DOCUMENT CONTROLLER
OBJECTIVES:
To obtain long term of employment, Enhance my knowledge to every aspect of work
I joined, where in I get an opportunity to contribute and learn on the job enriching me on the
personal front and am a part of professional management team.
PERSONAL INFORMATION:
Age : 43 Years old
Date of Birth : November 3, 1972
Gender : Male
Civil Status : Married
Height : 5”9 ½ inch
Weight : 185 lbs.
Nationality : Filipino
Religion : Catholic
QUALIFICATIONS:
Knowledge in different systems of Electronics Document Control Management
System such as Windows Project Completion System (WinPCS) Plant Project Completion
Certification System (Plant PCS) (PPMS, SITE PEROS) Site NPines HHI, & PMIS (Plant
Management Information System) SEC.
2. WORK EXPERIENCE
Hyundai Heavy Industries Co. Ltd.
Jeddah South Thermal Power Plant
JSTPP Stage I Project
Consultant: Fichtner
Position: QA/QC DCC PCS .Engineer
July 04, 2013 to June 2016
QA/QC Department
Hyundai Heavy Industries Co. Ltd.
Riyadh PP11 IPP Project
Riyadh, Saudi Arabia
Consultant: Mott Macdonald
Position: QA/QC DCC PCS .Engineer
Feb 24, 2011 – June 03, 2013
QA/QC Department
Duties and Responsibilities:
Responsible of QA/QC General Documents such Civil, Architectural, Mechanical,
Electrical, Instrumentation & Piping.
Preparing consolidating Daily RFI’s Summary Sheet submitted by all
subcontractors’ prior O/E notification.
Preparing Daily, weekly, & monthly Mechanical Completion MCCR MC Status
and directly report to QA/QC general manager.
Preparing Quality Audit Reports such CAR.
Coordinate With QA/QC Discipline Managers Concerning IFC Shop Drawing
Distribution (PPMS, SITE PEROS)
Monitoring Plant PCS Data, Controlling MCCR (Mechanical Completion Check
Reports and Punch List Items)
Updating of Incoming Documents, Letters correspondence etc. form Client and
Subcontractors, Maintain and update the computerized document control database.
Controlling Plant Project Completion System (Plant PCS) Issuing AC-1
(Acceptance Certificate) ensure all MCCR and A’ punch are closed before AC-1
Issue Prior to Commissioning.
Controlling NCR and Punch List of Weekly and Monthly Report
Responsible for Clients Documents Turnover of MCCR (Dossier Documents)
Produce status and overdue reports.
Correspondence preparation including providing full document support to the
Project Managers and Project Team
Logging and distribution of in-coming correspondence.
Maintain and comply with management system procedures PMIS project
management information system SEC.
3. GAMA QATAR
RAS LAFFAN INDUSTRIAL CITY
QATAR GAS LNG 3 &4 ON SHORE
FACILITIES PROJECT
Position: QA/QC Document controller
(December 22, 2009 up to Nov. 2010)
Duties and Responsibilities:
Prepare transmittal, back log up-date, and test package monitoring
Monitor & up-date test packages from test pack preparation, to WinPcs.
Certification.(CTJV test pack center)
Encoding all the RFI (Request Form Inspection) and ITR (Inspection Test Report)
to the database using MS Access and MS Excel
Preparing, Compiling of Site Quality Assurance Book (SQARB) final Dossier
documents.
GENTECH INDUSTRIAL CORPORATION
# 27 Arty rd, Talipapa Novaliches, Quezon, City
Position: QC Officer / Acting Safety Officer
(April 13, 2009 to December 19, 2009)
Project: THE BEACON TOWER I PHASE I
A Arnaiz, Cor. Chino Roces, Makati, City
Duties and Responsibilities
Responsible for developing the QC plan of the project, and lead the process
implementation of the Quality Management Plan System
Responsible for coordinating design issues, ensuring shop drawings submittals are
approved.
Resolution of quality related issues, and maintaining the quality manual.
Preparation of reports, such as weekly and monthly progress report, Submittals log
and schedule.
To ensure that all inspection and test are recorded on the appropriate Quality Control Plan
(QCP).
To report any defective materials or non-conforming activity to QA/QC senior engineer.
Safety officer
Responsible for developing and implementing the Environmental Health and safety
aspect at the construction area.
Lead the implementation of the safety manual.
Lead tool box meeting.
LA-WYN CONSTRUCTION
Magdiwang, Noveleta, Cavite
Position: STORE WAREHOUSE SUPERVISOR
(October 20, 2008 to March 2009)
4. Duties and Responsibilities
In charge of ordering, receiving, recording and issuance of all incoming machines,
Equipment, Spare parts and tools.
Conduct stock inventory and make reports of all spare movements in monthly basis.
Check reports of packing materials, Monitor and maintain the stocks
Coordinate with the QC department to insure adequate supply.
GAMA AL MOUSHEGAN ARABIA LIMITED
HAWIAH GAS TREAT & COMPRESSION
FACILITIES PROJECT
Position: Document Controller
(Aug 10, 2006 to September 04 2008)
MS VERA FASHION
Walapane, Kandy, Srilanka
Position: Technical Manager
(March 2004 to Aug, 2005)
Duties and responsibilities
Planner scheduler and time study of line production
Doing the production consumption analysis
Implementing working procedure and standard
Coordinate and implement technical aspect of work in every department
DNP GARMENTS
# 33 angulana Station rd,
Angolana Moratowa, Srilanka
Position: Store Warehouse Supervisor
(May, 2001 to Dec. 2003)
UP MASTER INTERNATIONAL CORPORATION
PEZA, Rosario, Cavite, Philippines
Position: Warehouse Supervisor
(March 2000 to Sept.2000)
YICK FUNG INTERNATIONAL CORPORATION
PEZA. Rosario, Cavite, Philippines
Position: Warehouse Supervisor
(Aug, 1999 to Feb. 2000)
CHONG WON FASHION INC.
PEZA, Rosario, Cavite, Philippines
Position: Sample Maker / Technician
(March, 1995 to July, 1999)
5. TRAININGS AND SEMINAR:
Basic Occupational Safety and Health (BOSH) Philippines
Incident Injury Free (IIF) CTJV Qatar
Pre Mechanical Commissioning Seminar (PMC) (Chiyoda Technip Joint Venture)
CTJV Qatar
PlantPCS (Plant Project Completion & Certificate Tracking System)
Riyadh PP11 KSA
EDUCATIONAL ATAINMENT:
College : Bicol University
Ligaspi City Albay, Philippines
B.S. Industrial Engineering (S-Y 1991 – 1994)
SKILLS:
Demonstrates good oral and written communication skills
Able to establish and maintain proactive and professional relationships with all levels
of personnel.
Computer literate knowledge in the operation of MS office (Excel, Word, MS Access,
and power Point) Etc.
REFERENCE:
Mr. Marvin R. Salazar Senior Personnel Officer
BP07014@bp.hhi.co.kr
Jeddah, Kingdom of Saudi Arabia
Tel. # : +966-53 225 4695
Bravo : +966-51 512 3128
I certify as per the best of my knowledge, all the information above is true and fair.
I hope you will find the same in order and give me an opportunity so that I can utilize my
knowledge and experience for giving better results towards the job responsibilities given to
me and the better prospect of the organization
VICENTE R. CATE
Passport # EB8427707