1.The natureof the reliable,Discipline, Responsibility,Hardworking,Trustworthy
2.SkillsProjectisreliable
SiteManager (2),SiteEngineering(2),Quality Control (2)
COMPUTER SKILLS
Languages
Englishlanguagesufficiently mastered
Software
ProficientinMS Project
ProficientinAutocadwith Mahir
MasteringOfficewith excellent
MasteringGraphicssuch as:Corel,Photoshop,Powerpoint,sketchup
EXPERIENCE
October 2013 untill
today
1. PT Nusapratama Dwikharisma
Perusahaan yangbergerakdalambidangpengawasan gedung berlantai
banyak
1. Ciputra World Puri Kembangan
1.1. MonitoringSoilRetainingjobs
Monitoringstressingof ground anchors
MonitoringWallerbeamfieldthatprogressisachieved.
Monitoringerectionsstrutting
2. Page2
1.2. Doing Mass Found work
MonitoringExcavationBorpile
MonitoringCuttingBorpile
MonitoringBorpilethatUndercast
Performtestingiron material
TestingMaterialsfor ConcreteAdhimix,settingtimetestmass found
Material TestingIntegral to thetop tier MassFound
Supervision of Excavationand urugan
Correcttheworkingdrawingsof thestructure.
Monitoringrangingfromlandfill sand,floorwork until begestingRaft
Mengechek pembesian Raft
MonitoringExcavation
CheckingPreparationCor Raft,rangingfromtents,lighting,pumps,
up to the amountof labor required in accordanceleast.
1.3. Pengawasin infrastructure work;
pairsof retainingwall foundation
Preparinghomeconstructionplnsubstations
Installation of precastarkon.
2. Hotel AstonCirebon,14 Lantai.
Doing the calculations together for principal jobs and added all the work that
has been done.
3. Apartment Simprug projectBotanica, 37 Floor
3.1. Finishing Construction Phase
(Starting from the unit to the Podium, basement, Public Facilities and
interior)
Direct the main contractor, Contractor Appointment of Owner, Main
Contractor and Sub-contractors so that all work can be run
Meeting on a weekly basis to monitor project
Daily meetings in order to progress in the field every day goes well
Supervise the work finisng start marking, masonry up to the handover of the
unit to the owner.
Oversee Stairs
Oversee Corridor
Oversee conditioned room and living room Room Panel
Oversee Unit (inerior, marble, reling, glass and windows, finishing stages)
Oversee the facade, ranging from pairs of precast up painting
Supervise jobs in Roof ranging from the gondola, rooftank, steel structures,
space LMR)
Coordinate all work all MEP related jobs such as Plumbing, Mechanical and
Electrical for the production process can be completed quickly, smoothly and
no problems.
Supervise the work Riser Ducting, Hidrant, Cable Drag Panel, Clean Air
Oversee the electrical installation
Supervise the Installation of a horizontal pipe hydrants, ducting, electrical
network, BAS system
Supervise the installation of electrical panels, pumps, Hidrant, Ac units on
each floor
Supervise the installation of elevators
3.2. Stage Handover Units
Direct the main contractor, Contractor Appointment of Owner, Main
Contractor and Sub-contractors so that the handover process can be run on
target.
Directing all work all the work can run well.
3. Page3
August2011 untill
September 2013
2. Quality Control, PT TALINDO EKA PERSADA (TOTALINDO)
International scale contractingcompanyinthe fieldof civil,mechanical
and electrical.The projectisdone todayApartmentGreenLake Sunter,
ownerAgungPodomoroGroup
1. Structural Drafter Engineering and Architecture
Preparingworkingdrawings for the provisionof fieldwork
Submit images to a consultant untilthe image in the Constitution to be
brought to court.
2. Site Engginering and Quality Control
Asking permissionto workto oversight consultants to be carried out in the
field.
Bridging lapnagn to engineeringsothat the image producedin accordance
with the needs ofthe field engginering
3. Hand Over
Set up a physical unit to finishwithas muchas you
mengechekfunctionallyattachedallthe toolsto functionproperly.
Preparingfiles existing file to be when serahterima is complete.
July 2010 until
August2011
3. Site Engineering, Kharisma Rekayasa Global
Company engagedin mechanicaland electrical, but wantsto expand his
businessbegan to takethe civil field.
Due to field conditionslimited number of existing engineering personnel
and site supervisor,then it becomesa doubleduty,including:
PreparingImagespurposes in thefield,
MonitoringPilingland and seastake
SuperviseWork Urugwith sand.
Decision sand material fromtheriverbed up to the landfill
MonitoringCastingpilecap
Monitoringconveyorinstallation
Monitoringerksen 15mhigh steel observation post
MonitoringWork Performancetargets.
4. Page4
July 2003 until
August2010
4. Leader Estate Management, Developer Casa Goya Residence
Companydeveloperswhoseconcentrationinaresidential buildingin
the middle toupperKebonJerukWestJakarta
1.PlanningPhase
Drawingand detailingWork ImageHometo the field
2.PhaseControl Cutand Fill
Overseeingtheprocessof Cutand fill
Transportation of garbageto a depth of 8m
Fill with layersof red soil mountainsto landplots ready for construction
3.Stage of DevelopmentControl Infrastructure.
SuperviseConstruction Worksroad
Fencingaround theArkon
Work Means public streetlighting
Makingwater channel u-ditch on therightsideof theroad
Coordinated with citizens
4.Show Unit
BuildingControl of BaseUp to 100%physical
Supervision Interiorshowunit.
5.Stage of DevelopmentControl Shelter
Supervision of construction of House Live2 floors.
6.Stage of DevelopmentControl Club Houseasa supportingfacility
Developmentof a SwimmingPool
Constructionof theHall 2nd floor
Operational ClubHouse.
7.Stage EstateManagement
Security Pemgelolaan
Park Management
Residential Management
Treatmentroad
Managementof citizen dues.
5. Page5
EDUCATION
2000 to 2002 Bachelorof Architectural Engineering,Diponegoro University inSemarang,
1994 to 2002 Bachelorof Architectural Engineering,Academy of ArchitectureYKPNYogyakarta
1991 to 1994 SMA N 1,SidarejaCilacapin Central Java
1991 to 1994 SMPN1 Cilacapof Central JavaGandrungmangu
1984 sd 1991 SD N 1,Gandrungmangu Cilacap in Central Java
PERSONAL DATA
Age : 41 Years
Dateof birth : Cilacap,December 26, 1974
Citizenship : Indonesia
Domicile : Citra Swarna Permai HousingBlock F5 No.15 Village SegaraJayasubdistrict
TarumajayaNorth Bekasi,WestJava.
Gender : Man
Bestregards
Tri Wahyudi,S.T