SlideShare a Scribd company logo
1 of 16
“HIGHWAY DRAINAGE,
ARBORICULTURE AND
LIGHTING”
1
PREPARED BY : ASST. PROF. VATSAL D. PATEL
MAHATMA GANDHI INSTITUTE OF
TECHNICAL EDUCATION &
RESEARCH CENTRE, NAVSARI.
HIGHWAY DRAINAGE
 During rains, part of the rain water flows on surface and
part of it percolates through the soil mass as gravitational
water until it reaches the ground water below the water
table.
 Removal or diversion of surface water from the roadway
and adjoining land is termed as surface drainage.
REQUIREMENTS OF DRAINAGE
SYSTEM
 Adjoining land : The surface water from the adjoining
land should be prevented from entering the roadway.
 Camber : The road surface should be provided with
sufficient camber to drain off the rain water quickly.
 Gradient : In the areas of heavy rainfall minimum
gradient should be provided.
 Cross drainage works : Cross drainage works should be
designed in such a way that the road surface is not
overtopped even at the time of highest flood.
 Highest Flood Level (HFL) : The level of carriage way
should be kept at least 60 cm above the H.F.L.
REQUIREMENTS OF DRAINAGE
SYSTEM
 Side drains : The side drain should have sufficient
capacity and longitudinal slope to carry away all the surface
water collected.
 Intercepting drains : In hilly areas, intercepting drains
should be provided parallel to the road.
 Water table : Highest level of ground water table should
be kept well below the level of subgrade, preferably by at
least 1.2 m.
SURFACE DRAINAGE SYSTEM
 Side drains for road in embankment :
 When road is constructed in embankment, it is necessary to
provide side drain on one side or both sides, Such side
drains should be constructed at least 2.0 m away from the
bottom edge of an embankment.
 The depth of side drain is kept 1.0 to 1.5 m to prevent the
entry of drain water into the embankment.
SURFACE DRAINAGE SYSTEM
 Side drains for road in cutting :
 When road is constructed in cutting side drains are
provided on either side of road.
 The drain should not overflow in any circumstances.
SURFACE DRAINAGE SYSTEM
 Covered drainage trenches:
 Closed side drains are preferred as open and deep side
drains are dangerous where space is limited. In such cases
covered drains of drainage trenches properly filled with
layers of coarse sand and gravel may be used. Coarser
gravel layers are provided at the bottom of the drain.
SURFACE DRAINAGE SYSTEM
 Catch basins:
 Catch basin is a structure like chamber constructed on a
sewer line. Water from pavement surface is collected in
catch basin and discharged to the sewer line.
SURFACE DRAINAGE SYSTEM
 Inlets :
 Inlets is a structure constructed along the edge of the urban
road to discharge rain water into the storm water sewer.
 Inlets is a concrete box with grating either at the top or on
the side. If grating is horizontal, it is called horizontal inlet.
If grading is vertical, it is called vertical inlet or curb inlet.
SUB-SURFACE DRAINAGE
SYSTEM
 Removal or diversion of excess soil-water from the
subgrade is termed as sub-surface drainage.
 Sub-surface drainage is necessary in the following
situations :
 When road is in cutting and water seeping from sides.
 When road is near the foot of hill and is likely to be
damaged by water flowing down the hill.
 When road is passing through plain area and water is likely
to be accumulated on sides.
 Where water rises up to subgrade by capillary action.
SUB-SURFACE DRAINAGE
SYSTEM
 Lowering of water table :
 The highest level of water table should be fairly below the
level of subgrade, in order that the subgrade and pavement
layers are not subjected to excessive moisture.
 The water table should be kept at least 1.0 to 1.2 m below
the subgrade. In places where water table is high best
remedy is to take the road formulation on embankment of
height not less than 1.0 to 1.2 m.
SUB-SURFACE DRAINAGE
SYSTEM
 Controlling seepage flow :
 when the general ground as well as the impervious strata
below are sloping, seepage flow is likely to exist. the
seepage zone is at depth less than 0.6 to 0.9 m from the
subgrade level, longitudinal pipe drain in trenched filled
with filter material and clay seal may be constructed to
intercept the seepage flow.
SUB-SURFACE DRAINAGE
SYSTEM
 Controlling capillary water :
 A layer of granular material of suitable thickness is
provided during the construction of embankment, between
the subgrade and the highest level of subsurface water
table. The thickness of the granular capillary cut off layer
should be sufficiently higher than the anticipated capillary
rise within the granular layer so that the capillary water can
not rise above the cut off layer.
ROAD ARBORICULTURE
 A The word 'arbori' is originated from the Latin world
'arbor' meaning a tree.
 Thus, arboriculture means the tree culture or care and
planting of trees.
 It is the usual practice to grow trees on both the sides of a
road especially in case of roads passing through country or
non-built up area.
ROAD ARBORICULTURE
 Objectives :
 To provide attractive landscape of road sides.
 To provide shade to the road users.
 To provide fruit bearing trees and timber.
 To protect against moving sand in desert areas.
 To intercept the annoying sound waves and fumes from
road vehicles.
 To help in the stabilization of the formation.
 To prevent the bituminous road. surface from becoming too
soft.
16

More Related Content

What's hot

2.5 HIGHWAY TRANSPORTATION : PAVEMENT MAINTENANCE (TRE) 3150611 GTU
2.5 HIGHWAY TRANSPORTATION : PAVEMENT MAINTENANCE (TRE) 3150611 GTU2.5 HIGHWAY TRANSPORTATION : PAVEMENT MAINTENANCE (TRE) 3150611 GTU
2.5 HIGHWAY TRANSPORTATION : PAVEMENT MAINTENANCE (TRE) 3150611 GTUVATSAL PATEL
 
Different Cross sections of Rail Tracks and Railway Station Layout
Different Cross sections of Rail Tracks and Railway Station LayoutDifferent Cross sections of Rail Tracks and Railway Station Layout
Different Cross sections of Rail Tracks and Railway Station LayoutSunil Kumar Meena
 
Construction of flexible pavements
Construction of flexible pavementsConstruction of flexible pavements
Construction of flexible pavementspradip dangar
 
Hill roads and Drainage
Hill roads and DrainageHill roads and Drainage
Hill roads and Drainageholegajendra
 
Highway Cross-sectional Elements
Highway Cross-sectional ElementsHighway Cross-sectional Elements
Highway Cross-sectional ElementsAkshathaBhandary
 
Station and Yards in Indian Railway
Station and Yards in Indian RailwayStation and Yards in Indian Railway
Station and Yards in Indian RailwayArbaz Kazi
 
Elements of road x-section
Elements of road x-section Elements of road x-section
Elements of road x-section Rana Ibrahim
 
Highway Horizontal Alignment
Highway Horizontal AlignmentHighway Horizontal Alignment
Highway Horizontal AlignmentAkshathaBhandary
 
Highway Drainage (Highway Engineering)
Highway Drainage (Highway Engineering)Highway Drainage (Highway Engineering)
Highway Drainage (Highway Engineering)Kiranmoy Samanta
 
Railways for urban transportation
Railways for urban transportationRailways for urban transportation
Railways for urban transportationgayathrysatheesan1
 
Coning of Wheels in Railways & Rail Creep
Coning of Wheels in Railways & Rail CreepConing of Wheels in Railways & Rail Creep
Coning of Wheels in Railways & Rail CreepRAMPRASAD KUMAWAT
 
Flexible and-rigid-pavements
Flexible and-rigid-pavementsFlexible and-rigid-pavements
Flexible and-rigid-pavementsHARITSEHRAWAT
 
Highway engineering PPT
Highway engineering PPTHighway engineering PPT
Highway engineering PPTKavin Raval
 
CONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROADCONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROADGLA University
 
Dense Bituminous macadam
Dense Bituminous macadamDense Bituminous macadam
Dense Bituminous macadampradip dangar
 
Rigid Pavement Design Part II
Rigid Pavement Design Part IIRigid Pavement Design Part II
Rigid Pavement Design Part IISachin Kulkarni
 

What's hot (20)

Design of rigid pavements
Design of rigid pavementsDesign of rigid pavements
Design of rigid pavements
 
2.5 HIGHWAY TRANSPORTATION : PAVEMENT MAINTENANCE (TRE) 3150611 GTU
2.5 HIGHWAY TRANSPORTATION : PAVEMENT MAINTENANCE (TRE) 3150611 GTU2.5 HIGHWAY TRANSPORTATION : PAVEMENT MAINTENANCE (TRE) 3150611 GTU
2.5 HIGHWAY TRANSPORTATION : PAVEMENT MAINTENANCE (TRE) 3150611 GTU
 
Different Cross sections of Rail Tracks and Railway Station Layout
Different Cross sections of Rail Tracks and Railway Station LayoutDifferent Cross sections of Rail Tracks and Railway Station Layout
Different Cross sections of Rail Tracks and Railway Station Layout
 
Construction of flexible pavements
Construction of flexible pavementsConstruction of flexible pavements
Construction of flexible pavements
 
Hill roads and Drainage
Hill roads and DrainageHill roads and Drainage
Hill roads and Drainage
 
Canal headworks
Canal headworksCanal headworks
Canal headworks
 
Sight distance
Sight distanceSight distance
Sight distance
 
Highway Cross-sectional Elements
Highway Cross-sectional ElementsHighway Cross-sectional Elements
Highway Cross-sectional Elements
 
Station and Yards in Indian Railway
Station and Yards in Indian RailwayStation and Yards in Indian Railway
Station and Yards in Indian Railway
 
Elements of road x-section
Elements of road x-section Elements of road x-section
Elements of road x-section
 
Unit 4
Unit 4Unit 4
Unit 4
 
Highway Horizontal Alignment
Highway Horizontal AlignmentHighway Horizontal Alignment
Highway Horizontal Alignment
 
Highway Drainage (Highway Engineering)
Highway Drainage (Highway Engineering)Highway Drainage (Highway Engineering)
Highway Drainage (Highway Engineering)
 
Railways for urban transportation
Railways for urban transportationRailways for urban transportation
Railways for urban transportation
 
Coning of Wheels in Railways & Rail Creep
Coning of Wheels in Railways & Rail CreepConing of Wheels in Railways & Rail Creep
Coning of Wheels in Railways & Rail Creep
 
Flexible and-rigid-pavements
Flexible and-rigid-pavementsFlexible and-rigid-pavements
Flexible and-rigid-pavements
 
Highway engineering PPT
Highway engineering PPTHighway engineering PPT
Highway engineering PPT
 
CONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROADCONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROAD
 
Dense Bituminous macadam
Dense Bituminous macadamDense Bituminous macadam
Dense Bituminous macadam
 
Rigid Pavement Design Part II
Rigid Pavement Design Part IIRigid Pavement Design Part II
Rigid Pavement Design Part II
 

Similar to 2.6 HIGHWAY TRANSPORTATION : HIGHWAY DRAINAGE, ARBORICULTURE AND LIGHTING (TRE) 3150611 GTU

Chapter Four -4 Highway Drainage slide.pdf
Chapter Four -4 Highway Drainage slide.pdfChapter Four -4 Highway Drainage slide.pdf
Chapter Four -4 Highway Drainage slide.pdfrajundauliya
 
Highway Drainage System
Highway Drainage SystemHighway Drainage System
Highway Drainage SystemGOKULCIVER
 
DRAINAGE OF PAVEMENT AND WATER PERCOLATION ppt.pptx
DRAINAGE OF PAVEMENT AND WATER PERCOLATION ppt.pptxDRAINAGE OF PAVEMENT AND WATER PERCOLATION ppt.pptx
DRAINAGE OF PAVEMENT AND WATER PERCOLATION ppt.pptxAmitYadav363360
 
Module 5: Highway Drainage and Highway Economics
Module 5: Highway Drainage and Highway EconomicsModule 5: Highway Drainage and Highway Economics
Module 5: Highway Drainage and Highway EconomicsDhananjayM6
 
Highway drainage system
Highway drainage systemHighway drainage system
Highway drainage systemmadhvitilgam
 
Chapter 4 Drainge and maintenance of road
Chapter 4 Drainge and maintenance of roadChapter 4 Drainge and maintenance of road
Chapter 4 Drainge and maintenance of roadKHUSHBU SHAH
 
Raod side ditches
Raod side ditchesRaod side ditches
Raod side ditchesamanullahk
 
15 drainase bawah permukaan
15   drainase bawah permukaan15   drainase bawah permukaan
15 drainase bawah permukaanKharistya Amaru
 
Ground water recharge & water logging
Ground water recharge & water loggingGround water recharge & water logging
Ground water recharge & water loggingNIKHIL PAKWANNE
 
Ground water recharge & water logging by Nikhil Pakwanne
Ground water recharge & water logging by Nikhil PakwanneGround water recharge & water logging by Nikhil Pakwanne
Ground water recharge & water logging by Nikhil PakwanneNIKHIL PAKWANNE
 
Techniques of rain water harvesting in urban and rural areas
Techniques of rain water harvesting in urban and rural areasTechniques of rain water harvesting in urban and rural areas
Techniques of rain water harvesting in urban and rural areasIEI GSC
 
Canal of design
Canal of designCanal of design
Canal of designPREMKUMAR
 
Laying and Testing of sewer
Laying and Testing of sewerLaying and Testing of sewer
Laying and Testing of sewersathyan s
 

Similar to 2.6 HIGHWAY TRANSPORTATION : HIGHWAY DRAINAGE, ARBORICULTURE AND LIGHTING (TRE) 3150611 GTU (20)

Chapter Four -4 Highway Drainage slide.pdf
Chapter Four -4 Highway Drainage slide.pdfChapter Four -4 Highway Drainage slide.pdf
Chapter Four -4 Highway Drainage slide.pdf
 
Highway drainage
Highway drainageHighway drainage
Highway drainage
 
Highway Drainage System
Highway Drainage SystemHighway Drainage System
Highway Drainage System
 
DRAINAGE OF PAVEMENT AND WATER PERCOLATION ppt.pptx
DRAINAGE OF PAVEMENT AND WATER PERCOLATION ppt.pptxDRAINAGE OF PAVEMENT AND WATER PERCOLATION ppt.pptx
DRAINAGE OF PAVEMENT AND WATER PERCOLATION ppt.pptx
 
Module 5: Highway Drainage and Highway Economics
Module 5: Highway Drainage and Highway EconomicsModule 5: Highway Drainage and Highway Economics
Module 5: Highway Drainage and Highway Economics
 
20160716_WATER SUPPLY.ppt
20160716_WATER SUPPLY.ppt20160716_WATER SUPPLY.ppt
20160716_WATER SUPPLY.ppt
 
Highway drainage system
Highway drainage systemHighway drainage system
Highway drainage system
 
Chapter 4 Drainge and maintenance of road
Chapter 4 Drainge and maintenance of roadChapter 4 Drainge and maintenance of road
Chapter 4 Drainge and maintenance of road
 
Raod side ditches
Raod side ditchesRaod side ditches
Raod side ditches
 
15 drainase bawah permukaan
15   drainase bawah permukaan15   drainase bawah permukaan
15 drainase bawah permukaan
 
Drainage water management
Drainage water management Drainage water management
Drainage water management
 
chapt 6.pptx
chapt 6.pptxchapt 6.pptx
chapt 6.pptx
 
Ground water recharge & water logging
Ground water recharge & water loggingGround water recharge & water logging
Ground water recharge & water logging
 
Ground water recharge & water logging by Nikhil Pakwanne
Ground water recharge & water logging by Nikhil PakwanneGround water recharge & water logging by Nikhil Pakwanne
Ground water recharge & water logging by Nikhil Pakwanne
 
Techniques of rain water harvesting in urban and rural areas
Techniques of rain water harvesting in urban and rural areasTechniques of rain water harvesting in urban and rural areas
Techniques of rain water harvesting in urban and rural areas
 
New
NewNew
New
 
Canal of design
Canal of designCanal of design
Canal of design
 
Drainage
DrainageDrainage
Drainage
 
To be presented
To be presentedTo be presented
To be presented
 
Laying and Testing of sewer
Laying and Testing of sewerLaying and Testing of sewer
Laying and Testing of sewer
 

More from VATSAL PATEL

5. AIR TRANSPORTATION (TRE) GTU 3150611
5. AIR TRANSPORTATION (TRE) GTU 31506115. AIR TRANSPORTATION (TRE) GTU 3150611
5. AIR TRANSPORTATION (TRE) GTU 3150611VATSAL PATEL
 
3. RAIL TRANSPORTATION (TRE) GTU 3150611
3. RAIL TRANSPORTATION (TRE) GTU 31506113. RAIL TRANSPORTATION (TRE) GTU 3150611
3. RAIL TRANSPORTATION (TRE) GTU 3150611VATSAL PATEL
 
2.7 HIGHWAY TRANSPORTATION : TRAFFIC ENGINEERING (TRE) 3150611 GTU
2.7 HIGHWAY TRANSPORTATION : TRAFFIC ENGINEERING (TRE) 3150611 GTU2.7 HIGHWAY TRANSPORTATION : TRAFFIC ENGINEERING (TRE) 3150611 GTU
2.7 HIGHWAY TRANSPORTATION : TRAFFIC ENGINEERING (TRE) 3150611 GTUVATSAL PATEL
 
2. PORT PLANNING (PHE) GTU 3170623
2. PORT PLANNING (PHE) GTU 31706232. PORT PLANNING (PHE) GTU 3170623
2. PORT PLANNING (PHE) GTU 3170623VATSAL PATEL
 
4. WATER TRANSPORTATION (TRE) GTU 3150611
4. WATER TRANSPORTATION (TRE) GTU 31506114. WATER TRANSPORTATION (TRE) GTU 3150611
4. WATER TRANSPORTATION (TRE) GTU 3150611VATSAL PATEL
 
8. IMPACT ANALYSIS (PHE) GTU 3170623
8. IMPACT ANALYSIS (PHE) GTU 31706238. IMPACT ANALYSIS (PHE) GTU 3170623
8. IMPACT ANALYSIS (PHE) GTU 3170623VATSAL PATEL
 
2.3 HIGHWAY TRANSPORTATION : HIGHWAY MATERIALS (TRE) 3150611 GTU
2.3 HIGHWAY TRANSPORTATION : HIGHWAY MATERIALS (TRE) 3150611 GTU2.3 HIGHWAY TRANSPORTATION : HIGHWAY MATERIALS (TRE) 3150611 GTU
2.3 HIGHWAY TRANSPORTATION : HIGHWAY MATERIALS (TRE) 3150611 GTUVATSAL PATEL
 
7. SEAPORT MAINTENANCE (PHE) GTU 3170623
7. SEAPORT MAINTENANCE (PHE) GTU 31706237. SEAPORT MAINTENANCE (PHE) GTU 3170623
7. SEAPORT MAINTENANCE (PHE) GTU 3170623VATSAL PATEL
 
6. NAVIGATIONAL AIDS (PHE) GTU 3170623
6. NAVIGATIONAL AIDS (PHE) GTU 31706236. NAVIGATIONAL AIDS (PHE) GTU 3170623
6. NAVIGATIONAL AIDS (PHE) GTU 3170623VATSAL PATEL
 
5. PORT AMENITIES & OPERATIONS (PHE) GTU 3170623
5. PORT AMENITIES & OPERATIONS (PHE) GTU 31706235. PORT AMENITIES & OPERATIONS (PHE) GTU 3170623
5. PORT AMENITIES & OPERATIONS (PHE) GTU 3170623VATSAL PATEL
 
4. HARBOUR INFRASTRUCTURES (PHE) GTU 3170623
4. HARBOUR INFRASTRUCTURES (PHE) GTU 31706234. HARBOUR INFRASTRUCTURES (PHE) GTU 3170623
4. HARBOUR INFRASTRUCTURES (PHE) GTU 3170623VATSAL PATEL
 
3. NATURAL PHENOMENA (PHE) GTU 3170623
3. NATURAL PHENOMENA (PHE) GTU 31706233. NATURAL PHENOMENA (PHE) GTU 3170623
3. NATURAL PHENOMENA (PHE) GTU 3170623VATSAL PATEL
 
2.2 HIGHWAY TRANSPORTATION : HIGHWAY GEOMETRIC DESIGN (TRE) 3150611 GTU
2.2 HIGHWAY TRANSPORTATION : HIGHWAY GEOMETRIC DESIGN (TRE) 3150611 GTU2.2 HIGHWAY TRANSPORTATION : HIGHWAY GEOMETRIC DESIGN (TRE) 3150611 GTU
2.2 HIGHWAY TRANSPORTATION : HIGHWAY GEOMETRIC DESIGN (TRE) 3150611 GTUVATSAL PATEL
 
1. INTRODUCTION TO WATER TRANSPORTATION (PHE) GTU 3170623
1. INTRODUCTION  TO WATER TRANSPORTATION (PHE) GTU 31706231. INTRODUCTION  TO WATER TRANSPORTATION (PHE) GTU 3170623
1. INTRODUCTION TO WATER TRANSPORTATION (PHE) GTU 3170623VATSAL PATEL
 
2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTU
2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTU2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTU
2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTUVATSAL PATEL
 
1. INTRODUCTION (TRE) 3150611 GTU
1. INTRODUCTION (TRE) 3150611 GTU1. INTRODUCTION (TRE) 3150611 GTU
1. INTRODUCTION (TRE) 3150611 GTUVATSAL PATEL
 
9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTU
9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTU9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTU
9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTUVATSAL PATEL
 
8. THEORY OF ERRORS (SUR) 3140601 GTU
8. THEORY OF ERRORS (SUR) 3140601 GTU8. THEORY OF ERRORS (SUR) 3140601 GTU
8. THEORY OF ERRORS (SUR) 3140601 GTUVATSAL PATEL
 
7. GEODETIC SYRVEYING (SUR) 3140601 GTU
7. GEODETIC SYRVEYING (SUR) 3140601 GTU7. GEODETIC SYRVEYING (SUR) 3140601 GTU
7. GEODETIC SYRVEYING (SUR) 3140601 GTUVATSAL PATEL
 
6. TACHOMETRIC SURVEYING (SUR) 3140601 GTU
6. TACHOMETRIC SURVEYING (SUR) 3140601 GTU6. TACHOMETRIC SURVEYING (SUR) 3140601 GTU
6. TACHOMETRIC SURVEYING (SUR) 3140601 GTUVATSAL PATEL
 

More from VATSAL PATEL (20)

5. AIR TRANSPORTATION (TRE) GTU 3150611
5. AIR TRANSPORTATION (TRE) GTU 31506115. AIR TRANSPORTATION (TRE) GTU 3150611
5. AIR TRANSPORTATION (TRE) GTU 3150611
 
3. RAIL TRANSPORTATION (TRE) GTU 3150611
3. RAIL TRANSPORTATION (TRE) GTU 31506113. RAIL TRANSPORTATION (TRE) GTU 3150611
3. RAIL TRANSPORTATION (TRE) GTU 3150611
 
2.7 HIGHWAY TRANSPORTATION : TRAFFIC ENGINEERING (TRE) 3150611 GTU
2.7 HIGHWAY TRANSPORTATION : TRAFFIC ENGINEERING (TRE) 3150611 GTU2.7 HIGHWAY TRANSPORTATION : TRAFFIC ENGINEERING (TRE) 3150611 GTU
2.7 HIGHWAY TRANSPORTATION : TRAFFIC ENGINEERING (TRE) 3150611 GTU
 
2. PORT PLANNING (PHE) GTU 3170623
2. PORT PLANNING (PHE) GTU 31706232. PORT PLANNING (PHE) GTU 3170623
2. PORT PLANNING (PHE) GTU 3170623
 
4. WATER TRANSPORTATION (TRE) GTU 3150611
4. WATER TRANSPORTATION (TRE) GTU 31506114. WATER TRANSPORTATION (TRE) GTU 3150611
4. WATER TRANSPORTATION (TRE) GTU 3150611
 
8. IMPACT ANALYSIS (PHE) GTU 3170623
8. IMPACT ANALYSIS (PHE) GTU 31706238. IMPACT ANALYSIS (PHE) GTU 3170623
8. IMPACT ANALYSIS (PHE) GTU 3170623
 
2.3 HIGHWAY TRANSPORTATION : HIGHWAY MATERIALS (TRE) 3150611 GTU
2.3 HIGHWAY TRANSPORTATION : HIGHWAY MATERIALS (TRE) 3150611 GTU2.3 HIGHWAY TRANSPORTATION : HIGHWAY MATERIALS (TRE) 3150611 GTU
2.3 HIGHWAY TRANSPORTATION : HIGHWAY MATERIALS (TRE) 3150611 GTU
 
7. SEAPORT MAINTENANCE (PHE) GTU 3170623
7. SEAPORT MAINTENANCE (PHE) GTU 31706237. SEAPORT MAINTENANCE (PHE) GTU 3170623
7. SEAPORT MAINTENANCE (PHE) GTU 3170623
 
6. NAVIGATIONAL AIDS (PHE) GTU 3170623
6. NAVIGATIONAL AIDS (PHE) GTU 31706236. NAVIGATIONAL AIDS (PHE) GTU 3170623
6. NAVIGATIONAL AIDS (PHE) GTU 3170623
 
5. PORT AMENITIES & OPERATIONS (PHE) GTU 3170623
5. PORT AMENITIES & OPERATIONS (PHE) GTU 31706235. PORT AMENITIES & OPERATIONS (PHE) GTU 3170623
5. PORT AMENITIES & OPERATIONS (PHE) GTU 3170623
 
4. HARBOUR INFRASTRUCTURES (PHE) GTU 3170623
4. HARBOUR INFRASTRUCTURES (PHE) GTU 31706234. HARBOUR INFRASTRUCTURES (PHE) GTU 3170623
4. HARBOUR INFRASTRUCTURES (PHE) GTU 3170623
 
3. NATURAL PHENOMENA (PHE) GTU 3170623
3. NATURAL PHENOMENA (PHE) GTU 31706233. NATURAL PHENOMENA (PHE) GTU 3170623
3. NATURAL PHENOMENA (PHE) GTU 3170623
 
2.2 HIGHWAY TRANSPORTATION : HIGHWAY GEOMETRIC DESIGN (TRE) 3150611 GTU
2.2 HIGHWAY TRANSPORTATION : HIGHWAY GEOMETRIC DESIGN (TRE) 3150611 GTU2.2 HIGHWAY TRANSPORTATION : HIGHWAY GEOMETRIC DESIGN (TRE) 3150611 GTU
2.2 HIGHWAY TRANSPORTATION : HIGHWAY GEOMETRIC DESIGN (TRE) 3150611 GTU
 
1. INTRODUCTION TO WATER TRANSPORTATION (PHE) GTU 3170623
1. INTRODUCTION  TO WATER TRANSPORTATION (PHE) GTU 31706231. INTRODUCTION  TO WATER TRANSPORTATION (PHE) GTU 3170623
1. INTRODUCTION TO WATER TRANSPORTATION (PHE) GTU 3170623
 
2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTU
2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTU2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTU
2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTU
 
1. INTRODUCTION (TRE) 3150611 GTU
1. INTRODUCTION (TRE) 3150611 GTU1. INTRODUCTION (TRE) 3150611 GTU
1. INTRODUCTION (TRE) 3150611 GTU
 
9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTU
9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTU9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTU
9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTU
 
8. THEORY OF ERRORS (SUR) 3140601 GTU
8. THEORY OF ERRORS (SUR) 3140601 GTU8. THEORY OF ERRORS (SUR) 3140601 GTU
8. THEORY OF ERRORS (SUR) 3140601 GTU
 
7. GEODETIC SYRVEYING (SUR) 3140601 GTU
7. GEODETIC SYRVEYING (SUR) 3140601 GTU7. GEODETIC SYRVEYING (SUR) 3140601 GTU
7. GEODETIC SYRVEYING (SUR) 3140601 GTU
 
6. TACHOMETRIC SURVEYING (SUR) 3140601 GTU
6. TACHOMETRIC SURVEYING (SUR) 3140601 GTU6. TACHOMETRIC SURVEYING (SUR) 3140601 GTU
6. TACHOMETRIC SURVEYING (SUR) 3140601 GTU
 

Recently uploaded

Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 

Recently uploaded (20)

DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 

2.6 HIGHWAY TRANSPORTATION : HIGHWAY DRAINAGE, ARBORICULTURE AND LIGHTING (TRE) 3150611 GTU

  • 1. “HIGHWAY DRAINAGE, ARBORICULTURE AND LIGHTING” 1 PREPARED BY : ASST. PROF. VATSAL D. PATEL MAHATMA GANDHI INSTITUTE OF TECHNICAL EDUCATION & RESEARCH CENTRE, NAVSARI.
  • 2. HIGHWAY DRAINAGE  During rains, part of the rain water flows on surface and part of it percolates through the soil mass as gravitational water until it reaches the ground water below the water table.  Removal or diversion of surface water from the roadway and adjoining land is termed as surface drainage.
  • 3. REQUIREMENTS OF DRAINAGE SYSTEM  Adjoining land : The surface water from the adjoining land should be prevented from entering the roadway.  Camber : The road surface should be provided with sufficient camber to drain off the rain water quickly.  Gradient : In the areas of heavy rainfall minimum gradient should be provided.  Cross drainage works : Cross drainage works should be designed in such a way that the road surface is not overtopped even at the time of highest flood.  Highest Flood Level (HFL) : The level of carriage way should be kept at least 60 cm above the H.F.L.
  • 4. REQUIREMENTS OF DRAINAGE SYSTEM  Side drains : The side drain should have sufficient capacity and longitudinal slope to carry away all the surface water collected.  Intercepting drains : In hilly areas, intercepting drains should be provided parallel to the road.  Water table : Highest level of ground water table should be kept well below the level of subgrade, preferably by at least 1.2 m.
  • 5. SURFACE DRAINAGE SYSTEM  Side drains for road in embankment :  When road is constructed in embankment, it is necessary to provide side drain on one side or both sides, Such side drains should be constructed at least 2.0 m away from the bottom edge of an embankment.  The depth of side drain is kept 1.0 to 1.5 m to prevent the entry of drain water into the embankment.
  • 6. SURFACE DRAINAGE SYSTEM  Side drains for road in cutting :  When road is constructed in cutting side drains are provided on either side of road.  The drain should not overflow in any circumstances.
  • 7. SURFACE DRAINAGE SYSTEM  Covered drainage trenches:  Closed side drains are preferred as open and deep side drains are dangerous where space is limited. In such cases covered drains of drainage trenches properly filled with layers of coarse sand and gravel may be used. Coarser gravel layers are provided at the bottom of the drain.
  • 8. SURFACE DRAINAGE SYSTEM  Catch basins:  Catch basin is a structure like chamber constructed on a sewer line. Water from pavement surface is collected in catch basin and discharged to the sewer line.
  • 9. SURFACE DRAINAGE SYSTEM  Inlets :  Inlets is a structure constructed along the edge of the urban road to discharge rain water into the storm water sewer.  Inlets is a concrete box with grating either at the top or on the side. If grating is horizontal, it is called horizontal inlet. If grading is vertical, it is called vertical inlet or curb inlet.
  • 10. SUB-SURFACE DRAINAGE SYSTEM  Removal or diversion of excess soil-water from the subgrade is termed as sub-surface drainage.  Sub-surface drainage is necessary in the following situations :  When road is in cutting and water seeping from sides.  When road is near the foot of hill and is likely to be damaged by water flowing down the hill.  When road is passing through plain area and water is likely to be accumulated on sides.  Where water rises up to subgrade by capillary action.
  • 11. SUB-SURFACE DRAINAGE SYSTEM  Lowering of water table :  The highest level of water table should be fairly below the level of subgrade, in order that the subgrade and pavement layers are not subjected to excessive moisture.  The water table should be kept at least 1.0 to 1.2 m below the subgrade. In places where water table is high best remedy is to take the road formulation on embankment of height not less than 1.0 to 1.2 m.
  • 12. SUB-SURFACE DRAINAGE SYSTEM  Controlling seepage flow :  when the general ground as well as the impervious strata below are sloping, seepage flow is likely to exist. the seepage zone is at depth less than 0.6 to 0.9 m from the subgrade level, longitudinal pipe drain in trenched filled with filter material and clay seal may be constructed to intercept the seepage flow.
  • 13. SUB-SURFACE DRAINAGE SYSTEM  Controlling capillary water :  A layer of granular material of suitable thickness is provided during the construction of embankment, between the subgrade and the highest level of subsurface water table. The thickness of the granular capillary cut off layer should be sufficiently higher than the anticipated capillary rise within the granular layer so that the capillary water can not rise above the cut off layer.
  • 14. ROAD ARBORICULTURE  A The word 'arbori' is originated from the Latin world 'arbor' meaning a tree.  Thus, arboriculture means the tree culture or care and planting of trees.  It is the usual practice to grow trees on both the sides of a road especially in case of roads passing through country or non-built up area.
  • 15. ROAD ARBORICULTURE  Objectives :  To provide attractive landscape of road sides.  To provide shade to the road users.  To provide fruit bearing trees and timber.  To protect against moving sand in desert areas.  To intercept the annoying sound waves and fumes from road vehicles.  To help in the stabilization of the formation.  To prevent the bituminous road. surface from becoming too soft.
  • 16. 16