Recommendations for Award of Contract
2A Demolition Ebert Inc. $184,000.00
3A Concrete Systems Gresser Company $1,321,800.00
Print Back to Calendar Return Previous Next
AI- 2440 General Business 10) E) 1)
City Council - Regular Session
Meeting Date: 12/15/2015
FROM: Jamie Polley
Department: Parks and Recreation
Subject
Award of Construction Contracts for the Shakopee Ice Arena and Community Center
Improvements, Project No. PR2015-3, Res. No. 7659 (A, B, C)
Action Sought
Award contracts for the construction of a new ice arena and renovations to the Shakopee
Community Center.
Background
The City Council approved the plans and specification and authorized the advertisement for bids
for the new ice arena and Community Center renovations on October 20, 2015. The City
Council determined that the project will be funded utilizing tax abatement bonds. The Council
authorized the hiring of a Construction Manager, RJM Construction, for this project and to work
with 292 Design Group to develop a number of bid packages.
Discussion
On December 1, 2015 the City received a total of one hundred eight bids for twenty-six bid
categories. Two of the bid categories will be rebid at a later date due to cost and/or number of
bids received. RJM has completed the review of the bids and have conducted a scope review
with the apparent low bidders. RJM is recommending the award of contracts to the following
low bidders. A letter from RJM with the recommendations is attached.
12/11/15, 4:22 PMAgenda
Page 2 of 3http://agenda.shakopeemn.gov/agenda_publish.cfm?id=&mt=ALL&ge…&seq=2440&rev=0&ag=365&ln=9183&nseq=2454&nrev=0&pseq=&prev=#
3B Precast Structural Concrete Fabcon Precast, LLC $3,258,506.00
4A Masonry Systems Del's Construction $1,160,000.00
5A Structural & Misc Steel -
Material
Lejeune Steel Co $946,810.00
5B Structural & Misc Steel-
Install
High Five Erectors II $398,796.00
6A Carpentry Systems Ebert Inc. $1,212,900.00
7A Waterproofing REBID $108,453.00
7B Roofing Systems McPhillips Bros $1,288,000.00
8A Aluminum
Entrances/Storefront
Capital City Glass $867,000.00
9A Gypsum
Board/Drywall/Plaster
Quality Drywall Midwest $354,000.00
9B Tiling CD Tile $321,340.00
9C Acoustical Ceilings Kirk Acoustics $328,000.00
9D Flooring Sonus Interiors $430,400.00
9E Painting Systems Superior Painting $490,575.00
13A Aquatic Systems Associated Pool Builders $1,816,700.00
13B Ice Rink Systems
Commercial Refrigeration
System
$1,973,487.00
14A Passenger Elevator REBID $82,938.00
21A Fire Protection Systems Frontier Fire Protection $319,980.00
22A Plumbing Systems Modern Piping $1,137,700.00
23A HVAC Systems SCR $2,070,000.00
26A Electrical Systems E2 Electrical Services $1,257,000.00
31A Earthwork & Site Utilities Rachel Contracting $1,023,124.00
32A Asphalt Paving Bituminous Roadways, Inc $154,900.00
32B Concrete
Sidewalk/Curb/Gutter
Chard Tiling and Excavating $86,344.00
32C Landscaping Plant Pros, LLC $134,034.00
Budget
Impact
The total
construction
cost, including contingency and contractor's fee, of the project is $25,826,178.00. In addition to
the construction costs are the owner costs including SAC/TWC charges and permit fees,
furniture, equipment, low voltage, security, contingency, etc. totaling $2,854,501.00. Design fees
total $1,736,100.00. The total project cost is $30,416,779, this amount is listed in the Springsted
12/11/15, 4:22 PMAgenda
Page 3 of 3http://agenda.shakopeemn.gov/agenda_publish.cfm?id=&mt=ALL&ge…&seq=2440&rev=0&ag=365&ln=9183&nseq=2454&nrev=0&pseq=&prev=#
report that the City Council received on November 17, 2015 and within the amount of the
bonds adopted by Resolution No. 7640.
Relationship to Vision
A. Keep Shakopee a safe and healthy community where residents can pursue active and quality
lifestyles.
B. Positively manage the challenges and opportunities presented by growth development and
change.
C. Maintain the City's strong financial health.
Requested Action
If the City Council concurs, offer Resolution No. 7659, a resolution awarding contracts for the
construction of the Shakopee Ice Arena and Community Center Improvements, Project No.
PR2015-3.
Attachments
Resolution No. 7659
RJM Recommendation Letter
AgendaQuick©2005 - 2015 Destiny Software Inc., All Rights Reserved
December 10, 2015
Jamie Polley
Director of Parks & Recreation
City of Shakopee
1255 Fuller St. S.
Shakopee MN 55379
RE: Shakopee Ice Arena and Community Center Renovation
Recommendations for Award of Contract
Dear Ms. Polley,
On December 1, 2015 bids were received at the City of Shakopee for Shakopee Ice Arena and
Community Center Renovation project. A total of one hundred and eight (108) bids were received for
twenty-six (26) bid categories. Attached is a bid summary by trade for each bid category.
Bid Category 7A Waterproofing and 14A Elevator will be rebid at a future date.
After reviewing the project cost with the City of Shakopee staff it has been recommended to accept
alternates 2, 3A, 3B, 3C, 3D, 3E, 4, 5A, 5B, 7 for a total project budget of $30,416,779.
RJM has completed its review of the bids and in addition to the bid review, we have also conducted a
scope review with the apparent low bidder for each bid and quote category. Based on the results of
these reviews we recommend to the City Council that they award the contracts as follows:
BID CATEGORY AWARD AMOUNT
2A – Demolition (Excludes Site Demolition)
Ebert Inc. $184,000.00
23350 County Rd 10
Corcoran, MN 55357
3A – Concrete Systems
Gresser Company $1,321,800.00
3 Checkered Flag Blvd.
Shakopee, MN 55379
3B – Precast Structural Concrete
Fabcon Precast, LLC $3,258,506.00
6111 West Highway 13
Savage, MN 55378
4A – Masonry Systems
Del’s Construction $1,160,000.00
35832 Ottawa Road
Le Sueur, MN 56058
5A – Structural and Misc. Steel – Material
Lejeune Steel Co. $946,810.00
118 W. 60th
St.
Minneapolis, MN 55419
5B – Structural and Misc. Steel – Install
High-Five Erectors II $398,796.00
3005 4th
Ave. East
Shakopee, MN 55379
6A – Carpentry Systems
Ebert Inc. $1,212,900.00
23350 County Rd 10
Corcoran, MN 55357
7A – Waterproofing - REBID $108,453.00
Hankemeyer
7B – Roofing Systems
Mcphillips Bros. $1,288,000.00
2590 Centennial Drive
St. Paul, MN 55109
8A – Aluminum Entrances/Storefront
Capital City Glass $867,000.00
1521 93rd
Lane NE
Blaine, MN 55449
9A – Gypsum Board/Drywall/Plaster
Quality Drywall Midwest $354,000.00
4990 Highway 169 N.
New Hope, MN 55428
9B – Tiling
CD Tile $321,340.00
3103 103rd
Lane NE #160
Blaine, MN 55449
9C – Acoustical Ceilings
Kirk Acoustics $328,000.00
395 Bridgepoint Way
South St. Paul, MN 55075
9D – Flooring
Sonus Interiors
6225 Sandburg Road
Golden Valley, MN 55427
$430,400.00
9E – Painting Systems
Superior Painting $490,575.00
3543 88th
Ave. NE
Circle Pines, MN 55014-4108
13A – Aquatic Systems
Associated Pool Builders $1,816,700.00
2121 Lovett Avenue
Bismarck, ND 58504
13B – Ice Rink Systems
Commercial Refrigeration System $1,973,487.00
104 East Chestnut Street
Virginia, MN 55792
14A – Passenger Elevators - REBID
Minnesota Elevator $82,938.00
19336 607th
Ave.
Mankato, MN 56001
21A – Fire Protection Systems
Frontier Fire Protection $319,980.00
75 County Road B East
Little Canada, MN 55117
22A – Plumbing Systems
Modern Piping $1,137,700.00
8370 West I-35W Service Dr.
Blaine, MN 55449
23A – HVAC Systems
SCR $2,070,000.00
604 Lincoln Ave. NE
St. Cloud, MN 56304
26A – Electrical Systems
E2 Electrical Services $1,257,000.00
15895 Highway 7 East
Hutchinson, MN 55350
31A – Earthwork and Site Utilities
Rachel Contracting $1,023,124.00
4125 Napier Court N.E.
St. Michael, MN 55376
32A – Asphalt Paving
Bituminous Roadways, Inc. $154,900.00
1520 Commerce Drive
Mendota Heights, MN 55120
32B – Concrete Sidewalks/Curb/Gutter
Chard Tiling and Excavating $ 86,344.00
26239 State Highway 25
Belle Plaine, MN 56011
32C – Landscaping
Plant Pros, LLC $134,034.00
Box 490861
Blaine, MN 55449
The bid values of accepted alternates’ are included in the above award amount totals.
If you should have any questions, please feel free to contact me.
Sincerely,
Tara Blotske
Project Manager

More Related Content

Viewers also liked

Vapaaehtoisten rekrytointi, perehdyttäminen Vapaaehtoisjohtaminen organisaati...
Vapaaehtoisten rekrytointi, perehdyttäminen Vapaaehtoisjohtaminen organisaati...Vapaaehtoisten rekrytointi, perehdyttäminen Vapaaehtoisjohtaminen organisaati...
Vapaaehtoisten rekrytointi, perehdyttäminen Vapaaehtoisjohtaminen organisaati...Lari Karreinen
 
Non Motorized Training Program , Manado 07-09-2014
Non Motorized Training Program , Manado 07-09-2014Non Motorized Training Program , Manado 07-09-2014
Non Motorized Training Program , Manado 07-09-2014Rio Wicaksono
 
Suriname ICT Vision 2020 by ICT Associatie Suriname June 2015
Suriname ICT Vision 2020 by ICT Associatie Suriname June 2015Suriname ICT Vision 2020 by ICT Associatie Suriname June 2015
Suriname ICT Vision 2020 by ICT Associatie Suriname June 2015Cyril Soeri
 

Viewers also liked (7)

Vapaaehtoisten rekrytointi, perehdyttäminen Vapaaehtoisjohtaminen organisaati...
Vapaaehtoisten rekrytointi, perehdyttäminen Vapaaehtoisjohtaminen organisaati...Vapaaehtoisten rekrytointi, perehdyttäminen Vapaaehtoisjohtaminen organisaati...
Vapaaehtoisten rekrytointi, perehdyttäminen Vapaaehtoisjohtaminen organisaati...
 
Digital Readiness Level (DRL), Simon Barnes
Digital Readiness Level (DRL), Simon BarnesDigital Readiness Level (DRL), Simon Barnes
Digital Readiness Level (DRL), Simon Barnes
 
Retinoscope, optom faslu muhammed
Retinoscope, optom faslu muhammedRetinoscope, optom faslu muhammed
Retinoscope, optom faslu muhammed
 
Non Motorized Training Program , Manado 07-09-2014
Non Motorized Training Program , Manado 07-09-2014Non Motorized Training Program , Manado 07-09-2014
Non Motorized Training Program , Manado 07-09-2014
 
Suriname ICT Vision 2020 by ICT Associatie Suriname June 2015
Suriname ICT Vision 2020 by ICT Associatie Suriname June 2015Suriname ICT Vision 2020 by ICT Associatie Suriname June 2015
Suriname ICT Vision 2020 by ICT Associatie Suriname June 2015
 
Cancer cavidad oral
Cancer cavidad oral Cancer cavidad oral
Cancer cavidad oral
 
Camerawork
CameraworkCamerawork
Camerawork
 

Similar to Community center bid recommendations

CE 162 Design Presentation
CE 162 Design PresentationCE 162 Design Presentation
CE 162 Design PresentationRyan Maidrand
 
2009 Budget Presentation
2009 Budget Presentation2009 Budget Presentation
2009 Budget PresentationBrett Deaton
 
Public works presentation 9 30final
Public works presentation 9 30finalPublic works presentation 9 30final
Public works presentation 9 30finalCityofEvanston2
 
City of Salina-9th Street Curb & Gutter Project
City of Salina-9th Street Curb & Gutter ProjectCity of Salina-9th Street Curb & Gutter Project
City of Salina-9th Street Curb & Gutter ProjectCity of Salina
 
Daycare: Urban Land Development Project
Daycare: Urban Land Development ProjectDaycare: Urban Land Development Project
Daycare: Urban Land Development ProjectAshley Garvey
 
Demand analysis – Build steel structure warehouse in Russia
Demand analysis – Build steel structure warehouse in RussiaDemand analysis – Build steel structure warehouse in Russia
Demand analysis – Build steel structure warehouse in RussiaJohn William
 
Senior Design Capstone Presentation
Senior Design Capstone PresentationSenior Design Capstone Presentation
Senior Design Capstone Presentationfinkjosh
 
Costs
CostsCosts
CostsJ C
 
Bannister-PV Info Report 7-3-12
Bannister-PV Info Report 7-3-12Bannister-PV Info Report 7-3-12
Bannister-PV Info Report 7-3-12Larry N. Bannister
 
New Jersey Subsidies Paid to Bloom Energy Per FOIA 2019.08.05
New Jersey Subsidies Paid to Bloom Energy Per FOIA 2019.08.05New Jersey Subsidies Paid to Bloom Energy Per FOIA 2019.08.05
New Jersey Subsidies Paid to Bloom Energy Per FOIA 2019.08.05Hindenburg Research
 
South Dakota State Bridge Profile
South Dakota State Bridge ProfileSouth Dakota State Bridge Profile
South Dakota State Bridge Profileartba
 
2008 Off-Sites Interconnecting Piping End of Year Review
2008 Off-Sites Interconnecting Piping End of Year Review2008 Off-Sites Interconnecting Piping End of Year Review
2008 Off-Sites Interconnecting Piping End of Year ReviewTom Atkinson
 

Similar to Community center bid recommendations (20)

CE 162 Design Presentation
CE 162 Design PresentationCE 162 Design Presentation
CE 162 Design Presentation
 
2009 Budget Presentation
2009 Budget Presentation2009 Budget Presentation
2009 Budget Presentation
 
Public works presentation 9 30final
Public works presentation 9 30finalPublic works presentation 9 30final
Public works presentation 9 30final
 
Roadway Impact Fees
Roadway Impact FeesRoadway Impact Fees
Roadway Impact Fees
 
City of Salina-9th Street Curb & Gutter Project
City of Salina-9th Street Curb & Gutter ProjectCity of Salina-9th Street Curb & Gutter Project
City of Salina-9th Street Curb & Gutter Project
 
UCDAAP9NOV16
UCDAAP9NOV16UCDAAP9NOV16
UCDAAP9NOV16
 
Structural Design Project
Structural Design ProjectStructural Design Project
Structural Design Project
 
Daycare: Urban Land Development Project
Daycare: Urban Land Development ProjectDaycare: Urban Land Development Project
Daycare: Urban Land Development Project
 
Demand analysis – Build steel structure warehouse in Russia
Demand analysis – Build steel structure warehouse in RussiaDemand analysis – Build steel structure warehouse in Russia
Demand analysis – Build steel structure warehouse in Russia
 
List of CIP
List of CIPList of CIP
List of CIP
 
Gltc OM facility Bid Tabulation
Gltc OM facility Bid TabulationGltc OM facility Bid Tabulation
Gltc OM facility Bid Tabulation
 
Water-Wastewater Impact Fees
Water-Wastewater Impact FeesWater-Wastewater Impact Fees
Water-Wastewater Impact Fees
 
Water-Wastewater Impact Fees
Water-Wastewater Impact FeesWater-Wastewater Impact Fees
Water-Wastewater Impact Fees
 
GBI: Role of BS
GBI: Role of BSGBI: Role of BS
GBI: Role of BS
 
Senior Design Capstone Presentation
Senior Design Capstone PresentationSenior Design Capstone Presentation
Senior Design Capstone Presentation
 
Costs
CostsCosts
Costs
 
Bannister-PV Info Report 7-3-12
Bannister-PV Info Report 7-3-12Bannister-PV Info Report 7-3-12
Bannister-PV Info Report 7-3-12
 
New Jersey Subsidies Paid to Bloom Energy Per FOIA 2019.08.05
New Jersey Subsidies Paid to Bloom Energy Per FOIA 2019.08.05New Jersey Subsidies Paid to Bloom Energy Per FOIA 2019.08.05
New Jersey Subsidies Paid to Bloom Energy Per FOIA 2019.08.05
 
South Dakota State Bridge Profile
South Dakota State Bridge ProfileSouth Dakota State Bridge Profile
South Dakota State Bridge Profile
 
2008 Off-Sites Interconnecting Piping End of Year Review
2008 Off-Sites Interconnecting Piping End of Year Review2008 Off-Sites Interconnecting Piping End of Year Review
2008 Off-Sites Interconnecting Piping End of Year Review
 

Recently uploaded

Vashi Escorts, {Pooja 09892124323}, Vashi Call Girls
Vashi Escorts, {Pooja 09892124323}, Vashi Call GirlsVashi Escorts, {Pooja 09892124323}, Vashi Call Girls
Vashi Escorts, {Pooja 09892124323}, Vashi Call GirlsPooja Nehwal
 
Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!Krish109503
 
N Chandrababu Naidu Launches 'Praja Galam' As Part of TDP’s Election Campaign
N Chandrababu Naidu Launches 'Praja Galam' As Part of TDP’s Election CampaignN Chandrababu Naidu Launches 'Praja Galam' As Part of TDP’s Election Campaign
N Chandrababu Naidu Launches 'Praja Galam' As Part of TDP’s Election Campaignanjanibaddipudi1
 
23042024_First India Newspaper Jaipur.pdf
23042024_First India Newspaper Jaipur.pdf23042024_First India Newspaper Jaipur.pdf
23042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012ankitnayak356677
 
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docxkfjstone13
 
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docxkfjstone13
 
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptxLorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptxlorenzodemidio01
 
Chandrayaan 3 Successful Moon Landing Mission.pdf
Chandrayaan 3 Successful Moon Landing Mission.pdfChandrayaan 3 Successful Moon Landing Mission.pdf
Chandrayaan 3 Successful Moon Landing Mission.pdfauroraaudrey4826
 
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...Axel Bruns
 
Manipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpkManipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpkbhavenpr
 
Top 10 Wealthiest People In The World.pdf
Top 10 Wealthiest People In The World.pdfTop 10 Wealthiest People In The World.pdf
Top 10 Wealthiest People In The World.pdfauroraaudrey4826
 
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docxkfjstone13
 
College Call Girls Kolhapur Aanya 8617697112 Independent Escort Service Kolhapur
College Call Girls Kolhapur Aanya 8617697112 Independent Escort Service KolhapurCollege Call Girls Kolhapur Aanya 8617697112 Independent Escort Service Kolhapur
College Call Girls Kolhapur Aanya 8617697112 Independent Escort Service KolhapurCall girls in Ahmedabad High profile
 
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkcomplaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkbhavenpr
 
Identifying & Combating Misinformation w/ Fact Checking Tools
Identifying & Combating Misinformation w/ Fact Checking ToolsIdentifying & Combating Misinformation w/ Fact Checking Tools
Identifying & Combating Misinformation w/ Fact Checking ToolsUjjwal Acharya
 
Brief biography of Julius Robert Oppenheimer
Brief biography of Julius Robert OppenheimerBrief biography of Julius Robert Oppenheimer
Brief biography of Julius Robert OppenheimerOmarCabrera39
 
26042024_First India Newspaper Jaipur.pdf
26042024_First India Newspaper Jaipur.pdf26042024_First India Newspaper Jaipur.pdf
26042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Referendum Party 2024 Election Manifesto
Referendum Party 2024 Election ManifestoReferendum Party 2024 Election Manifesto
Referendum Party 2024 Election ManifestoSABC News
 
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...AlexisTorres963861
 

Recently uploaded (20)

Vashi Escorts, {Pooja 09892124323}, Vashi Call Girls
Vashi Escorts, {Pooja 09892124323}, Vashi Call GirlsVashi Escorts, {Pooja 09892124323}, Vashi Call Girls
Vashi Escorts, {Pooja 09892124323}, Vashi Call Girls
 
Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!
 
N Chandrababu Naidu Launches 'Praja Galam' As Part of TDP’s Election Campaign
N Chandrababu Naidu Launches 'Praja Galam' As Part of TDP’s Election CampaignN Chandrababu Naidu Launches 'Praja Galam' As Part of TDP’s Election Campaign
N Chandrababu Naidu Launches 'Praja Galam' As Part of TDP’s Election Campaign
 
23042024_First India Newspaper Jaipur.pdf
23042024_First India Newspaper Jaipur.pdf23042024_First India Newspaper Jaipur.pdf
23042024_First India Newspaper Jaipur.pdf
 
VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012
 
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
 
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
 
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptxLorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
 
Chandrayaan 3 Successful Moon Landing Mission.pdf
Chandrayaan 3 Successful Moon Landing Mission.pdfChandrayaan 3 Successful Moon Landing Mission.pdf
Chandrayaan 3 Successful Moon Landing Mission.pdf
 
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
 
Manipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpkManipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpk
 
Top 10 Wealthiest People In The World.pdf
Top 10 Wealthiest People In The World.pdfTop 10 Wealthiest People In The World.pdf
Top 10 Wealthiest People In The World.pdf
 
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
 
College Call Girls Kolhapur Aanya 8617697112 Independent Escort Service Kolhapur
College Call Girls Kolhapur Aanya 8617697112 Independent Escort Service KolhapurCollege Call Girls Kolhapur Aanya 8617697112 Independent Escort Service Kolhapur
College Call Girls Kolhapur Aanya 8617697112 Independent Escort Service Kolhapur
 
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkcomplaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
 
Identifying & Combating Misinformation w/ Fact Checking Tools
Identifying & Combating Misinformation w/ Fact Checking ToolsIdentifying & Combating Misinformation w/ Fact Checking Tools
Identifying & Combating Misinformation w/ Fact Checking Tools
 
Brief biography of Julius Robert Oppenheimer
Brief biography of Julius Robert OppenheimerBrief biography of Julius Robert Oppenheimer
Brief biography of Julius Robert Oppenheimer
 
26042024_First India Newspaper Jaipur.pdf
26042024_First India Newspaper Jaipur.pdf26042024_First India Newspaper Jaipur.pdf
26042024_First India Newspaper Jaipur.pdf
 
Referendum Party 2024 Election Manifesto
Referendum Party 2024 Election ManifestoReferendum Party 2024 Election Manifesto
Referendum Party 2024 Election Manifesto
 
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
 

Community center bid recommendations

  • 1. 12/11/15, 4:22 PMAgenda Page 1 of 3http://agenda.shakopeemn.gov/agenda_publish.cfm?id=&mt=ALL&ge…&seq=2440&rev=0&ag=365&ln=9183&nseq=2454&nrev=0&pseq=&prev=# Recommendations for Award of Contract 2A Demolition Ebert Inc. $184,000.00 3A Concrete Systems Gresser Company $1,321,800.00 Print Back to Calendar Return Previous Next AI- 2440 General Business 10) E) 1) City Council - Regular Session Meeting Date: 12/15/2015 FROM: Jamie Polley Department: Parks and Recreation Subject Award of Construction Contracts for the Shakopee Ice Arena and Community Center Improvements, Project No. PR2015-3, Res. No. 7659 (A, B, C) Action Sought Award contracts for the construction of a new ice arena and renovations to the Shakopee Community Center. Background The City Council approved the plans and specification and authorized the advertisement for bids for the new ice arena and Community Center renovations on October 20, 2015. The City Council determined that the project will be funded utilizing tax abatement bonds. The Council authorized the hiring of a Construction Manager, RJM Construction, for this project and to work with 292 Design Group to develop a number of bid packages. Discussion On December 1, 2015 the City received a total of one hundred eight bids for twenty-six bid categories. Two of the bid categories will be rebid at a later date due to cost and/or number of bids received. RJM has completed the review of the bids and have conducted a scope review with the apparent low bidders. RJM is recommending the award of contracts to the following low bidders. A letter from RJM with the recommendations is attached.
  • 2. 12/11/15, 4:22 PMAgenda Page 2 of 3http://agenda.shakopeemn.gov/agenda_publish.cfm?id=&mt=ALL&ge…&seq=2440&rev=0&ag=365&ln=9183&nseq=2454&nrev=0&pseq=&prev=# 3B Precast Structural Concrete Fabcon Precast, LLC $3,258,506.00 4A Masonry Systems Del's Construction $1,160,000.00 5A Structural & Misc Steel - Material Lejeune Steel Co $946,810.00 5B Structural & Misc Steel- Install High Five Erectors II $398,796.00 6A Carpentry Systems Ebert Inc. $1,212,900.00 7A Waterproofing REBID $108,453.00 7B Roofing Systems McPhillips Bros $1,288,000.00 8A Aluminum Entrances/Storefront Capital City Glass $867,000.00 9A Gypsum Board/Drywall/Plaster Quality Drywall Midwest $354,000.00 9B Tiling CD Tile $321,340.00 9C Acoustical Ceilings Kirk Acoustics $328,000.00 9D Flooring Sonus Interiors $430,400.00 9E Painting Systems Superior Painting $490,575.00 13A Aquatic Systems Associated Pool Builders $1,816,700.00 13B Ice Rink Systems Commercial Refrigeration System $1,973,487.00 14A Passenger Elevator REBID $82,938.00 21A Fire Protection Systems Frontier Fire Protection $319,980.00 22A Plumbing Systems Modern Piping $1,137,700.00 23A HVAC Systems SCR $2,070,000.00 26A Electrical Systems E2 Electrical Services $1,257,000.00 31A Earthwork & Site Utilities Rachel Contracting $1,023,124.00 32A Asphalt Paving Bituminous Roadways, Inc $154,900.00 32B Concrete Sidewalk/Curb/Gutter Chard Tiling and Excavating $86,344.00 32C Landscaping Plant Pros, LLC $134,034.00 Budget Impact The total construction cost, including contingency and contractor's fee, of the project is $25,826,178.00. In addition to the construction costs are the owner costs including SAC/TWC charges and permit fees, furniture, equipment, low voltage, security, contingency, etc. totaling $2,854,501.00. Design fees total $1,736,100.00. The total project cost is $30,416,779, this amount is listed in the Springsted
  • 3. 12/11/15, 4:22 PMAgenda Page 3 of 3http://agenda.shakopeemn.gov/agenda_publish.cfm?id=&mt=ALL&ge…&seq=2440&rev=0&ag=365&ln=9183&nseq=2454&nrev=0&pseq=&prev=# report that the City Council received on November 17, 2015 and within the amount of the bonds adopted by Resolution No. 7640. Relationship to Vision A. Keep Shakopee a safe and healthy community where residents can pursue active and quality lifestyles. B. Positively manage the challenges and opportunities presented by growth development and change. C. Maintain the City's strong financial health. Requested Action If the City Council concurs, offer Resolution No. 7659, a resolution awarding contracts for the construction of the Shakopee Ice Arena and Community Center Improvements, Project No. PR2015-3. Attachments Resolution No. 7659 RJM Recommendation Letter AgendaQuick©2005 - 2015 Destiny Software Inc., All Rights Reserved
  • 4. December 10, 2015 Jamie Polley Director of Parks & Recreation City of Shakopee 1255 Fuller St. S. Shakopee MN 55379 RE: Shakopee Ice Arena and Community Center Renovation Recommendations for Award of Contract Dear Ms. Polley, On December 1, 2015 bids were received at the City of Shakopee for Shakopee Ice Arena and Community Center Renovation project. A total of one hundred and eight (108) bids were received for twenty-six (26) bid categories. Attached is a bid summary by trade for each bid category. Bid Category 7A Waterproofing and 14A Elevator will be rebid at a future date. After reviewing the project cost with the City of Shakopee staff it has been recommended to accept alternates 2, 3A, 3B, 3C, 3D, 3E, 4, 5A, 5B, 7 for a total project budget of $30,416,779. RJM has completed its review of the bids and in addition to the bid review, we have also conducted a scope review with the apparent low bidder for each bid and quote category. Based on the results of these reviews we recommend to the City Council that they award the contracts as follows: BID CATEGORY AWARD AMOUNT 2A – Demolition (Excludes Site Demolition) Ebert Inc. $184,000.00 23350 County Rd 10 Corcoran, MN 55357 3A – Concrete Systems Gresser Company $1,321,800.00 3 Checkered Flag Blvd. Shakopee, MN 55379 3B – Precast Structural Concrete Fabcon Precast, LLC $3,258,506.00 6111 West Highway 13
  • 5. Savage, MN 55378 4A – Masonry Systems Del’s Construction $1,160,000.00 35832 Ottawa Road Le Sueur, MN 56058 5A – Structural and Misc. Steel – Material Lejeune Steel Co. $946,810.00 118 W. 60th St. Minneapolis, MN 55419 5B – Structural and Misc. Steel – Install High-Five Erectors II $398,796.00 3005 4th Ave. East Shakopee, MN 55379 6A – Carpentry Systems Ebert Inc. $1,212,900.00 23350 County Rd 10 Corcoran, MN 55357 7A – Waterproofing - REBID $108,453.00 Hankemeyer 7B – Roofing Systems Mcphillips Bros. $1,288,000.00 2590 Centennial Drive St. Paul, MN 55109 8A – Aluminum Entrances/Storefront Capital City Glass $867,000.00 1521 93rd Lane NE Blaine, MN 55449 9A – Gypsum Board/Drywall/Plaster Quality Drywall Midwest $354,000.00 4990 Highway 169 N. New Hope, MN 55428
  • 6. 9B – Tiling CD Tile $321,340.00 3103 103rd Lane NE #160 Blaine, MN 55449 9C – Acoustical Ceilings Kirk Acoustics $328,000.00 395 Bridgepoint Way South St. Paul, MN 55075 9D – Flooring Sonus Interiors 6225 Sandburg Road Golden Valley, MN 55427 $430,400.00 9E – Painting Systems Superior Painting $490,575.00 3543 88th Ave. NE Circle Pines, MN 55014-4108 13A – Aquatic Systems Associated Pool Builders $1,816,700.00 2121 Lovett Avenue Bismarck, ND 58504 13B – Ice Rink Systems Commercial Refrigeration System $1,973,487.00 104 East Chestnut Street Virginia, MN 55792 14A – Passenger Elevators - REBID Minnesota Elevator $82,938.00 19336 607th Ave. Mankato, MN 56001 21A – Fire Protection Systems Frontier Fire Protection $319,980.00 75 County Road B East Little Canada, MN 55117
  • 7. 22A – Plumbing Systems Modern Piping $1,137,700.00 8370 West I-35W Service Dr. Blaine, MN 55449 23A – HVAC Systems SCR $2,070,000.00 604 Lincoln Ave. NE St. Cloud, MN 56304 26A – Electrical Systems E2 Electrical Services $1,257,000.00 15895 Highway 7 East Hutchinson, MN 55350 31A – Earthwork and Site Utilities Rachel Contracting $1,023,124.00 4125 Napier Court N.E. St. Michael, MN 55376 32A – Asphalt Paving Bituminous Roadways, Inc. $154,900.00 1520 Commerce Drive Mendota Heights, MN 55120 32B – Concrete Sidewalks/Curb/Gutter Chard Tiling and Excavating $ 86,344.00 26239 State Highway 25 Belle Plaine, MN 56011 32C – Landscaping Plant Pros, LLC $134,034.00 Box 490861 Blaine, MN 55449 The bid values of accepted alternates’ are included in the above award amount totals. If you should have any questions, please feel free to contact me.