Assets deterioration is a natural
phenomenon over time. This happens due to
various reasons through corrosion,
weakening of materials, natural disaster
damage, etc. A way of managing and
inspecting the quality and quantity of
deterioration is called a condition
assessment.
Conditioning
Moniterning of
Builduing.
Asset management of properties
Rahul Singh, NICMAR Pune
1
Condition Monitoring of Academic Block Building (NICMAR)
Asset Management of Properties
Submitted By:
Rahul Dhanik (RP14068)
National Institute of Construction Management and Research, Pune
2
Contents:
S.No Topic Page No.
1. Introduction 3
2. Description of the asset 3
3. Literature review 4
3.1 Need for condition monitoring 4
3.2 Techniques of condition monitoring 4
4. Condition monitoring of the asset 4
4.1 Methodology used 4
4.2 Questionnaire 5
4.3 Data Collection 6
4.3.1 Secondary data 6
4.3.2 Primary data 7
5. Analysis 11
6. Conclusion 11
7. References 11
List of images and tables:
S.No Name Page No
1 Image 1: Life of building 3
2 Image 2: Live condition of the asset 10
3 Table 1: Rating criteria 7
4 Table 2: Rating of rooms 8
3
1. Introduction
Assets deterioration is a natural phenomenon over time. This happens due to various reasons through
corrosion, weakening of materials, natural disaster damage, etc. A way of managing and inspecting the
quality and quantity of deterioration is called a condition assessment. Inspection and investigation of
technical condition of buildings and its structures has become one of the most important activities of
construction nowadays. Ensuring reliability of buildings, to conduct the repair work, as well as the
development of project documentation for reconstruction buildings and structures is known as asset
management of buildings.
2. Description of the Asset
NICMAR's Pune Campus is situated at Balewadi, 14 kmsaway from the Pune Central Railway Station and
7 kms away from Pune University. The Campus started its operation in year 2004 and is spread across 11
acres of land and is constructed using the latest materials and technologies and having numerous
The structure which is taken for the research purpose is Academic Block. This is an institutional building
where the scope of wear and tear is not much. The NICMAR structure was constructed in 2 phases, first
phase in 2005 (library side up to Deans’ office) and Phase 2 in 2009(current DG office and class rooms
above the new faculty block). If we take lifecycle of this building to be 50 years then the building is in its
childhood stage (only 5, 10 years old)
The building consists of ground, first and second floors where various classes, faculty rooms and offices
are located.
Image 1: Life of Building
Source:http://www.choa.bc.ca/_resources/Bulletin04_Life_of_Buildings.pdf
4
3. Literature Review
Condition monitoring involves the continuous or periodic assessment of the condition of an asset while it is
in its lifecycle. Basically condition monitoring is the process of monitoring some parameters from the asset,
such that a significant change in the parameter can give information about the health of the asset. It
involves the continuous or periodic assessment of the condition of an asset while it is in its life cycle.
3.1 Needfor Condition Monitoring Systems
 The need to predict Asset failures
 The need for a holistic view of equipment condition
 The need for greater accuracy in failure prediction
 The need to reduce the cost of Condition Monitoring
 The need to improve Assets and its component reliability
 The need to optimiseAsset performance
3.2 Techniques of Conditioning Monitoring
 Visual inspection – Operational performance.
 Vibration Measurement and Analysis.
 Infrared Thermography.
 Oil Analysis and Tribology.
 Ultrasonic.
 Motor Current Analysis.
 Acoustic based analysis.
 Non destructive test techniques.
 Lubrication Sample Management and Analysis.
4. Condition Monitoring of Asset
4.1 Methodology used
 The most basic form of conditioning monitoring is visual inspection and we followed the same for
our project.
 We have divided every room into five parts i.e. flooring, painting, ceiling, furniture and electrical
components. Then according to visual look of these items we have given them different ratings.
 We don’t have any quantifiable parameters to support our inspection. So we have four ratings to
every item by four individuals.
 Then for final data we have took average of those four ratings.
5
4.2 Questionnaire
Name of the project:Academic Block, NICMAR Pune.
Detail of the respondent: S.D.JANGAM ( Maintenance Manager )
Q.1 When was the asset constructed/rehabilitated/replaced?
Ans: Phase wise construction: Phase 1 in 2004 and phase 2 in 2009.
Q.2 What is the asset’s theoretical effective life?
Ans: 100 years.
Q.3 Where is the asset in its lifecycle?
Ans: 10 years.
Q.4 Has the asset been inspected physically and by what process?
Ans: Annual physical inspection is done by assigned committee during summer vacations.
Q.5 How could planned maintenance prevent the asset’s failure or extend the time of failure?
Ans: Routine maintenance helps determines the small and initials issues which when corrected timely
helps prevent major failures.
Q.6 Is the asset technically or commercially obsolete?
Ans: No
Q.7 Are asset condition grading appropriate and relevant?
Ans: Yes
Q.8 Are asset condition monitoring process effective?
Ans: Yes
Q.9 Type of asset.
Ans: Fixed asset – Institutional building.
Q.10 The criticality of the asset.
Ans: Not very critical.
Q.11 The relative age of the asset.
Ans:5, 10 years. The building is in initial stage considering the life of building as 100 years.
Q.12 Existing asset condition assessment practices?
Ans:Visual inspection- Routine physical inspection which is done on yearly basis.
Q.13 Available options/techniques.
Ans:Visual inspection only.
Q.14Condition assessment frequency.
Ans: The building is inspected yearly and maintenance is done on the priority basis of the whole campus.
6
4.3 Data collection
Primary data is collected by visual inspection and secondary data is collected by interviewing.
4.3.1Secondary data
Maintenance of asset
 Yearly planned maintenance is done to prevent the asset’s failure.
 Maintenance cost is Rs. 2.25 Crore (for whole campus).
 Yearly budget is decided for the maintenance.
 Maintenance done on priority basis.
Substation:
 Manual checking and cleaning of electrical switches is done yearly by alcohol.
Power failure:
 800 to 1000 litre of diesel is required monthly. (for whole campus)
Furniture:
 Yearly physical checking of all the items like chair, desk, dice etc is done.
 High priority is given to the furniture.
 Backup furnitureis also available and can be replaced whenever required.
Water cooler:
 Cleaning of water tanks in every six months.
 Water sample is sent for testing in every six months to government approved labs.
Civil work:
 It includes tiles, paints, ceiling etc.
 Depute civil people for major works and special budget is sanctioned from the board.
Painting:
 Painting is done annually but on phase wise.
 Phase is selected on priority basis.
UPS:
 Manufacturer – DUBAS.
 Annual maintenance contract with DUBAS.
7
Major work done in asset’s life cycle
I. Water proofing of roof
 Water leakage problem in Room no S-14, S-16, S-17, S-18, S-19, S-20 and Accounts
Departments.
 Three year study by Path Work.
 Bitumen sheet water proofing for whole roof is done in 2014.
II. Water supply connection
 Water sources were insufficient in campus, dependent on Bore wells and water tankers.
 There is no water connection before 2013.
 In 2013, 2 inch water line connection was taken from PMC.
III. Construction of new staircase
 There is an increase in number of students at campus.
 An extra staircase is constructed near faculty staff room in 2009.
4.3.2 Primary data
 We have divided each room into five parts i.e. flooring, painting, ceiling, furniture and electrical
components. Then according to visual look of these items we have given them different ratings.
 We don’t have any quantifiable parameters to support our inspection. So we have given ratings to
each item by four individuals.
 Then for final data we have took average of those four ratings.
 Then sum of all the five parts will decide the condition of that particular room.
Total
1 to 5 Very Poor
5 to 10 Poor
10 to 15 Moderate
15 to 20 Good
20 to 25 Very Good
Table 1: Rating criteria
8
SR.
NO.
ROOM
FLOORING PAINT CEILING FURNITURE ELE.SWITCH
Total
1 F 11
5 5 5 5 5
5 5 5 5 5
4 4 4 4 4
4 4 5 4 5
4.5 4.5 4.8 4.5 4.8 23.0
2 F 14
5 4 5 4 4
4 4 4 4 5
3 3 4 3 4
4 4 4 4 4
4 3.75 4.25 3.75 4.25 20
3 F 15
3 3 5 4 5
4 3 5 4 4
3 3 4 3 3
4 3 5 4 4
3.5 3 4.75 3.75 4 19
4 F 17
2 3 5 4 5
4 4 5 4 5
3 4 4 4 4
3 3 5 4 4
3 3.5 4.75 4 4.5 19.75
5 F 21
4 4 5 4 3
4 4 4 4 5
4 4 3 3 4
4 4 5 4 3
4 4 4.25 3.75 3.75 19.75
6 S 11
3 5 4 3 5
3 4 3 3 5
3 4 3 4 3
4 5 4 4 5
3.25 4.5 3.5 3.5 4.5 19.25
7 S13
5 4 4 5 5
4 4 4 4 4
4 3 3 4 4
4 4 4 4 4
4.25 3.75 3.75 4.25 4.25 20.25
8 S 15
5 3 3 5 3
4 3 2 4 5
4 3 2 3 4
4 3 3 4 3
4.25 3 2.5 4 3.75 17.5
9 S 16
5 3 3 5 3
4 3 3 4 5
3 3 3 3 4
9
4 3 3 4 4
4 3 3 4 4 18
10 S 17
5 4 2 4 5
4 3 3 4 5
4 3 3 3 4
4 3 3 3 4
4.25 3.25 2.75 3.5 4.5 18.25
11 S 19
4 3 2 3 4
5 4 3 4 5
3 3 3 3 3
4 3 3 3 4
4 3.25 2.75 3.25 4 17.25
12 S 21
5 4 4 4 5
5 4 5 4 5
4 3 3 4 4
5 4 4 4 5
4.75 3.75 4 4 4.75 21.25
13 G-TOILET 1st
F.
4 3 4 3 5
4 4 4 4 5
3 3 5 4 5
4 4 5 3 5
3.75 3.5 4.5 3.5 5 20.25
14 G-TOILET 2nd
F.
4 2 4 4 5
4 2 4 3 4
3 2 3 2 3
4 3 4 3 4
3.75 2.25 3.75 3 4 16.75
15 L-TOILET 1st
F
3 3 3 3 4
3 2 3 2 4
2 2 2 2 4
2 2 3 3 4
2.5 2.25 2.75 2.5 4 14
16 L-TOILET 2nd
F
4 4 4 4 4
3 3 3 4 4
3 4 4 3 4
3 4 3 4 4
3.25 3.75 3.5 3.75 4 18.25
17 EXTERIOR
3 2 2 3 3
3 3 2 2 3
2 2 3 3 3
3 3 2 3 2
2.75 2.5 2.25 2.75 2.75 13
Table 2 : Rating of the rooms
10
Image 2 :Live condition of the asset
11
5. Analysis:
As the building is newly constructed ( 5 year ) , most of it is in good shape barring a few.
Problem area:
Some of the areas have deteriorated heavily like Girls Toilet and Roof of the Second floor.
Solutions:
Regular maintenance and up keep will help reduce the chances of further deterioration and help
have a longer life cycle and in turn save the cost.
6. Conclusion :
NICMAR being a premier institute in Construction and Real Estate Management needs to maintain
its reputation in terms of its own construction and maintenance of its buildings (Assets). Therefore
it is utmost important that more focus is given to up keep and maintenance of the campus. We
have observed and found out some problematic areas which need immediate attention. Our
suggestion is to look and tackle those areas for better asset life cycle.
7. References
 The Hillsborough County ,Florida Experience:U.S.Department of Transportation-2005
 Using NI Hardware and Software to Build the CMS-1000 Combustion Dynamic Condition
Monitoring System : Jordan Pritt, Turbine Technology Services Corporation
 Model-based Framework for Oil Production Forecasting and Optimization-A Case Study in
Integrated Asset Management:Cong Zhang, AbdollahOrangi, AmolBakshi, Will Da Sie, and
Viktor K. Prasanna,University of Southern California, Los Angeles, CA 90089 USA
 Using CompactRIO to Develop a Large-Scale Condition Monitoring and Management System:
Chua SengHiap, Singapore Technologies Kinetics Ltd
 Using LabVIEW to Design a Greenhouse Remote Monitoring System:- Fulu Wang, Northeast
Agriculture University
 On-Line Sensors for Condition Monitoring: Michel Murphy Condition Monitoring International
LLC Roswell, GA, USA Thomas S Kent BEng, AMIMechE – Development Engineer Kittiwake
Developments, Littlehampton U.K.( 61st STLE Annual Meeting Condition Monitoring
Technical Session Calgary, AB Canada)
 Remote Condition Monitoring of London Underground Track Circuits: Sam Etchell, London
Underground Limited
 Machine condition monitoring system using vibration analysis- Case Study of
BamblePetrochemicalPlant,Norway :D.N.Brown&J.C.JorgensenBriiel&Kjsev

More Related Content

Similar to Asset final

IRJET- Structural Audit – A Case Study of Educational Building
IRJET-  	  Structural Audit – A Case Study of Educational BuildingIRJET-  	  Structural Audit – A Case Study of Educational Building
IRJET- Structural Audit – A Case Study of Educational BuildingIRJET Journal
 
Presentation by shubham vyas
Presentation by shubham vyasPresentation by shubham vyas
Presentation by shubham vyasPMI_IREP_TP
 
Presentation by shubham vyas
Presentation by shubham vyasPresentation by shubham vyas
Presentation by shubham vyasPMI_IREP_TP
 
IRJET- Health Evaluation-Case Study
IRJET- Health Evaluation-Case StudyIRJET- Health Evaluation-Case Study
IRJET- Health Evaluation-Case StudyIRJET Journal
 
Anis rahman khokan's internship paper
Anis rahman khokan's internship paperAnis rahman khokan's internship paper
Anis rahman khokan's internship paperAnis Rahman Khokan
 
Capital Needs Assessment Example
Capital Needs Assessment ExampleCapital Needs Assessment Example
Capital Needs Assessment ExampleAdam Hoeksema
 
7th_8th_SEM_SYLLABUS.pdf
7th_8th_SEM_SYLLABUS.pdf7th_8th_SEM_SYLLABUS.pdf
7th_8th_SEM_SYLLABUS.pdfPranayManwar
 
FORENSIC ANALYSIS OF COLLAPSE OF SURFSIDE CONDMINIMUM, MIAMI
FORENSIC ANALYSIS OF COLLAPSE OF SURFSIDE CONDMINIMUM, MIAMIFORENSIC ANALYSIS OF COLLAPSE OF SURFSIDE CONDMINIMUM, MIAMI
FORENSIC ANALYSIS OF COLLAPSE OF SURFSIDE CONDMINIMUM, MIAMIIRJET Journal
 
IRJET- Review on Restrengthening of Existing R.C Structure with Considera...
IRJET-  	  Review on Restrengthening of Existing R.C Structure with Considera...IRJET-  	  Review on Restrengthening of Existing R.C Structure with Considera...
IRJET- Review on Restrengthening of Existing R.C Structure with Considera...IRJET Journal
 
Iwsm2014 the effect of highlighting error categories in fsm training on the...
Iwsm2014   the effect of highlighting error categories in fsm training on the...Iwsm2014   the effect of highlighting error categories in fsm training on the...
Iwsm2014 the effect of highlighting error categories in fsm training on the...Nesma
 
IRJET- Repair and Rehabilitation of a Building
IRJET- Repair and Rehabilitation of a BuildingIRJET- Repair and Rehabilitation of a Building
IRJET- Repair and Rehabilitation of a BuildingIRJET Journal
 
IRJET- Comparative Study of Top down & Bottom up Method Construction Schedule...
IRJET- Comparative Study of Top down & Bottom up Method Construction Schedule...IRJET- Comparative Study of Top down & Bottom up Method Construction Schedule...
IRJET- Comparative Study of Top down & Bottom up Method Construction Schedule...IRJET Journal
 
IRJET- Structural Audit Report
IRJET-  	  Structural Audit ReportIRJET-  	  Structural Audit Report
IRJET- Structural Audit ReportIRJET Journal
 
Concrete Mix Design Report
Concrete Mix Design ReportConcrete Mix Design Report
Concrete Mix Design ReportZakaria Yahya
 
Reserve Study - The Component Analysis
Reserve Study - The Component AnalysisReserve Study - The Component Analysis
Reserve Study - The Component AnalysisJoel Tax
 
IRJET- School in the Cloud
IRJET- School in the CloudIRJET- School in the Cloud
IRJET- School in the CloudIRJET Journal
 
Construction practices aphb
Construction practices aphbConstruction practices aphb
Construction practices aphbhlksd
 

Similar to Asset final (20)

IRJET- Structural Audit – A Case Study of Educational Building
IRJET-  	  Structural Audit – A Case Study of Educational BuildingIRJET-  	  Structural Audit – A Case Study of Educational Building
IRJET- Structural Audit – A Case Study of Educational Building
 
Presentation by shubham vyas
Presentation by shubham vyasPresentation by shubham vyas
Presentation by shubham vyas
 
Presentation by shubham vyas
Presentation by shubham vyasPresentation by shubham vyas
Presentation by shubham vyas
 
IRJET- Health Evaluation-Case Study
IRJET- Health Evaluation-Case StudyIRJET- Health Evaluation-Case Study
IRJET- Health Evaluation-Case Study
 
Anis rahman khokan's internship paper
Anis rahman khokan's internship paperAnis rahman khokan's internship paper
Anis rahman khokan's internship paper
 
Capital Needs Assessment Example
Capital Needs Assessment ExampleCapital Needs Assessment Example
Capital Needs Assessment Example
 
7th_8th_SEM_SYLLABUS.pdf
7th_8th_SEM_SYLLABUS.pdf7th_8th_SEM_SYLLABUS.pdf
7th_8th_SEM_SYLLABUS.pdf
 
FORENSIC ANALYSIS OF COLLAPSE OF SURFSIDE CONDMINIMUM, MIAMI
FORENSIC ANALYSIS OF COLLAPSE OF SURFSIDE CONDMINIMUM, MIAMIFORENSIC ANALYSIS OF COLLAPSE OF SURFSIDE CONDMINIMUM, MIAMI
FORENSIC ANALYSIS OF COLLAPSE OF SURFSIDE CONDMINIMUM, MIAMI
 
IRJET- Review on Restrengthening of Existing R.C Structure with Considera...
IRJET-  	  Review on Restrengthening of Existing R.C Structure with Considera...IRJET-  	  Review on Restrengthening of Existing R.C Structure with Considera...
IRJET- Review on Restrengthening of Existing R.C Structure with Considera...
 
Iwsm2014 the effect of highlighting error categories in fsm training on the...
Iwsm2014   the effect of highlighting error categories in fsm training on the...Iwsm2014   the effect of highlighting error categories in fsm training on the...
Iwsm2014 the effect of highlighting error categories in fsm training on the...
 
IRJET- Repair and Rehabilitation of a Building
IRJET- Repair and Rehabilitation of a BuildingIRJET- Repair and Rehabilitation of a Building
IRJET- Repair and Rehabilitation of a Building
 
IRJET- Comparative Study of Top down & Bottom up Method Construction Schedule...
IRJET- Comparative Study of Top down & Bottom up Method Construction Schedule...IRJET- Comparative Study of Top down & Bottom up Method Construction Schedule...
IRJET- Comparative Study of Top down & Bottom up Method Construction Schedule...
 
13324396.pptx
13324396.pptx13324396.pptx
13324396.pptx
 
Hcms Sdm
Hcms SdmHcms Sdm
Hcms Sdm
 
My Resume 2016 July
My Resume 2016 JulyMy Resume 2016 July
My Resume 2016 July
 
IRJET- Structural Audit Report
IRJET-  	  Structural Audit ReportIRJET-  	  Structural Audit Report
IRJET- Structural Audit Report
 
Concrete Mix Design Report
Concrete Mix Design ReportConcrete Mix Design Report
Concrete Mix Design Report
 
Reserve Study - The Component Analysis
Reserve Study - The Component AnalysisReserve Study - The Component Analysis
Reserve Study - The Component Analysis
 
IRJET- School in the Cloud
IRJET- School in the CloudIRJET- School in the Cloud
IRJET- School in the Cloud
 
Construction practices aphb
Construction practices aphbConstruction practices aphb
Construction practices aphb
 

Asset final

  • 1. Assets deterioration is a natural phenomenon over time. This happens due to various reasons through corrosion, weakening of materials, natural disaster damage, etc. A way of managing and inspecting the quality and quantity of deterioration is called a condition assessment. Conditioning Moniterning of Builduing. Asset management of properties Rahul Singh, NICMAR Pune
  • 2. 1 Condition Monitoring of Academic Block Building (NICMAR) Asset Management of Properties Submitted By: Rahul Dhanik (RP14068) National Institute of Construction Management and Research, Pune
  • 3. 2 Contents: S.No Topic Page No. 1. Introduction 3 2. Description of the asset 3 3. Literature review 4 3.1 Need for condition monitoring 4 3.2 Techniques of condition monitoring 4 4. Condition monitoring of the asset 4 4.1 Methodology used 4 4.2 Questionnaire 5 4.3 Data Collection 6 4.3.1 Secondary data 6 4.3.2 Primary data 7 5. Analysis 11 6. Conclusion 11 7. References 11 List of images and tables: S.No Name Page No 1 Image 1: Life of building 3 2 Image 2: Live condition of the asset 10 3 Table 1: Rating criteria 7 4 Table 2: Rating of rooms 8
  • 4. 3 1. Introduction Assets deterioration is a natural phenomenon over time. This happens due to various reasons through corrosion, weakening of materials, natural disaster damage, etc. A way of managing and inspecting the quality and quantity of deterioration is called a condition assessment. Inspection and investigation of technical condition of buildings and its structures has become one of the most important activities of construction nowadays. Ensuring reliability of buildings, to conduct the repair work, as well as the development of project documentation for reconstruction buildings and structures is known as asset management of buildings. 2. Description of the Asset NICMAR's Pune Campus is situated at Balewadi, 14 kmsaway from the Pune Central Railway Station and 7 kms away from Pune University. The Campus started its operation in year 2004 and is spread across 11 acres of land and is constructed using the latest materials and technologies and having numerous The structure which is taken for the research purpose is Academic Block. This is an institutional building where the scope of wear and tear is not much. The NICMAR structure was constructed in 2 phases, first phase in 2005 (library side up to Deans’ office) and Phase 2 in 2009(current DG office and class rooms above the new faculty block). If we take lifecycle of this building to be 50 years then the building is in its childhood stage (only 5, 10 years old) The building consists of ground, first and second floors where various classes, faculty rooms and offices are located. Image 1: Life of Building Source:http://www.choa.bc.ca/_resources/Bulletin04_Life_of_Buildings.pdf
  • 5. 4 3. Literature Review Condition monitoring involves the continuous or periodic assessment of the condition of an asset while it is in its lifecycle. Basically condition monitoring is the process of monitoring some parameters from the asset, such that a significant change in the parameter can give information about the health of the asset. It involves the continuous or periodic assessment of the condition of an asset while it is in its life cycle. 3.1 Needfor Condition Monitoring Systems  The need to predict Asset failures  The need for a holistic view of equipment condition  The need for greater accuracy in failure prediction  The need to reduce the cost of Condition Monitoring  The need to improve Assets and its component reliability  The need to optimiseAsset performance 3.2 Techniques of Conditioning Monitoring  Visual inspection – Operational performance.  Vibration Measurement and Analysis.  Infrared Thermography.  Oil Analysis and Tribology.  Ultrasonic.  Motor Current Analysis.  Acoustic based analysis.  Non destructive test techniques.  Lubrication Sample Management and Analysis. 4. Condition Monitoring of Asset 4.1 Methodology used  The most basic form of conditioning monitoring is visual inspection and we followed the same for our project.  We have divided every room into five parts i.e. flooring, painting, ceiling, furniture and electrical components. Then according to visual look of these items we have given them different ratings.  We don’t have any quantifiable parameters to support our inspection. So we have four ratings to every item by four individuals.  Then for final data we have took average of those four ratings.
  • 6. 5 4.2 Questionnaire Name of the project:Academic Block, NICMAR Pune. Detail of the respondent: S.D.JANGAM ( Maintenance Manager ) Q.1 When was the asset constructed/rehabilitated/replaced? Ans: Phase wise construction: Phase 1 in 2004 and phase 2 in 2009. Q.2 What is the asset’s theoretical effective life? Ans: 100 years. Q.3 Where is the asset in its lifecycle? Ans: 10 years. Q.4 Has the asset been inspected physically and by what process? Ans: Annual physical inspection is done by assigned committee during summer vacations. Q.5 How could planned maintenance prevent the asset’s failure or extend the time of failure? Ans: Routine maintenance helps determines the small and initials issues which when corrected timely helps prevent major failures. Q.6 Is the asset technically or commercially obsolete? Ans: No Q.7 Are asset condition grading appropriate and relevant? Ans: Yes Q.8 Are asset condition monitoring process effective? Ans: Yes Q.9 Type of asset. Ans: Fixed asset – Institutional building. Q.10 The criticality of the asset. Ans: Not very critical. Q.11 The relative age of the asset. Ans:5, 10 years. The building is in initial stage considering the life of building as 100 years. Q.12 Existing asset condition assessment practices? Ans:Visual inspection- Routine physical inspection which is done on yearly basis. Q.13 Available options/techniques. Ans:Visual inspection only. Q.14Condition assessment frequency. Ans: The building is inspected yearly and maintenance is done on the priority basis of the whole campus.
  • 7. 6 4.3 Data collection Primary data is collected by visual inspection and secondary data is collected by interviewing. 4.3.1Secondary data Maintenance of asset  Yearly planned maintenance is done to prevent the asset’s failure.  Maintenance cost is Rs. 2.25 Crore (for whole campus).  Yearly budget is decided for the maintenance.  Maintenance done on priority basis. Substation:  Manual checking and cleaning of electrical switches is done yearly by alcohol. Power failure:  800 to 1000 litre of diesel is required monthly. (for whole campus) Furniture:  Yearly physical checking of all the items like chair, desk, dice etc is done.  High priority is given to the furniture.  Backup furnitureis also available and can be replaced whenever required. Water cooler:  Cleaning of water tanks in every six months.  Water sample is sent for testing in every six months to government approved labs. Civil work:  It includes tiles, paints, ceiling etc.  Depute civil people for major works and special budget is sanctioned from the board. Painting:  Painting is done annually but on phase wise.  Phase is selected on priority basis. UPS:  Manufacturer – DUBAS.  Annual maintenance contract with DUBAS.
  • 8. 7 Major work done in asset’s life cycle I. Water proofing of roof  Water leakage problem in Room no S-14, S-16, S-17, S-18, S-19, S-20 and Accounts Departments.  Three year study by Path Work.  Bitumen sheet water proofing for whole roof is done in 2014. II. Water supply connection  Water sources were insufficient in campus, dependent on Bore wells and water tankers.  There is no water connection before 2013.  In 2013, 2 inch water line connection was taken from PMC. III. Construction of new staircase  There is an increase in number of students at campus.  An extra staircase is constructed near faculty staff room in 2009. 4.3.2 Primary data  We have divided each room into five parts i.e. flooring, painting, ceiling, furniture and electrical components. Then according to visual look of these items we have given them different ratings.  We don’t have any quantifiable parameters to support our inspection. So we have given ratings to each item by four individuals.  Then for final data we have took average of those four ratings.  Then sum of all the five parts will decide the condition of that particular room. Total 1 to 5 Very Poor 5 to 10 Poor 10 to 15 Moderate 15 to 20 Good 20 to 25 Very Good Table 1: Rating criteria
  • 9. 8 SR. NO. ROOM FLOORING PAINT CEILING FURNITURE ELE.SWITCH Total 1 F 11 5 5 5 5 5 5 5 5 5 5 4 4 4 4 4 4 4 5 4 5 4.5 4.5 4.8 4.5 4.8 23.0 2 F 14 5 4 5 4 4 4 4 4 4 5 3 3 4 3 4 4 4 4 4 4 4 3.75 4.25 3.75 4.25 20 3 F 15 3 3 5 4 5 4 3 5 4 4 3 3 4 3 3 4 3 5 4 4 3.5 3 4.75 3.75 4 19 4 F 17 2 3 5 4 5 4 4 5 4 5 3 4 4 4 4 3 3 5 4 4 3 3.5 4.75 4 4.5 19.75 5 F 21 4 4 5 4 3 4 4 4 4 5 4 4 3 3 4 4 4 5 4 3 4 4 4.25 3.75 3.75 19.75 6 S 11 3 5 4 3 5 3 4 3 3 5 3 4 3 4 3 4 5 4 4 5 3.25 4.5 3.5 3.5 4.5 19.25 7 S13 5 4 4 5 5 4 4 4 4 4 4 3 3 4 4 4 4 4 4 4 4.25 3.75 3.75 4.25 4.25 20.25 8 S 15 5 3 3 5 3 4 3 2 4 5 4 3 2 3 4 4 3 3 4 3 4.25 3 2.5 4 3.75 17.5 9 S 16 5 3 3 5 3 4 3 3 4 5 3 3 3 3 4
  • 10. 9 4 3 3 4 4 4 3 3 4 4 18 10 S 17 5 4 2 4 5 4 3 3 4 5 4 3 3 3 4 4 3 3 3 4 4.25 3.25 2.75 3.5 4.5 18.25 11 S 19 4 3 2 3 4 5 4 3 4 5 3 3 3 3 3 4 3 3 3 4 4 3.25 2.75 3.25 4 17.25 12 S 21 5 4 4 4 5 5 4 5 4 5 4 3 3 4 4 5 4 4 4 5 4.75 3.75 4 4 4.75 21.25 13 G-TOILET 1st F. 4 3 4 3 5 4 4 4 4 5 3 3 5 4 5 4 4 5 3 5 3.75 3.5 4.5 3.5 5 20.25 14 G-TOILET 2nd F. 4 2 4 4 5 4 2 4 3 4 3 2 3 2 3 4 3 4 3 4 3.75 2.25 3.75 3 4 16.75 15 L-TOILET 1st F 3 3 3 3 4 3 2 3 2 4 2 2 2 2 4 2 2 3 3 4 2.5 2.25 2.75 2.5 4 14 16 L-TOILET 2nd F 4 4 4 4 4 3 3 3 4 4 3 4 4 3 4 3 4 3 4 4 3.25 3.75 3.5 3.75 4 18.25 17 EXTERIOR 3 2 2 3 3 3 3 2 2 3 2 2 3 3 3 3 3 2 3 2 2.75 2.5 2.25 2.75 2.75 13 Table 2 : Rating of the rooms
  • 11. 10 Image 2 :Live condition of the asset
  • 12. 11 5. Analysis: As the building is newly constructed ( 5 year ) , most of it is in good shape barring a few. Problem area: Some of the areas have deteriorated heavily like Girls Toilet and Roof of the Second floor. Solutions: Regular maintenance and up keep will help reduce the chances of further deterioration and help have a longer life cycle and in turn save the cost. 6. Conclusion : NICMAR being a premier institute in Construction and Real Estate Management needs to maintain its reputation in terms of its own construction and maintenance of its buildings (Assets). Therefore it is utmost important that more focus is given to up keep and maintenance of the campus. We have observed and found out some problematic areas which need immediate attention. Our suggestion is to look and tackle those areas for better asset life cycle. 7. References  The Hillsborough County ,Florida Experience:U.S.Department of Transportation-2005  Using NI Hardware and Software to Build the CMS-1000 Combustion Dynamic Condition Monitoring System : Jordan Pritt, Turbine Technology Services Corporation  Model-based Framework for Oil Production Forecasting and Optimization-A Case Study in Integrated Asset Management:Cong Zhang, AbdollahOrangi, AmolBakshi, Will Da Sie, and Viktor K. Prasanna,University of Southern California, Los Angeles, CA 90089 USA  Using CompactRIO to Develop a Large-Scale Condition Monitoring and Management System: Chua SengHiap, Singapore Technologies Kinetics Ltd  Using LabVIEW to Design a Greenhouse Remote Monitoring System:- Fulu Wang, Northeast Agriculture University  On-Line Sensors for Condition Monitoring: Michel Murphy Condition Monitoring International LLC Roswell, GA, USA Thomas S Kent BEng, AMIMechE – Development Engineer Kittiwake Developments, Littlehampton U.K.( 61st STLE Annual Meeting Condition Monitoring Technical Session Calgary, AB Canada)  Remote Condition Monitoring of London Underground Track Circuits: Sam Etchell, London Underground Limited  Machine condition monitoring system using vibration analysis- Case Study of BamblePetrochemicalPlant,Norway :D.N.Brown&J.C.JorgensenBriiel&Kjsev