SlideShare a Scribd company logo
1 of 5
TRI WAHYUDI
Citra Swarna Permai I HousingBlock F5 No. 15 Village Segara
Jaya subdistrictTarumajaya North Bekasi RegencyWestJava
Zip Code 17218 | 08121375944 | triwahyudi_jkt@yahoo.com
SUMMARY
1.The natureof the reliable,Discipline, Responsibility,Hardworking,Trustworthy
2.SkillsProjectisreliable
SiteManager (2),SiteEngineering(2),Quality Control (2)
COMPUTER SKILLS
Languages
 Englishlanguagesufficiently mastered
Software
 ProficientinMS Project
 ProficientinAutocadwith Mahir
 MasteringOfficewith excellent
 MasteringGraphicssuch as:Corel,Photoshop,Powerpoint,sketchup
EXPERIENCE
October 2013 untill
today
1. PT Nusapratama Dwikharisma
Perusahaan yangbergerakdalambidangpengawasan gedung berlantai
banyak
1. Ciputra World Puri Kembangan
1.1. MonitoringSoilRetainingjobs
 Monitoringstressingof ground anchors
 MonitoringWallerbeamfieldthatprogressisachieved.
 Monitoringerectionsstrutting
Page2
1.2. Doing Mass Found work
 MonitoringExcavationBorpile
 MonitoringCuttingBorpile
 MonitoringBorpilethatUndercast
 Performtestingiron material
 TestingMaterialsfor ConcreteAdhimix,settingtimetestmass found
 Material TestingIntegral to thetop tier MassFound
 Supervision of Excavationand urugan
 Correcttheworkingdrawingsof thestructure.
 Monitoringrangingfromlandfill sand,floorwork until begestingRaft
 Mengechek pembesian Raft
 MonitoringExcavation
 CheckingPreparationCor Raft,rangingfromtents,lighting,pumps,
up to the amountof labor required in accordanceleast.
1.3. Pengawasin infrastructure work;
 pairsof retainingwall foundation
 Preparinghomeconstructionplnsubstations
 Installation of precastarkon.
2. Hotel AstonCirebon,14 Lantai.
Doing the calculations together for principal jobs and added all the work that
has been done.
3. Apartment Simprug projectBotanica, 37 Floor
3.1. Finishing Construction Phase
(Starting from the unit to the Podium, basement, Public Facilities and
interior)
 Direct the main contractor, Contractor Appointment of Owner, Main
Contractor and Sub-contractors so that all work can be run
 Meeting on a weekly basis to monitor project
 Daily meetings in order to progress in the field every day goes well
 Supervise the work finisng start marking, masonry up to the handover of the
unit to the owner.
 Oversee Stairs
 Oversee Corridor
 Oversee conditioned room and living room Room Panel
 Oversee Unit (inerior, marble, reling, glass and windows, finishing stages)
 Oversee the facade, ranging from pairs of precast up painting
 Supervise jobs in Roof ranging from the gondola, rooftank, steel structures,
space LMR)
 Coordinate all work all MEP related jobs such as Plumbing, Mechanical and
Electrical for the production process can be completed quickly, smoothly and
no problems.
 Supervise the work Riser Ducting, Hidrant, Cable Drag Panel, Clean Air
 Oversee the electrical installation
 Supervise the Installation of a horizontal pipe hydrants, ducting, electrical
network, BAS system
 Supervise the installation of electrical panels, pumps, Hidrant, Ac units on
each floor
 Supervise the installation of elevators
3.2. Stage Handover Units
 Direct the main contractor, Contractor Appointment of Owner, Main
Contractor and Sub-contractors so that the handover process can be run on
target.
 Directing all work all the work can run well.
Page3
August2011 untill
September 2013
2. Quality Control, PT TALINDO EKA PERSADA (TOTALINDO)
International scale contractingcompanyinthe fieldof civil,mechanical
and electrical.The projectisdone todayApartmentGreenLake Sunter,
ownerAgungPodomoroGroup
1. Structural Drafter Engineering and Architecture
 Preparingworkingdrawings for the provisionof fieldwork
 Submit images to a consultant untilthe image in the Constitution to be
brought to court.
2. Site Engginering and Quality Control
 Asking permissionto workto oversight consultants to be carried out in the
field.
 Bridging lapnagn to engineeringsothat the image producedin accordance
with the needs ofthe field engginering
3. Hand Over
 Set up a physical unit to finishwithas muchas you
 mengechekfunctionallyattachedallthe toolsto functionproperly.
 Preparingfiles existing file to be when serahterima is complete.
July 2010 until
August2011
3. Site Engineering, Kharisma Rekayasa Global
Company engagedin mechanicaland electrical, but wantsto expand his
businessbegan to takethe civil field.
Due to field conditionslimited number of existing engineering personnel
and site supervisor,then it becomesa doubleduty,including:
 PreparingImagespurposes in thefield,
 MonitoringPilingland and seastake
 SuperviseWork Urugwith sand.
 Decision sand material fromtheriverbed up to the landfill
 MonitoringCastingpilecap
 Monitoringconveyorinstallation
 Monitoringerksen 15mhigh steel observation post
 MonitoringWork Performancetargets.
Page4
July 2003 until
August2010
4. Leader Estate Management, Developer Casa Goya Residence
Companydeveloperswhoseconcentrationinaresidential buildingin
the middle toupperKebonJerukWestJakarta
1.PlanningPhase
 Drawingand detailingWork ImageHometo the field
2.PhaseControl Cutand Fill
 Overseeingtheprocessof Cutand fill
 Transportation of garbageto a depth of 8m
 Fill with layersof red soil mountainsto landplots ready for construction
3.Stage of DevelopmentControl Infrastructure.
 SuperviseConstruction Worksroad
 Fencingaround theArkon
 Work Means public streetlighting
 Makingwater channel u-ditch on therightsideof theroad
 Coordinated with citizens
4.Show Unit
 BuildingControl of BaseUp to 100%physical
 Supervision Interiorshowunit.
5.Stage of DevelopmentControl Shelter
 Supervision of construction of House Live2 floors.
6.Stage of DevelopmentControl Club Houseasa supportingfacility
 Developmentof a SwimmingPool
 Constructionof theHall 2nd floor
 Operational ClubHouse.
7.Stage EstateManagement
 Security Pemgelolaan
 Park Management
 Residential Management
 Treatmentroad
 Managementof citizen dues.
Page5
EDUCATION
2000 to 2002 Bachelorof Architectural Engineering,Diponegoro University inSemarang,
1994 to 2002 Bachelorof Architectural Engineering,Academy of ArchitectureYKPNYogyakarta
1991 to 1994 SMA N 1,SidarejaCilacapin Central Java
1991 to 1994 SMPN1 Cilacapof Central JavaGandrungmangu
1984 sd 1991 SD N 1,Gandrungmangu Cilacap in Central Java
PERSONAL DATA
Age : 41 Years
Dateof birth : Cilacap,December 26, 1974
Citizenship : Indonesia
Domicile : Citra Swarna Permai HousingBlock F5 No.15 Village SegaraJayasubdistrict
TarumajayaNorth Bekasi,WestJava.
Gender : Man
Bestregards
Tri Wahyudi,S.T

More Related Content

What's hot

Resume - RAVI PRAKASH
Resume - RAVI PRAKASHResume - RAVI PRAKASH
Resume - RAVI PRAKASHRavi Prakash
 
Sandher Updated Resume15
Sandher Updated Resume15Sandher Updated Resume15
Sandher Updated Resume15Sandher Subayno
 
Karl james davis cv new
Karl james davis cv newKarl james davis cv new
Karl james davis cv newkarl davis
 
vikash kumar NOV 2014 - project - Commissioning
vikash kumar NOV 2014 - project - Commissioningvikash kumar NOV 2014 - project - Commissioning
vikash kumar NOV 2014 - project - Commissioningvikash kumar
 
Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16Robert Zachowski
 
Projects - consulting engineer
Projects - consulting engineerProjects - consulting engineer
Projects - consulting engineerChris Owen
 
Mohamed Ahmed (2008)
Mohamed Ahmed  (2008)Mohamed Ahmed  (2008)
Mohamed Ahmed (2008)Mohamed Ahmed
 
Mohamed kamal cv2018
Mohamed kamal cv2018Mohamed kamal cv2018
Mohamed kamal cv2018MOHAMED KAMAL
 
Ken Neyer Plumbing Case Study_June 2015
Ken Neyer Plumbing Case Study_June 2015Ken Neyer Plumbing Case Study_June 2015
Ken Neyer Plumbing Case Study_June 2015Jim Mercer
 
Todd Smith 2016 (Resume))
Todd Smith 2016 (Resume))Todd Smith 2016 (Resume))
Todd Smith 2016 (Resume))Todd Smith
 
Stephen music resume seeking new opportunities
Stephen music resume seeking new opportunitiesStephen music resume seeking new opportunities
Stephen music resume seeking new opportunitiesStephen Music
 
TED_BEERY_RESUME
TED_BEERY_RESUMETED_BEERY_RESUME
TED_BEERY_RESUMETed Beery
 

What's hot (19)

Resume - RAVI PRAKASH
Resume - RAVI PRAKASHResume - RAVI PRAKASH
Resume - RAVI PRAKASH
 
CV of Purushotham (1)
CV of Purushotham (1)CV of Purushotham (1)
CV of Purushotham (1)
 
Sandher Updated Resume15
Sandher Updated Resume15Sandher Updated Resume15
Sandher Updated Resume15
 
Karl james davis cv new
Karl james davis cv newKarl james davis cv new
Karl james davis cv new
 
vikash kumar NOV 2014 - project - Commissioning
vikash kumar NOV 2014 - project - Commissioningvikash kumar NOV 2014 - project - Commissioning
vikash kumar NOV 2014 - project - Commissioning
 
My Resume.1
My Resume.1My Resume.1
My Resume.1
 
Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16
 
Projects - consulting engineer
Projects - consulting engineerProjects - consulting engineer
Projects - consulting engineer
 
Mohamed Ahmed (2008)
Mohamed Ahmed  (2008)Mohamed Ahmed  (2008)
Mohamed Ahmed (2008)
 
Mohamed kamal cv2018
Mohamed kamal cv2018Mohamed kamal cv2018
Mohamed kamal cv2018
 
Ken Neyer Plumbing Case Study_June 2015
Ken Neyer Plumbing Case Study_June 2015Ken Neyer Plumbing Case Study_June 2015
Ken Neyer Plumbing Case Study_June 2015
 
Todd Smith 2016 (Resume))
Todd Smith 2016 (Resume))Todd Smith 2016 (Resume))
Todd Smith 2016 (Resume))
 
Stephen music resume seeking new opportunities
Stephen music resume seeking new opportunitiesStephen music resume seeking new opportunities
Stephen music resume seeking new opportunities
 
TED_BEERY_RESUME
TED_BEERY_RESUMETED_BEERY_RESUME
TED_BEERY_RESUME
 
MANOJ RESUME
MANOJ RESUMEMANOJ RESUME
MANOJ RESUME
 
AAMIR - PROFILE
AAMIR - PROFILEAAMIR - PROFILE
AAMIR - PROFILE
 
Survey Engr
Survey EngrSurvey Engr
Survey Engr
 
CVPLAING
CVPLAINGCVPLAING
CVPLAING
 
ronald coventry cv n5
ronald coventry cv n5ronald coventry cv n5
ronald coventry cv n5
 

Viewers also liked (20)

中暑与热衰竭
中暑与热衰竭中暑与热衰竭
中暑与热衰竭
 
急救训练营
急救训练营急救训练营
急救训练营
 
会员大会 2016
会员大会 2016会员大会 2016
会员大会 2016
 
BFA & BFA-RE 2016
BFA & BFA-RE 2016BFA & BFA-RE 2016
BFA & BFA-RE 2016
 
中级组 Lesson 4 - 9
中级组 Lesson 4 - 9中级组 Lesson 4 - 9
中级组 Lesson 4 - 9
 
初级组 Lesson 1
初级组 Lesson 1初级组 Lesson 1
初级组 Lesson 1
 
中级组 Bandage Transport CPR
中级组 Bandage Transport CPR中级组 Bandage Transport CPR
中级组 Bandage Transport CPR
 
区域性总部急救与部操比赛
区域性总部急救与部操比赛区域性总部急救与部操比赛
区域性总部急救与部操比赛
 
2015年12月总部步操训练
2015年12月总部步操训练2015年12月总部步操训练
2015年12月总部步操训练
 
Headaches
HeadachesHeadaches
Headaches
 
干部训练营
干部训练营干部训练营
干部训练营
 
八独中服务 2016
八独中服务 2016八独中服务 2016
八独中服务 2016
 
考前温馨活动
考前温馨活动考前温馨活动
考前温馨活动
 
初级组 Lesson 15
初级组 Lesson 15初级组 Lesson 15
初级组 Lesson 15
 
初级组 Lesson 2
初级组 Lesson 2初级组 Lesson 2
初级组 Lesson 2
 
Point of view_presentation
Point of view_presentationPoint of view_presentation
Point of view_presentation
 
Correct usage of computers.
Correct usage of computers.Correct usage of computers.
Correct usage of computers.
 
初级组 Lesson 4
初级组 Lesson 4初级组 Lesson 4
初级组 Lesson 4
 
Primary checkpoint science (0846) specimen 2014 paper 2 ms
Primary checkpoint   science (0846) specimen 2014 paper 2 msPrimary checkpoint   science (0846) specimen 2014 paper 2 ms
Primary checkpoint science (0846) specimen 2014 paper 2 ms
 
初级组 Lesson 3
初级组 Lesson 3初级组 Lesson 3
初级组 Lesson 3
 

Similar to Curiculum Vittae april 2016 (20)

cv2017rvs - Copy
cv2017rvs - Copycv2017rvs - Copy
cv2017rvs - Copy
 
JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
 
MEPpdf.PDF
MEPpdf.PDFMEPpdf.PDF
MEPpdf.PDF
 
Resume(1)
Resume(1)Resume(1)
Resume(1)
 
Pari Resume 2015 India
Pari Resume 2015 IndiaPari Resume 2015 India
Pari Resume 2015 India
 
Cv For Sitemanager
Cv For SitemanagerCv For Sitemanager
Cv For Sitemanager
 
RESUME_of_manish-New
RESUME_of_manish-NewRESUME_of_manish-New
RESUME_of_manish-New
 
Sharma cv
Sharma  cv Sharma  cv
Sharma cv
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAE
 
JAGMOC RESUME
JAGMOC RESUMEJAGMOC RESUME
JAGMOC RESUME
 
Haider Ali_CV
Haider Ali_CVHaider Ali_CV
Haider Ali_CV
 
Haider Ali_CV
Haider Ali_CVHaider Ali_CV
Haider Ali_CV
 
Ramendu cv - for Bd
Ramendu cv - for BdRamendu cv - for Bd
Ramendu cv - for Bd
 
412346228-Pragati-Towers-Mumbai.pdf
412346228-Pragati-Towers-Mumbai.pdf412346228-Pragati-Towers-Mumbai.pdf
412346228-Pragati-Towers-Mumbai.pdf
 
cv for Project Engineer
cv for Project Engineercv for Project Engineer
cv for Project Engineer
 
Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)
 
Syed C.V
Syed C.VSyed C.V
Syed C.V
 
Monthly Progress Report - September 2014
Monthly Progress Report - September 2014Monthly Progress Report - September 2014
Monthly Progress Report - September 2014
 
Roman Victor Santos
Roman Victor SantosRoman Victor Santos
Roman Victor Santos
 
Roman victor santos
Roman victor santosRoman victor santos
Roman victor santos
 

Curiculum Vittae april 2016

  • 1. TRI WAHYUDI Citra Swarna Permai I HousingBlock F5 No. 15 Village Segara Jaya subdistrictTarumajaya North Bekasi RegencyWestJava Zip Code 17218 | 08121375944 | triwahyudi_jkt@yahoo.com SUMMARY 1.The natureof the reliable,Discipline, Responsibility,Hardworking,Trustworthy 2.SkillsProjectisreliable SiteManager (2),SiteEngineering(2),Quality Control (2) COMPUTER SKILLS Languages  Englishlanguagesufficiently mastered Software  ProficientinMS Project  ProficientinAutocadwith Mahir  MasteringOfficewith excellent  MasteringGraphicssuch as:Corel,Photoshop,Powerpoint,sketchup EXPERIENCE October 2013 untill today 1. PT Nusapratama Dwikharisma Perusahaan yangbergerakdalambidangpengawasan gedung berlantai banyak 1. Ciputra World Puri Kembangan 1.1. MonitoringSoilRetainingjobs  Monitoringstressingof ground anchors  MonitoringWallerbeamfieldthatprogressisachieved.  Monitoringerectionsstrutting
  • 2. Page2 1.2. Doing Mass Found work  MonitoringExcavationBorpile  MonitoringCuttingBorpile  MonitoringBorpilethatUndercast  Performtestingiron material  TestingMaterialsfor ConcreteAdhimix,settingtimetestmass found  Material TestingIntegral to thetop tier MassFound  Supervision of Excavationand urugan  Correcttheworkingdrawingsof thestructure.  Monitoringrangingfromlandfill sand,floorwork until begestingRaft  Mengechek pembesian Raft  MonitoringExcavation  CheckingPreparationCor Raft,rangingfromtents,lighting,pumps, up to the amountof labor required in accordanceleast. 1.3. Pengawasin infrastructure work;  pairsof retainingwall foundation  Preparinghomeconstructionplnsubstations  Installation of precastarkon. 2. Hotel AstonCirebon,14 Lantai. Doing the calculations together for principal jobs and added all the work that has been done. 3. Apartment Simprug projectBotanica, 37 Floor 3.1. Finishing Construction Phase (Starting from the unit to the Podium, basement, Public Facilities and interior)  Direct the main contractor, Contractor Appointment of Owner, Main Contractor and Sub-contractors so that all work can be run  Meeting on a weekly basis to monitor project  Daily meetings in order to progress in the field every day goes well  Supervise the work finisng start marking, masonry up to the handover of the unit to the owner.  Oversee Stairs  Oversee Corridor  Oversee conditioned room and living room Room Panel  Oversee Unit (inerior, marble, reling, glass and windows, finishing stages)  Oversee the facade, ranging from pairs of precast up painting  Supervise jobs in Roof ranging from the gondola, rooftank, steel structures, space LMR)  Coordinate all work all MEP related jobs such as Plumbing, Mechanical and Electrical for the production process can be completed quickly, smoothly and no problems.  Supervise the work Riser Ducting, Hidrant, Cable Drag Panel, Clean Air  Oversee the electrical installation  Supervise the Installation of a horizontal pipe hydrants, ducting, electrical network, BAS system  Supervise the installation of electrical panels, pumps, Hidrant, Ac units on each floor  Supervise the installation of elevators 3.2. Stage Handover Units  Direct the main contractor, Contractor Appointment of Owner, Main Contractor and Sub-contractors so that the handover process can be run on target.  Directing all work all the work can run well.
  • 3. Page3 August2011 untill September 2013 2. Quality Control, PT TALINDO EKA PERSADA (TOTALINDO) International scale contractingcompanyinthe fieldof civil,mechanical and electrical.The projectisdone todayApartmentGreenLake Sunter, ownerAgungPodomoroGroup 1. Structural Drafter Engineering and Architecture  Preparingworkingdrawings for the provisionof fieldwork  Submit images to a consultant untilthe image in the Constitution to be brought to court. 2. Site Engginering and Quality Control  Asking permissionto workto oversight consultants to be carried out in the field.  Bridging lapnagn to engineeringsothat the image producedin accordance with the needs ofthe field engginering 3. Hand Over  Set up a physical unit to finishwithas muchas you  mengechekfunctionallyattachedallthe toolsto functionproperly.  Preparingfiles existing file to be when serahterima is complete. July 2010 until August2011 3. Site Engineering, Kharisma Rekayasa Global Company engagedin mechanicaland electrical, but wantsto expand his businessbegan to takethe civil field. Due to field conditionslimited number of existing engineering personnel and site supervisor,then it becomesa doubleduty,including:  PreparingImagespurposes in thefield,  MonitoringPilingland and seastake  SuperviseWork Urugwith sand.  Decision sand material fromtheriverbed up to the landfill  MonitoringCastingpilecap  Monitoringconveyorinstallation  Monitoringerksen 15mhigh steel observation post  MonitoringWork Performancetargets.
  • 4. Page4 July 2003 until August2010 4. Leader Estate Management, Developer Casa Goya Residence Companydeveloperswhoseconcentrationinaresidential buildingin the middle toupperKebonJerukWestJakarta 1.PlanningPhase  Drawingand detailingWork ImageHometo the field 2.PhaseControl Cutand Fill  Overseeingtheprocessof Cutand fill  Transportation of garbageto a depth of 8m  Fill with layersof red soil mountainsto landplots ready for construction 3.Stage of DevelopmentControl Infrastructure.  SuperviseConstruction Worksroad  Fencingaround theArkon  Work Means public streetlighting  Makingwater channel u-ditch on therightsideof theroad  Coordinated with citizens 4.Show Unit  BuildingControl of BaseUp to 100%physical  Supervision Interiorshowunit. 5.Stage of DevelopmentControl Shelter  Supervision of construction of House Live2 floors. 6.Stage of DevelopmentControl Club Houseasa supportingfacility  Developmentof a SwimmingPool  Constructionof theHall 2nd floor  Operational ClubHouse. 7.Stage EstateManagement  Security Pemgelolaan  Park Management  Residential Management  Treatmentroad  Managementof citizen dues.
  • 5. Page5 EDUCATION 2000 to 2002 Bachelorof Architectural Engineering,Diponegoro University inSemarang, 1994 to 2002 Bachelorof Architectural Engineering,Academy of ArchitectureYKPNYogyakarta 1991 to 1994 SMA N 1,SidarejaCilacapin Central Java 1991 to 1994 SMPN1 Cilacapof Central JavaGandrungmangu 1984 sd 1991 SD N 1,Gandrungmangu Cilacap in Central Java PERSONAL DATA Age : 41 Years Dateof birth : Cilacap,December 26, 1974 Citizenship : Indonesia Domicile : Citra Swarna Permai HousingBlock F5 No.15 Village SegaraJayasubdistrict TarumajayaNorth Bekasi,WestJava. Gender : Man Bestregards Tri Wahyudi,S.T