote technical daily report for 050313
Keynote technical daily report for 050313
 
Lscc fa project 1 getting to know lawson state
Lscc fa project 1 getting to know lawson stateLscc fa project 1 getting to know lawson state
Lscc fa project 1 getting to know lawson state
 
2011 10-12 migbank-daily technical-analysis-report
2011 10-12 migbank-daily technical-analysis-report2011 10-12 migbank-daily technical-analysis-report
2011 10-12 migbank-daily technical-analysis-report
 
changwon MVP, EMDB, SMDB & DB
changwon MVP, EMDB, SMDB & DBchangwon MVP, EMDB, SMDB & DB
changwon MVP, EMDB, SMDB & DB
 
Indigenization of Russian Make WHR by Vizag Steel
Indigenization of Russian Make WHR by Vizag SteelIndigenization of Russian Make WHR by Vizag Steel
Indigenization of Russian Make WHR by Vizag Steel
 
Checklist internal audit
Checklist internal auditChecklist internal audit
Checklist internal audit
 
MCC PANEL WIRING, GA and BOM Sample
MCC PANEL WIRING, GA and BOM SampleMCC PANEL WIRING, GA and BOM Sample
MCC PANEL WIRING, GA and BOM Sample
 
Control Panel
Control PanelControl Panel
Control Panel
 
Industrial visit report
Industrial visit reportIndustrial visit report
Industrial visit report
 
6 SWOT Analysis Examples to Help You Write Your Own
6 SWOT Analysis Examples to Help You Write Your Own6 SWOT Analysis Examples to Help You Write Your Own
6 SWOT Analysis Examples to Help You Write Your Own
 

Similar to Factory Tour Report 120309

Qualification of Analytical Equipments
Qualification of Analytical EquipmentsQualification of Analytical Equipments
Qualification of Analytical EquipmentsDhawal_Raghuvanshi
 
Business Process Planning
Business Process PlanningBusiness Process Planning
Business Process PlanningLarry Whitmarsh
 
Performace of cryogenically treated HSS tools
Performace of cryogenically treated HSS toolsPerformace of cryogenically treated HSS tools
Performace of cryogenically treated HSS toolsNikhil Nagdev
 
Friability Tester Qualifiaction.pptx
Friability Tester Qualifiaction.pptxFriability Tester Qualifiaction.pptx
Friability Tester Qualifiaction.pptxOjas Sawalikar
 
G.c power point by royal debnath
G.c power point by royal debnathG.c power point by royal debnath
G.c power point by royal debnathhusnatazeen
 
Testo thermal imaging power flushing application story
Testo thermal imaging power flushing application storyTesto thermal imaging power flushing application story
Testo thermal imaging power flushing application storyTesto Limited
 
MMAE557 Consulting Project-Li He(A20358122),Xingye Dai(A20365915)
MMAE557 Consulting Project-Li He(A20358122),Xingye Dai(A20365915)MMAE557 Consulting Project-Li He(A20358122),Xingye Dai(A20365915)
MMAE557 Consulting Project-Li He(A20358122),Xingye Dai(A20365915)LI HE
 
Gasoline oxidation stability tester
Gasoline oxidation stability testerGasoline oxidation stability tester
Gasoline oxidation stability testerlabmen1998
 
How Auxiliary Contactors mounting may result into Mal-operation & hence tripp...
How Auxiliary Contactors mounting may result into Mal-operation & hence tripp...How Auxiliary Contactors mounting may result into Mal-operation & hence tripp...
How Auxiliary Contactors mounting may result into Mal-operation & hence tripp...System Protection
 
Msa attribute study
Msa attribute studyMsa attribute study
Msa attribute studyVipul Wadhwa
 

Similar to Factory Tour Report 120309 (20)

Qualification of Analytical Equipments
Qualification of Analytical EquipmentsQualification of Analytical Equipments
Qualification of Analytical Equipments
 
Rt 101 moving die rheometer
Rt 101 moving die rheometerRt 101 moving die rheometer
Rt 101 moving die rheometer
 
Business Process Planning
Business Process PlanningBusiness Process Planning
Business Process Planning
 
Friability test apparatus
Friability test apparatusFriability test apparatus
Friability test apparatus
 
report
reportreport
report
 
Performace of cryogenically treated HSS tools
Performace of cryogenically treated HSS toolsPerformace of cryogenically treated HSS tools
Performace of cryogenically treated HSS tools
 
PMS FY 22-23.pptx
PMS FY 22-23.pptxPMS FY 22-23.pptx
PMS FY 22-23.pptx
 
Friability Tester Qualifiaction.pptx
Friability Tester Qualifiaction.pptxFriability Tester Qualifiaction.pptx
Friability Tester Qualifiaction.pptx
 
G.c power point by royal debnath
G.c power point by royal debnathG.c power point by royal debnath
G.c power point by royal debnath
 
Testo thermal imaging power flushing application story
Testo thermal imaging power flushing application storyTesto thermal imaging power flushing application story
Testo thermal imaging power flushing application story
 
Presentation on Air Heater Inspection
Presentation on Air Heater Inspection Presentation on Air Heater Inspection
Presentation on Air Heater Inspection
 
MMAE557 Consulting Project-Li He(A20358122),Xingye Dai(A20365915)
MMAE557 Consulting Project-Li He(A20358122),Xingye Dai(A20365915)MMAE557 Consulting Project-Li He(A20358122),Xingye Dai(A20365915)
MMAE557 Consulting Project-Li He(A20358122),Xingye Dai(A20365915)
 
Gasoline oxidation stability tester
Gasoline oxidation stability testerGasoline oxidation stability tester
Gasoline oxidation stability tester
 
China inspection-china quality control report
China inspection-china quality control reportChina inspection-china quality control report
China inspection-china quality control report
 
mid sem report.pptx
mid sem report.pptxmid sem report.pptx
mid sem report.pptx
 
Quality Innovation Plan
Quality Innovation PlanQuality Innovation Plan
Quality Innovation Plan
 
How Auxiliary Contactors mounting may result into Mal-operation & hence tripp...
How Auxiliary Contactors mounting may result into Mal-operation & hence tripp...How Auxiliary Contactors mounting may result into Mal-operation & hence tripp...
How Auxiliary Contactors mounting may result into Mal-operation & hence tripp...
 
Air blast drying oven manual
Air blast drying oven manualAir blast drying oven manual
Air blast drying oven manual
 
Msa attribute study
Msa attribute studyMsa attribute study
Msa attribute study
 
Turbine protection test u4
Turbine protection test u4Turbine protection test u4
Turbine protection test u4
 

Factory Tour Report 120309

  • 1. Factory Tour Report Dec 3rd, 2009 Prepared by Stephen
  • 2.
  • 3.
  • 4.
  • 5.
  • 6. Ref: Wrong Hardness Tester which the manufacturing is using NO CALIBRATION RECORD Unfortunately the engineers didn't test and calibrate it before using it last time either, so got the wrong values.
  • 7.
  • 8. Refer: The hardness tester which is used by heat treatment shop, it's calibrated on Dec 1st, 2009 with the record, and tested by the hardness standard too. so all values are reliable
  • 9.
  • 10.
  • 11.
  • 12. Step 4. Some Other Issues 1. Painting: Regarding the part "Housing ROD ROTATOR 3020". I see there remarked that "O-ring Surface shall not be painted" and " all other external surfaces shall be painted..." but the manufacturer didn't apply paint to upper circle surface. I am not sure whether it's necessary. as it's inside another part. 2. I also found some small rust area in no painting surface, have asked them remove it and apply some anti-rust grease before delivery.