Delivering COBie data
focus on curtain wall and building envelopes
Jan Karlshøj
Technical University of Denmark (DTU), Kongens Lyngby, Denmark
Paolo Borin, Michele Carradori, Michele Scotton, Carlo Zanchetta
University of Padova, Padova, Italy
2
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
Index
Subject of the research
State of the art
Getting COBie
IDM development
Conclusions
Future developments
1
2
3
4
5
6
3
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
Subject of the research
BIM
model
i
i
i
i i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i i
i
i
i
i
i
i
i
i
ii
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
Facility
ManagerINFORMATION
EXCHANGE
Project lifecycle
4
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
Subject of the research
i
i
i
i i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i i
i
i
i
i
i
i
i
i
ii
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
Facility
Manager
information exchange:
MODEL VIEW DEFINITION
(MVD)
IFC BIM model
(ISO16739:2013)
=
COBie
Construction (to) Operations Building
information exchange
curtain
walls
*Project lifecycle
Production of
hundred of papers
and files difficult to be
used by Facility
Managers.
5
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
State of the art
Nowadays, the delivery of handover information
is still based on paper documents and PDF files.
RESULTS
Information often
available months
or years after
occupancy.
Time wasted
in recreating
information already
specified during
the project.
Manual inclusion
of information
in maintenance
management
software.
=
we need something else!
6
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
State of the art
COBie
aims to be a unique container able
to collect those pieces of
information needed for FM,
across the different project stages
can be delivered in
electronic format (.ifc,
.ifcxml, .xml)
standard, open and reusable
data structure, based on
the IFC schema.
it is a MVD since it represents
a subset of the entire IFC data
set.
7
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
State of the art
COBie’s data structure
8
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
State of the art
Two different behaviours can be internationally recognized:
all the equipments that need preventive maintenance plan, have consumable parts and require
management and regular inspections, are supposed to be included in COBie.
(as stated by Bill East, original developer of COBie)
COBie’s content:
U.S.A.
NBIMS-US v.3 - Chapter 2.4
July 2013, National BIM Standard
U.K.
BS 1192-4:2014
Sep. 2014, British Standard Institute
........................
……………………..
IfcCurtainWall
IfcPlate
IfcMember
……………………..
……………………..
IFC entities
exclusion list
COBie for all
(in UK COBie is
mandatory for all
central procured project
since April 2016)
9
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
State of the art
This research focused
on the UK scenario, since:
• the UK Goverment’s initiatives could become a
framework for the European States which
do not yet submit a BIM policy;
• the importance of the UK construction
business in Europe, especially regarding
private housing and commercial, where curtain
walls are commonly used;
Moreover, curtain walls are products that typically
require to be maintained during the project life-
cycle:
it could be useful to
check COBie against passive products!
How to obtain COBie?
10
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
Getting COBie
Curtain wall
BIM model
Create with
Autodesk Revit 2014
COBie
.xml
- The data format for
COBie required by the
UK Government
- It is just a mapping of the
COBie MVD: the
information content is the
same.
direct exportation
through an internal plug-in
indirect exportation
via IFC + external app.
1
2
11
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
Getting COBie
Curtain wall
BIM model
unitized
curtain walling system
=
Pre-assembled curtain cells,
composed by sub-elements,
which are installed on site.
stick
curtain walling system
=
All the elements are installed on site.
Curtain panels
(IfcPlate)
Curtain mullions
(IfcMember)
Curtain cell
sub-elements
Curtain cell
(IfcPlate)
Curtain system
(IfcCurtainWall)=
Curtain system
(IfcCurtainWall)
12
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
Getting COBie
Curtain wall
BIM model
COBie
.xml
direct exportation
COBie Extension for Revit
indirect exportation
via IFC + external app.
1
2
Non-collaborative procedure based on COBie .xml:
there could be several issue in aligning information
produced by the different stakeholders.
Automatic exportation of all the information included in the model,
relating to Contact, Facility, Floor, Space, Zone, Type,
Component, System, Attribute and Coordinate worksheets.
13
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
Getting COBie
Curtain wall
BIM model
COBie
.xml
direct exportation
COBie Extension for Revit
exporting the model
in IFC format
1
2
It is not possible to choose
COBie as MVD in Revit
while exporting in IFC format;
the Extended FM handover View
was used, but it is not approved by
buildingSMART International,
therefore not stable.
transforming the IFC model
in COBie .xml
Issues in the definition of mullions
(naming and Type association),
because of the IFC Exporter of
Revit.
Results:
Cobie Toolkit, BimService.
Chanche to modify the exclusion list
introduced by the US COBie spec.
No results:
BIMserver, BimService (old version).
No chanche to modify the exclusion list
introduced by the US COBie
specification.
14
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
Getting COBie
COBie
.xml
direct exportation
COBie Extension for Revit
indirect exportation
via IFC + external app.
1
2
Spare Resource Job Document
Revit, as a design software, is not able to handle information
that are typically exchanged during the construction phase.
Impact Connection Assembly Issue Coordinate System
Type
√
Component
√
Attribute
√
What is modeled as a family type in Revit, is also exported as
a Type in COBie. All the attributes included in the model can be
associated to the relevant COBie cell.
Optional content (BS 1192-4)Content expected not exactly defined Project-specific indications required
Same results!
Results evaluated considering the specific stakeholder and product
on which this research focused (and the related COBie worksheets).
:
15
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
IDM development
Industry Foundation Classes
IFC:
establishes the language
Model View Definition
MVD:
selects words and syntax constructions for a certain purpose
Information Delivery Manual
IDM:
defines how the speech occurs
Objective:
define a standardized methodology
for existing or new processes, in
order to assist the different
stakeholders in their tasks
=
16
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
IDM development
IDMs based on the approach described by Mondrup, Treldal, Karlshøj, Vestergaard (2014):
it is possible to define IDM packages that specify the information exchanges that
occur at a specific life-cycle stage involving specific actors of the process
A B
A
Cobie-related life-cycle stages, taken
from the BIM task Group (UK)
B
Actors’ roles taken from the British
regulation BS1192:2007
IDM 1
COBie Data Drop 3 - Specialist Designer
IDM 2
COBie Data Drop 4 - Subcontractor
Re-definition of the existing COBie IDM
(NBIMS-US v.3) in consideration of:
- BS 1192-4 and Uniclass;
17
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
IDM development
IDM components:
Business
Use Case
Process
Map
Exchange
Requirements
Exchange
Requirement
Models
Textual description of the
analyzed process
Graphic translation of
the Business Use Case
Description of the information
to be exchanged (who, when
and what)
technical specification of
the Exchange Requirement
(needed to develop a MVD)
Out of the boundaries
of this research
The COBie Responsibility Matrix
(projects.buildingsmartalliance.org) allows to link:
COBie Exchange Requirements  COBie .xml cells
18
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
IDM development
Main problem: what should be considered manageable assets?
premise:
curtain wall
complexity
Ontological complexity
of the considered product
• Design information, at various stages
• Construction information
• Operation & Maintenance information
• Manufacturing-based information
Huge variability of elements
if dimensions are considered
The entire curtain wall can be seen
• as unique object;
• as an assembly composed by several subsystems (cells);
• as an association of single elements.
E.g. in buildings like skyscrapers the hundreds of panels that
constitutes the facade could seem the same panel repeated for
hundreds of times, but they often differs for dimensions.
Different sources
of information
Interferences with
other disciplines components
Typical electrical and mechanical systems
COBie Assembly
specifies the elements Type
included in a cell Type
19
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
IDM development
Main problem: what should be considered manageable assets?
• No project-specific indications
• No stable practice on COBie
• Curtain wall complexity
 chosen criteria:
Every element:
• which needs specific maintenance operations
• for which replacement parts are provided
• that requires to be specified by additional
documents
• that requires to be specifically described by
those properties expected by the Type
worksheet (e.g. warranty information)
Every curtain wall cell*
is described by a specific
COBie Type
(regardless dimensions)
is exported as a
COBie
Component
*In the general case where
curtain walls are not subdivided
in cells, each element must be
exported as a Component too.
20
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
IDM development
Result: Exchange Requirement example
The ERs used by the COBie
specification included in
NBIMS-US v.3 were used.
Sub-ERs related to the COBie
worksheets were defined.
The specific IFC entity which
compiles a precise COBie cell
(taken from the COBie MVD).
Information to be exchanged is
defined in relation to the COBie
columns.
21
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
Conclusions
impossibility to reach the actual objective:
exchange of the entire set of information
needed for Facility Management
The best solution if the
purpose is just deliver COBie
data in .xml format, in order
to fulfil a contractual
requirement:
- Easy to use;
- No additional application
needed: all happens within
the Revit environment
Considered scenario:
22
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
Conclusions
Hopeful scenario:
using IFC is the only way to
enable interoperability
between the different actors
A MVD for Facility Management which
clearly defines the content of the exchange
and standardizes data flow (also for curtain
walls) is strongly needed.
23
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
Future developments
Consideration on how BIM tools translate in IFC format
the complex relations that charachterize curtain walls.
Application of the developed IDMs to different case studies,
in order to verify the validity of the proposal.
A
B
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
11th European Conference on Product and Process Modelling
eWork and eBusiness in Architecture, Engineering and Construction
Delivering COBie data - focus on curtain wall and building envelopes
Jan Karlshøj
Technical University of Denmark (DTU), Kongens Lyngby, Denmark
Paolo Borin, Michele Carradori, Michele Scotton, Carlo Zanchetta
University of Padova, Padova, Italy
Thank you for attention

More Related Content

What's hot

Implementing Building Information Modelling in Construction
Implementing Building Information Modelling in ConstructionImplementing Building Information Modelling in Construction
Implementing Building Information Modelling in ConstructionVeetil Digital Service
 
Dữ liệu Cobie và hệ thống phân loại trong Revit
Dữ liệu Cobie và hệ thống phân loại trong RevitDữ liệu Cobie và hệ thống phân loại trong Revit
Dữ liệu Cobie và hệ thống phân loại trong Revitcongnghebim
 
20191126 modulair IFC
20191126 modulair IFC20191126 modulair IFC
20191126 modulair IFCLéon Berlo
 
Building Information Modelling Presentation
Building Information Modelling PresentationBuilding Information Modelling Presentation
Building Information Modelling PresentationMotasem Albanna
 
Use of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectUse of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectMANNU KUMAR
 
COBieOWL An OWL ontology based on COBie standard
COBieOWL An OWL ontology based on COBie standardCOBieOWL An OWL ontology based on COBie standard
COBieOWL An OWL ontology based on COBie standardAna Roxin
 
BIM project execution
BIM project executionBIM project execution
BIM project executionStephen Au
 
BIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and Benefits
BIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and BenefitsBIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and Benefits
BIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and BenefitsUnited-BIM
 
BIM for Construction
BIM for Construction BIM for Construction
BIM for Construction Marc Goldman
 
5 Steps of Generating Clash Report Using Navisworks
5 Steps of Generating Clash Report Using Navisworks5 Steps of Generating Clash Report Using Navisworks
5 Steps of Generating Clash Report Using NavisworksUnited-BIM
 
Bim building information modelling
Bim  building information modellingBim  building information modelling
Bim building information modellingSumayyaSayeeda
 
How BIM 360 construction document management facilitates building work proces...
How BIM 360 construction document management facilitates building work proces...How BIM 360 construction document management facilitates building work proces...
How BIM 360 construction document management facilitates building work proces...Shubham Bhatnagar
 
Bim for facility management
Bim for facility managementBim for facility management
Bim for facility managementOmar Selim
 

What's hot (20)

Implementing Building Information Modelling in Construction
Implementing Building Information Modelling in ConstructionImplementing Building Information Modelling in Construction
Implementing Building Information Modelling in Construction
 
Dữ liệu Cobie và hệ thống phân loại trong Revit
Dữ liệu Cobie và hệ thống phân loại trong RevitDữ liệu Cobie và hệ thống phân loại trong Revit
Dữ liệu Cobie và hệ thống phân loại trong Revit
 
20191126 modulair IFC
20191126 modulair IFC20191126 modulair IFC
20191126 modulair IFC
 
Building Information Modelling Presentation
Building Information Modelling PresentationBuilding Information Modelling Presentation
Building Information Modelling Presentation
 
Use of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectUse of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real project
 
COBieOWL An OWL ontology based on COBie standard
COBieOWL An OWL ontology based on COBie standardCOBieOWL An OWL ontology based on COBie standard
COBieOWL An OWL ontology based on COBie standard
 
What is BIM?
What is BIM?What is BIM?
What is BIM?
 
BIM project execution
BIM project executionBIM project execution
BIM project execution
 
BIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and Benefits
BIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and BenefitsBIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and Benefits
BIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and Benefits
 
BIM for Construction
BIM for Construction BIM for Construction
BIM for Construction
 
What is BIM360.pdf
What is BIM360.pdfWhat is BIM360.pdf
What is BIM360.pdf
 
BIM Introduction
BIM IntroductionBIM Introduction
BIM Introduction
 
Bim overview
Bim overviewBim overview
Bim overview
 
what is BIM
what is BIMwhat is BIM
what is BIM
 
5 Steps of Generating Clash Report Using Navisworks
5 Steps of Generating Clash Report Using Navisworks5 Steps of Generating Clash Report Using Navisworks
5 Steps of Generating Clash Report Using Navisworks
 
Bim building information modelling
Bim  building information modellingBim  building information modelling
Bim building information modelling
 
BIM training
BIM training BIM training
BIM training
 
OPEN BIM
OPEN BIMOPEN BIM
OPEN BIM
 
How BIM 360 construction document management facilitates building work proces...
How BIM 360 construction document management facilitates building work proces...How BIM 360 construction document management facilitates building work proces...
How BIM 360 construction document management facilitates building work proces...
 
Bim for facility management
Bim for facility managementBim for facility management
Bim for facility management
 

Viewers also liked

14006 bbc bim renzo piano
14006 bbc bim renzo piano14006 bbc bim renzo piano
14006 bbc bim renzo pianoCarlo Zanchetta
 
Heritage o Historic BIM? La modellazione informativa per il patrimonio storic...
Heritage o Historic BIM? La modellazione informativa per il patrimonio storic...Heritage o Historic BIM? La modellazione informativa per il patrimonio storic...
Heritage o Historic BIM? La modellazione informativa per il patrimonio storic...BIM group @ University of Padua
 
Il Bim come strumento di conoscenza del progetto: l'esperienza della modellaz...
Il Bim come strumento di conoscenza del progetto: l'esperienza della modellaz...Il Bim come strumento di conoscenza del progetto: l'esperienza della modellaz...
Il Bim come strumento di conoscenza del progetto: l'esperienza della modellaz...BIM group @ University of Padua
 
La progettazione energetica nella progettazione integrata - Cristina Cecchini
La progettazione energetica nella progettazione integrata - Cristina CecchiniLa progettazione energetica nella progettazione integrata - Cristina Cecchini
La progettazione energetica nella progettazione integrata - Cristina CecchiniBIM group @ University of Padua
 
Bim, valore e qualità dall’innovazione tecnologica al performance based build...
Bim, valore e qualità dall’innovazione tecnologica al performance based build...Bim, valore e qualità dall’innovazione tecnologica al performance based build...
Bim, valore e qualità dall’innovazione tecnologica al performance based build...BIM group @ University of Padua
 
14006 bbc zanchetta_141017_
14006 bbc zanchetta_141017_14006 bbc zanchetta_141017_
14006 bbc zanchetta_141017_Carlo Zanchetta
 
Il BIM nel ciclo di vita dell'edificio: dal performance based design al total...
Il BIM nel ciclo di vita dell'edificio: dal performance based design al total...Il BIM nel ciclo di vita dell'edificio: dal performance based design al total...
Il BIM nel ciclo di vita dell'edificio: dal performance based design al total...BIM group @ University of Padua
 
BIM per il patrimonio culturale architettonico: sperimentazione per la chiesa...
BIM per il patrimonio culturale architettonico: sperimentazione per la chiesa...BIM per il patrimonio culturale architettonico: sperimentazione per la chiesa...
BIM per il patrimonio culturale architettonico: sperimentazione per la chiesa...BIM group @ University of Padua
 
Coordinamento e progettazione integrata: dal bim execution plan alla creazion...
Coordinamento e progettazione integrata: dal bim execution plan alla creazion...Coordinamento e progettazione integrata: dal bim execution plan alla creazion...
Coordinamento e progettazione integrata: dal bim execution plan alla creazion...BIM group @ University of Padua
 
Building information Modeling
Building information ModelingBuilding information Modeling
Building information ModelingValentinaMason
 
La progettazione energetica nella progettazione integrata - Cristina Cecchini
La progettazione energetica nella progettazione integrata - Cristina CecchiniLa progettazione energetica nella progettazione integrata - Cristina Cecchini
La progettazione energetica nella progettazione integrata - Cristina CecchiniBIM group @ University of Padua
 
Performance Based Building Design: il ruolo di Grasshopper e GeometryGym - C...
Performance Based Building Design:  il ruolo di Grasshopper e GeometryGym - C...Performance Based Building Design:  il ruolo di Grasshopper e GeometryGym - C...
Performance Based Building Design: il ruolo di Grasshopper e GeometryGym - C...BIM group @ University of Padua
 
Il progetto UNmodeling: Charles Correa - Carlo Zanchetta
Il progetto UNmodeling: Charles Correa - Carlo ZanchettaIl progetto UNmodeling: Charles Correa - Carlo Zanchetta
Il progetto UNmodeling: Charles Correa - Carlo ZanchettaBIM group @ University of Padua
 
Il Bim nel progetto di didattico UniPD: analisi storica e visualizzazione nel...
Il Bim nel progetto di didattico UniPD: analisi storica e visualizzazione nel...Il Bim nel progetto di didattico UniPD: analisi storica e visualizzazione nel...
Il Bim nel progetto di didattico UniPD: analisi storica e visualizzazione nel...BIM group @ University of Padua
 
Project e Construction Mangament attraverso il BIM: la modellazione 4D e 5D -...
Project e Construction Mangament attraverso il BIM: la modellazione 4D e 5D -...Project e Construction Mangament attraverso il BIM: la modellazione 4D e 5D -...
Project e Construction Mangament attraverso il BIM: la modellazione 4D e 5D -...BIM group @ University of Padua
 
Il BIM come srumento di controllo della fase realizzativa
Il BIM come srumento di controllo della fase realizzativaIl BIM come srumento di controllo della fase realizzativa
Il BIM come srumento di controllo della fase realizzativaBIM group @ University of Padua
 

Viewers also liked (20)

14006 bbc bim renzo piano
14006 bbc bim renzo piano14006 bbc bim renzo piano
14006 bbc bim renzo piano
 
Interoperabilità dei modelli informativi
Interoperabilità dei modelli informativiInteroperabilità dei modelli informativi
Interoperabilità dei modelli informativi
 
Heritage o Historic BIM? La modellazione informativa per il patrimonio storic...
Heritage o Historic BIM? La modellazione informativa per il patrimonio storic...Heritage o Historic BIM? La modellazione informativa per il patrimonio storic...
Heritage o Historic BIM? La modellazione informativa per il patrimonio storic...
 
Il Bim come strumento di conoscenza del progetto: l'esperienza della modellaz...
Il Bim come strumento di conoscenza del progetto: l'esperienza della modellaz...Il Bim come strumento di conoscenza del progetto: l'esperienza della modellaz...
Il Bim come strumento di conoscenza del progetto: l'esperienza della modellaz...
 
La progettazione energetica nella progettazione integrata - Cristina Cecchini
La progettazione energetica nella progettazione integrata - Cristina CecchiniLa progettazione energetica nella progettazione integrata - Cristina Cecchini
La progettazione energetica nella progettazione integrata - Cristina Cecchini
 
Bim, valore e qualità dall’innovazione tecnologica al performance based build...
Bim, valore e qualità dall’innovazione tecnologica al performance based build...Bim, valore e qualità dall’innovazione tecnologica al performance based build...
Bim, valore e qualità dall’innovazione tecnologica al performance based build...
 
14006 bbc zanchetta_141017_
14006 bbc zanchetta_141017_14006 bbc zanchetta_141017_
14006 bbc zanchetta_141017_
 
Rsa 2016 Boston Borin_Visualize the relationships
Rsa 2016 Boston Borin_Visualize the relationshipsRsa 2016 Boston Borin_Visualize the relationships
Rsa 2016 Boston Borin_Visualize the relationships
 
Il BIM nel ciclo di vita dell'edificio: dal performance based design al total...
Il BIM nel ciclo di vita dell'edificio: dal performance based design al total...Il BIM nel ciclo di vita dell'edificio: dal performance based design al total...
Il BIM nel ciclo di vita dell'edificio: dal performance based design al total...
 
BIM per il patrimonio culturale architettonico: sperimentazione per la chiesa...
BIM per il patrimonio culturale architettonico: sperimentazione per la chiesa...BIM per il patrimonio culturale architettonico: sperimentazione per la chiesa...
BIM per il patrimonio culturale architettonico: sperimentazione per la chiesa...
 
Coordinamento e progettazione integrata: dal bim execution plan alla creazion...
Coordinamento e progettazione integrata: dal bim execution plan alla creazion...Coordinamento e progettazione integrata: dal bim execution plan alla creazion...
Coordinamento e progettazione integrata: dal bim execution plan alla creazion...
 
Building information Modeling
Building information ModelingBuilding information Modeling
Building information Modeling
 
BIM Standard: analisi e necessità
BIM Standard: analisi e necessitàBIM Standard: analisi e necessità
BIM Standard: analisi e necessità
 
Algorithmic Modeling
Algorithmic ModelingAlgorithmic Modeling
Algorithmic Modeling
 
La progettazione energetica nella progettazione integrata - Cristina Cecchini
La progettazione energetica nella progettazione integrata - Cristina CecchiniLa progettazione energetica nella progettazione integrata - Cristina Cecchini
La progettazione energetica nella progettazione integrata - Cristina Cecchini
 
Performance Based Building Design: il ruolo di Grasshopper e GeometryGym - C...
Performance Based Building Design:  il ruolo di Grasshopper e GeometryGym - C...Performance Based Building Design:  il ruolo di Grasshopper e GeometryGym - C...
Performance Based Building Design: il ruolo di Grasshopper e GeometryGym - C...
 
Il progetto UNmodeling: Charles Correa - Carlo Zanchetta
Il progetto UNmodeling: Charles Correa - Carlo ZanchettaIl progetto UNmodeling: Charles Correa - Carlo Zanchetta
Il progetto UNmodeling: Charles Correa - Carlo Zanchetta
 
Il Bim nel progetto di didattico UniPD: analisi storica e visualizzazione nel...
Il Bim nel progetto di didattico UniPD: analisi storica e visualizzazione nel...Il Bim nel progetto di didattico UniPD: analisi storica e visualizzazione nel...
Il Bim nel progetto di didattico UniPD: analisi storica e visualizzazione nel...
 
Project e Construction Mangament attraverso il BIM: la modellazione 4D e 5D -...
Project e Construction Mangament attraverso il BIM: la modellazione 4D e 5D -...Project e Construction Mangament attraverso il BIM: la modellazione 4D e 5D -...
Project e Construction Mangament attraverso il BIM: la modellazione 4D e 5D -...
 
Il BIM come srumento di controllo della fase realizzativa
Il BIM come srumento di controllo della fase realizzativaIl BIM come srumento di controllo della fase realizzativa
Il BIM come srumento di controllo della fase realizzativa
 

Similar to Delivering COBie data

IMPRESS BIM Methodology (iBIMm) and Façade Retrofit Methodology using Cloud B...
IMPRESS BIM Methodology (iBIMm) and Façade Retrofit Methodology using Cloud B...IMPRESS BIM Methodology (iBIMm) and Façade Retrofit Methodology using Cloud B...
IMPRESS BIM Methodology (iBIMm) and Façade Retrofit Methodology using Cloud B...IES VE
 
On the relation between Model View Definitions (MVDs) and Linked Data technol...
On the relation between Model View Definitions (MVDs) and Linked Data technol...On the relation between Model View Definitions (MVDs) and Linked Data technol...
On the relation between Model View Definitions (MVDs) and Linked Data technol...Ana Roxin
 
To BIM4fm or not to BIM4fm?
To BIM4fm or not to BIM4fm?To BIM4fm or not to BIM4fm?
To BIM4fm or not to BIM4fm?Paul Akhurst
 
The Glass House V1 Building with Synthesis
The Glass House V1 Building with SynthesisThe Glass House V1 Building with Synthesis
The Glass House V1 Building with SynthesisBrij Consulting, LLC
 
Intro to buildingsmart and COBie - Nick Tune at Ecobuild 2015
Intro to buildingsmart and COBie - Nick Tune at Ecobuild 2015Intro to buildingsmart and COBie - Nick Tune at Ecobuild 2015
Intro to buildingsmart and COBie - Nick Tune at Ecobuild 2015The NBS
 
The Impact of Digital Engineering – Tim Broyd (ICE) #COMIT2016
The Impact of Digital Engineering – Tim Broyd (ICE)  #COMIT2016The Impact of Digital Engineering – Tim Broyd (ICE)  #COMIT2016
The Impact of Digital Engineering – Tim Broyd (ICE) #COMIT2016Comit Projects Ltd
 
Video Browser Showdown (VBS) 2012-2019
Video Browser Showdown (VBS) 2012-2019Video Browser Showdown (VBS) 2012-2019
Video Browser Showdown (VBS) 2012-2019klschoef
 
Digital Pathways 2011 BBC Final
Digital Pathways 2011 BBC FinalDigital Pathways 2011 BBC Final
Digital Pathways 2011 BBC FinalBBC
 
Archiver pilot phase kick off Award Ceremony
Archiver pilot phase kick off Award CeremonyArchiver pilot phase kick off Award Ceremony
Archiver pilot phase kick off Award CeremonyArchiver
 
Archiver pilot phase kick off Award Ceremony
Archiver pilot phase kick off Award CeremonyArchiver pilot phase kick off Award Ceremony
Archiver pilot phase kick off Award CeremonyArchiver
 
건설 스타트업과 오픈소스
건설 스타트업과 오픈소스건설 스타트업과 오픈소스
건설 스타트업과 오픈소스Tae wook kang
 
Adrian Woolard Beyond Digital V1
Adrian Woolard Beyond Digital V1Adrian Woolard Beyond Digital V1
Adrian Woolard Beyond Digital V1BBC
 
Application Of BIM Design Manuals A Case Study
Application Of BIM Design Manuals  A Case StudyApplication Of BIM Design Manuals  A Case Study
Application Of BIM Design Manuals A Case StudyFinni Rice
 
Relim open bim_20160330_1-2
Relim open bim_20160330_1-2Relim open bim_20160330_1-2
Relim open bim_20160330_1-2Jan Karlshøj
 
The Glass House V2 Matrix Expansion
The Glass House V2 Matrix ExpansionThe Glass House V2 Matrix Expansion
The Glass House V2 Matrix ExpansionBrij Consulting, LLC
 

Similar to Delivering COBie data (20)

IMPRESS BIM Methodology (iBIMm) and Façade Retrofit Methodology using Cloud B...
IMPRESS BIM Methodology (iBIMm) and Façade Retrofit Methodology using Cloud B...IMPRESS BIM Methodology (iBIMm) and Façade Retrofit Methodology using Cloud B...
IMPRESS BIM Methodology (iBIMm) and Façade Retrofit Methodology using Cloud B...
 
PI UK Seminar (Nov 2021) - PROFINET of Things
PI UK Seminar (Nov 2021) - PROFINET of ThingsPI UK Seminar (Nov 2021) - PROFINET of Things
PI UK Seminar (Nov 2021) - PROFINET of Things
 
On the relation between Model View Definitions (MVDs) and Linked Data technol...
On the relation between Model View Definitions (MVDs) and Linked Data technol...On the relation between Model View Definitions (MVDs) and Linked Data technol...
On the relation between Model View Definitions (MVDs) and Linked Data technol...
 
To BIM4fm or not to BIM4fm?
To BIM4fm or not to BIM4fm?To BIM4fm or not to BIM4fm?
To BIM4fm or not to BIM4fm?
 
The Glass House V1 Building with Synthesis
The Glass House V1 Building with SynthesisThe Glass House V1 Building with Synthesis
The Glass House V1 Building with Synthesis
 
24 pvpm bipv_supsi_20170331
24 pvpm bipv_supsi_2017033124 pvpm bipv_supsi_20170331
24 pvpm bipv_supsi_20170331
 
Intro to buildingsmart and COBie - Nick Tune at Ecobuild 2015
Intro to buildingsmart and COBie - Nick Tune at Ecobuild 2015Intro to buildingsmart and COBie - Nick Tune at Ecobuild 2015
Intro to buildingsmart and COBie - Nick Tune at Ecobuild 2015
 
The Impact of Digital Engineering – Tim Broyd (ICE) #COMIT2016
The Impact of Digital Engineering – Tim Broyd (ICE)  #COMIT2016The Impact of Digital Engineering – Tim Broyd (ICE)  #COMIT2016
The Impact of Digital Engineering – Tim Broyd (ICE) #COMIT2016
 
Making Sigillographic Material Accessible to Researchers – Digitising, Catalo...
Making Sigillographic Material Accessible to Researchers – Digitising, Catalo...Making Sigillographic Material Accessible to Researchers – Digitising, Catalo...
Making Sigillographic Material Accessible to Researchers – Digitising, Catalo...
 
Intech template
Intech templateIntech template
Intech template
 
Video Browser Showdown (VBS) 2012-2019
Video Browser Showdown (VBS) 2012-2019Video Browser Showdown (VBS) 2012-2019
Video Browser Showdown (VBS) 2012-2019
 
Digital Pathways 2011 BBC Final
Digital Pathways 2011 BBC FinalDigital Pathways 2011 BBC Final
Digital Pathways 2011 BBC Final
 
Irish Building Magazine[1]
Irish Building Magazine[1]Irish Building Magazine[1]
Irish Building Magazine[1]
 
Archiver pilot phase kick off Award Ceremony
Archiver pilot phase kick off Award CeremonyArchiver pilot phase kick off Award Ceremony
Archiver pilot phase kick off Award Ceremony
 
Archiver pilot phase kick off Award Ceremony
Archiver pilot phase kick off Award CeremonyArchiver pilot phase kick off Award Ceremony
Archiver pilot phase kick off Award Ceremony
 
건설 스타트업과 오픈소스
건설 스타트업과 오픈소스건설 스타트업과 오픈소스
건설 스타트업과 오픈소스
 
Adrian Woolard Beyond Digital V1
Adrian Woolard Beyond Digital V1Adrian Woolard Beyond Digital V1
Adrian Woolard Beyond Digital V1
 
Application Of BIM Design Manuals A Case Study
Application Of BIM Design Manuals  A Case StudyApplication Of BIM Design Manuals  A Case Study
Application Of BIM Design Manuals A Case Study
 
Relim open bim_20160330_1-2
Relim open bim_20160330_1-2Relim open bim_20160330_1-2
Relim open bim_20160330_1-2
 
The Glass House V2 Matrix Expansion
The Glass House V2 Matrix ExpansionThe Glass House V2 Matrix Expansion
The Glass House V2 Matrix Expansion
 

Recently uploaded

Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Jisc
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfUjwalaBharambe
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxChelloAnnAsuncion2
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.arsicmarija21
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfphamnguyenenglishnb
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Quarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayQuarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayMakMakNepo
 

Recently uploaded (20)

Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
Rapple "Scholarly Communications and the Sustainable Development Goals"
Rapple "Scholarly Communications and the Sustainable Development Goals"Rapple "Scholarly Communications and the Sustainable Development Goals"
Rapple "Scholarly Communications and the Sustainable Development Goals"
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Quarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayQuarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up Friday
 

Delivering COBie data

  • 1. ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus 11th European Conference on Product and Process Modelling eWork and eBusiness in Architecture, Engineering and Construction Delivering COBie data focus on curtain wall and building envelopes Jan Karlshøj Technical University of Denmark (DTU), Kongens Lyngby, Denmark Paolo Borin, Michele Carradori, Michele Scotton, Carlo Zanchetta University of Padova, Padova, Italy
  • 2. 2 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta Index Subject of the research State of the art Getting COBie IDM development Conclusions Future developments 1 2 3 4 5 6
  • 3. 3 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta Subject of the research BIM model i i i i i i i i i i i i i i i i i i i i i i i i i i i i i i i ii i i i i i i i i i i i i i i i i i i i Facility ManagerINFORMATION EXCHANGE Project lifecycle
  • 4. 4 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta Subject of the research i i i i i i i i i i i i i i i i i i i i i i i i i i i i i i i ii i i i i i i i i i i i i i i i i i i i Facility Manager information exchange: MODEL VIEW DEFINITION (MVD) IFC BIM model (ISO16739:2013) = COBie Construction (to) Operations Building information exchange curtain walls *Project lifecycle
  • 5. Production of hundred of papers and files difficult to be used by Facility Managers. 5 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta State of the art Nowadays, the delivery of handover information is still based on paper documents and PDF files. RESULTS Information often available months or years after occupancy. Time wasted in recreating information already specified during the project. Manual inclusion of information in maintenance management software. = we need something else!
  • 6. 6 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta State of the art COBie aims to be a unique container able to collect those pieces of information needed for FM, across the different project stages can be delivered in electronic format (.ifc, .ifcxml, .xml) standard, open and reusable data structure, based on the IFC schema. it is a MVD since it represents a subset of the entire IFC data set.
  • 7. 7 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta State of the art COBie’s data structure
  • 8. 8 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta State of the art Two different behaviours can be internationally recognized: all the equipments that need preventive maintenance plan, have consumable parts and require management and regular inspections, are supposed to be included in COBie. (as stated by Bill East, original developer of COBie) COBie’s content: U.S.A. NBIMS-US v.3 - Chapter 2.4 July 2013, National BIM Standard U.K. BS 1192-4:2014 Sep. 2014, British Standard Institute ........................ …………………….. IfcCurtainWall IfcPlate IfcMember …………………….. …………………….. IFC entities exclusion list COBie for all (in UK COBie is mandatory for all central procured project since April 2016)
  • 9. 9 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta State of the art This research focused on the UK scenario, since: • the UK Goverment’s initiatives could become a framework for the European States which do not yet submit a BIM policy; • the importance of the UK construction business in Europe, especially regarding private housing and commercial, where curtain walls are commonly used; Moreover, curtain walls are products that typically require to be maintained during the project life- cycle: it could be useful to check COBie against passive products!
  • 10. How to obtain COBie? 10 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta Getting COBie Curtain wall BIM model Create with Autodesk Revit 2014 COBie .xml - The data format for COBie required by the UK Government - It is just a mapping of the COBie MVD: the information content is the same. direct exportation through an internal plug-in indirect exportation via IFC + external app. 1 2
  • 11. 11 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta Getting COBie Curtain wall BIM model unitized curtain walling system = Pre-assembled curtain cells, composed by sub-elements, which are installed on site. stick curtain walling system = All the elements are installed on site. Curtain panels (IfcPlate) Curtain mullions (IfcMember) Curtain cell sub-elements Curtain cell (IfcPlate) Curtain system (IfcCurtainWall)= Curtain system (IfcCurtainWall)
  • 12. 12 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta Getting COBie Curtain wall BIM model COBie .xml direct exportation COBie Extension for Revit indirect exportation via IFC + external app. 1 2 Non-collaborative procedure based on COBie .xml: there could be several issue in aligning information produced by the different stakeholders. Automatic exportation of all the information included in the model, relating to Contact, Facility, Floor, Space, Zone, Type, Component, System, Attribute and Coordinate worksheets.
  • 13. 13 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta Getting COBie Curtain wall BIM model COBie .xml direct exportation COBie Extension for Revit exporting the model in IFC format 1 2 It is not possible to choose COBie as MVD in Revit while exporting in IFC format; the Extended FM handover View was used, but it is not approved by buildingSMART International, therefore not stable. transforming the IFC model in COBie .xml Issues in the definition of mullions (naming and Type association), because of the IFC Exporter of Revit. Results: Cobie Toolkit, BimService. Chanche to modify the exclusion list introduced by the US COBie spec. No results: BIMserver, BimService (old version). No chanche to modify the exclusion list introduced by the US COBie specification.
  • 14. 14 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta Getting COBie COBie .xml direct exportation COBie Extension for Revit indirect exportation via IFC + external app. 1 2 Spare Resource Job Document Revit, as a design software, is not able to handle information that are typically exchanged during the construction phase. Impact Connection Assembly Issue Coordinate System Type √ Component √ Attribute √ What is modeled as a family type in Revit, is also exported as a Type in COBie. All the attributes included in the model can be associated to the relevant COBie cell. Optional content (BS 1192-4)Content expected not exactly defined Project-specific indications required Same results! Results evaluated considering the specific stakeholder and product on which this research focused (and the related COBie worksheets). :
  • 15. 15 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta IDM development Industry Foundation Classes IFC: establishes the language Model View Definition MVD: selects words and syntax constructions for a certain purpose Information Delivery Manual IDM: defines how the speech occurs Objective: define a standardized methodology for existing or new processes, in order to assist the different stakeholders in their tasks =
  • 16. 16 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta IDM development IDMs based on the approach described by Mondrup, Treldal, Karlshøj, Vestergaard (2014): it is possible to define IDM packages that specify the information exchanges that occur at a specific life-cycle stage involving specific actors of the process A B A Cobie-related life-cycle stages, taken from the BIM task Group (UK) B Actors’ roles taken from the British regulation BS1192:2007 IDM 1 COBie Data Drop 3 - Specialist Designer IDM 2 COBie Data Drop 4 - Subcontractor Re-definition of the existing COBie IDM (NBIMS-US v.3) in consideration of: - BS 1192-4 and Uniclass;
  • 17. 17 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta IDM development IDM components: Business Use Case Process Map Exchange Requirements Exchange Requirement Models Textual description of the analyzed process Graphic translation of the Business Use Case Description of the information to be exchanged (who, when and what) technical specification of the Exchange Requirement (needed to develop a MVD) Out of the boundaries of this research The COBie Responsibility Matrix (projects.buildingsmartalliance.org) allows to link: COBie Exchange Requirements  COBie .xml cells
  • 18. 18 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta IDM development Main problem: what should be considered manageable assets? premise: curtain wall complexity Ontological complexity of the considered product • Design information, at various stages • Construction information • Operation & Maintenance information • Manufacturing-based information Huge variability of elements if dimensions are considered The entire curtain wall can be seen • as unique object; • as an assembly composed by several subsystems (cells); • as an association of single elements. E.g. in buildings like skyscrapers the hundreds of panels that constitutes the facade could seem the same panel repeated for hundreds of times, but they often differs for dimensions. Different sources of information Interferences with other disciplines components Typical electrical and mechanical systems
  • 19. COBie Assembly specifies the elements Type included in a cell Type 19 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta IDM development Main problem: what should be considered manageable assets? • No project-specific indications • No stable practice on COBie • Curtain wall complexity  chosen criteria: Every element: • which needs specific maintenance operations • for which replacement parts are provided • that requires to be specified by additional documents • that requires to be specifically described by those properties expected by the Type worksheet (e.g. warranty information) Every curtain wall cell* is described by a specific COBie Type (regardless dimensions) is exported as a COBie Component *In the general case where curtain walls are not subdivided in cells, each element must be exported as a Component too.
  • 20. 20 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta IDM development Result: Exchange Requirement example The ERs used by the COBie specification included in NBIMS-US v.3 were used. Sub-ERs related to the COBie worksheets were defined. The specific IFC entity which compiles a precise COBie cell (taken from the COBie MVD). Information to be exchanged is defined in relation to the COBie columns.
  • 21. 21 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta Conclusions impossibility to reach the actual objective: exchange of the entire set of information needed for Facility Management The best solution if the purpose is just deliver COBie data in .xml format, in order to fulfil a contractual requirement: - Easy to use; - No additional application needed: all happens within the Revit environment Considered scenario:
  • 22. 22 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta Conclusions Hopeful scenario: using IFC is the only way to enable interoperability between the different actors A MVD for Facility Management which clearly defines the content of the exchange and standardizes data flow (also for curtain walls) is strongly needed.
  • 23. 23 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta Future developments Consideration on how BIM tools translate in IFC format the complex relations that charachterize curtain walls. Application of the developed IDMs to different case studies, in order to verify the validity of the proposal. A B
  • 24. ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus 11th European Conference on Product and Process Modelling eWork and eBusiness in Architecture, Engineering and Construction Delivering COBie data - focus on curtain wall and building envelopes Jan Karlshøj Technical University of Denmark (DTU), Kongens Lyngby, Denmark Paolo Borin, Michele Carradori, Michele Scotton, Carlo Zanchetta University of Padova, Padova, Italy Thank you for attention