SlideShare a Scribd company logo
1 of 4
Download to read offline
DE BELEN, NIKKO JAY-AR S.
ADDRESS: 310 MASAGANA, PANDI, BULACAN
Contact no. 0942-375-6036
Email Address: njdb_18@yahoo.com
Career Objectives
 To be a part of a company that contributes professional and personal growth to its
employees and to serve the company’s valued customer with high sense of responsibility,
excellence and commitment for their best welfare and satisfaction.
Work Experience
 KALAYAAN ENGINEERING COMPANY INC. October 4, 2013 -Present
Project Engineer
Mechanical Ventilating and Air-Conditioning (MVAC)
4253 Emilia St. Makati City
Project:
Grand Hyatt Metrobank Center Phase-1 June 22, 2015 - Present
Fort Bonifacio 8 Ave. Global City
Taguig City
Project Engineer (MVAC)
Duties:
a) Supervise the operation and Installation of MVAC (Mechanical Ventilation and
Air-conditioning)
b) Performed checking of workers standard operating procedure, including daily activity,
accomplishment report and site instruction.
c) Ensure that the quality of all works carried out at the project site is in compliance with Project
Quality Plan and Inspection Test Plan.
d) Ensures materials received by warehouse have the certification documents required by the
purchase order and certification documents meet the specification.
e) Validates the QMS Quality Plan and Procedures of contractors/suppliers and the project
itself. Ensure all the files are properly documented
f) Prepare for SAF (Submittal Approved Form), MSAF (Material Submittal Approved Form),
and IWR (Inspection Work Request) prior to installation of MVAC System.
SMDC Lights Residences October 4, 2013 – June 22, 2015
Boni Avenue, Mandaluyong City
QA/QC Engineer/Project Engineer (MVAC)
Duties:
a) Supervise the operation and Installation of MVAC (Mechanical Ventilation and
Air-conditioning)
b) Performed checking of workers standard operating procedure, including daily activity,
accomplishment report and site instruction.
c) Ensure that the quality of all works carried out at the project site is in compliance with Project
Quality Plan and Inspection Test Plan.
d) Ensures materials received by warehouse have the certification documents required by the
purchase order and certification documents meet the specification.
e) Validates the QMS Quality Plan and Procedures of contractors/suppliers and the project
itself. Ensure all the files are properly documented
f) Prepare for SAF (Submittal Approved Form), MSAF (Material Submittal Approved Form),
and IWR (Inspection Work Request) prior to installation of MVAC System.
g) Prepare monthly billing and reconcile the amount prior to monthly accomplishment with the
general contractor’s approval.
 ENERTECH SYSTEM INDUSTRIES INC. April – June (2013)
On the Job Training
3855 Tech Rd., Prenza II, Marilao, Bulacan.
Duties:
- Fabricates and polishes the casing of boiler parts using CNC lathe machine.
- Preparing of testing forms and conducting of testing.
- Assembling of parts of boilers, fans, condenser and evaporators.
Eligibilitiy
 March 2016 Mechanical Engineer Licensure Examination- Passed
Professional Regulatory Commission
Educational Background
Tetriary: Bulacan State University – Malolos City, Bulacan
Bachelor of Science Major in Mechanical Engineering (BSME) 2007 - 2013
Secondary: Masagana High School 2003 – 2007
Elementary: Masagana Elementary School 1997 - 2003
Skills and Competencies
 Computer literacy includes MS OFFICE, and AutoCAD (2D).
 Knowledgeable in CNC LATHE MACHINE OPERATION.
 Knowledge in Lathe Machine Operation.
 Knowledge in Basic Welding
Trainings / Seminars Attended
 Fans and Blowers Maintenance Seminarv - KRUGER
SM Lights Residences, Boni Ave. Mandaluyong, City March 23, 2015
 Fire Detection and Alarm System (FDAS) - ISDN
SM Lights Residences, Boni Ave. Mandaluyong, City April 30, 2015
 PSME National Student Conference
SMX Convention Center, Pasay City October 25 – 26, 2011
 ME Student Convergence
UP Diliman, Quezon City September 9 – 10, 2011
Clubs and Organizations
 Philippine Society of Mechanical Engineers – BSU – Student Chapter
Member 2009 – 2013
 Singles For Christ (SFC- Bulacan Chapter)
Member 2012 - Present
Personal Data
Age : 25 years old height : 5’8”
Birthdate : February 18, 1991 Weight : 190 lbs
Birthplace : Pandi, Bulacan Religion : Catholic
Civil Status : Single Language : Filipino and English
Sex : Male Nationality : Filipino
Other Qualifications
 Can work efficiently even under pressure, on shifting schedule and overtime, can report
to work when a need arises, organized and disciplined at work, interested in all kinds of
learning, responsible and committed.
Character References
Engr. Christian Calderon
MEPFS Head/ Mechanical Engineer DDT Konstract Inc. +63923-688-5520
Engr. Eleazar L. Catalan
Project Manager Kalayaan Engineering Company Inc. +63919-883-7621
Mechanical Engineer
Engr. Wilmer Toledo Arknet Inc. +63998-446-2660
Mechanical Engineer
I hereby certify that all information stated above are true and correct to be the best of my knowledge.
NIKKO JAY-AR S. DE BELEN
Applicant

More Related Content

What's hot (20)

Resume
ResumeResume
Resume
 
Adjie Prasetyo - Curriculum_Vitae 2016
Adjie Prasetyo - Curriculum_Vitae 2016Adjie Prasetyo - Curriculum_Vitae 2016
Adjie Prasetyo - Curriculum_Vitae 2016
 
mohd irfan qureshi resume
mohd irfan qureshi resumemohd irfan qureshi resume
mohd irfan qureshi resume
 
Girisha DN C V
Girisha DN C VGirisha DN C V
Girisha DN C V
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitae
 
Resume
ResumeResume
Resume
 
CurriculumJoel_2016
CurriculumJoel_2016CurriculumJoel_2016
CurriculumJoel_2016
 
CPBCALAYAN Resume 2016
CPBCALAYAN Resume 2016CPBCALAYAN Resume 2016
CPBCALAYAN Resume 2016
 
Greg's Resume
Greg's Resume Greg's Resume
Greg's Resume
 
2016 Resume_Quality Engineer v3
2016 Resume_Quality Engineer v32016 Resume_Quality Engineer v3
2016 Resume_Quality Engineer v3
 
Ademar resume 2016
Ademar resume 2016Ademar resume 2016
Ademar resume 2016
 
CV shamsheer
CV shamsheerCV shamsheer
CV shamsheer
 
Material Controller
Material Controller Material Controller
Material Controller
 
2009 Quality Engineer Resume Weathers Mike
2009 Quality Engineer Resume Weathers Mike2009 Quality Engineer Resume Weathers Mike
2009 Quality Engineer Resume Weathers Mike
 
Patrick Rafferty 2016
Patrick Rafferty 2016Patrick Rafferty 2016
Patrick Rafferty 2016
 
WaiFong-Resume
WaiFong-ResumeWaiFong-Resume
WaiFong-Resume
 
JCardinal,RESUME_2016
JCardinal,RESUME_2016JCardinal,RESUME_2016
JCardinal,RESUME_2016
 
nomer mendoza august 18 2015
nomer mendoza august 18 2015nomer mendoza august 18 2015
nomer mendoza august 18 2015
 
JRodzUpdate2014 Resume2c
JRodzUpdate2014 Resume2cJRodzUpdate2014 Resume2c
JRodzUpdate2014 Resume2c
 
resume paramatt1
resume paramatt1resume paramatt1
resume paramatt1
 

Similar to Engr. De Belen

Similar to Engr. De Belen (20)

FREDERIC FUENTES_ 2014
FREDERIC FUENTES_ 2014FREDERIC FUENTES_ 2014
FREDERIC FUENTES_ 2014
 
John Michael G. Lumbo RESUME 2016_09_06
John Michael G. Lumbo RESUME 2016_09_06John Michael G. Lumbo RESUME 2016_09_06
John Michael G. Lumbo RESUME 2016_09_06
 
CV Vincent Cate
CV Vincent CateCV Vincent Cate
CV Vincent Cate
 
SAGUINSIN, KRISTOFFER CARLO B. (RESUME)
SAGUINSIN, KRISTOFFER CARLO B. (RESUME)SAGUINSIN, KRISTOFFER CARLO B. (RESUME)
SAGUINSIN, KRISTOFFER CARLO B. (RESUME)
 
Jme's profile
Jme's profileJme's profile
Jme's profile
 
CV_Goh Yeu Shan, Aaron
CV_Goh Yeu Shan, AaronCV_Goh Yeu Shan, Aaron
CV_Goh Yeu Shan, Aaron
 
Dave Jones Bermejo Resume 2016 Updated
Dave Jones Bermejo Resume 2016 Updated Dave Jones Bermejo Resume 2016 Updated
Dave Jones Bermejo Resume 2016 Updated
 
Nikhil Resume
Nikhil ResumeNikhil Resume
Nikhil Resume
 
BBA resume_2017
BBA resume_2017BBA resume_2017
BBA resume_2017
 
randy san andres resume
randy san andres resumerandy san andres resume
randy san andres resume
 
Resume_rev.3
Resume_rev.3Resume_rev.3
Resume_rev.3
 
Saddam A. Abas -PDF
Saddam A. Abas -PDFSaddam A. Abas -PDF
Saddam A. Abas -PDF
 
CV_Arvind Pandey
CV_Arvind PandeyCV_Arvind Pandey
CV_Arvind Pandey
 
Resume of Shaun D
Resume of Shaun DResume of Shaun D
Resume of Shaun D
 
alvin 2014 Resume (updated 29072015)
alvin 2014 Resume (updated 29072015)alvin 2014 Resume (updated 29072015)
alvin 2014 Resume (updated 29072015)
 
Abelio Noche
Abelio NocheAbelio Noche
Abelio Noche
 
LGD (new)
LGD (new)LGD (new)
LGD (new)
 
Mohd Ali Imran bin Jamaludin
Mohd Ali Imran bin JamaludinMohd Ali Imran bin Jamaludin
Mohd Ali Imran bin Jamaludin
 
Clemmie Crocker Resume 2-10-2017
Clemmie Crocker Resume  2-10-2017Clemmie Crocker Resume  2-10-2017
Clemmie Crocker Resume 2-10-2017
 
Radhuan CV 2015 latest
Radhuan CV 2015 latestRadhuan CV 2015 latest
Radhuan CV 2015 latest
 

Engr. De Belen

  • 1. DE BELEN, NIKKO JAY-AR S. ADDRESS: 310 MASAGANA, PANDI, BULACAN Contact no. 0942-375-6036 Email Address: njdb_18@yahoo.com Career Objectives  To be a part of a company that contributes professional and personal growth to its employees and to serve the company’s valued customer with high sense of responsibility, excellence and commitment for their best welfare and satisfaction. Work Experience  KALAYAAN ENGINEERING COMPANY INC. October 4, 2013 -Present Project Engineer Mechanical Ventilating and Air-Conditioning (MVAC) 4253 Emilia St. Makati City Project: Grand Hyatt Metrobank Center Phase-1 June 22, 2015 - Present Fort Bonifacio 8 Ave. Global City Taguig City Project Engineer (MVAC) Duties: a) Supervise the operation and Installation of MVAC (Mechanical Ventilation and Air-conditioning) b) Performed checking of workers standard operating procedure, including daily activity, accomplishment report and site instruction. c) Ensure that the quality of all works carried out at the project site is in compliance with Project Quality Plan and Inspection Test Plan. d) Ensures materials received by warehouse have the certification documents required by the purchase order and certification documents meet the specification. e) Validates the QMS Quality Plan and Procedures of contractors/suppliers and the project itself. Ensure all the files are properly documented f) Prepare for SAF (Submittal Approved Form), MSAF (Material Submittal Approved Form), and IWR (Inspection Work Request) prior to installation of MVAC System. SMDC Lights Residences October 4, 2013 – June 22, 2015 Boni Avenue, Mandaluyong City QA/QC Engineer/Project Engineer (MVAC) Duties: a) Supervise the operation and Installation of MVAC (Mechanical Ventilation and Air-conditioning)
  • 2. b) Performed checking of workers standard operating procedure, including daily activity, accomplishment report and site instruction. c) Ensure that the quality of all works carried out at the project site is in compliance with Project Quality Plan and Inspection Test Plan. d) Ensures materials received by warehouse have the certification documents required by the purchase order and certification documents meet the specification. e) Validates the QMS Quality Plan and Procedures of contractors/suppliers and the project itself. Ensure all the files are properly documented f) Prepare for SAF (Submittal Approved Form), MSAF (Material Submittal Approved Form), and IWR (Inspection Work Request) prior to installation of MVAC System. g) Prepare monthly billing and reconcile the amount prior to monthly accomplishment with the general contractor’s approval.  ENERTECH SYSTEM INDUSTRIES INC. April – June (2013) On the Job Training 3855 Tech Rd., Prenza II, Marilao, Bulacan. Duties: - Fabricates and polishes the casing of boiler parts using CNC lathe machine. - Preparing of testing forms and conducting of testing. - Assembling of parts of boilers, fans, condenser and evaporators. Eligibilitiy  March 2016 Mechanical Engineer Licensure Examination- Passed Professional Regulatory Commission Educational Background Tetriary: Bulacan State University – Malolos City, Bulacan Bachelor of Science Major in Mechanical Engineering (BSME) 2007 - 2013 Secondary: Masagana High School 2003 – 2007 Elementary: Masagana Elementary School 1997 - 2003 Skills and Competencies  Computer literacy includes MS OFFICE, and AutoCAD (2D).  Knowledgeable in CNC LATHE MACHINE OPERATION.  Knowledge in Lathe Machine Operation.  Knowledge in Basic Welding
  • 3. Trainings / Seminars Attended  Fans and Blowers Maintenance Seminarv - KRUGER SM Lights Residences, Boni Ave. Mandaluyong, City March 23, 2015  Fire Detection and Alarm System (FDAS) - ISDN SM Lights Residences, Boni Ave. Mandaluyong, City April 30, 2015  PSME National Student Conference SMX Convention Center, Pasay City October 25 – 26, 2011  ME Student Convergence UP Diliman, Quezon City September 9 – 10, 2011 Clubs and Organizations  Philippine Society of Mechanical Engineers – BSU – Student Chapter Member 2009 – 2013  Singles For Christ (SFC- Bulacan Chapter) Member 2012 - Present Personal Data Age : 25 years old height : 5’8” Birthdate : February 18, 1991 Weight : 190 lbs Birthplace : Pandi, Bulacan Religion : Catholic Civil Status : Single Language : Filipino and English Sex : Male Nationality : Filipino Other Qualifications  Can work efficiently even under pressure, on shifting schedule and overtime, can report to work when a need arises, organized and disciplined at work, interested in all kinds of learning, responsible and committed.
  • 4. Character References Engr. Christian Calderon MEPFS Head/ Mechanical Engineer DDT Konstract Inc. +63923-688-5520 Engr. Eleazar L. Catalan Project Manager Kalayaan Engineering Company Inc. +63919-883-7621 Mechanical Engineer Engr. Wilmer Toledo Arknet Inc. +63998-446-2660 Mechanical Engineer I hereby certify that all information stated above are true and correct to be the best of my knowledge. NIKKO JAY-AR S. DE BELEN Applicant