Road Side Ditches
Definition: A ditch is a small to moderate
depression created to channel water.
A ditch can be used for drainage, to drain water
from low-lying areas, alongside roadways or
fields, or to channel water from a more distant
source for plant irrigation.
Ditches:
Cross-Section of Ditches
• The three main types of cross-sections for
road side ditches are:
Triangular
Parabolic
Trapezoidal
The parabolic shaped id hydraulically the best
resistant to erosion, but it is little complicated in
design than the Triangular and trapezoidal one.
The triangular section, although easy to
construct is very much susceptible to erosion
and gets easily blocked with debris and is
generally not recommended.
The most commonly used X-section is the
trapezoidal section as it is acceptable from both
considerations- hydraulic as well as of
construction.
The side slopes of the ditches
As for earth slopes should be flat, lying in the
range 2:1 to 4:1 their intersections also should
be rounded as recommended in case of earth
slopes from the view point of ease in grassing
and continuity of the turf.
While the quantity of water to be drained, the
length of drain and the gradient will actually
determine the width at bottom, it should
normally be not less than 0.3m.
Also to fulfill the requirement of the roadside
ditch to drain the base course of the road
pavement, the bottom of the ditch has to be
taken at least to a depth of 0.3m to 0.6m below
the shoulder level.
Surface Drain linings
Why?
Unlined, bare earth surface of roadside ditches
are highly susceptible to erosion unless the flow
is limited to a very small amount. It is, therefore
necessary that road side ditches generally be
provided with a protective lining which would
avoid serious erosion problems and keep them
serviceable.
Types of lining?
Turfing:
This lining is more economical than other lining
to establish and with proper maintenance it will
provide adequate protection against erosion for
most of the site situations.
Key factor: Should form firm turf.
The efficiency of this technique depends upon
making the water flow over the NET.
Experience has shown that under two extreme
site conditions-on very flat grades and then
again on very steep grades. Technique of
grassing as a surface lining does not always
provide satisfactory.
Becoz- On very flat grades (less than 0.5 %) the
flow over a grass lining is too slow, and giving
rise to the problems of silting or occurrence of
deposition which is rather difficult to maintain.
And over extremely steep grades erosive
velocities are reached, which due to scouring
action can destroy the grass lining completely.
Under these conditions we provide:
Cement Concrete Lining
Brick/Rubble Masonry and even
Bituminous mixes.
Paved lining
The most practical concrete lining is the
prefabricated type. In this construction, the
panels are cast in standard form at a convenient
central plant.
Constructed easily on smooth base ground and
a panel size of 0.3m x 1m x 0.05 is a practical
size for handling. Narrow units may be cast for
the bottom of small ditch sections.
The ditch section is shaped to line and grade and
the surface smoothened. The slabs are then
placed in the ditch.
The banks are seeded to establish a turf right up
to the edge of the lining.
The concrete for precast slabs should be of
uniform consistency, using 20mm maximum size
of the aggregate.
This is how we can show the unlined, Partially lined and
Lined Ditches/Drains:
Velocity of Flow
For efficient functioning of a road side ditch, the flow
must be fast enough to prevent silting or deposition but
at the same time the flow must not be so fast as to cause
serious damage by scouring action.
To overcome the problem of silting or occurrence of
deposition a secondary smaller channel of V-shape is
provided at the bottom of the ditch to concentrate low
flow in a smaller area of X-sec. thereby increasing the
flow velocity.
This secondary channel should also be turfed to protect it
from erosion under storm flow.
A good turf lining will be able to withstand
velocities of about 5 to 6 Km/hr.
To get a fairly good idea of water velocity in the
ditch, throw a wooden chip into the ditch during
an intense storm and if a man can keep up with
the chip at a moderate walking speed, the
velocity of water is below maximum.
But if he has to run to keep up pace with the
chip the velocity is above the safe maximum.
Design Steps
1. From the known soil type, arrive at the value of Manning’s
Rugosity Coefficient.
2. Calculate the hydraulic mean depth from the Manning’s
formula.
3. Find out the X-sec. area from the given discharge and the
max permissible velocity.
4. From step 2 and 3 solve the simultaneous =n’s to obtain
bottom width and depth.
5. Calculate the critical depth and determine whether the
flow is Tranquil or Turbulent.
If it is Tranquil add a freeboard to the depth and
finalize the X-sec. and if flow is turbulent it may be necessary
to line the channel or decrease the longitudinal slope.
Q.: A longitudinal channel with a trapezoidal x-sec. is to be constructed in a cut section.
The bed slope is 0.0004. The mximum velocity is 0.6 m/sec. If the soil is clay with
Manning’s Rugosity coff. of 0.024. Design the channel for a discharge of 3 cu m/sec.
Solution steps:
• V=
𝑅2/3 𝑆1/2
𝑛
• 0.6=
𝑅2/3 𝑋 0.0004 1/2
0.024
=
𝑅2/3 𝑋 0.02
0.024
R= 0.61 m
A =
𝑄
𝑉
=
3.0
0.6
= 5𝑚2
Also; Perimeter P = A/R
= 5/0.61
= 8.20 m
Now A= d(b+2d) = 5
P = b + 2d(1+ 22
)1/2
= b + 4.48 d = 8.20
Thus we have: bd +2𝑑2
= 5
b+ 4.48d = 8.20
Solving the above =n’s we get:
d= 0.81 m and b= 4.57 m
Now calculating critical depth as:
𝑉2
𝑔
=
0.62
9.81
= 0.037 m
If the actual depth is greater than critical depth the flow
is called as Tranquil nd then no Lining is necessary other
wise Turbulent then lining is required.
Here: Actual depth is 0.81
And critical depth is 0.037
So Actual depth is greater hence no Lining is required.
Thanks for listening…
Good Bye

More Related Content

What's hot

energy dissipator in hydraulic structure
energy dissipator  in  hydraulic structure energy dissipator  in  hydraulic structure
energy dissipator in hydraulic structure Kiran Jadhav
 
Fluid Mechanic Lab - Reynold's Number Experiment
Fluid Mechanic Lab - Reynold's Number ExperimentFluid Mechanic Lab - Reynold's Number Experiment
Fluid Mechanic Lab - Reynold's Number ExperimentMuhammadSRaniYah
 
Lec-00-Weir&Barrages.pptx
Lec-00-Weir&Barrages.pptxLec-00-Weir&Barrages.pptx
Lec-00-Weir&Barrages.pptxWaqas Khan
 
Canal outlets
Canal outletsCanal outlets
Canal outletssaibabu48
 
Lacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation EngineeringLacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation EngineeringLatif Hyder Wadho
 
Setting out of curve (Survey)
Setting out of curve (Survey)Setting out of curve (Survey)
Setting out of curve (Survey)Bhavik Patel
 
CHAPTER 5 Earth work quantity and mass haul diagram..pdf
CHAPTER 5 Earth work quantity and mass haul diagram..pdfCHAPTER 5 Earth work quantity and mass haul diagram..pdf
CHAPTER 5 Earth work quantity and mass haul diagram..pdfMohdMusaHashim1
 
Type of caissons
Type of caissonsType of caissons
Type of caissonsAB MAKASANA
 
Wind Rose.pdf
Wind Rose.pdfWind Rose.pdf
Wind Rose.pdfWhUllahWa
 
Storage and distribution reservoirs
Storage and distribution reservoirsStorage and distribution reservoirs
Storage and distribution reservoirsfarooq husain
 
Estimation of storm sewage
Estimation of storm sewageEstimation of storm sewage
Estimation of storm sewagesidrarashiddar
 
Drainage in Irrigation Engineering
Drainage in Irrigation EngineeringDrainage in Irrigation Engineering
Drainage in Irrigation EngineeringJaptyesh Singh
 

What's hot (20)

Geoenvironmental engg
Geoenvironmental enggGeoenvironmental engg
Geoenvironmental engg
 
energy dissipator in hydraulic structure
energy dissipator  in  hydraulic structure energy dissipator  in  hydraulic structure
energy dissipator in hydraulic structure
 
Sedimentation
SedimentationSedimentation
Sedimentation
 
TYPES OF RESERVOIR
TYPES OF RESERVOIRTYPES OF RESERVOIR
TYPES OF RESERVOIR
 
Fluid Mechanic Lab - Reynold's Number Experiment
Fluid Mechanic Lab - Reynold's Number ExperimentFluid Mechanic Lab - Reynold's Number Experiment
Fluid Mechanic Lab - Reynold's Number Experiment
 
vertical-curves
vertical-curvesvertical-curves
vertical-curves
 
Lec-00-Weir&Barrages.pptx
Lec-00-Weir&Barrages.pptxLec-00-Weir&Barrages.pptx
Lec-00-Weir&Barrages.pptx
 
Aerated lagoons
Aerated lagoonsAerated lagoons
Aerated lagoons
 
Canal outlets
Canal outletsCanal outlets
Canal outlets
 
Lacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation EngineeringLacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation Engineering
 
Setting out of curve (Survey)
Setting out of curve (Survey)Setting out of curve (Survey)
Setting out of curve (Survey)
 
CHAPTER 5 Earth work quantity and mass haul diagram..pdf
CHAPTER 5 Earth work quantity and mass haul diagram..pdfCHAPTER 5 Earth work quantity and mass haul diagram..pdf
CHAPTER 5 Earth work quantity and mass haul diagram..pdf
 
Type of caissons
Type of caissonsType of caissons
Type of caissons
 
Irrigation
IrrigationIrrigation
Irrigation
 
Wind Rose.pdf
Wind Rose.pdfWind Rose.pdf
Wind Rose.pdf
 
Storage and distribution reservoirs
Storage and distribution reservoirsStorage and distribution reservoirs
Storage and distribution reservoirs
 
Plain sedimentation
Plain sedimentationPlain sedimentation
Plain sedimentation
 
1. curvature of track
1. curvature of track1. curvature of track
1. curvature of track
 
Estimation of storm sewage
Estimation of storm sewageEstimation of storm sewage
Estimation of storm sewage
 
Drainage in Irrigation Engineering
Drainage in Irrigation EngineeringDrainage in Irrigation Engineering
Drainage in Irrigation Engineering
 

Similar to Raod side ditches

7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERING7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERINGVATSAL PATEL
 
ENVIRONMENTAL POLLUTION CONTROL METHOD ADOPTED BY NTPC LTD. IN ASH DYKE (STAR...
ENVIRONMENTAL POLLUTION CONTROL METHOD ADOPTED BY NTPC LTD. IN ASH DYKE (STAR...ENVIRONMENTAL POLLUTION CONTROL METHOD ADOPTED BY NTPC LTD. IN ASH DYKE (STAR...
ENVIRONMENTAL POLLUTION CONTROL METHOD ADOPTED BY NTPC LTD. IN ASH DYKE (STAR...Sukesh Nayak
 
LOW LEVEL & HIGH LEVEL CAUSEWAY
LOW LEVEL & HIGH LEVEL CAUSEWAYLOW LEVEL & HIGH LEVEL CAUSEWAY
LOW LEVEL & HIGH LEVEL CAUSEWAYGhulam Yasin
 
Terraces:Soil Water Conservation structure
Terraces:Soil Water Conservation structureTerraces:Soil Water Conservation structure
Terraces:Soil Water Conservation structureMoudud Hasan
 
Tunneling exploration
Tunneling explorationTunneling exploration
Tunneling explorationjamali husain
 
15 drainase bawah permukaan
15   drainase bawah permukaan15   drainase bawah permukaan
15 drainase bawah permukaanKharistya Amaru
 
F3 Subsoil drainage and installation
F3 Subsoil drainage and installationF3 Subsoil drainage and installation
F3 Subsoil drainage and installationtoverwater
 
Subsurface drainage
Subsurface drainageSubsurface drainage
Subsurface drainageChethan B J
 
Unit 4-canal lining
Unit 4-canal liningUnit 4-canal lining
Unit 4-canal liningsaibabu48
 
2.6 HIGHWAY TRANSPORTATION : HIGHWAY DRAINAGE, ARBORICULTURE AND LIGHTING (TR...
2.6 HIGHWAY TRANSPORTATION : HIGHWAY DRAINAGE, ARBORICULTURE AND LIGHTING (TR...2.6 HIGHWAY TRANSPORTATION : HIGHWAY DRAINAGE, ARBORICULTURE AND LIGHTING (TR...
2.6 HIGHWAY TRANSPORTATION : HIGHWAY DRAINAGE, ARBORICULTURE AND LIGHTING (TR...VATSAL PATEL
 
LINING OF CHANNELS
LINING OF CHANNELSLINING OF CHANNELS
LINING OF CHANNELSANURAG YADAV
 
Dewatering
DewateringDewatering
DewateringJNTUK
 
Building Services :Drainage, Rain Water Disposal and Harvesting
Building Services :Drainage,  Rain Water Disposal and  HarvestingBuilding Services :Drainage,  Rain Water Disposal and  Harvesting
Building Services :Drainage, Rain Water Disposal and HarvestingSumit Ranjan
 
Well completion.
Well completion.Well completion.
Well completion.Mawa James
 
Efficient Use of Rain Water by Altering Channel System
Efficient Use of Rain Water by Altering Channel SystemEfficient Use of Rain Water by Altering Channel System
Efficient Use of Rain Water by Altering Channel Systemtheijes
 
A04320105
A04320105A04320105
A04320105theijes
 

Similar to Raod side ditches (20)

7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERING7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERING
 
ENVIRONMENTAL POLLUTION CONTROL METHOD ADOPTED BY NTPC LTD. IN ASH DYKE (STAR...
ENVIRONMENTAL POLLUTION CONTROL METHOD ADOPTED BY NTPC LTD. IN ASH DYKE (STAR...ENVIRONMENTAL POLLUTION CONTROL METHOD ADOPTED BY NTPC LTD. IN ASH DYKE (STAR...
ENVIRONMENTAL POLLUTION CONTROL METHOD ADOPTED BY NTPC LTD. IN ASH DYKE (STAR...
 
LOW LEVEL & HIGH LEVEL CAUSEWAY
LOW LEVEL & HIGH LEVEL CAUSEWAYLOW LEVEL & HIGH LEVEL CAUSEWAY
LOW LEVEL & HIGH LEVEL CAUSEWAY
 
Terraces:Soil Water Conservation structure
Terraces:Soil Water Conservation structureTerraces:Soil Water Conservation structure
Terraces:Soil Water Conservation structure
 
UNIT-2.pptx
UNIT-2.pptxUNIT-2.pptx
UNIT-2.pptx
 
Tunneling exploration
Tunneling explorationTunneling exploration
Tunneling exploration
 
15 drainase bawah permukaan
15   drainase bawah permukaan15   drainase bawah permukaan
15 drainase bawah permukaan
 
F3 Subsoil drainage and installation
F3 Subsoil drainage and installationF3 Subsoil drainage and installation
F3 Subsoil drainage and installation
 
Subsurface drainage
Subsurface drainageSubsurface drainage
Subsurface drainage
 
Unit 4-canal lining
Unit 4-canal liningUnit 4-canal lining
Unit 4-canal lining
 
Group 5 1
Group 5 1Group 5 1
Group 5 1
 
1 grassed water ways
1 grassed water ways1 grassed water ways
1 grassed water ways
 
2.6 HIGHWAY TRANSPORTATION : HIGHWAY DRAINAGE, ARBORICULTURE AND LIGHTING (TR...
2.6 HIGHWAY TRANSPORTATION : HIGHWAY DRAINAGE, ARBORICULTURE AND LIGHTING (TR...2.6 HIGHWAY TRANSPORTATION : HIGHWAY DRAINAGE, ARBORICULTURE AND LIGHTING (TR...
2.6 HIGHWAY TRANSPORTATION : HIGHWAY DRAINAGE, ARBORICULTURE AND LIGHTING (TR...
 
LINING OF CHANNELS
LINING OF CHANNELSLINING OF CHANNELS
LINING OF CHANNELS
 
Dewatering
DewateringDewatering
Dewatering
 
Building Services :Drainage, Rain Water Disposal and Harvesting
Building Services :Drainage,  Rain Water Disposal and  HarvestingBuilding Services :Drainage,  Rain Water Disposal and  Harvesting
Building Services :Drainage, Rain Water Disposal and Harvesting
 
Well completion.
Well completion.Well completion.
Well completion.
 
A04320105
A04320105A04320105
A04320105
 
Efficient Use of Rain Water by Altering Channel System
Efficient Use of Rain Water by Altering Channel SystemEfficient Use of Rain Water by Altering Channel System
Efficient Use of Rain Water by Altering Channel System
 
A04320105
A04320105A04320105
A04320105
 

Recently uploaded

Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 

Recently uploaded (20)

Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 

Raod side ditches

  • 1. LOVELY PROFESSIONAL UNIVERSITY GEOMETRIC DESIGN Topic: Road Side Ditches AMANULLAH KHAN Reg. No.: 11608087
  • 2. Road Side Ditches Definition: A ditch is a small to moderate depression created to channel water. A ditch can be used for drainage, to drain water from low-lying areas, alongside roadways or fields, or to channel water from a more distant source for plant irrigation.
  • 4.
  • 5. Cross-Section of Ditches • The three main types of cross-sections for road side ditches are: Triangular Parabolic Trapezoidal The parabolic shaped id hydraulically the best resistant to erosion, but it is little complicated in design than the Triangular and trapezoidal one.
  • 6. The triangular section, although easy to construct is very much susceptible to erosion and gets easily blocked with debris and is generally not recommended. The most commonly used X-section is the trapezoidal section as it is acceptable from both considerations- hydraulic as well as of construction.
  • 7. The side slopes of the ditches As for earth slopes should be flat, lying in the range 2:1 to 4:1 their intersections also should be rounded as recommended in case of earth slopes from the view point of ease in grassing and continuity of the turf.
  • 8. While the quantity of water to be drained, the length of drain and the gradient will actually determine the width at bottom, it should normally be not less than 0.3m. Also to fulfill the requirement of the roadside ditch to drain the base course of the road pavement, the bottom of the ditch has to be taken at least to a depth of 0.3m to 0.6m below the shoulder level.
  • 9. Surface Drain linings Why? Unlined, bare earth surface of roadside ditches are highly susceptible to erosion unless the flow is limited to a very small amount. It is, therefore necessary that road side ditches generally be provided with a protective lining which would avoid serious erosion problems and keep them serviceable.
  • 10. Types of lining? Turfing: This lining is more economical than other lining to establish and with proper maintenance it will provide adequate protection against erosion for most of the site situations. Key factor: Should form firm turf. The efficiency of this technique depends upon making the water flow over the NET.
  • 11. Experience has shown that under two extreme site conditions-on very flat grades and then again on very steep grades. Technique of grassing as a surface lining does not always provide satisfactory. Becoz- On very flat grades (less than 0.5 %) the flow over a grass lining is too slow, and giving rise to the problems of silting or occurrence of deposition which is rather difficult to maintain.
  • 12. And over extremely steep grades erosive velocities are reached, which due to scouring action can destroy the grass lining completely. Under these conditions we provide: Cement Concrete Lining Brick/Rubble Masonry and even Bituminous mixes.
  • 13. Paved lining The most practical concrete lining is the prefabricated type. In this construction, the panels are cast in standard form at a convenient central plant. Constructed easily on smooth base ground and a panel size of 0.3m x 1m x 0.05 is a practical size for handling. Narrow units may be cast for the bottom of small ditch sections.
  • 14. The ditch section is shaped to line and grade and the surface smoothened. The slabs are then placed in the ditch. The banks are seeded to establish a turf right up to the edge of the lining. The concrete for precast slabs should be of uniform consistency, using 20mm maximum size of the aggregate.
  • 15. This is how we can show the unlined, Partially lined and Lined Ditches/Drains:
  • 16. Velocity of Flow For efficient functioning of a road side ditch, the flow must be fast enough to prevent silting or deposition but at the same time the flow must not be so fast as to cause serious damage by scouring action. To overcome the problem of silting or occurrence of deposition a secondary smaller channel of V-shape is provided at the bottom of the ditch to concentrate low flow in a smaller area of X-sec. thereby increasing the flow velocity. This secondary channel should also be turfed to protect it from erosion under storm flow.
  • 17. A good turf lining will be able to withstand velocities of about 5 to 6 Km/hr. To get a fairly good idea of water velocity in the ditch, throw a wooden chip into the ditch during an intense storm and if a man can keep up with the chip at a moderate walking speed, the velocity of water is below maximum. But if he has to run to keep up pace with the chip the velocity is above the safe maximum.
  • 18. Design Steps 1. From the known soil type, arrive at the value of Manning’s Rugosity Coefficient. 2. Calculate the hydraulic mean depth from the Manning’s formula. 3. Find out the X-sec. area from the given discharge and the max permissible velocity. 4. From step 2 and 3 solve the simultaneous =n’s to obtain bottom width and depth. 5. Calculate the critical depth and determine whether the flow is Tranquil or Turbulent. If it is Tranquil add a freeboard to the depth and finalize the X-sec. and if flow is turbulent it may be necessary to line the channel or decrease the longitudinal slope.
  • 19. Q.: A longitudinal channel with a trapezoidal x-sec. is to be constructed in a cut section. The bed slope is 0.0004. The mximum velocity is 0.6 m/sec. If the soil is clay with Manning’s Rugosity coff. of 0.024. Design the channel for a discharge of 3 cu m/sec. Solution steps: • V= 𝑅2/3 𝑆1/2 𝑛 • 0.6= 𝑅2/3 𝑋 0.0004 1/2 0.024 = 𝑅2/3 𝑋 0.02 0.024 R= 0.61 m A = 𝑄 𝑉 = 3.0 0.6 = 5𝑚2
  • 20. Also; Perimeter P = A/R = 5/0.61 = 8.20 m Now A= d(b+2d) = 5 P = b + 2d(1+ 22 )1/2 = b + 4.48 d = 8.20 Thus we have: bd +2𝑑2 = 5 b+ 4.48d = 8.20 Solving the above =n’s we get: d= 0.81 m and b= 4.57 m
  • 21. Now calculating critical depth as: 𝑉2 𝑔 = 0.62 9.81 = 0.037 m If the actual depth is greater than critical depth the flow is called as Tranquil nd then no Lining is necessary other wise Turbulent then lining is required. Here: Actual depth is 0.81 And critical depth is 0.037 So Actual depth is greater hence no Lining is required.