1. List of Major Projects Performed at Coachella Valley Water District
(1991-1999)
CVWD
Spec. #
Project Title Design Fee (Est.)
Construction
Cost
91-10 Assessment District No. 92 for 48-lot commercial area In-house Design
91-42 Emergency Storage Upgrade In-house Design
92-12 City of La Quinta Specification In-house Design $370,758
92-21 Lift Station 81-03 Burr Street Force Main, Phase 2 In-house Design $1,027,058
92-30 Mecca Lift Station and Demolition (In-house) In-house Design $361,200
92-31 Cook Street Pumping Station Temporary Sewage Bypass In-house Design $93,685
92-35 Trunk Sewer Along Morningside Country Club In-house Design $1,741,000
92-36 Palm Desert WRP10 Headworks Expansion $478,206 $2,680,000
92-48 WRP10 Polymer Chiller In-house Design $23,596
93-28 WRP 7 Phase 2 Expansion $887,132 $13,536,530
93-30
Martinez, Villa, Navarro and Montezuma Water Main for 38 services (In-
house)
In-house Design $61,528
94-5 Washington Street Sewer Replacement In-house Design $40,800
94-16 Jefferson Street Lift Station, sewer force main and gravity sewer In-house Design $1,198,139
94-21 Montero Estates Assessment District 93 for 64-lot subdivision (In-house) In-house Design
94-37 Biosolids Removal Service (In-house contract) In-house Design
94-41 Varner Road/ 38th Avenue Trunk Sewer In-house Design $1,382,750
95-30
Date Palm Drive Trunk Sewer Extension Between Dinah Shore Drive and
Ramon Road
In-house Design $1,175,576
96-1 Water Reclamation Plant No. 7 Communications Tower In-house Design $52,994
No Spec Construction of 7 new percolation ponds and appurtenances In-house Design $280,000
97-9 Burr Street Gravity Sewer Between Avenue 43 and Fred Waring In-house Design $114,480
97-34 WRP7 Miscellaneous Work Items In-house Design $23,385
98-1 Date Palm Trunk Sewer Extension Between Ramon Road and Avenue 30 In-house Design $1,087,320
98-10
Palm Desert Water Reclamation 10 (WRP10) Mechanical Bar Screen
Upgrade
$55,450 $461,207
99-13 WRP10 Sewer Force Main and Lift Station 80-17 $183,880 $3,034,114
99-10 WRP 10 Tertiary Upgrade (Estimated Construction Cost) $488,195 $10,000,000
99-18 Highway 111 Sewer Between El Paseo Drive and Cook Street $50,300 $785,000
99-17 Cook Street Sewer Between Fred Waring Drive and Lift Station 80-03 $16,500 $280,000
$2,159,663 $39,811,120
Service Contracts
Biosolids Removal Service Contract 1995-1997
Biosolids Removal Service Contract 1997-1998
Biosolids Removal Service Contract 1998-2000
Reports and Studies with Consultants
WRP7 EIR (Consultant MW)
WRP10 Biosolid Study (Consultant MW) $80,000
Major Reports Completed Inhouse
Water Reclamation Plant No. 4 Expansion Report
Task Force Committee Report on Wastewater Plant Modifications to
reduce costs and increase productivity
Task Force Committee Report on Privatization of WRP7
Title 22 Compliance for WRP7
Major Projects in design prior to leaving CVWD
WRP10 Biosolid Design On-site (Estimated Construction Cost) $488,195 $5,000,000
WRP7 Aeration Basin Phase III