SlideShare a Scribd company logo
1 of 23
Material Phase LCA -
Phipps Center for Sustainable Landscapes, Pittsburgh
Presented by -
Agnisha & Tharangini
Introduction
โ€ข As the number of low-energy buildings increases, the need to
consider embodied energy from building materials increases,
especially if an overall goal is to reduce the buildingโ€™s life cycle
energy use.
โ€ข The Center for Sustainable Landscapes (CSL) is a three-story,
24,350 square foot educational, research, and administrative
office in Pittsburgh, PA, USA.
โ€ข This is a net-zero energy/water building, which aims to achieve
significant benchmarks in the United Statesโ€”the Living Building
Challenge and LEED Platinum, and SITES certification for
landscapes.
โ€ข Focus on materials was because of other studies, which
suggested that the materials used to construct green buildings
have higher environmental impacts than those of traditional
buildings
About the Building
โ€ข Using an integrated project delivery system, the project owner,
architects, engineers, and contractors designed the CSL to be
a facility that combines passive solar design, geothermal wells,
photovoltaics, solar hot water collectors, a constructed lagoon
and wetland system, permeable paving, and a green roof.
โ€ข The CSL is 3 stories with cast-in-place concrete and steel
framing for the structure and aluminum/glass curtain wall and
wood cladding for the envelope while the roof is a
combination of a green roof, paver patio, and thermoplastic
polyolefin white roof.
The site plan
locates the CSL
building,
landscape, paths
and nearby roads
within the larger-
campus context of
Phipps
Conservatoryand
Botanical
Gardens. - Photo
Credit:The Design
Alliance Architects
NET ZERO ENERGY
The CSL is a net positive
energy building. Through
original research and
careful monitoring
conducted with
Carnegie Mellon
University, the buildingโ€™s
energy performance has
increased from +5082
kWh to +11,185 kWh in
2014 and +18,724 kWh in
2015. - Photo Credit: The
Design Alliance
Architects
NET ZERO WATER
The net-zero water
diagrams illustrate the
components used to
capture and treat all
wateron the project site;
the upper diagram
illustrates stormwater
treatment, while the
lower illustratessanitary
watertreatment. - Photo
Credit:The Design
Alliance Architects
DAY LIGHTING &
NATURAL VENTILATION
The building sections
rendered here illustrate
some of the CSLโ€™s
daylighting and natural
ventilation strategies. -
Photo Credit: The Design
Alliance Architects
4 phases of LCA According to ISO 14040 standards
Phase 1
โ€ขgoal and scope definition, establishes the boundary conditions of the system, defines a
functional unit for the system, and enables equivalent comparisons with other products or
processes.
Phase 3
โ€ขLife Cycle Inventory (LCI), data is aggregated to determine the aggregate inputs and
outputs. In the case of a building materials study, this is often the quantity of materials used as
well as the emissions associated with the production of those materials.
โ€ขTask 2
Phase 2
Phase 4
โ€ขLife Cycle Impact Assessment (LCIA), the LCI is translated using characterization factors, into
impact categories, such as global warming potential and ecotoxicity.
โ€ข interpretation, where data and results are analyzed to determine areas of relatively high
environmental impacts and recommendations are made for improvements to the system.
LCA Boundary Definitions
โ€ข This LCA focuses on the environmental impacts of CSLโ€™s
building materials. The boundaries for this study include
material extraction and product processing and
manufacturing (defined herein as โ€œmaterials phaseโ€) of the
CSL.
โ€ข The building material phase is becoming increasingly important
as the impacts associated with the use phase of low-energy
buildings decreases. The functional unit of this study is defined
as the entire CSL building.
โ€ข The major components of the analysis range from structural
elements to interior flooring as well as ductwork for the
Heating, Ventilation and Air Conditioning (HVAC) system and
piping for plumbing. This LCA also includes the production
phase of the photovoltaic (PV) panels as well as the
geothermal heat wells.
SYSTEM BOUNDARY โ€“ MATERIAL PHASE
LCI Data Sources
โ€ข Material inventory data was obtained through CSLโ€™s project
documents, including estimates, plans, and specifications
provided by the architects and the pre-construction
management company.
โ€ข Materials were allocated to a representative LCI unit process
within an environmental impacts database, with preference
first given to the US based material process database Franklin
USA 98 [34].
โ€ข When Franklin USA 98 was insufficient to represent the material,
ecoinvent was used [35].
โ€ข If a unit process was not available in either Franklin USA 98 or
ecoinvent, another database was selected based on the best
possible information of the unit process description, boundary
considerations, and installed productuse.
LCI Database for Building
Material
CH = Switzerland
geographical code;
RER = Europe
geographical code;
U = unit process;
FAL = Franklin Associates
code;
ecoinvent Unit Process;
ETH-ESU 96 U;
Franklin USA 98;
Industry Data 2.0;
IDEMAT 2001 [37];
Table Cont...
LCI Database for Building
Material
CH = Switzerland
geographical code;
RER = Europe
geographical code;
U = unit process;
FAL = Franklin Associates
code;
ecoinvent Unit Process;
ETH-ESU 96 U;
Franklin USA 98;
Industry Data 2.0;
IDEMAT 2001 [37];
Impact Assessment Methods
โ€ข The LCIA phase was conducted using two impact assessment methods.
โ€ข First, embodied energy of the materials was calculated using a
Cumulative Energy Demand (CED) method developed by ecoinvent
โ€ข The remaining environmental impacts were calculated using TRACI ( Tool
for the Reduction and Assessment of Chemical and Other Environmental
Impacts), was developed by the Environmental Protection Agency (EPA)
as a US-based impact assessment method.
โ€ข The impact assessment categories reported from TRACI include -
1. global warming,
2. acidification,
3. human health cancer,
4. human health noncancer,
5. human health criteria air pollutants,
6. eutrophication,.
7. ecotoxicity,
8. smog,
9. natural resource depletion,
10. waterintake, and
11. ozone depletion
Life Cycle Environmental Impacts of Building Materials
โ€ขIn general, eitherthe
foundations and excavation or
structure categoriesof the CSL
represented the highest
environmental impact in nearly
every impact category
analyzed.
โ€ข Concrete contributes an
average of 73% of the
environmental impacts for the
excavation and foundations of
the building, and steel
contributes an average of 59%
of the environmental impacts
for the structural system of the
CSL.
โ€ขThe electrical system (PV
panels, inverters)& plumbing
system, also represents high
environmental impacts.
Life cycle impact of building materials by building system for
net-zero energy building (HH = human health).
โ€ขOther significant materials
include gravel, crystalline
silicone associated withthe
PV panels, and electronic
components associated
with the inverters.
โ€ขDue to the intense process
of mining gravel, including
machinery, electricity, and
hazardous waste disposal,
in conjunction with the
release of particulate
matter, gravel has high
human health impacts in
both cancer and non-
cancer categories
Life cycle environmental impacts of building materials by material type for
net-zero energy building (PV = photovoltaic).
Life Cycle Environmental Impacts of Building Materials
โ€ข For PV panels, the high waterintake category is a result of heat
recovery units withinthe PV system and preventionof dust
accumulation, which inhibits solar efficiency.
โ€ข Inverters required to utilize the PV panels contain many electronic
components, which are associated witha high level of toxicity risk.
Componentssuch as the integrated circuit, wiring board, and
inductor contribute to global warming potential, whilethe copper
wiringcontributes to categories such as acidification, eutrophication,
and human health impacts.
โ€ข Standard structures do not generally include PV panels in the
material phase as they utilize the grid or natural gas as primary
energy sources for the use phase. However,PV panels as a
renewable, non-fossil based fuel source reduce the impacts during
the use phase of the buildingโ€™s life cycle and reduce the total
environmental impacts of the CSL when allocated overthe buildingโ€™s
lifespan.
Life Cycle Environmental Impacts
Building and Material
properties for case study
comparison
โ€ขThe differences between
environmental impacts of this
net-zero energy building and
a standard structure largely
result from unique design
components such as passive
solar, natural ventilation, and
a
green roof.
โ€ขThe LCA of the CSL identified
concrete and steel as
materials with the largest
relative impacts.
โ€ขAn overview of the
traditional
structures compared to the
CSL is summarized in this
Table.
GLOBAL WARMING
POTENTIAL
โ€ขThe CSL was compared
with and withoutthe
inclusion of the PV panels,
inverters, and the
geothermal wells, due to
the fact that they are not a
common material.
โ€ขThe results show that PV
panels and inverters
account for approximately
16% of the total GWP, while
the geothermal wells
account for 5% of the total
GWP for the CSL.
โ€ขFor all structures, concrete
and steel accounted for a
large range of results, 11%
to 65% and 17% to 38% of
the buildingsโ€™ total GWP.
Global warming potential of the CSL compared to the published results.
PV = Photovoltaic & Inverters; GW = Geothermal Wells; Note: The
Kofoworola โ€™07 study did not report glass separately from other materials; it
is therefore represented in theโ€œotherโ€ category.
Embodied energy comparison between the Net-Zero Energy CSL building
and published LCA building studies;
PV = Photovoltaic & Inverters; GW = Geothermal Wells;
Note: Junnila โ€™03 and Kofoworola โ€™07 did not report on embodied energy.
EMBODIED ENERGY
COMPARISON
โ€ขThe PV panels and
inverters represent 49% of
the total embodied energy
and the geothermalwells
account for approximately
4% of the total embodied
energy of the CSL. High
levels of energy are
required for the production
of the PV panels and
inverters, contributing to
the high levels of
embodied energy.
โ€ขFor all structures, concrete
contributed 7% to 28% and
steel, 12% to 42% of the
total embodied energy,
respectively.
โ€ข Concrete and steel, the majority represented by the excavation and
foundations and structural building systems, represent the highest
environmental impacts in most categories.
โ€ข Gravelmakes up a noticeable impact in the human health
cancerous and non-cancerous categoriesof the CSL, whilethe
production of PV panels and inverters makes up over50% of water
intake and eutrophication impacts.
โ€ข It is important to identify those materialswithinthe building system
that have the greatest effect on a buildingโ€™s environmental impacts
in order to target specific areas for minimizing environmental impacts
in future construction.
โ€ข Comparing LCA results of the building to standard commercial
structures reveals that the addition of the CSLโ€™s energy reduction
systems, such as PV and geothermal wells, results in a 10% higher
global warming potential and nearly equal embodied energyper
square foot relative to standard commercial buildings.
Conclusion
โ€ข Compared to using 100% Portland cement, the use of 40% flyash for
cement replacementreduced concreteโ€™s overallGWP contribution
by 39%.
โ€ข Incorporation of engineered cementitious composites instead of
conventional steel expansion joints can reduce life cycle energy
consumption by 40%, waste generation by 50%, and raw material
consumption by 38%.
โ€ข For steel, stainless steel production incorporates the use of 33% of
recycled steel, which accounts for 3.6 kg of carbon dioxideemissions
per 1 kg of stainless steel produced. Theoretically,the use of 100%
recycled content in the production of stainless steel would result in
1.6 kg of carbon dioxidereleased for every 1 kg produced, or a 44%
overall carbon dioxide reduction.
โ€ข Applied to the CSL, the 100% recycling process would reduce carbon
dioxideby 85,000 kg and the total global warmingpotential for the
CSL building by 8%.
Need for Improvements
Thank you

More Related Content

What's hot

Fumihiko maki.pps
Fumihiko maki.ppsFumihiko maki.pps
Fumihiko maki.pps
aziz khan
ย 
420017443 cidco-exhibition-centre-vashi-navi-mumbai
420017443 cidco-exhibition-centre-vashi-navi-mumbai420017443 cidco-exhibition-centre-vashi-navi-mumbai
420017443 cidco-exhibition-centre-vashi-navi-mumbai
aasthashrivastava8
ย 

What's hot (20)

1. Green Building Concept.pptx
1. Green Building Concept.pptx1. Green Building Concept.pptx
1. Green Building Concept.pptx
ย 
Presentation on IGBC Green service Buildings Rating System
Presentation on IGBC Green service Buildings Rating SystemPresentation on IGBC Green service Buildings Rating System
Presentation on IGBC Green service Buildings Rating System
ย 
Holy city kolhapur
Holy city kolhapurHoly city kolhapur
Holy city kolhapur
ย 
California academy of Science: Case study
California academy of Science: Case studyCalifornia academy of Science: Case study
California academy of Science: Case study
ย 
achyut kanvinde - iitk
achyut kanvinde - iitkachyut kanvinde - iitk
achyut kanvinde - iitk
ย 
Griha
GrihaGriha
Griha
ย 
Indian Green Building Council (IGBC) Green New Buildings โ€“ 2014
Indian Green Building Council (IGBC) Green New Buildings โ€“ 2014Indian Green Building Council (IGBC) Green New Buildings โ€“ 2014
Indian Green Building Council (IGBC) Green New Buildings โ€“ 2014
ย 
Green Buildings
Green BuildingsGreen Buildings
Green Buildings
ย 
Introduction to IGBC Green Factory Rating System_January 2015
Introduction to IGBC Green Factory Rating System_January 2015Introduction to IGBC Green Factory Rating System_January 2015
Introduction to IGBC Green Factory Rating System_January 2015
ย 
Indira Paryawaran Bhawan
  Indira Paryawaran Bhawan  Indira Paryawaran Bhawan
Indira Paryawaran Bhawan
ย 
Building Green in China
Building Green in ChinaBuilding Green in China
Building Green in China
ย 
GRIHA
GRIHAGRIHA
GRIHA
ย 
Green building delhi case study
Green building delhi case studyGreen building delhi case study
Green building delhi case study
ย 
BREEAM Presentation
BREEAM PresentationBREEAM Presentation
BREEAM Presentation
ย 
Vancouver convention centre
Vancouver convention centre Vancouver convention centre
Vancouver convention centre
ย 
B.Arch Thesis: an animation hub @ khandala
B.Arch Thesis: an animation hub @ khandalaB.Arch Thesis: an animation hub @ khandala
B.Arch Thesis: an animation hub @ khandala
ย 
vernacular architecture lucknow (chowk)
vernacular architecture lucknow (chowk)vernacular architecture lucknow (chowk)
vernacular architecture lucknow (chowk)
ย 
Fumihiko maki.pps
Fumihiko maki.ppsFumihiko maki.pps
Fumihiko maki.pps
ย 
Campus landscaping nid
Campus landscaping nidCampus landscaping nid
Campus landscaping nid
ย 
420017443 cidco-exhibition-centre-vashi-navi-mumbai
420017443 cidco-exhibition-centre-vashi-navi-mumbai420017443 cidco-exhibition-centre-vashi-navi-mumbai
420017443 cidco-exhibition-centre-vashi-navi-mumbai
ย 

Similar to LCA

green building fdggnm,cvbndtfghjknlmfjbhnkm
green building fdggnm,cvbndtfghjknlmfjbhnkmgreen building fdggnm,cvbndtfghjknlmfjbhnkm
green building fdggnm,cvbndtfghjknlmfjbhnkm
MezmureDawit6
ย 
Green Buildings ! How much it would cost ?-ู….56-ู…ุจุงุฏุฑุฉ#ุชูˆุงุตู„_ุชุทูˆูŠุฑ-ุฃ.ุฏ.ุทุงุฑู‚...
Green Buildings !   How much it would cost ?-ู….56-ู…ุจุงุฏุฑุฉ#ุชูˆุงุตู„_ุชุทูˆูŠุฑ-ุฃ.ุฏ.ุทุงุฑู‚...Green Buildings !   How much it would cost ?-ู….56-ู…ุจุงุฏุฑุฉ#ุชูˆุงุตู„_ุชุทูˆูŠุฑ-ุฃ.ุฏ.ุทุงุฑู‚...
Green Buildings ! How much it would cost ?-ู….56-ู…ุจุงุฏุฑุฉ#ุชูˆุงุตู„_ุชุทูˆูŠุฑ-ุฃ.ุฏ.ุทุงุฑู‚...
Egyptian Engineers Association
ย 
ConcreteBlockLCAReport
ConcreteBlockLCAReportConcreteBlockLCAReport
ConcreteBlockLCAReport
Joseph Tursi
ย 
Green Roofs _Environmnetal Assessment
Green Roofs _Environmnetal AssessmentGreen Roofs _Environmnetal Assessment
Green Roofs _Environmnetal Assessment
Komal Dixit
ย 
22212 exe summ
22212 exe summ22212 exe summ
22212 exe summ
Animesh Gupta
ย 

Similar to LCA (20)

Life cycle assessment
Life cycle assessmentLife cycle assessment
Life cycle assessment
ย 
Climate change paper genge and kerr
Climate change paper genge and kerrClimate change paper genge and kerr
Climate change paper genge and kerr
ย 
5th International Conference : Garvin Heath
5th International Conference : Garvin Heath5th International Conference : Garvin Heath
5th International Conference : Garvin Heath
ย 
Lifecycle Assessment of Solar PV Systems: From Manufacturing to Recycling
Lifecycle Assessment of Solar PV Systems: From Manufacturing to RecyclingLifecycle Assessment of Solar PV Systems: From Manufacturing to Recycling
Lifecycle Assessment of Solar PV Systems: From Manufacturing to Recycling
ย 
Life Cycle Assessment
Life Cycle AssessmentLife Cycle Assessment
Life Cycle Assessment
ย 
green building fdggnm,cvbndtfghjknlmfjbhnkm
green building fdggnm,cvbndtfghjknlmfjbhnkmgreen building fdggnm,cvbndtfghjknlmfjbhnkm
green building fdggnm,cvbndtfghjknlmfjbhnkm
ย 
Photovoltaic Devices: Life Cycle Considerations
Photovoltaic Devices: Life Cycle ConsiderationsPhotovoltaic Devices: Life Cycle Considerations
Photovoltaic Devices: Life Cycle Considerations
ย 
Control CO2 emission from residential building
Control CO2 emission from residential building Control CO2 emission from residential building
Control CO2 emission from residential building
ย 
Materials Matter - Construction Materials and their Environmental Costs
Materials Matter - Construction Materials and their Environmental CostsMaterials Matter - Construction Materials and their Environmental Costs
Materials Matter - Construction Materials and their Environmental Costs
ย 
Green Buildings ! How much it would cost ?-ู….56-ู…ุจุงุฏุฑุฉ#ุชูˆุงุตู„_ุชุทูˆูŠุฑ-ุฃ.ุฏ.ุทุงุฑู‚...
Green Buildings !   How much it would cost ?-ู….56-ู…ุจุงุฏุฑุฉ#ุชูˆุงุตู„_ุชุทูˆูŠุฑ-ุฃ.ุฏ.ุทุงุฑู‚...Green Buildings !   How much it would cost ?-ู….56-ู…ุจุงุฏุฑุฉ#ุชูˆุงุตู„_ุชุทูˆูŠุฑ-ุฃ.ุฏ.ุทุงุฑู‚...
Green Buildings ! How much it would cost ?-ู….56-ู…ุจุงุฏุฑุฉ#ุชูˆุงุตู„_ุชุทูˆูŠุฑ-ุฃ.ุฏ.ุทุงุฑู‚...
ย 
perfect project report (1)
perfect project report (1)perfect project report (1)
perfect project report (1)
ย 
ConcreteBlockLCAReport
ConcreteBlockLCAReportConcreteBlockLCAReport
ConcreteBlockLCAReport
ย 
Green building presentation.pptx
Green building presentation.pptxGreen building presentation.pptx
Green building presentation.pptx
ย 
Green building.pptx
Green building.pptxGreen building.pptx
Green building.pptx
ย 
Green Roofs _Environmnetal Assessment
Green Roofs _Environmnetal AssessmentGreen Roofs _Environmnetal Assessment
Green Roofs _Environmnetal Assessment
ย 
Designing buildings to meet climate change challenges
Designing buildings to meet climate change challengesDesigning buildings to meet climate change challenges
Designing buildings to meet climate change challenges
ย 
22212 exe summ
22212 exe summ22212 exe summ
22212 exe summ
ย 
Reliability Study of Punching Shear Design of Column-Slab Connection accordin...
Reliability Study of Punching Shear Design of Column-Slab Connection accordin...Reliability Study of Punching Shear Design of Column-Slab Connection accordin...
Reliability Study of Punching Shear Design of Column-Slab Connection accordin...
ย 
A STUDY OF LIFE CYCLE ENERGY ASSEMENT OF A MULTI-STORIED RESIDENTIAL BUILDING...
A STUDY OF LIFE CYCLE ENERGY ASSEMENT OF A MULTI-STORIED RESIDENTIAL BUILDING...A STUDY OF LIFE CYCLE ENERGY ASSEMENT OF A MULTI-STORIED RESIDENTIAL BUILDING...
A STUDY OF LIFE CYCLE ENERGY ASSEMENT OF A MULTI-STORIED RESIDENTIAL BUILDING...
ย 
AIA 2013: Facts on the Ground: Testing the Performance of Ft. Carson's Green ...
AIA 2013: Facts on the Ground: Testing the Performance of Ft. Carson's Green ...AIA 2013: Facts on the Ground: Testing the Performance of Ft. Carson's Green ...
AIA 2013: Facts on the Ground: Testing the Performance of Ft. Carson's Green ...
ย 

Recently uploaded

Call Girls in Kapadvanj - 8250092165 Our call girls are sure to provide you w...
Call Girls in Kapadvanj - 8250092165 Our call girls are sure to provide you w...Call Girls in Kapadvanj - 8250092165 Our call girls are sure to provide you w...
Call Girls in Kapadvanj - 8250092165 Our call girls are sure to provide you w...
Sareena Khatun
ย 
Call Girls in Tiruppur 9332606886 ust Genuine Escort Model Sevice
Call Girls in Tiruppur  9332606886  ust Genuine Escort Model SeviceCall Girls in Tiruppur  9332606886  ust Genuine Escort Model Sevice
Call Girls in Tiruppur 9332606886 ust Genuine Escort Model Sevice
kumargunjan9515
ย 
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star HotelTop Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
kumargunjan9515
ย 
Unlimited Short Call Girls in Koppal { 9332606886 } VVIP NISHA Call Girls Nea...
Unlimited Short Call Girls in Koppal { 9332606886 } VVIP NISHA Call Girls Nea...Unlimited Short Call Girls in Koppal { 9332606886 } VVIP NISHA Call Girls Nea...
Unlimited Short Call Girls in Koppal { 9332606886 } VVIP NISHA Call Girls Nea...
kumargunjan9515
ย 
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
Sareena Khatun
ย 
Book Call Girls in Kathua { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Book Call Girls in Kathua { 9332606886 } VVIP NISHA Call Girls Near 5 Star HotelBook Call Girls in Kathua { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Book Call Girls in Kathua { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
kumargunjan9515
ย 
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi EscortsHigh Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
Monica Sydney
ย 
Corporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptxCorporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptx
arnab132
ย 

Recently uploaded (20)

Jumping Scales and Producing peripheries.pptx
Jumping Scales and Producing peripheries.pptxJumping Scales and Producing peripheries.pptx
Jumping Scales and Producing peripheries.pptx
ย 
Call Girls Ponda ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Ponda ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Ponda ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Ponda ( 8250092165 ) Cheap rates call girls | Get low budget
ย 
Russian Escort Dubai 0503464457 Dubai Escorts
Russian Escort Dubai 0503464457 Dubai EscortsRussian Escort Dubai 0503464457 Dubai Escorts
Russian Escort Dubai 0503464457 Dubai Escorts
ย 
Call Girls in Kapadvanj - 8250092165 Our call girls are sure to provide you w...
Call Girls in Kapadvanj - 8250092165 Our call girls are sure to provide you w...Call Girls in Kapadvanj - 8250092165 Our call girls are sure to provide you w...
Call Girls in Kapadvanj - 8250092165 Our call girls are sure to provide you w...
ย 
Faridabad Call Girl โ‚น7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
Faridabad Call Girl โ‚น7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...Faridabad Call Girl โ‚น7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
Faridabad Call Girl โ‚น7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
ย 
Call Girls in Tiruppur 9332606886 ust Genuine Escort Model Sevice
Call Girls in Tiruppur  9332606886  ust Genuine Escort Model SeviceCall Girls in Tiruppur  9332606886  ust Genuine Escort Model Sevice
Call Girls in Tiruppur 9332606886 ust Genuine Escort Model Sevice
ย 
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
ย 
Call girl in Ajman 0503464457 Ajman Call girl services
Call girl in Ajman 0503464457 Ajman Call girl servicesCall girl in Ajman 0503464457 Ajman Call girl services
Call girl in Ajman 0503464457 Ajman Call girl services
ย 
Russian Call girls in Dubai 0508644382 Dubai Call girls
Russian Call girls in Dubai 0508644382 Dubai Call girlsRussian Call girls in Dubai 0508644382 Dubai Call girls
Russian Call girls in Dubai 0508644382 Dubai Call girls
ย 
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
ย 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
ย 
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star HotelTop Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
ย 
Unlimited Short Call Girls in Koppal { 9332606886 } VVIP NISHA Call Girls Nea...
Unlimited Short Call Girls in Koppal { 9332606886 } VVIP NISHA Call Girls Nea...Unlimited Short Call Girls in Koppal { 9332606886 } VVIP NISHA Call Girls Nea...
Unlimited Short Call Girls in Koppal { 9332606886 } VVIP NISHA Call Girls Nea...
ย 
Climate Change
Climate ChangeClimate Change
Climate Change
ย 
Mira Road Comfortable Call Girls ,09167354423,Mira Road Model Call Girls .
Mira Road  Comfortable Call Girls ,09167354423,Mira Road Model Call Girls .Mira Road  Comfortable Call Girls ,09167354423,Mira Road Model Call Girls .
Mira Road Comfortable Call Girls ,09167354423,Mira Road Model Call Girls .
ย 
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
ย 
Book Call Girls in Kathua { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Book Call Girls in Kathua { 9332606886 } VVIP NISHA Call Girls Near 5 Star HotelBook Call Girls in Kathua { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Book Call Girls in Kathua { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
ย 
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi EscortsHigh Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
ย 
Call Girls in Shadnagar / 8250092165 Genuine Call girls with real Photos and ...
Call Girls in Shadnagar / 8250092165 Genuine Call girls with real Photos and ...Call Girls in Shadnagar / 8250092165 Genuine Call girls with real Photos and ...
Call Girls in Shadnagar / 8250092165 Genuine Call girls with real Photos and ...
ย 
Corporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptxCorporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptx
ย 

LCA

  • 1. Material Phase LCA - Phipps Center for Sustainable Landscapes, Pittsburgh Presented by - Agnisha & Tharangini
  • 2. Introduction โ€ข As the number of low-energy buildings increases, the need to consider embodied energy from building materials increases, especially if an overall goal is to reduce the buildingโ€™s life cycle energy use. โ€ข The Center for Sustainable Landscapes (CSL) is a three-story, 24,350 square foot educational, research, and administrative office in Pittsburgh, PA, USA. โ€ข This is a net-zero energy/water building, which aims to achieve significant benchmarks in the United Statesโ€”the Living Building Challenge and LEED Platinum, and SITES certification for landscapes. โ€ข Focus on materials was because of other studies, which suggested that the materials used to construct green buildings have higher environmental impacts than those of traditional buildings
  • 3. About the Building โ€ข Using an integrated project delivery system, the project owner, architects, engineers, and contractors designed the CSL to be a facility that combines passive solar design, geothermal wells, photovoltaics, solar hot water collectors, a constructed lagoon and wetland system, permeable paving, and a green roof. โ€ข The CSL is 3 stories with cast-in-place concrete and steel framing for the structure and aluminum/glass curtain wall and wood cladding for the envelope while the roof is a combination of a green roof, paver patio, and thermoplastic polyolefin white roof.
  • 4. The site plan locates the CSL building, landscape, paths and nearby roads within the larger- campus context of Phipps Conservatoryand Botanical Gardens. - Photo Credit:The Design Alliance Architects
  • 5. NET ZERO ENERGY The CSL is a net positive energy building. Through original research and careful monitoring conducted with Carnegie Mellon University, the buildingโ€™s energy performance has increased from +5082 kWh to +11,185 kWh in 2014 and +18,724 kWh in 2015. - Photo Credit: The Design Alliance Architects
  • 6. NET ZERO WATER The net-zero water diagrams illustrate the components used to capture and treat all wateron the project site; the upper diagram illustrates stormwater treatment, while the lower illustratessanitary watertreatment. - Photo Credit:The Design Alliance Architects
  • 7. DAY LIGHTING & NATURAL VENTILATION The building sections rendered here illustrate some of the CSLโ€™s daylighting and natural ventilation strategies. - Photo Credit: The Design Alliance Architects
  • 8. 4 phases of LCA According to ISO 14040 standards Phase 1 โ€ขgoal and scope definition, establishes the boundary conditions of the system, defines a functional unit for the system, and enables equivalent comparisons with other products or processes. Phase 3 โ€ขLife Cycle Inventory (LCI), data is aggregated to determine the aggregate inputs and outputs. In the case of a building materials study, this is often the quantity of materials used as well as the emissions associated with the production of those materials. โ€ขTask 2 Phase 2 Phase 4 โ€ขLife Cycle Impact Assessment (LCIA), the LCI is translated using characterization factors, into impact categories, such as global warming potential and ecotoxicity. โ€ข interpretation, where data and results are analyzed to determine areas of relatively high environmental impacts and recommendations are made for improvements to the system.
  • 9. LCA Boundary Definitions โ€ข This LCA focuses on the environmental impacts of CSLโ€™s building materials. The boundaries for this study include material extraction and product processing and manufacturing (defined herein as โ€œmaterials phaseโ€) of the CSL. โ€ข The building material phase is becoming increasingly important as the impacts associated with the use phase of low-energy buildings decreases. The functional unit of this study is defined as the entire CSL building. โ€ข The major components of the analysis range from structural elements to interior flooring as well as ductwork for the Heating, Ventilation and Air Conditioning (HVAC) system and piping for plumbing. This LCA also includes the production phase of the photovoltaic (PV) panels as well as the geothermal heat wells.
  • 10. SYSTEM BOUNDARY โ€“ MATERIAL PHASE
  • 11. LCI Data Sources โ€ข Material inventory data was obtained through CSLโ€™s project documents, including estimates, plans, and specifications provided by the architects and the pre-construction management company. โ€ข Materials were allocated to a representative LCI unit process within an environmental impacts database, with preference first given to the US based material process database Franklin USA 98 [34]. โ€ข When Franklin USA 98 was insufficient to represent the material, ecoinvent was used [35]. โ€ข If a unit process was not available in either Franklin USA 98 or ecoinvent, another database was selected based on the best possible information of the unit process description, boundary considerations, and installed productuse.
  • 12. LCI Database for Building Material CH = Switzerland geographical code; RER = Europe geographical code; U = unit process; FAL = Franklin Associates code; ecoinvent Unit Process; ETH-ESU 96 U; Franklin USA 98; Industry Data 2.0; IDEMAT 2001 [37];
  • 13. Table Cont... LCI Database for Building Material CH = Switzerland geographical code; RER = Europe geographical code; U = unit process; FAL = Franklin Associates code; ecoinvent Unit Process; ETH-ESU 96 U; Franklin USA 98; Industry Data 2.0; IDEMAT 2001 [37];
  • 14. Impact Assessment Methods โ€ข The LCIA phase was conducted using two impact assessment methods. โ€ข First, embodied energy of the materials was calculated using a Cumulative Energy Demand (CED) method developed by ecoinvent โ€ข The remaining environmental impacts were calculated using TRACI ( Tool for the Reduction and Assessment of Chemical and Other Environmental Impacts), was developed by the Environmental Protection Agency (EPA) as a US-based impact assessment method. โ€ข The impact assessment categories reported from TRACI include - 1. global warming, 2. acidification, 3. human health cancer, 4. human health noncancer, 5. human health criteria air pollutants, 6. eutrophication,. 7. ecotoxicity, 8. smog, 9. natural resource depletion, 10. waterintake, and 11. ozone depletion
  • 15. Life Cycle Environmental Impacts of Building Materials โ€ขIn general, eitherthe foundations and excavation or structure categoriesof the CSL represented the highest environmental impact in nearly every impact category analyzed. โ€ข Concrete contributes an average of 73% of the environmental impacts for the excavation and foundations of the building, and steel contributes an average of 59% of the environmental impacts for the structural system of the CSL. โ€ขThe electrical system (PV panels, inverters)& plumbing system, also represents high environmental impacts. Life cycle impact of building materials by building system for net-zero energy building (HH = human health).
  • 16. โ€ขOther significant materials include gravel, crystalline silicone associated withthe PV panels, and electronic components associated with the inverters. โ€ขDue to the intense process of mining gravel, including machinery, electricity, and hazardous waste disposal, in conjunction with the release of particulate matter, gravel has high human health impacts in both cancer and non- cancer categories Life cycle environmental impacts of building materials by material type for net-zero energy building (PV = photovoltaic). Life Cycle Environmental Impacts of Building Materials
  • 17. โ€ข For PV panels, the high waterintake category is a result of heat recovery units withinthe PV system and preventionof dust accumulation, which inhibits solar efficiency. โ€ข Inverters required to utilize the PV panels contain many electronic components, which are associated witha high level of toxicity risk. Componentssuch as the integrated circuit, wiring board, and inductor contribute to global warming potential, whilethe copper wiringcontributes to categories such as acidification, eutrophication, and human health impacts. โ€ข Standard structures do not generally include PV panels in the material phase as they utilize the grid or natural gas as primary energy sources for the use phase. However,PV panels as a renewable, non-fossil based fuel source reduce the impacts during the use phase of the buildingโ€™s life cycle and reduce the total environmental impacts of the CSL when allocated overthe buildingโ€™s lifespan. Life Cycle Environmental Impacts
  • 18. Building and Material properties for case study comparison โ€ขThe differences between environmental impacts of this net-zero energy building and a standard structure largely result from unique design components such as passive solar, natural ventilation, and a green roof. โ€ขThe LCA of the CSL identified concrete and steel as materials with the largest relative impacts. โ€ขAn overview of the traditional structures compared to the CSL is summarized in this Table.
  • 19. GLOBAL WARMING POTENTIAL โ€ขThe CSL was compared with and withoutthe inclusion of the PV panels, inverters, and the geothermal wells, due to the fact that they are not a common material. โ€ขThe results show that PV panels and inverters account for approximately 16% of the total GWP, while the geothermal wells account for 5% of the total GWP for the CSL. โ€ขFor all structures, concrete and steel accounted for a large range of results, 11% to 65% and 17% to 38% of the buildingsโ€™ total GWP. Global warming potential of the CSL compared to the published results. PV = Photovoltaic & Inverters; GW = Geothermal Wells; Note: The Kofoworola โ€™07 study did not report glass separately from other materials; it is therefore represented in theโ€œotherโ€ category.
  • 20. Embodied energy comparison between the Net-Zero Energy CSL building and published LCA building studies; PV = Photovoltaic & Inverters; GW = Geothermal Wells; Note: Junnila โ€™03 and Kofoworola โ€™07 did not report on embodied energy. EMBODIED ENERGY COMPARISON โ€ขThe PV panels and inverters represent 49% of the total embodied energy and the geothermalwells account for approximately 4% of the total embodied energy of the CSL. High levels of energy are required for the production of the PV panels and inverters, contributing to the high levels of embodied energy. โ€ขFor all structures, concrete contributed 7% to 28% and steel, 12% to 42% of the total embodied energy, respectively.
  • 21. โ€ข Concrete and steel, the majority represented by the excavation and foundations and structural building systems, represent the highest environmental impacts in most categories. โ€ข Gravelmakes up a noticeable impact in the human health cancerous and non-cancerous categoriesof the CSL, whilethe production of PV panels and inverters makes up over50% of water intake and eutrophication impacts. โ€ข It is important to identify those materialswithinthe building system that have the greatest effect on a buildingโ€™s environmental impacts in order to target specific areas for minimizing environmental impacts in future construction. โ€ข Comparing LCA results of the building to standard commercial structures reveals that the addition of the CSLโ€™s energy reduction systems, such as PV and geothermal wells, results in a 10% higher global warming potential and nearly equal embodied energyper square foot relative to standard commercial buildings. Conclusion
  • 22. โ€ข Compared to using 100% Portland cement, the use of 40% flyash for cement replacementreduced concreteโ€™s overallGWP contribution by 39%. โ€ข Incorporation of engineered cementitious composites instead of conventional steel expansion joints can reduce life cycle energy consumption by 40%, waste generation by 50%, and raw material consumption by 38%. โ€ข For steel, stainless steel production incorporates the use of 33% of recycled steel, which accounts for 3.6 kg of carbon dioxideemissions per 1 kg of stainless steel produced. Theoretically,the use of 100% recycled content in the production of stainless steel would result in 1.6 kg of carbon dioxidereleased for every 1 kg produced, or a 44% overall carbon dioxide reduction. โ€ข Applied to the CSL, the 100% recycling process would reduce carbon dioxideby 85,000 kg and the total global warmingpotential for the CSL building by 8%. Need for Improvements