SlideShare a Scribd company logo
1 of 2
Download to read offline
Confidential
Eng.JanGonzalezMadera,PE
Urb. Mansiones en Paseo de los Reyes #41 Juana Diaz, P.R.00795 ▪ (787)415-8310 ▪ jubalo50@hotmail.com
Engineering A competent Engineer with excellent communication, organization and co-
ordination skills.Aprovenleaderwitha strongbackground on problemsolving,and
able toestablishmutuallyrespectful,client-loyalrelationships.Consistently able
toexceed goalsthroughintenseplanning, effectiveworking strategies
andconsultativeapproach.
Experience Bermudez,Longo,Diaz-Masso LLC., San Juan, PR 2004-2015
ProjectManager
Managed and supervised projects for the “Autoridad de Acueductos y
Alcantarillados of Puerto Rico”. Project ranging from $400K to $13M.
Supervised over 50 craftsman, 1 engineer and 2 supervisors in a single
project.
Estimated new project regarding the civil and mechanical phases for bidding
and upon owner request.
Managed multiple projects simultaneous.
Prepared all documents necessaries to proceed with a new project. Permits,
Breakdown for Payments, Submittals, etc.
Coordinated man power, equipment and material to start and run a project.
Evaluated plans and scope of work to determine possible value engineering
and change order.
Presented, negotiated and managed change orders with owner, owner
representative and designer of a project.
Interpretation of contract agreement and preparation of documents to resolve
any dispute with owner on a project.
Created and manage project schedules on Primavera to insure on time
completion, milestone compliance, coordination of manpower and materials.
Managed project cost analysis and purchases analysis to ensure profit gain.
Performed trainings and orientations to owner’s personnel to
accomplishsuccessful turnoverofnewfacilitiesandequipment.
Directed subcontracts evaluating proposals, establishing contract
agreement and directly supervising in the field to ensure contract
compliance.
Evaluation of specification to ensure compliance of equipment and materials
to carryon negotiationwithvendorsandsuppliers to obtain the best market price
ensuring profit growth.
Trained field personal so that specific task can be achieved efficiently.
Managed meeting with owner and owner’s representatives to attend,
inform and resolve any issues regarding a project.
Supervised Civil, Mechanical and Electrical phases of the project.
Projects Sanitary Systems
Upgrade to the Sanitary Water System in “El Valle de Lajas” (2004-
2007). Installation of force main and gravity main at a maximum
depth of 20 ft. Construction of a pump station ($2.1M).
Upgrade to the Sanitary Water System in Aibonito (2007-2008).
Installation of gravity main at a maximum depth of 25 ft. ($1.2M).
Confidential
Eng. Jan Gonzalez Madera, PE Resume ▪ Page Two
Replacement of the Potable and Sanitary Water System in Cabo
Rojo (2008-2010). Project for improving the utilities ($1M).
Expansion of Waste Water Treatment Plant Guanica – Completion
of Project (2010-2011). Replacement of process equipments.
Sand blasting and painting of metal structure ($1.4M).
Energy Conservation Program – Honeywell- Waste Water
Treatment Plant Caguas Regional (2013). Replacement of a more
efficient aeration system ($500K).
Elimination Waste Water Treatment Plant Villa Taina, Lajas Phase
II – Construction of new pump station with force line to treatment
plant ($3.2M).
Potable Systems
Expansion to Water Filtration Plant in Lajas (2007-2010).
Complete construction of the plant expansion – civil, mechanical
and electrical. Plant automation ($11M).
Replacement of the Potable Water Distribution System in Cabo
Rojo (2008-2010). Project for improving the utilities ($1M).
Completion of the Water Filtration Plant Maginas, Sabana Grande
(2009-2010). Correction on design deficiency to obtain a proper
operation ($550K).
Upgrade for Compliance in Water Filtration Plant Sergio Cuevas,
Trujillo Alto (2010-2011). Replacement of plant’s process
equipment while maintaining the plant in operation (9.6M).
Completion of Water Transmission Line from Juana Diaz –
Coamo. (2012-2013). Completion and inspection/testing of water
transmission line installed on a previous project ($2.6M).
Water Treatment Plant Caguas Norte – Compliance (2012-2013).
Replacement of process equipment while maintaining the plant in
operation. New water intake construction on the Rio Grande de
Loiza ($7.6M).
Education University of Puerto Rico, Mayaguez Campus, Puerto Rico
BS in Civil Engineering –May 2004
Achievements Professional Engineer (license #21357).
Member of “Colegio de Ingeniero y Agrimensor de Puerto Rico”
Member of the Board of Directors of the Ponce Yacht and Fishing Club
Director of Infrastructure
USCG Merchant Mariner - Captain Master 100 TONS
TWIC Credentials
Skills&Languages FullyBilingual (Spanish-English)
Microsoft Office, Primavera, Microsoft Project and Timberline
AutoCAD, Solid Works and Google Sketch Up
References Upon request

More Related Content

What's hot

Mario N. Sanchez - CV (Civil)-2updated2016
Mario N. Sanchez - CV (Civil)-2updated2016Mario N. Sanchez - CV (Civil)-2updated2016
Mario N. Sanchez - CV (Civil)-2updated2016mario sanchez
 
Brophy resume,8-2016
Brophy resume,8-2016Brophy resume,8-2016
Brophy resume,8-2016brian brophy
 
shane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley Parsonsshane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley ParsonsShane Reynolds
 
Construction Manager Resume
Construction Manager ResumeConstruction Manager Resume
Construction Manager ResumeJack Dickerson
 
Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15  Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15 Mike Syslak
 
2016 Wesley Plaisted
2016 Wesley Plaisted2016 Wesley Plaisted
2016 Wesley PlaistedWes Plaisted
 
Jose Ruiz resume
Jose Ruiz resumeJose Ruiz resume
Jose Ruiz resumeJosé Ruiz
 
Kundan kumar singh - building
Kundan kumar singh - buildingKundan kumar singh - building
Kundan kumar singh - buildingKundan Singh
 
Chuck Shealy ud.resume
Chuck Shealy ud.resumeChuck Shealy ud.resume
Chuck Shealy ud.resumeChuck Shealy
 
Kevin J Hill S3
Kevin J Hill S3Kevin J Hill S3
Kevin J Hill S3Kevin Hill
 
Fathi Hamad Resume April 8 2016
Fathi Hamad Resume April 8 2016Fathi Hamad Resume April 8 2016
Fathi Hamad Resume April 8 2016Fathi Hamad
 

What's hot (20)

Christopher Kinnon Resume
Christopher Kinnon ResumeChristopher Kinnon Resume
Christopher Kinnon Resume
 
shishir_cv
shishir_cvshishir_cv
shishir_cv
 
Mario N. Sanchez - CV (Civil)-2updated2016
Mario N. Sanchez - CV (Civil)-2updated2016Mario N. Sanchez - CV (Civil)-2updated2016
Mario N. Sanchez - CV (Civil)-2updated2016
 
Brophy resume,8-2016
Brophy resume,8-2016Brophy resume,8-2016
Brophy resume,8-2016
 
shane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley Parsonsshane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley Parsons
 
Construction Manager Resume
Construction Manager ResumeConstruction Manager Resume
Construction Manager Resume
 
Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15  Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15
 
kshirleyresume1
kshirleyresume1kshirleyresume1
kshirleyresume1
 
Interra Project Experience
Interra Project ExperienceInterra Project Experience
Interra Project Experience
 
rcallueng resume
rcallueng resumercallueng resume
rcallueng resume
 
2016 Wesley Plaisted
2016 Wesley Plaisted2016 Wesley Plaisted
2016 Wesley Plaisted
 
ResumeSteve (9)
ResumeSteve (9)ResumeSteve (9)
ResumeSteve (9)
 
Jose Ruiz resume
Jose Ruiz resumeJose Ruiz resume
Jose Ruiz resume
 
cv-sammy
cv-sammycv-sammy
cv-sammy
 
Kundan kumar singh - building
Kundan kumar singh - buildingKundan kumar singh - building
Kundan kumar singh - building
 
Chuck Shealy ud.resume
Chuck Shealy ud.resumeChuck Shealy ud.resume
Chuck Shealy ud.resume
 
Kevin J Hill S3
Kevin J Hill S3Kevin J Hill S3
Kevin J Hill S3
 
Rajbir Singh-2
Rajbir Singh-2Rajbir Singh-2
Rajbir Singh-2
 
resume CIP 1
resume CIP 1resume CIP 1
resume CIP 1
 
Fathi Hamad Resume April 8 2016
Fathi Hamad Resume April 8 2016Fathi Hamad Resume April 8 2016
Fathi Hamad Resume April 8 2016
 

Viewers also liked

Viewers also liked (15)

Amilcar Linares Resume 1 updated
Amilcar Linares Resume 1 updatedAmilcar Linares Resume 1 updated
Amilcar Linares Resume 1 updated
 
Jorge hernandez resume
Jorge hernandez resumeJorge hernandez resume
Jorge hernandez resume
 
Peter Coleman resume
Peter Coleman resumePeter Coleman resume
Peter Coleman resume
 
Christine Magnetti Resume 2016
Christine Magnetti Resume 2016Christine Magnetti Resume 2016
Christine Magnetti Resume 2016
 
Memo_Example2
Memo_Example2Memo_Example2
Memo_Example2
 
DonB_Res_LexisNexis_1
DonB_Res_LexisNexis_1DonB_Res_LexisNexis_1
DonB_Res_LexisNexis_1
 
Corey_Morrill_Resume
Corey_Morrill_ResumeCorey_Morrill_Resume
Corey_Morrill_Resume
 
Resume Paul Vlasek3
Resume Paul Vlasek3Resume Paul Vlasek3
Resume Paul Vlasek3
 
Resume
ResumeResume
Resume
 
Lei Chen Resume (2016)
Lei Chen Resume (2016)Lei Chen Resume (2016)
Lei Chen Resume (2016)
 
Ed kerbs resume 2015
Ed kerbs resume 2015Ed kerbs resume 2015
Ed kerbs resume 2015
 
Marcus Hooks Resume 2016
Marcus Hooks Resume 2016Marcus Hooks Resume 2016
Marcus Hooks Resume 2016
 
Kinsel Troy Resume
Kinsel Troy ResumeKinsel Troy Resume
Kinsel Troy Resume
 
2016 resume
2016 resume2016 resume
2016 resume
 
Saul E.docx RESUME 2016
Saul E.docx RESUME 2016Saul E.docx RESUME 2016
Saul E.docx RESUME 2016
 

Similar to Resume_Jan Gonzalez Madera

E. Thor Anderson resume 2016
E. Thor Anderson resume 2016E. Thor Anderson resume 2016
E. Thor Anderson resume 2016Thor Anderson
 
Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016Sher Chuhan
 
Resume_Koziol_Environmental Civil Engr
Resume_Koziol_Environmental Civil EngrResume_Koziol_Environmental Civil Engr
Resume_Koziol_Environmental Civil EngrDaniel Koziol
 
_Phillip L Ursery Resume
_Phillip L Ursery Resume_Phillip L Ursery Resume
_Phillip L Ursery Resumepursery
 
Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_Mike Koons
 
Steven Longman Resume 2016
Steven Longman Resume 2016Steven Longman Resume 2016
Steven Longman Resume 2016Steve Longman
 
Benoit Giroux - CV2015 English Linkedin no page 6
Benoit Giroux - CV2015 English Linkedin no page 6Benoit Giroux - CV2015 English Linkedin no page 6
Benoit Giroux - CV2015 English Linkedin no page 6Benoit Giroux
 
Miguel A. Rivera Barbosa, EIT
Miguel A. Rivera Barbosa, EITMiguel A. Rivera Barbosa, EIT
Miguel A. Rivera Barbosa, EITMiguel Rivera
 
Erik D resume for Project Manager position
Erik D resume for Project Manager positionErik D resume for Project Manager position
Erik D resume for Project Manager positionErik Slaughter
 
Cover Letter & Resume
Cover Letter & ResumeCover Letter & Resume
Cover Letter & ResumeRichard Rask
 
Resume-Miguel Ramirez-March 2015
Resume-Miguel Ramirez-March 2015Resume-Miguel Ramirez-March 2015
Resume-Miguel Ramirez-March 2015Miguel Ramirez
 
Linkedin Summary
Linkedin SummaryLinkedin Summary
Linkedin SummaryIlyas Ahsan
 
jerry-pinder-resume
jerry-pinder-resumejerry-pinder-resume
jerry-pinder-resumeJerry Pinder
 
Tim Rocha Resume
Tim Rocha Resume Tim Rocha Resume
Tim Rocha Resume Tim Rocha
 

Similar to Resume_Jan Gonzalez Madera (20)

JM Portfolio 04-2016
JM Portfolio 04-2016JM Portfolio 04-2016
JM Portfolio 04-2016
 
Alexis Feliciano Resume r
Alexis Feliciano Resume rAlexis Feliciano Resume r
Alexis Feliciano Resume r
 
CLARK PE RESUME
CLARK PE RESUMECLARK PE RESUME
CLARK PE RESUME
 
E. Thor Anderson resume 2016
E. Thor Anderson resume 2016E. Thor Anderson resume 2016
E. Thor Anderson resume 2016
 
Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016
 
Resume_Koziol_Environmental Civil Engr
Resume_Koziol_Environmental Civil EngrResume_Koziol_Environmental Civil Engr
Resume_Koziol_Environmental Civil Engr
 
_Phillip L Ursery Resume
_Phillip L Ursery Resume_Phillip L Ursery Resume
_Phillip L Ursery Resume
 
Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_
 
Tringale Resume 9-2-14
Tringale Resume 9-2-14Tringale Resume 9-2-14
Tringale Resume 9-2-14
 
Donnie Belloit_Reume
Donnie Belloit_ReumeDonnie Belloit_Reume
Donnie Belloit_Reume
 
Steven Longman Resume 2016
Steven Longman Resume 2016Steven Longman Resume 2016
Steven Longman Resume 2016
 
Benoit Giroux - CV2015 English Linkedin no page 6
Benoit Giroux - CV2015 English Linkedin no page 6Benoit Giroux - CV2015 English Linkedin no page 6
Benoit Giroux - CV2015 English Linkedin no page 6
 
Miguel A. Rivera Barbosa, EIT
Miguel A. Rivera Barbosa, EITMiguel A. Rivera Barbosa, EIT
Miguel A. Rivera Barbosa, EIT
 
Erik D resume for Project Manager position
Erik D resume for Project Manager positionErik D resume for Project Manager position
Erik D resume for Project Manager position
 
Cover Letter & Resume
Cover Letter & ResumeCover Letter & Resume
Cover Letter & Resume
 
Resume-Miguel Ramirez-March 2015
Resume-Miguel Ramirez-March 2015Resume-Miguel Ramirez-March 2015
Resume-Miguel Ramirez-March 2015
 
Linkedin Summary
Linkedin SummaryLinkedin Summary
Linkedin Summary
 
jerry-pinder-resume
jerry-pinder-resumejerry-pinder-resume
jerry-pinder-resume
 
resume'2016.docx
resume'2016.docxresume'2016.docx
resume'2016.docx
 
Tim Rocha Resume
Tim Rocha Resume Tim Rocha Resume
Tim Rocha Resume
 

Resume_Jan Gonzalez Madera

  • 1. Confidential Eng.JanGonzalezMadera,PE Urb. Mansiones en Paseo de los Reyes #41 Juana Diaz, P.R.00795 ▪ (787)415-8310 ▪ jubalo50@hotmail.com Engineering A competent Engineer with excellent communication, organization and co- ordination skills.Aprovenleaderwitha strongbackground on problemsolving,and able toestablishmutuallyrespectful,client-loyalrelationships.Consistently able toexceed goalsthroughintenseplanning, effectiveworking strategies andconsultativeapproach. Experience Bermudez,Longo,Diaz-Masso LLC., San Juan, PR 2004-2015 ProjectManager Managed and supervised projects for the “Autoridad de Acueductos y Alcantarillados of Puerto Rico”. Project ranging from $400K to $13M. Supervised over 50 craftsman, 1 engineer and 2 supervisors in a single project. Estimated new project regarding the civil and mechanical phases for bidding and upon owner request. Managed multiple projects simultaneous. Prepared all documents necessaries to proceed with a new project. Permits, Breakdown for Payments, Submittals, etc. Coordinated man power, equipment and material to start and run a project. Evaluated plans and scope of work to determine possible value engineering and change order. Presented, negotiated and managed change orders with owner, owner representative and designer of a project. Interpretation of contract agreement and preparation of documents to resolve any dispute with owner on a project. Created and manage project schedules on Primavera to insure on time completion, milestone compliance, coordination of manpower and materials. Managed project cost analysis and purchases analysis to ensure profit gain. Performed trainings and orientations to owner’s personnel to accomplishsuccessful turnoverofnewfacilitiesandequipment. Directed subcontracts evaluating proposals, establishing contract agreement and directly supervising in the field to ensure contract compliance. Evaluation of specification to ensure compliance of equipment and materials to carryon negotiationwithvendorsandsuppliers to obtain the best market price ensuring profit growth. Trained field personal so that specific task can be achieved efficiently. Managed meeting with owner and owner’s representatives to attend, inform and resolve any issues regarding a project. Supervised Civil, Mechanical and Electrical phases of the project. Projects Sanitary Systems Upgrade to the Sanitary Water System in “El Valle de Lajas” (2004- 2007). Installation of force main and gravity main at a maximum depth of 20 ft. Construction of a pump station ($2.1M). Upgrade to the Sanitary Water System in Aibonito (2007-2008). Installation of gravity main at a maximum depth of 25 ft. ($1.2M).
  • 2. Confidential Eng. Jan Gonzalez Madera, PE Resume ▪ Page Two Replacement of the Potable and Sanitary Water System in Cabo Rojo (2008-2010). Project for improving the utilities ($1M). Expansion of Waste Water Treatment Plant Guanica – Completion of Project (2010-2011). Replacement of process equipments. Sand blasting and painting of metal structure ($1.4M). Energy Conservation Program – Honeywell- Waste Water Treatment Plant Caguas Regional (2013). Replacement of a more efficient aeration system ($500K). Elimination Waste Water Treatment Plant Villa Taina, Lajas Phase II – Construction of new pump station with force line to treatment plant ($3.2M). Potable Systems Expansion to Water Filtration Plant in Lajas (2007-2010). Complete construction of the plant expansion – civil, mechanical and electrical. Plant automation ($11M). Replacement of the Potable Water Distribution System in Cabo Rojo (2008-2010). Project for improving the utilities ($1M). Completion of the Water Filtration Plant Maginas, Sabana Grande (2009-2010). Correction on design deficiency to obtain a proper operation ($550K). Upgrade for Compliance in Water Filtration Plant Sergio Cuevas, Trujillo Alto (2010-2011). Replacement of plant’s process equipment while maintaining the plant in operation (9.6M). Completion of Water Transmission Line from Juana Diaz – Coamo. (2012-2013). Completion and inspection/testing of water transmission line installed on a previous project ($2.6M). Water Treatment Plant Caguas Norte – Compliance (2012-2013). Replacement of process equipment while maintaining the plant in operation. New water intake construction on the Rio Grande de Loiza ($7.6M). Education University of Puerto Rico, Mayaguez Campus, Puerto Rico BS in Civil Engineering –May 2004 Achievements Professional Engineer (license #21357). Member of “Colegio de Ingeniero y Agrimensor de Puerto Rico” Member of the Board of Directors of the Ponce Yacht and Fishing Club Director of Infrastructure USCG Merchant Mariner - Captain Master 100 TONS TWIC Credentials Skills&Languages FullyBilingual (Spanish-English) Microsoft Office, Primavera, Microsoft Project and Timberline AutoCAD, Solid Works and Google Sketch Up References Upon request