Resource Levelling - PMBOK - Example
•
11 likes
•
5,177 views
Waleed Liaqat
Follow
An example describing resource levelling according to PMBOK
Read less
Read more
Education
Technology
Business
Report
Share
Report
Share
1 of 6
Download now
Download to read offline
Recommended
5year lahore board xi
5year lahore board xi
Asad Shafat
UBC_Transcript
UBC_Transcript
Ziyang Jin
Back to basics scheduling Webinar
Back to basics scheduling Webinar
Association for Project Management
Transcript
Transcript
Raymond Russell
Practice pert gantt
Practice pert gantt
Hira Farooq
EPC-4 Package Status Update September 16-09-2011
EPC-4 Package Status Update September 16-09-2011
abughaws
arm
arm
Kevin scott
The 5 Pillars of Cloudiness
The 5 Pillars of Cloudiness
Wayne Walls
Recommended
5year lahore board xi
5year lahore board xi
Asad Shafat
UBC_Transcript
UBC_Transcript
Ziyang Jin
Back to basics scheduling Webinar
Back to basics scheduling Webinar
Association for Project Management
Transcript
Transcript
Raymond Russell
Practice pert gantt
Practice pert gantt
Hira Farooq
EPC-4 Package Status Update September 16-09-2011
EPC-4 Package Status Update September 16-09-2011
abughaws
arm
arm
Kevin scott
The 5 Pillars of Cloudiness
The 5 Pillars of Cloudiness
Wayne Walls
Bas Vodde - The story of LEsS
Bas Vodde - The story of LEsS
Scrum Australia Pty Ltd
PH Test.pdf
PH Test.pdf
ssusercc4520
The circle
The circle
sjamaths
Angular Frankfurt #1 - Managing Application State in Reactive Angular Applica...
Angular Frankfurt #1 - Managing Application State in Reactive Angular Applica...
Florian Reifschneider
Single Family Gantt Chart-John Mueller
Single Family Gantt Chart-John Mueller
John Mueller
GC minyak jelantah
GC minyak jelantah
shintia putri
Logs & exponential
Logs & exponential
sjamaths
prongshollow
prongshollow
Kevin scott
armfor3dprinter
armfor3dprinter
Kevin scott
Assembly2
Assembly2
Kevin scott
Applied computer and business skills pacing chart sem 1 15 16
Applied computer and business skills pacing chart sem 1 15 16
Kathy Sheridan
Root cause analysis procedure
Root cause analysis procedure
Sambeet Panda
Consider the following resource loading table. Assume that we canno.docx
Consider the following resource loading table. Assume that we canno.docx
donnajames55
Fast and accurate metrics. Is it actually possible?
Fast and accurate metrics. Is it actually possible?
Bogdan Storozhuk
Lecture 5.pdf
Lecture 5.pdf
JamalKhan696508
EM Assignment 3.docx
EM Assignment 3.docx
HadiKhan958765
Asset final
Asset final
Rahul Singh Dhanik
Mech 202 Project 2 Report
Mech 202 Project 2 Report
Justin Weinmeister
Project management
Project management
Anurag Srivastava
A Short Study of Galois Field
A Short Study of Galois Field
Hazratali Naim
Critical path method (cpm)
Critical path method (cpm)
Nikka Lopez
newmicrosoftofficepowerpointpresentation-150826055944-lva1-app6891.pdf
newmicrosoftofficepowerpointpresentation-150826055944-lva1-app6891.pdf
BiswajitPalei2
More Related Content
What's hot
Bas Vodde - The story of LEsS
Bas Vodde - The story of LEsS
Scrum Australia Pty Ltd
PH Test.pdf
PH Test.pdf
ssusercc4520
The circle
The circle
sjamaths
Angular Frankfurt #1 - Managing Application State in Reactive Angular Applica...
Angular Frankfurt #1 - Managing Application State in Reactive Angular Applica...
Florian Reifschneider
Single Family Gantt Chart-John Mueller
Single Family Gantt Chart-John Mueller
John Mueller
GC minyak jelantah
GC minyak jelantah
shintia putri
Logs & exponential
Logs & exponential
sjamaths
prongshollow
prongshollow
Kevin scott
armfor3dprinter
armfor3dprinter
Kevin scott
Assembly2
Assembly2
Kevin scott
Applied computer and business skills pacing chart sem 1 15 16
Applied computer and business skills pacing chart sem 1 15 16
Kathy Sheridan
Root cause analysis procedure
Root cause analysis procedure
Sambeet Panda
What's hot
(12)
Bas Vodde - The story of LEsS
Bas Vodde - The story of LEsS
PH Test.pdf
PH Test.pdf
The circle
The circle
Angular Frankfurt #1 - Managing Application State in Reactive Angular Applica...
Angular Frankfurt #1 - Managing Application State in Reactive Angular Applica...
Single Family Gantt Chart-John Mueller
Single Family Gantt Chart-John Mueller
GC minyak jelantah
GC minyak jelantah
Logs & exponential
Logs & exponential
prongshollow
prongshollow
armfor3dprinter
armfor3dprinter
Assembly2
Assembly2
Applied computer and business skills pacing chart sem 1 15 16
Applied computer and business skills pacing chart sem 1 15 16
Root cause analysis procedure
Root cause analysis procedure
Similar to Resource Levelling - PMBOK - Example
Consider the following resource loading table. Assume that we canno.docx
Consider the following resource loading table. Assume that we canno.docx
donnajames55
Fast and accurate metrics. Is it actually possible?
Fast and accurate metrics. Is it actually possible?
Bogdan Storozhuk
Lecture 5.pdf
Lecture 5.pdf
JamalKhan696508
EM Assignment 3.docx
EM Assignment 3.docx
HadiKhan958765
Asset final
Asset final
Rahul Singh Dhanik
Mech 202 Project 2 Report
Mech 202 Project 2 Report
Justin Weinmeister
Project management
Project management
Anurag Srivastava
A Short Study of Galois Field
A Short Study of Galois Field
Hazratali Naim
Critical path method (cpm)
Critical path method (cpm)
Nikka Lopez
newmicrosoftofficepowerpointpresentation-150826055944-lva1-app6891.pdf
newmicrosoftofficepowerpointpresentation-150826055944-lva1-app6891.pdf
BiswajitPalei2
CPM practicals (2) with answers.pptx
CPM practicals (2) with answers.pptx
zxcvbnm43
Week 10 part 1 pe 6282 Block Diagrams
Week 10 part 1 pe 6282 Block Diagrams
Charlton Inao
Similar to Resource Levelling - PMBOK - Example
(12)
Consider the following resource loading table. Assume that we canno.docx
Consider the following resource loading table. Assume that we canno.docx
Fast and accurate metrics. Is it actually possible?
Fast and accurate metrics. Is it actually possible?
Lecture 5.pdf
Lecture 5.pdf
EM Assignment 3.docx
EM Assignment 3.docx
Asset final
Asset final
Mech 202 Project 2 Report
Mech 202 Project 2 Report
Project management
Project management
A Short Study of Galois Field
A Short Study of Galois Field
Critical path method (cpm)
Critical path method (cpm)
newmicrosoftofficepowerpointpresentation-150826055944-lva1-app6891.pdf
newmicrosoftofficepowerpointpresentation-150826055944-lva1-app6891.pdf
CPM practicals (2) with answers.pptx
CPM practicals (2) with answers.pptx
Week 10 part 1 pe 6282 Block Diagrams
Week 10 part 1 pe 6282 Block Diagrams
More from Waleed Liaqat
The Three Step Writing Process (Technical & Business Writing)
The Three Step Writing Process (Technical & Business Writing)
Waleed Liaqat
Nietzsche's Philosophies
Nietzsche's Philosophies
Waleed Liaqat
Selected verses from the quran
Selected verses from the quran
Waleed Liaqat
Brief Introduction to Architecture
Brief Introduction to Architecture
Waleed Liaqat
Urban Planning Types, Processes and History
Urban Planning Types, Processes and History
Waleed Liaqat
Construction machinery - Associated costs and basic concepts
Construction machinery - Associated costs and basic concepts
Waleed Liaqat
Fundamentals of Effective Business Communication
Fundamentals of Effective Business Communication
Waleed Liaqat
Introduction to town and Urban planning
Introduction to town and Urban planning
Waleed Liaqat
Brief Introduction to Project Life Cycle And Organizational Structures
Brief Introduction to Project Life Cycle And Organizational Structures
Waleed Liaqat
Brief Introduction to Project Management
Brief Introduction to Project Management
Waleed Liaqat
Public Health Engineering - Concepts Regarding Water
Public Health Engineering - Concepts Regarding Water
Waleed Liaqat
Youth and Education in Pakistan
Youth and Education in Pakistan
Waleed Liaqat
LEED 2009 applied to a mixed - use building
LEED 2009 applied to a mixed - use building
Waleed Liaqat
An Overview of the History of Pakistan: 1947 - 1973
An Overview of the History of Pakistan: 1947 - 1973
Waleed Liaqat
Richter scale and mercalli scale
Richter scale and mercalli scale
Waleed Liaqat
Key Components of Cost Estimation in construction
Key Components of Cost Estimation in construction
Waleed Liaqat
Plain Concrete - General concepts
Plain Concrete - General concepts
Waleed Liaqat
S-curve analysis for development of hydrographs
S-curve analysis for development of hydrographs
Waleed Liaqat
Activity on Arrow Diagram
Activity on Arrow Diagram
Waleed Liaqat
Remote sensing and it's applications
Remote sensing and it's applications
Waleed Liaqat
More from Waleed Liaqat
(20)
The Three Step Writing Process (Technical & Business Writing)
The Three Step Writing Process (Technical & Business Writing)
Nietzsche's Philosophies
Nietzsche's Philosophies
Selected verses from the quran
Selected verses from the quran
Brief Introduction to Architecture
Brief Introduction to Architecture
Urban Planning Types, Processes and History
Urban Planning Types, Processes and History
Construction machinery - Associated costs and basic concepts
Construction machinery - Associated costs and basic concepts
Fundamentals of Effective Business Communication
Fundamentals of Effective Business Communication
Introduction to town and Urban planning
Introduction to town and Urban planning
Brief Introduction to Project Life Cycle And Organizational Structures
Brief Introduction to Project Life Cycle And Organizational Structures
Brief Introduction to Project Management
Brief Introduction to Project Management
Public Health Engineering - Concepts Regarding Water
Public Health Engineering - Concepts Regarding Water
Youth and Education in Pakistan
Youth and Education in Pakistan
LEED 2009 applied to a mixed - use building
LEED 2009 applied to a mixed - use building
An Overview of the History of Pakistan: 1947 - 1973
An Overview of the History of Pakistan: 1947 - 1973
Richter scale and mercalli scale
Richter scale and mercalli scale
Key Components of Cost Estimation in construction
Key Components of Cost Estimation in construction
Plain Concrete - General concepts
Plain Concrete - General concepts
S-curve analysis for development of hydrographs
S-curve analysis for development of hydrographs
Activity on Arrow Diagram
Activity on Arrow Diagram
Remote sensing and it's applications
Remote sensing and it's applications
Recently uploaded
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
JemimahLaneBuaron
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
Disha Kariya
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
VishalSingh1417
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
pragatimahajan3
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
Jayanti Pande
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
sanyamsingh5019
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
chloefrazer622
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Krashi Coaching
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024
Janet Corral
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Sapana Sha
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
Thiyagu K
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
agholdier
microwave assisted reaction. General introduction
microwave assisted reaction. General introduction
Maksud Ahmed
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
Association for Project Management
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
fonyou31
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
RAM LAL ANAND COLLEGE, DELHI UNIVERSITY.
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
iammrhaywood
Recently uploaded
(20)
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
microwave assisted reaction. General introduction
microwave assisted reaction. General introduction
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
Resource Levelling - PMBOK - Example
1.
Waleed Liaqat 122 SEC A Construction
Project Management Assignment # 3 Submitted to: Lec. Bilal Zafar From:
2.
3.
Activity Duration ES
EF LS LF TF FF A 2 0 2 0 2 0 0 B 4 2 6 4 8 2 0 C 6 2 8 2 8 0 0 D 9 2 11 6 15 4 4 E 5 6 11 10 15 4 4 F 7 8 15 8 15 0 0 G 3 15 18 15 18 0 nil 18 Total Duration of project (Days) B 4 D 9 C 6 F 7 E 5 G 3 A 2 PS Critical
4.
Activity A 3 3 B
2 2 2 2 C 4 4 4 4 4 4 D 3 3 3 3 3 3 3 3 3 E 4 4 4 4 4 F 2 2 2 2 2 2 G 4 4 4 Day 1 2 3 4 5 6 7 8 9 10 11 13 14 15 16 17 18 Total Laborers 3 3 9 9 9 9 11 11 9 9 9 2 2 2 4 4 4 KEY OveruseFloat Non critical Activity Critical Activity 0 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 1 3 1 4 15 1 6 1 7 18 LABORERS DAYS BEFORE LEVELLING
5.
Activity A 3 3 B
X X 2 2 2 2 C 4 4 4 4 4 4 D 3 3 3 3 3 3 3 3 3 E X X 4 4 4 4 F 2 2 2 2 2 2 G 4 4 4 Day 1 2 3 4 5 6 7 8 9 10 11 13 14 15 16 17 18 Total Laborers 3 3 7 7 9 9 9 9 9 9 9 6 2 2 4 4 4 0 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 LABORERS DAYS INTERMEDIATE LEVELLING
6.
Activity A 3 3 B
X X 2 2 2 2 C 4 4 4 4 4 4 D D D D D 3 3 3 3 3 3 3 3 E X X 4 4 4 4 F 2 2 2 2 2 2 G 4 4 4 Day 1 2 3 4 5 6 7 8 9 10 11 13 14 15 16 17 18 Total Laborers 3 3 4 4 6 6 9 9 9 9 9 9 5 5 4 4 4 Float X ASSIGNMENT FIX D DISTRIBUTIO N FIX KEY Critical Activity Non critical Activity 0 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 LABORERS DAYS AFTER COMPLETE LEVELLING
Download now