CONSTRUCTION
CONSIDERATIONS :
Requirements, Different Construction
Activities,
Compaction Control
Presentation by
UDAY KUMAR DEVALLA (MT17WRE002)
TULSHIDAS JIBHAKATE (MT17WRE003)
LAXMI MAROTI KHANDRE (MT17WRE004)
REQUIREMENTS
The principal requirement in the design of an
earth dam is to provide a structure at the
minimum cost which remains safe and stable
during all phases of construction and operation of
the reservoir
Technical requirements :
1. The slopes of the embankment must be stable
under all conditions of construction and
reservoir operation including sudden
drawdown of the storage reservoir
2. The embankment must be so designed as not
to induce excessive stresses in the foundation
3. The upstream slope must be protected against
erosion by wave action; the top crest and the
down stream slope must also be protected
against erosion due to wind and rain
DIFFERENT
CONSTRUCTION
ACTIVITIES
1. Site preparation
2. Diversion and coffer damming
3. Foundation preparation
4. Grouting
5. Excavation
6. Fill placement and
7. Soil compaction
Site preparation
a) Cleaning and grubbing
Cleaning:
Removal of trees, rocky stones ,
temporary structures etc.
Grubbing:
Removal of plant roots and organic
matter for the location of the borrow pits
(confined within the region of embankment )
Site preparation
b) Stripping :
Removal of all top soil , organic matter and
other soft pockets
c) Scaling :
Removal of loose overburden of weathered
rock and other weak material from the abutments
Diversion & Coffer
Damming
A coffer dam must be relatively low in cost but as a
watertight as practicable
Dump starting from
the abutments on the
both sides and
working towards
centre of the dam
Fig
Foundation preparation
The cutoff trench is dug as an open excavation
which carried out to sound rock level or other
impervious stratum.
It is normally a sloping side trench which is
excavated and back filled with a impervious
material, compacted in the same manner as the
impervious zone of the embankment.
Grouting
Grouting is injecting mixture of cement , water and
other admixtures like sand, clay and rock dust in the
subsoil formation
It serves two fold objectives
1. Make the formation impervious and
2. Improve its strength and compressibility
Grouting is done by filling cracks, fissures, cavities and
even voids between the soil grains with the grouting
material
Excavation
The excavation in barrow pits depends upon the type
of available materials and the positioning with respect
to soil moisture present in the pits
Following methods are generally used
1. Hand excavation
2. Power shovel
3. Drag line
4. Scrapper
5. Elevating grader
Fill placement
Material handled by Dumped in
Hands Small pits
Truck or wagons Uniformly spread piles
Scrapers Uniformly thin layers of the thickness
of its blades
Bulldozers or road grader Uniformly in piles and wind rows
In-place processing:
Involves mixing of two materials such as impervious clay
(in small amount ) with less water tight sandy soils ( in
large amounts ) as in core construction
Soil Compaction
Compaction is the process by which the required
density of the soil in the embankment can be attained
Compaction of the soil materials is carried out by
rollers which are of the following types
1. Sheeps foot roller
2. Heavy pneumatic tired roller
3. Vibrating roller
4. Crawler type equipment e.g tractors
5. Ordinary pavement rollers
Compaction Control
The field engineer has to
make periodic checks to see
whether the compaction is
giving desired results.
The procedure of checking
involves
1. Measurement of dry unit
weight
2. Measurement of
moisture content
Different methods
Fill water content
Direct Heat Chemical
1.Laboratory Oven
Speedy moisture
2.Laboratory Microwave
3.Gas Stove
4.Moisture Analyzer
Fill unit weight Fill unit weight and water content
1.Sand Cone test (SCT) 1.Moisture Density
Indicator(MDI)
2.Water Balloon (WB) 2.Nuclear Density Gauge (NDG)
3.Steel Shot (SS) 3.Soil Density Gauge (SDG)
4.Electrical Density Gauge
Sand Cone Test
The sand cone apparatus is formed by a jar made
of plastic or glass with a metal cone attached to its
top. The jar is filled with a reference sand
Water Balloon Test
1
2
3
4
5
6
Nuclear Density Gauge
It is used to obtain the in situ dry unit weight and
the water content
Principle:
The test is based on the following principle: the
amount of gamma rays counted by the
equipment during a certain period (usually 1
min) is inversely proportional to the density of
the material
The equipment is composed by three main elements:
1. A nuclear source - responsible for the emission of
gamma rays or neutrons
2. A radiation detector
3. A counters with provisions - to detect an automatic
and precise timing for the arrival of the modified
gamma ray.
Nuclear Density Gauge
Density:
Source emits Gamma rays
Water content:
Source emits Neutrons
Nuclear Density Gauge
Two modes
References :
1. Elements of water resources engineering by KN Duggal & JP Soni
2. Geotechnical engineering by VNS Murthy
3. Geotechnical engineering by Venkataramaiah
4. https://run.unl.pt/bitstream/10362/16025/1/Blanco_2015.pdf
5. https://labmekanikatanah.wordpress.com/2013/10/29/field-
test-rubber-balloon-method/
THANK YOU

More Related Content

What's hot

Hydraulics structures
Hydraulics  structuresHydraulics  structures
Hydraulics structuresThanarajS
 
Chapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavationsChapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavationsKHUSHBU SHAH
 
Tube wells and their design
Tube wells and their designTube wells and their design
Tube wells and their designMoudud Hasan
 
Bridge inspection,maintenance and repair
Bridge inspection,maintenance and repairBridge inspection,maintenance and repair
Bridge inspection,maintenance and repairKartikSuryawanshi2
 
Construction techniques
Construction techniquesConstruction techniques
Construction techniquessunilighare
 
Equipments for erection and compaction
Equipments for erection and compactionEquipments for erection and compaction
Equipments for erection and compactionPrasanthi Nelloor
 
Canal falls and its classification
Canal falls and its classificationCanal falls and its classification
Canal falls and its classificationGNANA PRAKASH
 
Chapter 4 (a) stone masonry
Chapter 4 (a) stone masonryChapter 4 (a) stone masonry
Chapter 4 (a) stone masonryKHUSHBU SHAH
 
Unit 4 maintenance & repair methods for masonry mrs
Unit 4 maintenance & repair methods for masonry mrsUnit 4 maintenance & repair methods for masonry mrs
Unit 4 maintenance & repair methods for masonry mrsAbhay Abhale
 
Well foundations
Well foundationsWell foundations
Well foundationsganesh6561
 
Open Channel VS Pipe Flow
Open Channel VS Pipe FlowOpen Channel VS Pipe Flow
Open Channel VS Pipe FlowFatma Abdalla
 
Techniques for various structural repair
Techniques for various  structural repairTechniques for various  structural repair
Techniques for various structural repairUdayram Patil
 
Dam construction
Dam constructionDam construction
Dam constructionalizay41
 
Canal regulation works. m4pptx
Canal regulation works. m4pptxCanal regulation works. m4pptx
Canal regulation works. m4pptxBibhabasu Mohanty
 
Direct shear test
Direct shear testDirect shear test
Direct shear testKHK karimi
 
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDFCTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDFShankar Ramasamy
 

What's hot (20)

EARTHEN DAM.pdf
EARTHEN DAM.pdfEARTHEN DAM.pdf
EARTHEN DAM.pdf
 
Hydraulics structures
Hydraulics  structuresHydraulics  structures
Hydraulics structures
 
Chapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavationsChapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavations
 
Tube wells and their design
Tube wells and their designTube wells and their design
Tube wells and their design
 
Bridge inspection,maintenance and repair
Bridge inspection,maintenance and repairBridge inspection,maintenance and repair
Bridge inspection,maintenance and repair
 
Construction techniques
Construction techniquesConstruction techniques
Construction techniques
 
Equipments for erection and compaction
Equipments for erection and compactionEquipments for erection and compaction
Equipments for erection and compaction
 
1.1 box jacking
1.1 box jacking1.1 box jacking
1.1 box jacking
 
Canal falls and its classification
Canal falls and its classificationCanal falls and its classification
Canal falls and its classification
 
Chapter 4 (a) stone masonry
Chapter 4 (a) stone masonryChapter 4 (a) stone masonry
Chapter 4 (a) stone masonry
 
Unit 4 maintenance & repair methods for masonry mrs
Unit 4 maintenance & repair methods for masonry mrsUnit 4 maintenance & repair methods for masonry mrs
Unit 4 maintenance & repair methods for masonry mrs
 
Well foundations
Well foundationsWell foundations
Well foundations
 
Gravity dam
Gravity damGravity dam
Gravity dam
 
Coffer dam and its type
Coffer dam and its typeCoffer dam and its type
Coffer dam and its type
 
Open Channel VS Pipe Flow
Open Channel VS Pipe FlowOpen Channel VS Pipe Flow
Open Channel VS Pipe Flow
 
Techniques for various structural repair
Techniques for various  structural repairTechniques for various  structural repair
Techniques for various structural repair
 
Dam construction
Dam constructionDam construction
Dam construction
 
Canal regulation works. m4pptx
Canal regulation works. m4pptxCanal regulation works. m4pptx
Canal regulation works. m4pptx
 
Direct shear test
Direct shear testDirect shear test
Direct shear test
 
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDFCTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
 

Similar to Construction considerations of Earthen Dams

Lecture-6 Earthdams.pptx
Lecture-6 Earthdams.pptxLecture-6 Earthdams.pptx
Lecture-6 Earthdams.pptxAleemNawaz6
 
SUMMER TRAINING REPORTS OF SOIL TESTING
SUMMER TRAINING REPORTS OF SOIL TESTINGSUMMER TRAINING REPORTS OF SOIL TESTING
SUMMER TRAINING REPORTS OF SOIL TESTINGraish ansari
 
Summer training report on soil testing experiments
Summer training report on soil testing experimentsSummer training report on soil testing experiments
Summer training report on soil testing experimentsashishcivil098
 
Excavation and filling - Execution, QC & Equipment 101
Excavation and filling - Execution, QC & Equipment 101Excavation and filling - Execution, QC & Equipment 101
Excavation and filling - Execution, QC & Equipment 101SHAZEBALIKHAN1
 
unit - IV - Concrete methods.pdf
unit - IV - Concrete methods.pdfunit - IV - Concrete methods.pdf
unit - IV - Concrete methods.pdfAbishekKumar81
 
DREDGING PROCESS AND ITS EFFECT
DREDGING PROCESS AND ITS EFFECTDREDGING PROCESS AND ITS EFFECT
DREDGING PROCESS AND ITS EFFECTINDRANIL BANERJEE
 
Geotechnical-Engineering (1).pdf
Geotechnical-Engineering (1).pdfGeotechnical-Engineering (1).pdf
Geotechnical-Engineering (1).pdfXise1
 
Casting process and moulding process file for trainning report complet trainn...
Casting process and moulding process file for trainning report complet trainn...Casting process and moulding process file for trainning report complet trainn...
Casting process and moulding process file for trainning report complet trainn...chourasiya12345
 
Ce8611 Highway Engineering Laboratory Manual
Ce8611 Highway Engineering Laboratory ManualCe8611 Highway Engineering Laboratory Manual
Ce8611 Highway Engineering Laboratory ManualLokesh Kalliz
 
Presentation - Case Study on Site Investigation Plan at Chek.pptx
Presentation - Case Study on Site Investigation Plan at Chek.pptxPresentation - Case Study on Site Investigation Plan at Chek.pptx
Presentation - Case Study on Site Investigation Plan at Chek.pptxolaboughannam1
 
Presentation - Case Study on Site Investigation Plan at Chek.pptx
Presentation - Case Study on Site Investigation Plan at Chek.pptxPresentation - Case Study on Site Investigation Plan at Chek.pptx
Presentation - Case Study on Site Investigation Plan at Chek.pptxolaboughannam1
 
Under water concrete
Under water concreteUnder water concrete
Under water concreteMuftah Aljoat
 
Basics of peroleum engineering
Basics of peroleum engineeringBasics of peroleum engineering
Basics of peroleum engineeringShivam Yadav
 
A Repot File On Exploring Civil Engineering: A Comprehensive Internship Expe...
A Repot File  On Exploring Civil Engineering: A Comprehensive Internship Expe...A Repot File  On Exploring Civil Engineering: A Comprehensive Internship Expe...
A Repot File On Exploring Civil Engineering: A Comprehensive Internship Expe...Prince Ahirwar
 
Soil compaction
Soil compaction Soil compaction
Soil compaction kumar9051
 

Similar to Construction considerations of Earthen Dams (20)

Lecture-6 Earthdams.pptx
Lecture-6 Earthdams.pptxLecture-6 Earthdams.pptx
Lecture-6 Earthdams.pptx
 
SUMMER TRAINING REPORTS OF SOIL TESTING
SUMMER TRAINING REPORTS OF SOIL TESTINGSUMMER TRAINING REPORTS OF SOIL TESTING
SUMMER TRAINING REPORTS OF SOIL TESTING
 
Summer training report on soil testing experiments
Summer training report on soil testing experimentsSummer training report on soil testing experiments
Summer training report on soil testing experiments
 
Excavation and filling - Execution, QC & Equipment 101
Excavation and filling - Execution, QC & Equipment 101Excavation and filling - Execution, QC & Equipment 101
Excavation and filling - Execution, QC & Equipment 101
 
unit - IV - Concrete methods.pdf
unit - IV - Concrete methods.pdfunit - IV - Concrete methods.pdf
unit - IV - Concrete methods.pdf
 
DREDGING PROCESS AND ITS EFFECT
DREDGING PROCESS AND ITS EFFECTDREDGING PROCESS AND ITS EFFECT
DREDGING PROCESS AND ITS EFFECT
 
Geotechnical-Engineering (1).pdf
Geotechnical-Engineering (1).pdfGeotechnical-Engineering (1).pdf
Geotechnical-Engineering (1).pdf
 
Casting process and moulding process file for trainning report complet trainn...
Casting process and moulding process file for trainning report complet trainn...Casting process and moulding process file for trainning report complet trainn...
Casting process and moulding process file for trainning report complet trainn...
 
Ce8611 Highway Engineering Laboratory Manual
Ce8611 Highway Engineering Laboratory ManualCe8611 Highway Engineering Laboratory Manual
Ce8611 Highway Engineering Laboratory Manual
 
Presentation - Case Study on Site Investigation Plan at Chek.pptx
Presentation - Case Study on Site Investigation Plan at Chek.pptxPresentation - Case Study on Site Investigation Plan at Chek.pptx
Presentation - Case Study on Site Investigation Plan at Chek.pptx
 
Presentation - Case Study on Site Investigation Plan at Chek.pptx
Presentation - Case Study on Site Investigation Plan at Chek.pptxPresentation - Case Study on Site Investigation Plan at Chek.pptx
Presentation - Case Study on Site Investigation Plan at Chek.pptx
 
Chapter-1.ppt
Chapter-1.pptChapter-1.ppt
Chapter-1.ppt
 
coffer Dam.pptx
coffer Dam.pptxcoffer Dam.pptx
coffer Dam.pptx
 
Under water concrete
Under water concreteUnder water concrete
Under water concrete
 
Foundation
FoundationFoundation
Foundation
 
Basics of peroleum engineering
Basics of peroleum engineeringBasics of peroleum engineering
Basics of peroleum engineering
 
Main projor
Main projor Main projor
Main projor
 
Main projor
Main projor Main projor
Main projor
 
A Repot File On Exploring Civil Engineering: A Comprehensive Internship Expe...
A Repot File  On Exploring Civil Engineering: A Comprehensive Internship Expe...A Repot File  On Exploring Civil Engineering: A Comprehensive Internship Expe...
A Repot File On Exploring Civil Engineering: A Comprehensive Internship Expe...
 
Soil compaction
Soil compaction Soil compaction
Soil compaction
 

Recently uploaded

Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxNadaHaitham1
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 

Recently uploaded (20)

Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 

Construction considerations of Earthen Dams

  • 1. CONSTRUCTION CONSIDERATIONS : Requirements, Different Construction Activities, Compaction Control Presentation by UDAY KUMAR DEVALLA (MT17WRE002) TULSHIDAS JIBHAKATE (MT17WRE003) LAXMI MAROTI KHANDRE (MT17WRE004)
  • 2. REQUIREMENTS The principal requirement in the design of an earth dam is to provide a structure at the minimum cost which remains safe and stable during all phases of construction and operation of the reservoir
  • 3. Technical requirements : 1. The slopes of the embankment must be stable under all conditions of construction and reservoir operation including sudden drawdown of the storage reservoir 2. The embankment must be so designed as not to induce excessive stresses in the foundation 3. The upstream slope must be protected against erosion by wave action; the top crest and the down stream slope must also be protected against erosion due to wind and rain
  • 4. DIFFERENT CONSTRUCTION ACTIVITIES 1. Site preparation 2. Diversion and coffer damming 3. Foundation preparation 4. Grouting 5. Excavation 6. Fill placement and 7. Soil compaction
  • 5. Site preparation a) Cleaning and grubbing Cleaning: Removal of trees, rocky stones , temporary structures etc. Grubbing: Removal of plant roots and organic matter for the location of the borrow pits (confined within the region of embankment )
  • 6. Site preparation b) Stripping : Removal of all top soil , organic matter and other soft pockets c) Scaling : Removal of loose overburden of weathered rock and other weak material from the abutments
  • 7. Diversion & Coffer Damming A coffer dam must be relatively low in cost but as a watertight as practicable Dump starting from the abutments on the both sides and working towards centre of the dam Fig
  • 8. Foundation preparation The cutoff trench is dug as an open excavation which carried out to sound rock level or other impervious stratum. It is normally a sloping side trench which is excavated and back filled with a impervious material, compacted in the same manner as the impervious zone of the embankment.
  • 9. Grouting Grouting is injecting mixture of cement , water and other admixtures like sand, clay and rock dust in the subsoil formation It serves two fold objectives 1. Make the formation impervious and 2. Improve its strength and compressibility Grouting is done by filling cracks, fissures, cavities and even voids between the soil grains with the grouting material
  • 10. Excavation The excavation in barrow pits depends upon the type of available materials and the positioning with respect to soil moisture present in the pits Following methods are generally used 1. Hand excavation 2. Power shovel 3. Drag line 4. Scrapper 5. Elevating grader
  • 11. Fill placement Material handled by Dumped in Hands Small pits Truck or wagons Uniformly spread piles Scrapers Uniformly thin layers of the thickness of its blades Bulldozers or road grader Uniformly in piles and wind rows In-place processing: Involves mixing of two materials such as impervious clay (in small amount ) with less water tight sandy soils ( in large amounts ) as in core construction
  • 12. Soil Compaction Compaction is the process by which the required density of the soil in the embankment can be attained Compaction of the soil materials is carried out by rollers which are of the following types 1. Sheeps foot roller 2. Heavy pneumatic tired roller 3. Vibrating roller 4. Crawler type equipment e.g tractors 5. Ordinary pavement rollers
  • 13. Compaction Control The field engineer has to make periodic checks to see whether the compaction is giving desired results. The procedure of checking involves 1. Measurement of dry unit weight 2. Measurement of moisture content
  • 14. Different methods Fill water content Direct Heat Chemical 1.Laboratory Oven Speedy moisture 2.Laboratory Microwave 3.Gas Stove 4.Moisture Analyzer Fill unit weight Fill unit weight and water content 1.Sand Cone test (SCT) 1.Moisture Density Indicator(MDI) 2.Water Balloon (WB) 2.Nuclear Density Gauge (NDG) 3.Steel Shot (SS) 3.Soil Density Gauge (SDG) 4.Electrical Density Gauge
  • 15. Sand Cone Test The sand cone apparatus is formed by a jar made of plastic or glass with a metal cone attached to its top. The jar is filled with a reference sand
  • 18. Nuclear Density Gauge It is used to obtain the in situ dry unit weight and the water content
  • 19. Principle: The test is based on the following principle: the amount of gamma rays counted by the equipment during a certain period (usually 1 min) is inversely proportional to the density of the material The equipment is composed by three main elements: 1. A nuclear source - responsible for the emission of gamma rays or neutrons 2. A radiation detector 3. A counters with provisions - to detect an automatic and precise timing for the arrival of the modified gamma ray.
  • 20. Nuclear Density Gauge Density: Source emits Gamma rays Water content: Source emits Neutrons
  • 22. References : 1. Elements of water resources engineering by KN Duggal & JP Soni 2. Geotechnical engineering by VNS Murthy 3. Geotechnical engineering by Venkataramaiah 4. https://run.unl.pt/bitstream/10362/16025/1/Blanco_2015.pdf 5. https://labmekanikatanah.wordpress.com/2013/10/29/field- test-rubber-balloon-method/