List of Major Projects Performed at Coachella Valley Water District
(1991-1999)
CVWD
Spec. #
Project Title Design Fee (Est.)
Construction
Cost
91-10 Assessment District No. 92 for 48-lot commercial area In-house Design
91-42 Emergency Storage Upgrade In-house Design
92-12 City of La Quinta Specification In-house Design $370,758
92-21 Lift Station 81-03 Burr Street Force Main, Phase 2 In-house Design $1,027,058
92-30 Mecca Lift Station and Demolition (In-house) In-house Design $361,200
92-31 Cook Street Pumping Station Temporary Sewage Bypass In-house Design $93,685
92-35 Trunk Sewer Along Morningside Country Club In-house Design $1,741,000
92-36 Palm Desert WRP10 Headworks Expansion $478,206 $2,680,000
92-48 WRP10 Polymer Chiller In-house Design $23,596
93-28 WRP 7 Phase 2 Expansion $887,132 $13,536,530
93-30
Martinez, Villa, Navarro and Montezuma Water Main for 38 services (In-
house)
In-house Design $61,528
94-5 Washington Street Sewer Replacement In-house Design $40,800
94-16 Jefferson Street Lift Station, sewer force main and gravity sewer In-house Design $1,198,139
94-21 Montero Estates Assessment District 93 for 64-lot subdivision (In-house) In-house Design
94-37 Biosolids Removal Service (In-house contract) In-house Design
94-41 Varner Road/ 38th Avenue Trunk Sewer In-house Design $1,382,750
95-30
Date Palm Drive Trunk Sewer Extension Between Dinah Shore Drive and
Ramon Road
In-house Design $1,175,576
96-1 Water Reclamation Plant No. 7 Communications Tower In-house Design $52,994
No Spec Construction of 7 new percolation ponds and appurtenances In-house Design $280,000
97-9 Burr Street Gravity Sewer Between Avenue 43 and Fred Waring In-house Design $114,480
97-34 WRP7 Miscellaneous Work Items In-house Design $23,385
98-1 Date Palm Trunk Sewer Extension Between Ramon Road and Avenue 30 In-house Design $1,087,320
98-10
Palm Desert Water Reclamation 10 (WRP10) Mechanical Bar Screen
Upgrade
$55,450 $461,207
99-13 WRP10 Sewer Force Main and Lift Station 80-17 $183,880 $3,034,114
99-10 WRP 10 Tertiary Upgrade (Estimated Construction Cost) $488,195 $10,000,000
99-18 Highway 111 Sewer Between El Paseo Drive and Cook Street $50,300 $785,000
99-17 Cook Street Sewer Between Fred Waring Drive and Lift Station 80-03 $16,500 $280,000
$2,159,663 $39,811,120
Service Contracts
Biosolids Removal Service Contract 1995-1997
Biosolids Removal Service Contract 1997-1998
Biosolids Removal Service Contract 1998-2000
Reports and Studies with Consultants
WRP7 EIR (Consultant MW)
WRP10 Biosolid Study (Consultant MW) $80,000
Major Reports Completed Inhouse
Water Reclamation Plant No. 4 Expansion Report
Task Force Committee Report on Wastewater Plant Modifications to
reduce costs and increase productivity
Task Force Committee Report on Privatization of WRP7
Title 22 Compliance for WRP7
Major Projects in design prior to leaving CVWD
WRP10 Biosolid Design On-site (Estimated Construction Cost) $488,195 $5,000,000
WRP7 Aeration Basin Phase III

More Related Content

Similar to List of CIP

Community center bid recommendations
Community center bid recommendationsCommunity center bid recommendations
Community center bid recommendationsuniquelyshakopeenews
 
Item 7.1 art center study session
Item 7.1   art center study sessionItem 7.1   art center study session
Item 7.1 art center study sessionE'ville Eye
 
Item # 9 - Award ADA Swimming Pool Renovations
Item # 9 - Award ADA Swimming Pool RenovationsItem # 9 - Award ADA Swimming Pool Renovations
Item # 9 - Award ADA Swimming Pool Renovationsahcitycouncil
 
MW Project Experience Updated 7-24-16
MW Project Experience Updated 7-24-16MW Project Experience Updated 7-24-16
MW Project Experience Updated 7-24-16Mark Williams
 
2015 OAWWA 30-INCH SLIP-LINING
2015 OAWWA 30-INCH SLIP-LINING2015 OAWWA 30-INCH SLIP-LINING
2015 OAWWA 30-INCH SLIP-LININGTimothy Antos
 
67 GARRICK STREET COOLANGATTA s
67 GARRICK STREET COOLANGATTA s67 GARRICK STREET COOLANGATTA s
67 GARRICK STREET COOLANGATTA sMike Darwich
 
Mep restaurant and dining
Mep restaurant and diningMep restaurant and dining
Mep restaurant and diningSam Abdelfattah
 
CV Armien Fredericks March 2016
CV Armien Fredericks March 2016CV Armien Fredericks March 2016
CV Armien Fredericks March 2016Armien Fredericks
 
1 T1 Bigler Site 2 6-1-2022.pdf
1 T1 Bigler Site 2 6-1-2022.pdf1 T1 Bigler Site 2 6-1-2022.pdf
1 T1 Bigler Site 2 6-1-2022.pdfImanbirSinghMann
 
Sc 0009-rwpc-pip-civ-cal-0511 0-a
Sc 0009-rwpc-pip-civ-cal-0511 0-aSc 0009-rwpc-pip-civ-cal-0511 0-a
Sc 0009-rwpc-pip-civ-cal-0511 0-ajulio-civil
 
Hayfield Road Pipe Conveyance System January 2021
Hayfield Road Pipe Conveyance System January 2021Hayfield Road Pipe Conveyance System January 2021
Hayfield Road Pipe Conveyance System January 2021Fairfax County
 

Similar to List of CIP (20)

+
++
+
 
Community center bid recommendations
Community center bid recommendationsCommunity center bid recommendations
Community center bid recommendations
 
Water Outage Schedule
Water Outage ScheduleWater Outage Schedule
Water Outage Schedule
 
1.3 pbcwud update
1.3 pbcwud update1.3 pbcwud update
1.3 pbcwud update
 
Water-Wastewater Impact Fees
Water-Wastewater Impact FeesWater-Wastewater Impact Fees
Water-Wastewater Impact Fees
 
Water-Wastewater Impact Fees
Water-Wastewater Impact FeesWater-Wastewater Impact Fees
Water-Wastewater Impact Fees
 
Item 7.1 art center study session
Item 7.1   art center study sessionItem 7.1   art center study session
Item 7.1 art center study session
 
Item # 9 - Award ADA Swimming Pool Renovations
Item # 9 - Award ADA Swimming Pool RenovationsItem # 9 - Award ADA Swimming Pool Renovations
Item # 9 - Award ADA Swimming Pool Renovations
 
MW Project Experience Updated 7-24-16
MW Project Experience Updated 7-24-16MW Project Experience Updated 7-24-16
MW Project Experience Updated 7-24-16
 
FY19 Bond Projects
FY19 Bond ProjectsFY19 Bond Projects
FY19 Bond Projects
 
2015 OAWWA 30-INCH SLIP-LINING
2015 OAWWA 30-INCH SLIP-LINING2015 OAWWA 30-INCH SLIP-LINING
2015 OAWWA 30-INCH SLIP-LINING
 
School Facilities Referendum Recommendations
School Facilities Referendum RecommendationsSchool Facilities Referendum Recommendations
School Facilities Referendum Recommendations
 
67 GARRICK STREET COOLANGATTA s
67 GARRICK STREET COOLANGATTA s67 GARRICK STREET COOLANGATTA s
67 GARRICK STREET COOLANGATTA s
 
Mep restaurant and dining
Mep restaurant and diningMep restaurant and dining
Mep restaurant and dining
 
final project_FINAL
final project_FINALfinal project_FINAL
final project_FINAL
 
CV Armien Fredericks March 2016
CV Armien Fredericks March 2016CV Armien Fredericks March 2016
CV Armien Fredericks March 2016
 
1 T1 Bigler Site 2 6-1-2022.pdf
1 T1 Bigler Site 2 6-1-2022.pdf1 T1 Bigler Site 2 6-1-2022.pdf
1 T1 Bigler Site 2 6-1-2022.pdf
 
Resume M McAbee
Resume M McAbeeResume M McAbee
Resume M McAbee
 
Sc 0009-rwpc-pip-civ-cal-0511 0-a
Sc 0009-rwpc-pip-civ-cal-0511 0-aSc 0009-rwpc-pip-civ-cal-0511 0-a
Sc 0009-rwpc-pip-civ-cal-0511 0-a
 
Hayfield Road Pipe Conveyance System January 2021
Hayfield Road Pipe Conveyance System January 2021Hayfield Road Pipe Conveyance System January 2021
Hayfield Road Pipe Conveyance System January 2021
 

List of CIP

  • 1. List of Major Projects Performed at Coachella Valley Water District (1991-1999) CVWD Spec. # Project Title Design Fee (Est.) Construction Cost 91-10 Assessment District No. 92 for 48-lot commercial area In-house Design 91-42 Emergency Storage Upgrade In-house Design 92-12 City of La Quinta Specification In-house Design $370,758 92-21 Lift Station 81-03 Burr Street Force Main, Phase 2 In-house Design $1,027,058 92-30 Mecca Lift Station and Demolition (In-house) In-house Design $361,200 92-31 Cook Street Pumping Station Temporary Sewage Bypass In-house Design $93,685 92-35 Trunk Sewer Along Morningside Country Club In-house Design $1,741,000 92-36 Palm Desert WRP10 Headworks Expansion $478,206 $2,680,000 92-48 WRP10 Polymer Chiller In-house Design $23,596 93-28 WRP 7 Phase 2 Expansion $887,132 $13,536,530 93-30 Martinez, Villa, Navarro and Montezuma Water Main for 38 services (In- house) In-house Design $61,528 94-5 Washington Street Sewer Replacement In-house Design $40,800 94-16 Jefferson Street Lift Station, sewer force main and gravity sewer In-house Design $1,198,139 94-21 Montero Estates Assessment District 93 for 64-lot subdivision (In-house) In-house Design 94-37 Biosolids Removal Service (In-house contract) In-house Design 94-41 Varner Road/ 38th Avenue Trunk Sewer In-house Design $1,382,750 95-30 Date Palm Drive Trunk Sewer Extension Between Dinah Shore Drive and Ramon Road In-house Design $1,175,576 96-1 Water Reclamation Plant No. 7 Communications Tower In-house Design $52,994 No Spec Construction of 7 new percolation ponds and appurtenances In-house Design $280,000 97-9 Burr Street Gravity Sewer Between Avenue 43 and Fred Waring In-house Design $114,480 97-34 WRP7 Miscellaneous Work Items In-house Design $23,385 98-1 Date Palm Trunk Sewer Extension Between Ramon Road and Avenue 30 In-house Design $1,087,320 98-10 Palm Desert Water Reclamation 10 (WRP10) Mechanical Bar Screen Upgrade $55,450 $461,207 99-13 WRP10 Sewer Force Main and Lift Station 80-17 $183,880 $3,034,114 99-10 WRP 10 Tertiary Upgrade (Estimated Construction Cost) $488,195 $10,000,000 99-18 Highway 111 Sewer Between El Paseo Drive and Cook Street $50,300 $785,000 99-17 Cook Street Sewer Between Fred Waring Drive and Lift Station 80-03 $16,500 $280,000 $2,159,663 $39,811,120 Service Contracts Biosolids Removal Service Contract 1995-1997 Biosolids Removal Service Contract 1997-1998 Biosolids Removal Service Contract 1998-2000 Reports and Studies with Consultants WRP7 EIR (Consultant MW) WRP10 Biosolid Study (Consultant MW) $80,000 Major Reports Completed Inhouse Water Reclamation Plant No. 4 Expansion Report Task Force Committee Report on Wastewater Plant Modifications to reduce costs and increase productivity Task Force Committee Report on Privatization of WRP7 Title 22 Compliance for WRP7 Major Projects in design prior to leaving CVWD WRP10 Biosolid Design On-site (Estimated Construction Cost) $488,195 $5,000,000 WRP7 Aeration Basin Phase III