SlideShare a Scribd company logo

Air blast drying oven manual

This is Lucy Zhong from Shenzhen China providing professional PCB Assembly technical service / training,quickly delivery, and low cost China made SMT equipment total solutions. Please contact me whatsapp/wechat/phone:+8618379197060

1 of 8
Download to read offline
Shenzhen Southern Mach inery Sales and
Service Co.,Ltd
Address: Room 1806, Block 3, Jinyun COFCO, Qianjin 2nd Road ,Baoan District,Shenzhen City, China
Shenzhen Southern Machinery Sales And Service Co.,Ltd www.smthelp.com1
Version: Feb, 2012
Air-blast Drying Oven
Instruction Manual
Thank you for your choosing our products. Please read this manual carefully before you operate
the air-blast drying oven. And keep it properly after you read it. We believe this manual will help
you operate the oven well.
Summary
Shenzhen Southern Mach inery Sales and
Service Co.,Ltd
Address: Room 1806, Block 3, Jinyun COFCO, Qianjin 2nd Road ,Baoan District,Shenzhen City, China
Shenzhen Southern Machinery Sales And Service Co.,Ltd www.smthelp.com2
Provided to industrial and mining enterprises,laboratories and scientific research institutes for desi
ccation, torrefaction, wax-melting and sterilization.
Primary Technical Characteristics
Models
Parameters
9023A 9053A 9123A 9203A
Interior dimension:
W×D×H(mm)
300×300×270 420×350×350 550×350×550 600×550×600
Plank 2 2 2 2
Temperature range RT+10-250℃
Temperature
control/stability
0.1 ℃/±0.5℃
Power supply 220V、50Hz
Consume power 500W 750W 1500W 2000W
Install and adjust
1) Don't collide the body and make an effort on its glass in the middle of transportation.
2) The equipments should be placed steady after falling to the ground.
3) Don't use the instrument in the place where is sunlight or heat damp.
4) The equipments should keep off the electromagnetism interference source, and connect
equipments a ground of line connect ground effectively.
5) The equipments while circulating normally, product inside the box's putting to put should not
run into inside the wall.
6) The power cable never mind depends a behind, also not let the instrument or other products
press on-line in the power supply in order to prevent hurts power cable.
Usage
Shenzhen Southern Mach inery Sales and
Service Co.,Ltd
Address: Room 1806, Block 3, Jinyun COFCO, Qianjin 2nd Road ,Baoan District,Shenzhen City, China
Shenzhen Southern Machinery Sales And Service Co.,Ltd www.smthelp.com3
1, Open the door and need the processing article to put to put plank into the box up, close the
door.
2, Connect power supply, insert the power supply plug into the AC outlet, the power switch
of the front-panel place in the position of "open", the gauge appears the numeral
manifestation at this time, meaning the equipments enters work appearance.
3, Pass the operation temperature controller, set you must of temperature inside the box.
4, The instrument begins to work, temperature inside the box attains initial value gradually,
time through the dry processing need after, handle a work completion.
5, Close power supply, need temperature inside the box to open to put the spirit valve after
near to the environment temperature, relieve vacuum inside the box. Open the door, take out
article.
【!】Hint specially
1) Product didn't carry on correction generally through strict test before the factory, is bad such
as the environment of the hour of usage, the environment temperature outran feat scope, will
cause the temperature manifestation value and actual temperature error margin inside the box,
if outrun the technique index sign scope of, can revise, concretely the step according to the
temperature controller operating instructions to press to need to carry on correction.
2) Instrument is under the normal work appearance, if open a box of time to lead to grow, after
closing a box of door temporarily temperature inside the box is some fluctuations, this is the
normal phenomenon.
3) Attention of testing: The thermometer that test inside the box use wants to use 1.0 mercury
thermometer of the accuracies, and put mercury to the center in the box.
Shenzhen Southern Mach inery Sales and
Service Co.,Ltd
Address: Room 1806, Block 3, Jinyun COFCO, Qianjin 2nd Road ,Baoan District,Shenzhen City, China
Shenzhen Southern Machinery Sales And Service Co.,Ltd www.smthelp.com4
FCD-2000
Intelligent temperature Controller Operating instructions
1、 Brief introduction
Power: 220V±10%..AC
Range of temperature: RT+10~250℃;
Range of time: 0~9999 Minute;
Sensor: Pt100;
Environment temperature: 0~50.0℃;
Relative humidity: <85%RH;
2、Panel Instructions
3、Operating
When it is switched on, “8888…”displays for about 4 seconds, it starts running. Press
the temperature menu button “ ”, the controller runs into the temperature / time setting
state, the under window of controller displays the symbol of temperature setting “SP”, and
the over window of the displays the set value of temperature, the user can adjust the
value according to the needs. Re-press the button, the controller runs into the time setting
state, the under window of controller displays the symbol of time setting “St”, the over
window displays the set value of time, the user can adjust the value according to needs
(0~9999) (If the working time is set as 0000, it indicates the timer is inoperative, the
controller will run continuously.) Press the button again, then it returns to the running
state. Press the menu button of temperature for 3 seconds, it runs into the internal value
setting state; if press another 3 seconds, it will return to the running state. In the above
mentioned 2 states, if there is not any operation for 30s, the controller will auto quit the
Shenzhen Southern Mach inery Sales and
Service Co.,Ltd
Address: Room 1806, Block 3, Jinyun COFCO, Qianjin 2nd Road ,Baoan District,Shenzhen City, China
Shenzhen Southern Machinery Sales And Service Co.,Ltd www.smthelp.com5
above mentioned states and the adjusted value will not be saved. When the runtime is
over, the over window of controller will display “End”, the buzzer will sound for 30s, then it
can be muted by pressing the button “▲”. When press the button “▼”for 3s at the time,
the program will restart then.
When the heater is working, the ALM indicator turns on.
When temperature is beyond “SP+AL”, the ALM indicator turns on.
4、Parameter list
Parameter
indicator
Name Instruction of the function
(Setting range)
factory set value
Lc- Password key when Lc=3 ,then we can enter the
next parameters listed. 0
P--
Proportional
band
Adjustment of proportional function.
(8.0~50.0)
35.0
AL-
Alarming
setting
When temperature is beyond
“SP+AL”, the ALM indicator turns on.
The buzzer sounds and the heater output
turns off.
(0.0~20.0)
20.0℃
Pb-
Zero point
adjust
When the zero error comparatively
larger, to update this value should be
needed.
Pb=measure value –actual value
(-9.9~9.9)
0.0
PK-
Full point
adjust
When the full point error also
comparatively larger, to update this value
should be needed.
PK=1000×(measure value –actual
value)/ actual value.
(-999~999)
0
rH-
Range of
temp setting
The range of temperature setting.
(0.0~400.0)
300.0
5、Wiring
Shenzhen Southern Mach inery Sales and
Service Co.,Ltd
Address: Room 1806, Block 3, Jinyun COFCO, Qianjin 2nd Road ,Baoan District,Shenzhen City, China
Shenzhen Southern Machinery Sales And Service Co.,Ltd www.smthelp.com6
Regulation
1) Chemistry product of the combustibility and volatility isn’t put absolutely into the box.
2) If appear circumstances, such as abnormality, smell and smoke...etc. during the period of use,
please turn off power immediately, the customer shouldn’t absolutely to fix blindly, should
notify our company, it is looked into to fix by the professional personnel.
3) The box inner part and the equipments surface want to usually wipe to sweep by keep, the
clarity of the increment glass. Don't use sour, the alkali or other causticity aqua to wipe
outward appearance noodles.
4) The equipments don’t work for long-term, it should be pulled out power cable in order to
prevent the equipments hurt a person. Should press the usage condition to circulate
periodically (general the quarterly degree) for 2-3 days also to banish the dampness of the
electric appliances part, avoid a relevant spare part of damage.

Recommended

Vacuum membrane press machine's manual
Vacuum membrane press machine's manualVacuum membrane press machine's manual
Vacuum membrane press machine's manualAmy Ming
 
Xenon lamp-aging-test-chamber
Xenon lamp-aging-test-chamberXenon lamp-aging-test-chamber
Xenon lamp-aging-test-chamber世满 江
 
Xenon lamp-aging-test-chamber
Xenon lamp-aging-test-chamberXenon lamp-aging-test-chamber
Xenon lamp-aging-test-chamber世满 江
 
Operation instructions of air circulation oven 2016
Operation instructions of air circulation oven 2016Operation instructions of air circulation oven 2016
Operation instructions of air circulation oven 2016伟华 周
 
Xenon lamp aging test chamber
Xenon lamp aging test chamberXenon lamp aging test chamber
Xenon lamp aging test chamber世满 江
 
S 6600-pc reflow oven
S 6600-pc reflow  ovenS 6600-pc reflow  oven
S 6600-pc reflow ovenQuella Fan
 

More Related Content

Similar to Air blast drying oven manual

Reflow Oven for SMT line E8
Reflow Oven for SMT line E8 Reflow Oven for SMT line E8
Reflow Oven for SMT line E8 Mark Tung
 
How does a maize milling plant work
How does a maize milling plant workHow does a maize milling plant work
How does a maize milling plant workLila Wei
 
Uv aging-test-chamber
Uv aging-test-chamberUv aging-test-chamber
Uv aging-test-chamber世满 江
 
Uv aging-test-chamber
Uv aging-test-chamberUv aging-test-chamber
Uv aging-test-chamber世满 江
 
hummudity test machine.pptx
hummudity test machine.pptxhummudity test machine.pptx
hummudity test machine.pptxTewodrosAtirsaw
 
Uv aging test chamber
Uv aging test chamberUv aging test chamber
Uv aging test chamber世满 江
 
E 042 shr user manual
E 042 shr user manualE 042 shr user manual
E 042 shr user manualE-beauty
 
Manual of Thermostat Fan Coil 4Pipes MH8 series - MCO HOME
Manual of Thermostat Fan Coil 4Pipes MH8 series - MCO HOME Manual of Thermostat Fan Coil 4Pipes MH8 series - MCO HOME
Manual of Thermostat Fan Coil 4Pipes MH8 series - MCO HOME Domotica daVinci
 
small-hole-edm-manual.pdf
small-hole-edm-manual.pdfsmall-hole-edm-manual.pdf
small-hole-edm-manual.pdfRobin Yu
 
Anole Hot Runner Controller
Anole Hot Runner ControllerAnole Hot Runner Controller
Anole Hot Runner ControllerAnole Hot Runner
 
Hướng dẫn sử dụng máy đo nhiệt độ Testo 610
Hướng dẫn sử dụng máy đo nhiệt độ Testo 610Hướng dẫn sử dụng máy đo nhiệt độ Testo 610
Hướng dẫn sử dụng máy đo nhiệt độ Testo 610Tenmars Việt Nam
 
Ultrasonic Fuel Monitoring Sensor v3.0
Ultrasonic Fuel Monitoring Sensor v3.0Ultrasonic Fuel Monitoring Sensor v3.0
Ultrasonic Fuel Monitoring Sensor v3.0robin huang
 
Constant temperature and humidity chamber - C&T RF Antennas Inc
Constant temperature and humidity chamber - C&T RF Antennas IncConstant temperature and humidity chamber - C&T RF Antennas Inc
Constant temperature and humidity chamber - C&T RF Antennas IncAntenna Manufacturer Coco
 
Side Swing Gate Opener Installation Manual
Side Swing Gate Opener Installation ManualSide Swing Gate Opener Installation Manual
Side Swing Gate Opener Installation ManualLeviWu1
 

Similar to Air blast drying oven manual (20)

Reflow Oven for SMT line E8
Reflow Oven for SMT line E8 Reflow Oven for SMT line E8
Reflow Oven for SMT line E8
 
How does a maize milling plant work
How does a maize milling plant workHow does a maize milling plant work
How does a maize milling plant work
 
Uv aging-test-chamber
Uv aging-test-chamberUv aging-test-chamber
Uv aging-test-chamber
 
Uv aging-test-chamber
Uv aging-test-chamberUv aging-test-chamber
Uv aging-test-chamber
 
Taber abrasion tester
Taber abrasion testerTaber abrasion tester
Taber abrasion tester
 
hummudity test machine.pptx
hummudity test machine.pptxhummudity test machine.pptx
hummudity test machine.pptx
 
Granbo ultrasonic cleaner gn3613-user manual
Granbo ultrasonic cleaner gn3613-user manualGranbo ultrasonic cleaner gn3613-user manual
Granbo ultrasonic cleaner gn3613-user manual
 
Uv aging test chamber
Uv aging test chamberUv aging test chamber
Uv aging test chamber
 
SP118 Solar Working Station 2014 New Manual
SP118 Solar Working Station 2014 New ManualSP118 Solar Working Station 2014 New Manual
SP118 Solar Working Station 2014 New Manual
 
E 042 shr user manual
E 042 shr user manualE 042 shr user manual
E 042 shr user manual
 
Mh8 fc um
Mh8 fc umMh8 fc um
Mh8 fc um
 
Pressure transmitter dalian zero instrument technology co., ltd china
Pressure transmitter dalian zero instrument technology co., ltd china Pressure transmitter dalian zero instrument technology co., ltd china
Pressure transmitter dalian zero instrument technology co., ltd china
 
Manual of Thermostat Fan Coil 4Pipes MH8 series - MCO HOME
Manual of Thermostat Fan Coil 4Pipes MH8 series - MCO HOME Manual of Thermostat Fan Coil 4Pipes MH8 series - MCO HOME
Manual of Thermostat Fan Coil 4Pipes MH8 series - MCO HOME
 
Hi8us hg01 v2 manual
Hi8us hg01 v2 manualHi8us hg01 v2 manual
Hi8us hg01 v2 manual
 
small-hole-edm-manual.pdf
small-hole-edm-manual.pdfsmall-hole-edm-manual.pdf
small-hole-edm-manual.pdf
 
Anole Hot Runner Controller
Anole Hot Runner ControllerAnole Hot Runner Controller
Anole Hot Runner Controller
 
Hướng dẫn sử dụng máy đo nhiệt độ Testo 610
Hướng dẫn sử dụng máy đo nhiệt độ Testo 610Hướng dẫn sử dụng máy đo nhiệt độ Testo 610
Hướng dẫn sử dụng máy đo nhiệt độ Testo 610
 
Ultrasonic Fuel Monitoring Sensor v3.0
Ultrasonic Fuel Monitoring Sensor v3.0Ultrasonic Fuel Monitoring Sensor v3.0
Ultrasonic Fuel Monitoring Sensor v3.0
 
Constant temperature and humidity chamber - C&T RF Antennas Inc
Constant temperature and humidity chamber - C&T RF Antennas IncConstant temperature and humidity chamber - C&T RF Antennas Inc
Constant temperature and humidity chamber - C&T RF Antennas Inc
 
Side Swing Gate Opener Installation Manual
Side Swing Gate Opener Installation ManualSide Swing Gate Opener Installation Manual
Side Swing Gate Opener Installation Manual
 

Recently uploaded

sffdsfdsfsdfsd gdsfa gsdfg w arga g a graa
sffdsfdsfsdfsd gdsfa gsdfg w arga  g a graasffdsfdsfsdfsd gdsfa gsdfg w arga  g a graa
sffdsfdsfsdfsd gdsfa gsdfg w arga g a graaLeadersOfTomorrow1
 
The Smart Seller's Guide to Cash for Cars in Adelaide
The Smart Seller's Guide to Cash for Cars in AdelaideThe Smart Seller's Guide to Cash for Cars in Adelaide
The Smart Seller's Guide to Cash for Cars in AdelaideCash For Cars Adelaide
 
Heidi by Johanna Spyri.pdf New Era of Modern
Heidi by Johanna Spyri.pdf New Era of ModernHeidi by Johanna Spyri.pdf New Era of Modern
Heidi by Johanna Spyri.pdf New Era of Modernplaybadicecream1
 
Cinematic Language.pptx xxxxxxxxxxxxxxxx
Cinematic Language.pptx xxxxxxxxxxxxxxxxCinematic Language.pptx xxxxxxxxxxxxxxxx
Cinematic Language.pptx xxxxxxxxxxxxxxxxcaitlinbooton
 
draft-information-package-leaflet-regarding-polysorbates-used-excipients-medi...
draft-information-package-leaflet-regarding-polysorbates-used-excipients-medi...draft-information-package-leaflet-regarding-polysorbates-used-excipients-medi...
draft-information-package-leaflet-regarding-polysorbates-used-excipients-medi...pvmalirosh
 
Stay Away from Distractions: Avoid distractions such as texting
Stay Away from Distractions:  Avoid distractions such as textingStay Away from Distractions:  Avoid distractions such as texting
Stay Away from Distractions: Avoid distractions such as textingJeff Lupient Wife
 
Minimum Difficulty of a Job Schedule.pptx
Minimum Difficulty of a Job Schedule.pptxMinimum Difficulty of a Job Schedule.pptx
Minimum Difficulty of a Job Schedule.pptxssuser82c38d
 

Recently uploaded (8)

Friday - peak day for red-light fatalities
Friday - peak day for red-light fatalitiesFriday - peak day for red-light fatalities
Friday - peak day for red-light fatalities
 
sffdsfdsfsdfsd gdsfa gsdfg w arga g a graa
sffdsfdsfsdfsd gdsfa gsdfg w arga  g a graasffdsfdsfsdfsd gdsfa gsdfg w arga  g a graa
sffdsfdsfsdfsd gdsfa gsdfg w arga g a graa
 
The Smart Seller's Guide to Cash for Cars in Adelaide
The Smart Seller's Guide to Cash for Cars in AdelaideThe Smart Seller's Guide to Cash for Cars in Adelaide
The Smart Seller's Guide to Cash for Cars in Adelaide
 
Heidi by Johanna Spyri.pdf New Era of Modern
Heidi by Johanna Spyri.pdf New Era of ModernHeidi by Johanna Spyri.pdf New Era of Modern
Heidi by Johanna Spyri.pdf New Era of Modern
 
Cinematic Language.pptx xxxxxxxxxxxxxxxx
Cinematic Language.pptx xxxxxxxxxxxxxxxxCinematic Language.pptx xxxxxxxxxxxxxxxx
Cinematic Language.pptx xxxxxxxxxxxxxxxx
 
draft-information-package-leaflet-regarding-polysorbates-used-excipients-medi...
draft-information-package-leaflet-regarding-polysorbates-used-excipients-medi...draft-information-package-leaflet-regarding-polysorbates-used-excipients-medi...
draft-information-package-leaflet-regarding-polysorbates-used-excipients-medi...
 
Stay Away from Distractions: Avoid distractions such as texting
Stay Away from Distractions:  Avoid distractions such as textingStay Away from Distractions:  Avoid distractions such as texting
Stay Away from Distractions: Avoid distractions such as texting
 
Minimum Difficulty of a Job Schedule.pptx
Minimum Difficulty of a Job Schedule.pptxMinimum Difficulty of a Job Schedule.pptx
Minimum Difficulty of a Job Schedule.pptx
 

Air blast drying oven manual

  • 1. Shenzhen Southern Mach inery Sales and Service Co.,Ltd Address: Room 1806, Block 3, Jinyun COFCO, Qianjin 2nd Road ,Baoan District,Shenzhen City, China Shenzhen Southern Machinery Sales And Service Co.,Ltd www.smthelp.com1 Version: Feb, 2012 Air-blast Drying Oven Instruction Manual Thank you for your choosing our products. Please read this manual carefully before you operate the air-blast drying oven. And keep it properly after you read it. We believe this manual will help you operate the oven well. Summary
  • 2. Shenzhen Southern Mach inery Sales and Service Co.,Ltd Address: Room 1806, Block 3, Jinyun COFCO, Qianjin 2nd Road ,Baoan District,Shenzhen City, China Shenzhen Southern Machinery Sales And Service Co.,Ltd www.smthelp.com2 Provided to industrial and mining enterprises,laboratories and scientific research institutes for desi ccation, torrefaction, wax-melting and sterilization. Primary Technical Characteristics Models Parameters 9023A 9053A 9123A 9203A Interior dimension: W×D×H(mm) 300×300×270 420×350×350 550×350×550 600×550×600 Plank 2 2 2 2 Temperature range RT+10-250℃ Temperature control/stability 0.1 ℃/±0.5℃ Power supply 220V、50Hz Consume power 500W 750W 1500W 2000W Install and adjust 1) Don't collide the body and make an effort on its glass in the middle of transportation. 2) The equipments should be placed steady after falling to the ground. 3) Don't use the instrument in the place where is sunlight or heat damp. 4) The equipments should keep off the electromagnetism interference source, and connect equipments a ground of line connect ground effectively. 5) The equipments while circulating normally, product inside the box's putting to put should not run into inside the wall. 6) The power cable never mind depends a behind, also not let the instrument or other products press on-line in the power supply in order to prevent hurts power cable. Usage
  • 3. Shenzhen Southern Mach inery Sales and Service Co.,Ltd Address: Room 1806, Block 3, Jinyun COFCO, Qianjin 2nd Road ,Baoan District,Shenzhen City, China Shenzhen Southern Machinery Sales And Service Co.,Ltd www.smthelp.com3 1, Open the door and need the processing article to put to put plank into the box up, close the door. 2, Connect power supply, insert the power supply plug into the AC outlet, the power switch of the front-panel place in the position of "open", the gauge appears the numeral manifestation at this time, meaning the equipments enters work appearance. 3, Pass the operation temperature controller, set you must of temperature inside the box. 4, The instrument begins to work, temperature inside the box attains initial value gradually, time through the dry processing need after, handle a work completion. 5, Close power supply, need temperature inside the box to open to put the spirit valve after near to the environment temperature, relieve vacuum inside the box. Open the door, take out article. 【!】Hint specially 1) Product didn't carry on correction generally through strict test before the factory, is bad such as the environment of the hour of usage, the environment temperature outran feat scope, will cause the temperature manifestation value and actual temperature error margin inside the box, if outrun the technique index sign scope of, can revise, concretely the step according to the temperature controller operating instructions to press to need to carry on correction. 2) Instrument is under the normal work appearance, if open a box of time to lead to grow, after closing a box of door temporarily temperature inside the box is some fluctuations, this is the normal phenomenon. 3) Attention of testing: The thermometer that test inside the box use wants to use 1.0 mercury thermometer of the accuracies, and put mercury to the center in the box.
  • 4. Shenzhen Southern Mach inery Sales and Service Co.,Ltd Address: Room 1806, Block 3, Jinyun COFCO, Qianjin 2nd Road ,Baoan District,Shenzhen City, China Shenzhen Southern Machinery Sales And Service Co.,Ltd www.smthelp.com4 FCD-2000 Intelligent temperature Controller Operating instructions 1、 Brief introduction Power: 220V±10%..AC Range of temperature: RT+10~250℃; Range of time: 0~9999 Minute; Sensor: Pt100; Environment temperature: 0~50.0℃; Relative humidity: <85%RH; 2、Panel Instructions 3、Operating When it is switched on, “8888…”displays for about 4 seconds, it starts running. Press the temperature menu button “ ”, the controller runs into the temperature / time setting state, the under window of controller displays the symbol of temperature setting “SP”, and the over window of the displays the set value of temperature, the user can adjust the value according to the needs. Re-press the button, the controller runs into the time setting state, the under window of controller displays the symbol of time setting “St”, the over window displays the set value of time, the user can adjust the value according to needs (0~9999) (If the working time is set as 0000, it indicates the timer is inoperative, the controller will run continuously.) Press the button again, then it returns to the running state. Press the menu button of temperature for 3 seconds, it runs into the internal value setting state; if press another 3 seconds, it will return to the running state. In the above mentioned 2 states, if there is not any operation for 30s, the controller will auto quit the
  • 5. Shenzhen Southern Mach inery Sales and Service Co.,Ltd Address: Room 1806, Block 3, Jinyun COFCO, Qianjin 2nd Road ,Baoan District,Shenzhen City, China Shenzhen Southern Machinery Sales And Service Co.,Ltd www.smthelp.com5 above mentioned states and the adjusted value will not be saved. When the runtime is over, the over window of controller will display “End”, the buzzer will sound for 30s, then it can be muted by pressing the button “▲”. When press the button “▼”for 3s at the time, the program will restart then. When the heater is working, the ALM indicator turns on. When temperature is beyond “SP+AL”, the ALM indicator turns on. 4、Parameter list Parameter indicator Name Instruction of the function (Setting range) factory set value Lc- Password key when Lc=3 ,then we can enter the next parameters listed. 0 P-- Proportional band Adjustment of proportional function. (8.0~50.0) 35.0 AL- Alarming setting When temperature is beyond “SP+AL”, the ALM indicator turns on. The buzzer sounds and the heater output turns off. (0.0~20.0) 20.0℃ Pb- Zero point adjust When the zero error comparatively larger, to update this value should be needed. Pb=measure value –actual value (-9.9~9.9) 0.0 PK- Full point adjust When the full point error also comparatively larger, to update this value should be needed. PK=1000×(measure value –actual value)/ actual value. (-999~999) 0 rH- Range of temp setting The range of temperature setting. (0.0~400.0) 300.0 5、Wiring
  • 6. Shenzhen Southern Mach inery Sales and Service Co.,Ltd Address: Room 1806, Block 3, Jinyun COFCO, Qianjin 2nd Road ,Baoan District,Shenzhen City, China Shenzhen Southern Machinery Sales And Service Co.,Ltd www.smthelp.com6 Regulation 1) Chemistry product of the combustibility and volatility isn’t put absolutely into the box. 2) If appear circumstances, such as abnormality, smell and smoke...etc. during the period of use, please turn off power immediately, the customer shouldn’t absolutely to fix blindly, should notify our company, it is looked into to fix by the professional personnel. 3) The box inner part and the equipments surface want to usually wipe to sweep by keep, the clarity of the increment glass. Don't use sour, the alkali or other causticity aqua to wipe outward appearance noodles. 4) The equipments don’t work for long-term, it should be pulled out power cable in order to prevent the equipments hurt a person. Should press the usage condition to circulate periodically (general the quarterly degree) for 2-3 days also to banish the dampness of the electric appliances part, avoid a relevant spare part of damage.
  • 7. Shenzhen Southern Mach inery Sales and Service Co.,Ltd Address: Room 1806, Block 3, Jinyun COFCO, Qianjin 2nd Road ,Baoan District,Shenzhen City, China Shenzhen Southern Machinery Sales And Service Co.,Ltd www.smthelp.com7 Electrical circuit diagram
  • 8. Shenzhen Southern Mach inery Sales and Service Co.,Ltd Address: Room 1806, Block 3, Jinyun COFCO, Qianjin 2nd Road ,Baoan District,Shenzhen City, China Shenzhen Southern Machinery Sales And Service Co.,Ltd www.smthelp.com8