WHAT IS TOTAL QUALITY MANAGEMENT ?
TQM is an approach to improving the
effectiveness and flexibilities of business as a
whole. It is essentially a way of organizing
and involving the whole organization, every
department, every activity and every single
person at every level. TQM ensures that the
management adopts a strategic overview of
the quality and focuses on prevention rather
than inspection.
OBJECTIVES OF TQM
 Meeting the customers requirements is the primary
objective and the key to organizational survival and
growth.
 The second objective of TQM is continuous
improvement of quality. The management should
stimulate the employees in becoming increasingly
competent and creative
 Third, TQM aims at developing the relationship of
openness and trust among the employees at all
levels in the organisation.
SIGNIFICANCE OF TQM
 The importance of TQM lies in the fact that it
encourages innovation, makes the
organization adaptable to change, motivates
people for better quality, and integrates the
business arising out of a common purpose
and all these provide the organization with a
valuable and distinctive competitive edge.
ELEMENTS OF TQM
 Be customer focused
It requires the company to check customers
attitudes regularly and includes the idea of internal
customers as well as external ones.
o Do it right the first time
This means avoiding rework, i.e., cutting the
amount of defective work.
o Constantly improve
Continuous improvement allows the company
gradually to get better.
 Quality is an attitude
Every one has to be committed to quality. That
means changing the attitude of the entire
workforce, and altering the way the company
operates.
o Telling staff what is going on
This involves improved communication. Typically, it
includes team briefing.
o Educate and train people
An unskilled workforce makes mistakes. Giving
more skills to workers means they can do a wider
range of jobs, and do them better. It also means
educating staff in the principles of TQM, which is a
whole new style of working
REASONS FOR FAILURE
TQM fails because
 Top management sees no reason for change.
 Top management is not concerned for its staff.
 The workforce and the management do not agree
on what needs to happen.
 Urgent problems intervene.
 TQM is imposed on the workforce, which does not
inwardly accept it.
 No performance measure or targets are set, so
progress cannot be measured.
 Processes are not analyzed, systems are weak and
procedures are not written down.
Masaaki Imai is known as the developer of
KAIZEN.
‘KAI’ means ‘Change or the action to correct’.
‘ZEN’ means ‘Good’.
Kaizen is small incremental changes made for
improving productivity and minimizing wastes.
3 MAIN PRINCIPLES OF KAIZEN
 1. Consider the process and the results.
 2. The need to look at the entire process of the job
at hand and to evaluate the job as to the best way
to get the job done.
 3. Kaizen must be approached in such a way that
no one is blamed and that best process is put into
place.
FEATURES OF KAIZEN
 Widely applicable.
 Highly effective and result oriented.
 A learning experience.
 Team based and cross-functional.
PHASES IN KAIZEN
 A. Select an event
 B. Plan an event.
 C. Implement an event.
 D. Follow-up an event.
BENEFITS OF KAIZEN
 Kaizen reduces waste - like inventory waste, time
waste and workers motion.
 Kaizen improves space utilization and product
quality.
 Results in higher employee moral and job
satisfaction.
 Teaches workers how to solve everyday problems.
What is Lean?
Lean means creating more value for
customers with fewer resources.
ORIGIN
Lean Manufacturing is sometimes called the Toyota
Production System (TPS) because Toyota Motor
Company’s Eiji Toyoda and Taiichui Ohno are given credit
for its approach and innovations.
SEVEN PRINCIPLES OF LEAN
1. Over-Production
2. Waiting
3. Transportation
4. Inventory
5. Motion
6. Over-processing
7. Defective units
,
 1. Over Production – Producing over customer
requirements, producing unnecessary materials /
products.
 2. Waiting – Time delays, idle time (time during
which value is not added to the product).
 3. Transportation – Multiple handling, delay in
materials handling, unnecessary handling.
 4. Inventory – Holding or purchasing unnecessary
raw materials, work in process, and finished goods.
 5. Motion – Actions of people or equipment that do
not add value to the product.
 Over-processing – Unnecessary steps or work
elements / procedures (non added value work).
 7. Defective units – Production of a part that is
scrapped or requires rework.
CONCEPT USED IN LEAN
 JIT (just in time):- It means producing the
necessary items in necessary quantities at the
necessary time.
 Benefits of JIT:
 1. Reduced operating cost
 2. Greater performance
 3. Higher quality
 4. Improved delivery
 5. Increased flexibility and innovativeness
 6. Shortened lead time
 7. Reduced inventory
.
“ The most dangerous kind of waste is the
waste we do not recognize." ~ Shigeo
Shingo
Prepared by:-
Bhavya Sharma
Shivi Srivastav
Saurabh Negi

More Related Content

What's hot

7 tools of quality
7 tools of quality7 tools of quality
7 tools of qualityFarah Amreen
 
Quality Guru Philip B. Crosby’s Management Principles
Quality Guru Philip B. Crosby’sManagement PrinciplesQuality Guru Philip B. Crosby’sManagement Principles
Quality Guru Philip B. Crosby’s Management PrinciplesHarishankar Sahu
 
Continuous process improvement
Continuous process improvementContinuous process improvement
Continuous process improvementNaeem Hassan
 
5S Priciples TQM-Total Quality management
5S Priciples TQM-Total Quality management5S Priciples TQM-Total Quality management
5S Priciples TQM-Total Quality managementDHARMARAJ M
 
Plan, Do, Study, Act (PDSA) Cycle in Total Quality Management
Plan, Do, Study, Act (PDSA) Cycle in Total Quality ManagementPlan, Do, Study, Act (PDSA) Cycle in Total Quality Management
Plan, Do, Study, Act (PDSA) Cycle in Total Quality ManagementDr.Raja R
 
Total Quality Management
Total Quality ManagementTotal Quality Management
Total Quality ManagementOnkar Satam
 
Failure Mode Effective Analysis in TQM
Failure Mode Effective Analysis in TQMFailure Mode Effective Analysis in TQM
Failure Mode Effective Analysis in TQMPalanivel rajan
 
Total Quality Management(TQM)
Total Quality Management(TQM)Total Quality Management(TQM)
Total Quality Management(TQM)Aakash Shahu
 
Taguchi loss function
Taguchi loss functionTaguchi loss function
Taguchi loss functionnithyanithi26
 
Total Quality Management (TQM)
Total Quality Management (TQM)Total Quality Management (TQM)
Total Quality Management (TQM)Mudassar Salman
 
Quality dimensions for BMS
Quality dimensions for BMSQuality dimensions for BMS
Quality dimensions for BMSSameer Omles
 
Kaizen Philosophy
Kaizen PhilosophyKaizen Philosophy
Kaizen Philosophypratik207
 

What's hot (20)

7 tools of quality
7 tools of quality7 tools of quality
7 tools of quality
 
TQM
TQMTQM
TQM
 
Quality Guru Philip B. Crosby’s Management Principles
Quality Guru Philip B. Crosby’sManagement PrinciplesQuality Guru Philip B. Crosby’sManagement Principles
Quality Guru Philip B. Crosby’s Management Principles
 
Tqm culture
Tqm cultureTqm culture
Tqm culture
 
Continuous process improvement
Continuous process improvementContinuous process improvement
Continuous process improvement
 
5S Priciples TQM-Total Quality management
5S Priciples TQM-Total Quality management5S Priciples TQM-Total Quality management
5S Priciples TQM-Total Quality management
 
Plan, Do, Study, Act (PDSA) Cycle in Total Quality Management
Plan, Do, Study, Act (PDSA) Cycle in Total Quality ManagementPlan, Do, Study, Act (PDSA) Cycle in Total Quality Management
Plan, Do, Study, Act (PDSA) Cycle in Total Quality Management
 
Total Quality Management
Total Quality ManagementTotal Quality Management
Total Quality Management
 
Lean management
Lean management Lean management
Lean management
 
Benchmarking TQM
Benchmarking TQMBenchmarking TQM
Benchmarking TQM
 
Quality circle - copy
Quality circle - copyQuality circle - copy
Quality circle - copy
 
Failure Mode Effective Analysis in TQM
Failure Mode Effective Analysis in TQMFailure Mode Effective Analysis in TQM
Failure Mode Effective Analysis in TQM
 
Total Quality Management(TQM)
Total Quality Management(TQM)Total Quality Management(TQM)
Total Quality Management(TQM)
 
Taguchi loss function
Taguchi loss functionTaguchi loss function
Taguchi loss function
 
Kaizen
KaizenKaizen
Kaizen
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
 
Total Quality Management (TQM)
Total Quality Management (TQM)Total Quality Management (TQM)
Total Quality Management (TQM)
 
Quality dimensions for BMS
Quality dimensions for BMSQuality dimensions for BMS
Quality dimensions for BMS
 
Kaizen Philosophy
Kaizen PhilosophyKaizen Philosophy
Kaizen Philosophy
 
Lean system
Lean systemLean system
Lean system
 

Viewers also liked (17)

tmq-y
 tmq-y tmq-y
tmq-y
 
Modelo EFQM
Modelo EFQMModelo EFQM
Modelo EFQM
 
Estrategias de calidad
Estrategias de calidadEstrategias de calidad
Estrategias de calidad
 
Tqm (total quality management)actividad14 calidad
Tqm (total quality management)actividad14 calidadTqm (total quality management)actividad14 calidad
Tqm (total quality management)actividad14 calidad
 
Tqm
TqmTqm
Tqm
 
Coca cola
Coca cola  Coca cola
Coca cola
 
Gerencia de la calidad total2parcial
Gerencia de la calidad total2parcialGerencia de la calidad total2parcial
Gerencia de la calidad total2parcial
 
Gerencia de calidad de total
Gerencia de calidad de totalGerencia de calidad de total
Gerencia de calidad de total
 
Estrategia de Gestión
Estrategia de GestiónEstrategia de Gestión
Estrategia de Gestión
 
Estrategia de Gestion de calidad
Estrategia de Gestion de calidadEstrategia de Gestion de calidad
Estrategia de Gestion de calidad
 
Estrategias De Calidad Total[1]
Estrategias De Calidad Total[1]Estrategias De Calidad Total[1]
Estrategias De Calidad Total[1]
 
Calidad Total
Calidad TotalCalidad Total
Calidad Total
 
Calidad Total
Calidad TotalCalidad Total
Calidad Total
 
Introducción - Calidad Total
Introducción - Calidad Total Introducción - Calidad Total
Introducción - Calidad Total
 
Gestión de la Calidad Total – TQM
Gestión de la Calidad Total – TQMGestión de la Calidad Total – TQM
Gestión de la Calidad Total – TQM
 
Calidad Total
Calidad TotalCalidad Total
Calidad Total
 
Tqm power point
Tqm power pointTqm power point
Tqm power point
 

Similar to Kaizen, TQM, Lean

Tqmpowerpoint 121116221207-phpapp01
Tqmpowerpoint 121116221207-phpapp01Tqmpowerpoint 121116221207-phpapp01
Tqmpowerpoint 121116221207-phpapp01rupesh jaiswal
 
How to Change for Total Quality Management
How to Change for Total Quality ManagementHow to Change for Total Quality Management
How to Change for Total Quality ManagementMuhammad Rawaha Saleem
 
E42e Tqm – Path Light To Success
E42e Tqm – Path Light To SuccessE42e Tqm – Path Light To Success
E42e Tqm – Path Light To Successajithsrc
 
Quality management principles operation management-amit kumar singh
Quality management principles operation management-amit kumar singhQuality management principles operation management-amit kumar singh
Quality management principles operation management-amit kumar singhAMIT KUMAR SINGH singh
 
STEPS TO IMPLEMENT TQM IN AN ORGANIZATION – A CASE STUDY
STEPS TO IMPLEMENT TQM IN AN ORGANIZATION – A CASE STUDYSTEPS TO IMPLEMENT TQM IN AN ORGANIZATION – A CASE STUDY
STEPS TO IMPLEMENT TQM IN AN ORGANIZATION – A CASE STUDYRajasekhara Muddana
 
Introduction to Total Quality Management
Introduction to Total Quality ManagementIntroduction to Total Quality Management
Introduction to Total Quality ManagementDrJayantaKumarMahato1
 
Introduction to Total Quality Management
Introduction to Total Quality ManagementIntroduction to Total Quality Management
Introduction to Total Quality ManagementDrJayantaKumarMahato1
 
Kaizen, A Continuous Improvements
Kaizen, A Continuous ImprovementsKaizen, A Continuous Improvements
Kaizen, A Continuous ImprovementsAshraf Hameed
 
Total quality management
Total quality managementTotal quality management
Total quality managementArif Nadaf
 
ORGANIZATIONAL PERFORMANCE AND EFFECTIVENESS (KAIZEN)
ORGANIZATIONAL PERFORMANCE AND EFFECTIVENESS (KAIZEN) ORGANIZATIONAL PERFORMANCE AND EFFECTIVENESS (KAIZEN)
ORGANIZATIONAL PERFORMANCE AND EFFECTIVENESS (KAIZEN) berhanu taye
 

Similar to Kaizen, TQM, Lean (20)

Tqmpowerpoint 121116221207-phpapp01
Tqmpowerpoint 121116221207-phpapp01Tqmpowerpoint 121116221207-phpapp01
Tqmpowerpoint 121116221207-phpapp01
 
Tqm
TqmTqm
Tqm
 
T.q. managment
T.q. managmentT.q. managment
T.q. managment
 
Tqm
Tqm Tqm
Tqm
 
How to Change for Total Quality Management
How to Change for Total Quality ManagementHow to Change for Total Quality Management
How to Change for Total Quality Management
 
E42e Tqm – Path Light To Success
E42e Tqm – Path Light To SuccessE42e Tqm – Path Light To Success
E42e Tqm – Path Light To Success
 
TQM.pptx
TQM.pptxTQM.pptx
TQM.pptx
 
Quality management principles operation management-amit kumar singh
Quality management principles operation management-amit kumar singhQuality management principles operation management-amit kumar singh
Quality management principles operation management-amit kumar singh
 
Total quality management
Total quality managementTotal quality management
Total quality management
 
Total quality management
Total quality managementTotal quality management
Total quality management
 
Total quality management
Total quality managementTotal quality management
Total quality management
 
STEPS TO IMPLEMENT TQM IN AN ORGANIZATION – A CASE STUDY
STEPS TO IMPLEMENT TQM IN AN ORGANIZATION – A CASE STUDYSTEPS TO IMPLEMENT TQM IN AN ORGANIZATION – A CASE STUDY
STEPS TO IMPLEMENT TQM IN AN ORGANIZATION – A CASE STUDY
 
Introduction to Total Quality Management
Introduction to Total Quality ManagementIntroduction to Total Quality Management
Introduction to Total Quality Management
 
Introduction to Total Quality Management
Introduction to Total Quality ManagementIntroduction to Total Quality Management
Introduction to Total Quality Management
 
Total quality management (tqm)
Total quality management (tqm)Total quality management (tqm)
Total quality management (tqm)
 
Tqm
TqmTqm
Tqm
 
Kaizen, A Continuous Improvements
Kaizen, A Continuous ImprovementsKaizen, A Continuous Improvements
Kaizen, A Continuous Improvements
 
Lean management
Lean managementLean management
Lean management
 
Total quality management
Total quality managementTotal quality management
Total quality management
 
ORGANIZATIONAL PERFORMANCE AND EFFECTIVENESS (KAIZEN)
ORGANIZATIONAL PERFORMANCE AND EFFECTIVENESS (KAIZEN) ORGANIZATIONAL PERFORMANCE AND EFFECTIVENESS (KAIZEN)
ORGANIZATIONAL PERFORMANCE AND EFFECTIVENESS (KAIZEN)
 

Recently uploaded

UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Effects of rheological properties on mixing
Effects of rheological properties on mixingEffects of rheological properties on mixing
Effects of rheological properties on mixingviprabot1
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture designssuser87fa0c1
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage examplePragyanshuParadkar1
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 

Recently uploaded (20)

UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Effects of rheological properties on mixing
Effects of rheological properties on mixingEffects of rheological properties on mixing
Effects of rheological properties on mixing
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture design
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage example
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 

Kaizen, TQM, Lean

  • 1.
  • 2. WHAT IS TOTAL QUALITY MANAGEMENT ? TQM is an approach to improving the effectiveness and flexibilities of business as a whole. It is essentially a way of organizing and involving the whole organization, every department, every activity and every single person at every level. TQM ensures that the management adopts a strategic overview of the quality and focuses on prevention rather than inspection.
  • 3. OBJECTIVES OF TQM  Meeting the customers requirements is the primary objective and the key to organizational survival and growth.  The second objective of TQM is continuous improvement of quality. The management should stimulate the employees in becoming increasingly competent and creative  Third, TQM aims at developing the relationship of openness and trust among the employees at all levels in the organisation.
  • 4. SIGNIFICANCE OF TQM  The importance of TQM lies in the fact that it encourages innovation, makes the organization adaptable to change, motivates people for better quality, and integrates the business arising out of a common purpose and all these provide the organization with a valuable and distinctive competitive edge.
  • 5. ELEMENTS OF TQM  Be customer focused It requires the company to check customers attitudes regularly and includes the idea of internal customers as well as external ones. o Do it right the first time This means avoiding rework, i.e., cutting the amount of defective work. o Constantly improve Continuous improvement allows the company gradually to get better.
  • 6.  Quality is an attitude Every one has to be committed to quality. That means changing the attitude of the entire workforce, and altering the way the company operates. o Telling staff what is going on This involves improved communication. Typically, it includes team briefing. o Educate and train people An unskilled workforce makes mistakes. Giving more skills to workers means they can do a wider range of jobs, and do them better. It also means educating staff in the principles of TQM, which is a whole new style of working
  • 7. REASONS FOR FAILURE TQM fails because  Top management sees no reason for change.  Top management is not concerned for its staff.  The workforce and the management do not agree on what needs to happen.  Urgent problems intervene.  TQM is imposed on the workforce, which does not inwardly accept it.  No performance measure or targets are set, so progress cannot be measured.  Processes are not analyzed, systems are weak and procedures are not written down.
  • 8. Masaaki Imai is known as the developer of KAIZEN. ‘KAI’ means ‘Change or the action to correct’. ‘ZEN’ means ‘Good’. Kaizen is small incremental changes made for improving productivity and minimizing wastes.
  • 9. 3 MAIN PRINCIPLES OF KAIZEN  1. Consider the process and the results.  2. The need to look at the entire process of the job at hand and to evaluate the job as to the best way to get the job done.  3. Kaizen must be approached in such a way that no one is blamed and that best process is put into place.
  • 10. FEATURES OF KAIZEN  Widely applicable.  Highly effective and result oriented.  A learning experience.  Team based and cross-functional.
  • 11. PHASES IN KAIZEN  A. Select an event  B. Plan an event.  C. Implement an event.  D. Follow-up an event.
  • 12. BENEFITS OF KAIZEN  Kaizen reduces waste - like inventory waste, time waste and workers motion.  Kaizen improves space utilization and product quality.  Results in higher employee moral and job satisfaction.  Teaches workers how to solve everyday problems.
  • 13. What is Lean? Lean means creating more value for customers with fewer resources. ORIGIN Lean Manufacturing is sometimes called the Toyota Production System (TPS) because Toyota Motor Company’s Eiji Toyoda and Taiichui Ohno are given credit for its approach and innovations.
  • 14. SEVEN PRINCIPLES OF LEAN 1. Over-Production 2. Waiting 3. Transportation 4. Inventory 5. Motion 6. Over-processing 7. Defective units
  • 15. ,  1. Over Production – Producing over customer requirements, producing unnecessary materials / products.  2. Waiting – Time delays, idle time (time during which value is not added to the product).  3. Transportation – Multiple handling, delay in materials handling, unnecessary handling.  4. Inventory – Holding or purchasing unnecessary raw materials, work in process, and finished goods.
  • 16.  5. Motion – Actions of people or equipment that do not add value to the product.  Over-processing – Unnecessary steps or work elements / procedures (non added value work).  7. Defective units – Production of a part that is scrapped or requires rework.
  • 17. CONCEPT USED IN LEAN  JIT (just in time):- It means producing the necessary items in necessary quantities at the necessary time.  Benefits of JIT:  1. Reduced operating cost  2. Greater performance  3. Higher quality  4. Improved delivery  5. Increased flexibility and innovativeness  6. Shortened lead time  7. Reduced inventory
  • 18. . “ The most dangerous kind of waste is the waste we do not recognize." ~ Shigeo Shingo
  • 19. Prepared by:- Bhavya Sharma Shivi Srivastav Saurabh Negi