SlideShare a Scribd company logo
BasheerAhmed Nahiyoon
Senior Infrastructure/Road/Wet Utilities Engineer
B.E Civil
ACADEMIC QUALIFICATION:
• Bachelor in Civil Engineering from Mehran University of Engineering & Technology Jamshoro 1994 Sindh Pakistan
(0542412672&0566289892) Transferable Iqama(Require position only for Riyadh Region)
COVER LETTER
Dear Sir,
As a versatile and highexperience of Construction management withinextensive background in the Construction Industry. I am
ready to work as infrastructure, Senior Engineer and Construction Engineer.
Some achievements include.
ACADEMIC QUALIFICATION:
 Bachelor in Civil Engineering from MehranUniversity of Engineering & Technology Jamshoro1994 Sindh Pakistan
 PROFESSIONAL ASSOCIATION:
 Register Life Member of PakistanEngineering Council& Saudi Engineering Council.
 Positionin Iqama Civil Engineer
Infrastructure, Roads andBuilding Structure
 Infrastructure Wet Utilities
 Main Road High Ways
 Asphalt with Carpeting
 Embankment work
 Culverts, Pipe Culverts, Retaining Wall, Underpass, Over headBridges.
 Stone Masonry bridges with RCC Slab
 RCC Channel for Cable and Raw Water 8 km Length
Sewerage and Effluent Treatment Plant withBiological Treatment Ponds and RCC Structure
 Water, Sewer and Storm water Net work with wall meter fixing.
 Earth Work with Soil, Sand Stone lining with Stone pitching.
 Brick Lining
 RCC Structure 50 Intersectionmanholes Pump room and HighPressure pumps with Submersible.
Building Construction
 Building Construction Dormitories Ground + Six Stories.
 RCC Structure Single Story 200 Villas LoadBearing Structure
 RCC Structure Awami Markaz Larkana Sindh Pakistan.
My resume provides further details on myprofessional skills and educational background. Please contact me at your earliest
convenience for more details.
Thank you for your time andConsideration. I look forward to hearing from you.
Basheer Ahmed Nahiyoon
Summary of Skills and Experience
20+ years project management, project planning, project control, and contract administrationexperience inConstruction
industry, Manufacturing industry relatedto ,Roads RCC Structure , Infrastructure, Buildings, Water, Sewerage and Effluent
Treatment Plant Desalination plant withNet Work projects.
 Strong skills in managing issues, changes and problems.
 Dedicated team-player with excellent time-management and project management skills.
 Meet stringent deadlines through efficient prioritization of workload and delivery schedules.
 Well versant with applications associated with project management, sales, marketing, contract administration,
planning, spreadsheets and word processing.
 Demonstrated report-writing skills as evident from proposal writing for various projects.
 Written and oral communication skills in English effective team player.
 Oral communication skills in Arabic.
 EMPLOYMENT CAREER OVERVIEW:
 Experience Saudi Arabia 2002 to Update
Senior Infrastructure Engineer Saudi Arabian Parsons Ltd
July 2014 to Update
Largest Consultant Company from Last 70 years
Project in Hand:
Project includes the Infrastructure facilities, Road works and Wet utilities for MoH Residential Projects which cost 669 Million
SR.As Senior Infrastructure Engineer Responsibilities
Supervision Sub Ordinates to enforce work as Specification.
 Review Shop Drawing and check IFC Drawing Wet Utilities withManholes.
 Review ITP, Method Statement and ITR.
 Wet Utilities networkand comments for necessarychanges as existing system withEND Users.
 Check Excavation, Backfilling; Pipe laying, Warning precaution up to testing andcommissioning.
 Distribute WIR to Concern person for Inspection.
 Check Qualityof Approved material andchecking same as approved.
 Attend all Mock-ups before anynew activity.
 Inspect workmanship and advice to Contractor how to improve progress.
 Reviews Material Submittal/SPQ and RFI.
 Supervision daily site work and ensure activityas Spects.
 Review Daily Progress Report and Check achieve Plan from Contractor.
 Inspection all pipe Site work testing, Review Factorytest Certificate andThird Party Certificate.
 Check Qualityand Guarantee Certificates as periodmention inSpects.
 Update weekly LOG of Material/SPQ,
 Check the Certifyprogress payment From Contractor.
 EvaluationSub Ordinates Quarterly.
 Review Site Payment with QS.
Senior Engineer AL RAWAD Co & Al Jazirah ENT April 2013 to July 2014
 Founded in 1970 Largest Co Construction and Maintenance Co
 Developed the projects strategythat meets the project's required performance, schedule andbudgetary targets
 Manage and Solve all Technical Problem
 Arrange all Tendering and Bidding Document and Submission to Client New Projects
 Manage speed up progress with in minimum time
 Arrange all Raw material with Competitive price from Local market and Abroad as per Technical Specification
 Managed and coordinated with all Staff
 Developed procurement as Customer procurement department.
 Selected trade suppliers, and coordinated their activities.
 Provided mentoring, coaching, and technical guidance to Construction team
Senior Civil Engineer February 2008 to April 2013
Mohd A. Al Suwailem Construction Co Infra Structure Project Client AL Qassim University
 Clearing Grubbing Cross Sectional and Profile start Cut fill to maintain require level.
 Earth work up to Asphalt Carpeting, RCC Structure with walk ways and crossing.
 Excavation Trenches for Utilities Water, Sewer, Storm, Power and Tele Communication backfill up to Carpeting,
 Provide Safety on top of Utilities as per Specification.
 Managedthe completion of the project within available time for minimise the cost of project, initiation, planning, forecasti ng
and project close out.
 Negotiated, prepared and executed the prime contract throughout the design and construction phases of the project.
Worked closely with clients, team members and other stakeholders to identify, recommend, develop, implement, and
support cost-effective project delivery.
 Created scope, schedule and cost baseline, monitored and tracked all baselines during all the project phases.
 Managed and coordinated construction activities, reviews and approved payment applications.
 Developed procurement and contracting strategies with client’s procurement department.
Project Manager 2004 to 2008
Al Jazirah Establishment Project Client NWC
Infrastructure and water Supply net work Water Pipe line in Riyadh & Kharj city nearly 46km Period Two Years.
 Arranged worked and take permission from 13 departments for the Excavation of require place.
 Managedthe completion of the project within available time for minimise the cost of project, initiation, planning, forecasti ng
and project close out.
 Negotiated, prepared and executed the prime contract throughout the design and construction phases of the project.
 Worked closely with clients, team members and other stakeholders to identify, recommend, develop, implement, and
support cost-effective project delivery.
 Created scope, schedule and cost baseline, monitored and tracked all baselines during all the project phases.
 Managed and coordinated construction activities, reviews and approved payment applications.
 Developed procurement and contracting strategies with client’s procurement department.
Project Manager 2002to 2004
Al Jazirah Establishment Project Client NWC
Project management Infra Structure and Water meter in Riyadh City 4000 meter have changed within 1& half years with
different locationin Riyadh.
 Managed the completion of the project life cycle from initiation, planning, forecasting and project close out.
 Negotiated, prepared and executed the prime contract throughout the design and construction phases of the project.
 Worked closely with clients, team members and other stakeholders to identify, recommend, develop, implement, and
support cost-effective project delivery.
 Created scope, schedule and cost baseline, monitored and tracked all baselines during all the project phases.
 Managed and coordinated construction activities, reviews and approved payment applications.
 Developed procurement and contracting strategies with client’s procurement department.
 Selected trade contractors and suppliers, and coordinated their activities.
 Provided mentoring, coaching, and technical guidance to project team.
ExperiencePakistan from October 1993to January 2002
Field Engineer, Site Engineer Site Agent and Section In charge (Different position from 1993 – 2002)
Employer Sachal Engineering Works Pakistan
 Launched in 1972, Sachal Engineering Works (SEW) has successfully executed a number of projects in Sewerage and
Effluent Treatment Plant, Roads, bridges, airfields, and Water treatment plants. The phenomenal successes within
Pakistan and due recognition of the quality of its work, prompted SEW to look beyond the borders of the count
Prepared and negotiated sub-contracts issued and monitored change orders of various trades.
 Monitored progress and cost against base-line schedules and budgets.
 Reviewed detailed construction work packages for integration with engineering, procurement and construction.
 Coordinated inspections with the related municipal building department and interacted with officials from multiple
levels of government.
 Section in charge Period 2000 to2002
Responsibilities as Section In charge on Road Section in 20 km portion.
DesignBy AAA Associats
Sachal Engineering Works with China Construction Co
Road Construction Project with 80 KM Big Span Bridge on Indus River to Connect two Province Punjab an Pakhtoonkhwah nearly
150 other RCC Structure like Box culverts, , RCC and Steel pipe Conduits Under Passes, Fly over’s and many more Structure
involve in mention project
 Site Agent Period 1997 to 2000
Building Construction project Designby Load Bearing Capacity under Mott MacDonald Consultant and Designer Total Quantity of
Bungalows 240 with four types.
 Site Engineer Period 1995 to 1997
Lakhra Power plant Infrastructure, RCC Channel with 4 Stone Load Bearing Bridges and Sewerage Treatment plant Under Water
and Power Ministry of Pakistan
 Field Engineer Period 1993 to 1995
Effluent Treatment Plant Under Sandoz Chemical Co mention Project treats the Waste and Chemical Water and
Re-cycling to use for Agriculture and irrigation purpose mention project design by Environment department Switzerland.
Languages
 English Reading Writing Speaking Fluently
 Urdu Reading Writing Speaking Fluently
 Sindhi Reading Writing Speaking Fluently
 Arabic Reading fluently & Understand 50% Writing fast & 30% Understand
 Computer Knowledge :AutoCAD, Word, Excel, Microsoft PowerPoint
REFRENCES
Eng Ghulam Mustafa Umrani Senior MEP Engineer AL RASHID TRADING & Contracting Co
Mobile# 00966 591377064Eng Mohammad Anees Senior Engineer Mohd Ali Al Suwailem Company Limited
Mobile# 0500797877

More Related Content

What's hot

Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)RAJA KUMAR .R
 
Syed mohammed project manager civil
Syed mohammed project manager civilSyed mohammed project manager civil
Syed mohammed project manager civil
syedmohd77
 
CV UPDATE17-11-2015
CV UPDATE17-11-2015CV UPDATE17-11-2015
CV UPDATE17-11-2015DEVARAJ B C
 
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021
Eduardo H. Pare
 
Civil Engineer CV
Civil Engineer CVCivil Engineer CV
Civil Engineer CVAfzal Khan
 
ANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAEANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAEankush kumar
 
CV AMINUL 19-05-2015
CV AMINUL 19-05-2015CV AMINUL 19-05-2015
CV AMINUL 19-05-2015Aminul Haque
 
Sathish_CV Quality Control Engineer
Sathish_CV Quality Control EngineerSathish_CV Quality Control Engineer
Sathish_CV Quality Control EngineerSathish Murugesan
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Amir Mohammed
 
Vimal, Civil Engr CV
Vimal, Civil Engr CVVimal, Civil Engr CV
Vimal, Civil Engr CVvimal nc
 
EDUARDO H. PARE CV - STRUCTURAL ENGINEER
EDUARDO H. PARE CV - STRUCTURAL ENGINEEREDUARDO H. PARE CV - STRUCTURAL ENGINEER
EDUARDO H. PARE CV - STRUCTURAL ENGINEER
Eduardo H. Pare
 

What's hot (19)

Hafiz- resume
Hafiz- resumeHafiz- resume
Hafiz- resume
 
Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)
 
Syed mohammed project manager civil
Syed mohammed project manager civilSyed mohammed project manager civil
Syed mohammed project manager civil
 
CV UPDATE17-11-2015
CV UPDATE17-11-2015CV UPDATE17-11-2015
CV UPDATE17-11-2015
 
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021
 
Civil Engineer CV
Civil Engineer CVCivil Engineer CV
Civil Engineer CV
 
Civil engineer
Civil engineerCivil engineer
Civil engineer
 
ANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAEANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAE
 
CV AMINUL 19-05-2015
CV AMINUL 19-05-2015CV AMINUL 19-05-2015
CV AMINUL 19-05-2015
 
Sathish_CV Quality Control Engineer
Sathish_CV Quality Control EngineerSathish_CV Quality Control Engineer
Sathish_CV Quality Control Engineer
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...
 
Nidhin George_CV
Nidhin George_CVNidhin George_CV
Nidhin George_CV
 
Vimal, Civil Engr CV
Vimal, Civil Engr CVVimal, Civil Engr CV
Vimal, Civil Engr CV
 
Cv mm
Cv mmCv mm
Cv mm
 
Adly CV111
Adly CV111Adly CV111
Adly CV111
 
CV - Senior QAQC Engineer-Civil
CV - Senior QAQC Engineer-CivilCV - Senior QAQC Engineer-Civil
CV - Senior QAQC Engineer-Civil
 
Infrastructure engineer. CV
Infrastructure engineer. CVInfrastructure engineer. CV
Infrastructure engineer. CV
 
M SUBBA RAO CV latest
M SUBBA RAO CV latestM SUBBA RAO CV latest
M SUBBA RAO CV latest
 
EDUARDO H. PARE CV - STRUCTURAL ENGINEER
EDUARDO H. PARE CV - STRUCTURAL ENGINEEREDUARDO H. PARE CV - STRUCTURAL ENGINEER
EDUARDO H. PARE CV - STRUCTURAL ENGINEER
 

Viewers also liked

Asif CV Jan 15
Asif CV Jan 15Asif CV Jan 15
Asif CV Jan 15Asif Arain
 
Muhammad Aslam Bhutto Cv 2015
Muhammad Aslam Bhutto Cv 2015Muhammad Aslam Bhutto Cv 2015
Muhammad Aslam Bhutto Cv 2015muhammad aslam
 

Viewers also liked (6)

NadeemCV-1
NadeemCV-1NadeemCV-1
NadeemCV-1
 
Asif CV Jan 15
Asif CV Jan 15Asif CV Jan 15
Asif CV Jan 15
 
cv inayat ali bhan
cv inayat ali bhancv inayat ali bhan
cv inayat ali bhan
 
Muhammad Aslam Bhutto Cv 2015
Muhammad Aslam Bhutto Cv 2015Muhammad Aslam Bhutto Cv 2015
Muhammad Aslam Bhutto Cv 2015
 
GA_CV
GA_CVGA_CV
GA_CV
 
Mudasar Resume-
Mudasar Resume-Mudasar Resume-
Mudasar Resume-
 

Similar to Basheer Ahmed Senior Infrastructure

Moayad c.v version 3
Moayad c.v version 3Moayad c.v version 3
Moayad c.v version 3Moayad Qblawi
 
Rahim a m
Rahim a mRahim a m
Rahim a m
Rahim A M
 
CIVIL ENGINEER-PROJECT MANAGER
CIVIL ENGINEER-PROJECT MANAGERCIVIL ENGINEER-PROJECT MANAGER
CIVIL ENGINEER-PROJECT MANAGERKhaled mohamed
 
My Fresh Cv.pdf
My Fresh Cv.pdfMy Fresh Cv.pdf
My Fresh Cv.pdf
tauqeerarain9211
 
Jahangir.Contractor
Jahangir.ContractorJahangir.Contractor
Jahangir.Contractor
Jahangir R. Contractor
 
Sheikh Mohammed Muntazer Resume
Sheikh Mohammed Muntazer Resume Sheikh Mohammed Muntazer Resume
Sheikh Mohammed Muntazer Resume Muntazir Sheikh
 
Sheikh Mohammed Muntazer- Resume - Final
Sheikh Mohammed Muntazer- Resume - FinalSheikh Mohammed Muntazer- Resume - Final
Sheikh Mohammed Muntazer- Resume - FinalMuntazir Sheikh
 
Khalid_Alismail_ New Resume rev07
Khalid_Alismail_ New Resume rev07Khalid_Alismail_ New Resume rev07
Khalid_Alismail_ New Resume rev07Khalid Alismail
 
Khalid alismail new resume rev07
Khalid alismail  new resume rev07Khalid alismail  new resume rev07
Khalid alismail new resume rev07
Khalid Alismail
 
Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019
Sandeep Pandey
 

Similar to Basheer Ahmed Senior Infrastructure (20)

Moayad c.v version 3
Moayad c.v version 3Moayad c.v version 3
Moayad c.v version 3
 
Rahim a m
Rahim a mRahim a m
Rahim a m
 
Manickam - CV
Manickam - CVManickam - CV
Manickam - CV
 
Rafeek's CV
Rafeek's CV Rafeek's CV
Rafeek's CV
 
AL SARABI CV
AL SARABI CVAL SARABI CV
AL SARABI CV
 
CIVIL ENGINEER-PROJECT MANAGER
CIVIL ENGINEER-PROJECT MANAGERCIVIL ENGINEER-PROJECT MANAGER
CIVIL ENGINEER-PROJECT MANAGER
 
JAMES -CV -
JAMES -CV -JAMES -CV -
JAMES -CV -
 
My Fresh Cv.pdf
My Fresh Cv.pdfMy Fresh Cv.pdf
My Fresh Cv.pdf
 
Jahangir.Contractor
Jahangir.ContractorJahangir.Contractor
Jahangir.Contractor
 
Sheikh Mohammed Muntazer Resume
Sheikh Mohammed Muntazer Resume Sheikh Mohammed Muntazer Resume
Sheikh Mohammed Muntazer Resume
 
Sheikh Mohammed Muntazer- Resume - Final
Sheikh Mohammed Muntazer- Resume - FinalSheikh Mohammed Muntazer- Resume - Final
Sheikh Mohammed Muntazer- Resume - Final
 
Khalid_Alismail_ New Resume rev07
Khalid_Alismail_ New Resume rev07Khalid_Alismail_ New Resume rev07
Khalid_Alismail_ New Resume rev07
 
Khalid alismail new resume rev07
Khalid alismail  new resume rev07Khalid alismail  new resume rev07
Khalid alismail new resume rev07
 
Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019
 
cv for Project Engineer
cv for Project Engineercv for Project Engineer
cv for Project Engineer
 
New_Hissam_CV (3).PDF
New_Hissam_CV (3).PDFNew_Hissam_CV (3).PDF
New_Hissam_CV (3).PDF
 
Basheer Ahmed
Basheer Ahmed Basheer Ahmed
Basheer Ahmed
 
CV
CVCV
CV
 
Civil Engineer
Civil EngineerCivil Engineer
Civil Engineer
 
Civil Engineer
Civil EngineerCivil Engineer
Civil Engineer
 

Basheer Ahmed Senior Infrastructure

  • 1. BasheerAhmed Nahiyoon Senior Infrastructure/Road/Wet Utilities Engineer B.E Civil ACADEMIC QUALIFICATION: • Bachelor in Civil Engineering from Mehran University of Engineering & Technology Jamshoro 1994 Sindh Pakistan (0542412672&0566289892) Transferable Iqama(Require position only for Riyadh Region) COVER LETTER Dear Sir, As a versatile and highexperience of Construction management withinextensive background in the Construction Industry. I am ready to work as infrastructure, Senior Engineer and Construction Engineer. Some achievements include. ACADEMIC QUALIFICATION:  Bachelor in Civil Engineering from MehranUniversity of Engineering & Technology Jamshoro1994 Sindh Pakistan  PROFESSIONAL ASSOCIATION:  Register Life Member of PakistanEngineering Council& Saudi Engineering Council.  Positionin Iqama Civil Engineer Infrastructure, Roads andBuilding Structure  Infrastructure Wet Utilities  Main Road High Ways  Asphalt with Carpeting  Embankment work  Culverts, Pipe Culverts, Retaining Wall, Underpass, Over headBridges.  Stone Masonry bridges with RCC Slab  RCC Channel for Cable and Raw Water 8 km Length Sewerage and Effluent Treatment Plant withBiological Treatment Ponds and RCC Structure  Water, Sewer and Storm water Net work with wall meter fixing.  Earth Work with Soil, Sand Stone lining with Stone pitching.  Brick Lining  RCC Structure 50 Intersectionmanholes Pump room and HighPressure pumps with Submersible. Building Construction  Building Construction Dormitories Ground + Six Stories.  RCC Structure Single Story 200 Villas LoadBearing Structure  RCC Structure Awami Markaz Larkana Sindh Pakistan. My resume provides further details on myprofessional skills and educational background. Please contact me at your earliest convenience for more details. Thank you for your time andConsideration. I look forward to hearing from you. Basheer Ahmed Nahiyoon
  • 2. Summary of Skills and Experience 20+ years project management, project planning, project control, and contract administrationexperience inConstruction industry, Manufacturing industry relatedto ,Roads RCC Structure , Infrastructure, Buildings, Water, Sewerage and Effluent Treatment Plant Desalination plant withNet Work projects.  Strong skills in managing issues, changes and problems.  Dedicated team-player with excellent time-management and project management skills.  Meet stringent deadlines through efficient prioritization of workload and delivery schedules.  Well versant with applications associated with project management, sales, marketing, contract administration, planning, spreadsheets and word processing.  Demonstrated report-writing skills as evident from proposal writing for various projects.  Written and oral communication skills in English effective team player.  Oral communication skills in Arabic.  EMPLOYMENT CAREER OVERVIEW:  Experience Saudi Arabia 2002 to Update Senior Infrastructure Engineer Saudi Arabian Parsons Ltd July 2014 to Update Largest Consultant Company from Last 70 years Project in Hand: Project includes the Infrastructure facilities, Road works and Wet utilities for MoH Residential Projects which cost 669 Million SR.As Senior Infrastructure Engineer Responsibilities Supervision Sub Ordinates to enforce work as Specification.  Review Shop Drawing and check IFC Drawing Wet Utilities withManholes.  Review ITP, Method Statement and ITR.  Wet Utilities networkand comments for necessarychanges as existing system withEND Users.  Check Excavation, Backfilling; Pipe laying, Warning precaution up to testing andcommissioning.  Distribute WIR to Concern person for Inspection.  Check Qualityof Approved material andchecking same as approved.  Attend all Mock-ups before anynew activity.  Inspect workmanship and advice to Contractor how to improve progress.  Reviews Material Submittal/SPQ and RFI.  Supervision daily site work and ensure activityas Spects.  Review Daily Progress Report and Check achieve Plan from Contractor.  Inspection all pipe Site work testing, Review Factorytest Certificate andThird Party Certificate.  Check Qualityand Guarantee Certificates as periodmention inSpects.  Update weekly LOG of Material/SPQ,  Check the Certifyprogress payment From Contractor.  EvaluationSub Ordinates Quarterly.  Review Site Payment with QS. Senior Engineer AL RAWAD Co & Al Jazirah ENT April 2013 to July 2014  Founded in 1970 Largest Co Construction and Maintenance Co  Developed the projects strategythat meets the project's required performance, schedule andbudgetary targets  Manage and Solve all Technical Problem  Arrange all Tendering and Bidding Document and Submission to Client New Projects  Manage speed up progress with in minimum time  Arrange all Raw material with Competitive price from Local market and Abroad as per Technical Specification  Managed and coordinated with all Staff
  • 3.  Developed procurement as Customer procurement department.  Selected trade suppliers, and coordinated their activities.  Provided mentoring, coaching, and technical guidance to Construction team Senior Civil Engineer February 2008 to April 2013 Mohd A. Al Suwailem Construction Co Infra Structure Project Client AL Qassim University  Clearing Grubbing Cross Sectional and Profile start Cut fill to maintain require level.  Earth work up to Asphalt Carpeting, RCC Structure with walk ways and crossing.  Excavation Trenches for Utilities Water, Sewer, Storm, Power and Tele Communication backfill up to Carpeting,  Provide Safety on top of Utilities as per Specification.  Managedthe completion of the project within available time for minimise the cost of project, initiation, planning, forecasti ng and project close out.  Negotiated, prepared and executed the prime contract throughout the design and construction phases of the project. Worked closely with clients, team members and other stakeholders to identify, recommend, develop, implement, and support cost-effective project delivery.  Created scope, schedule and cost baseline, monitored and tracked all baselines during all the project phases.  Managed and coordinated construction activities, reviews and approved payment applications.  Developed procurement and contracting strategies with client’s procurement department. Project Manager 2004 to 2008 Al Jazirah Establishment Project Client NWC Infrastructure and water Supply net work Water Pipe line in Riyadh & Kharj city nearly 46km Period Two Years.  Arranged worked and take permission from 13 departments for the Excavation of require place.  Managedthe completion of the project within available time for minimise the cost of project, initiation, planning, forecasti ng and project close out.  Negotiated, prepared and executed the prime contract throughout the design and construction phases of the project.  Worked closely with clients, team members and other stakeholders to identify, recommend, develop, implement, and support cost-effective project delivery.  Created scope, schedule and cost baseline, monitored and tracked all baselines during all the project phases.  Managed and coordinated construction activities, reviews and approved payment applications.  Developed procurement and contracting strategies with client’s procurement department. Project Manager 2002to 2004 Al Jazirah Establishment Project Client NWC Project management Infra Structure and Water meter in Riyadh City 4000 meter have changed within 1& half years with different locationin Riyadh.  Managed the completion of the project life cycle from initiation, planning, forecasting and project close out.  Negotiated, prepared and executed the prime contract throughout the design and construction phases of the project.  Worked closely with clients, team members and other stakeholders to identify, recommend, develop, implement, and support cost-effective project delivery.  Created scope, schedule and cost baseline, monitored and tracked all baselines during all the project phases.  Managed and coordinated construction activities, reviews and approved payment applications.  Developed procurement and contracting strategies with client’s procurement department.  Selected trade contractors and suppliers, and coordinated their activities.  Provided mentoring, coaching, and technical guidance to project team.
  • 4. ExperiencePakistan from October 1993to January 2002 Field Engineer, Site Engineer Site Agent and Section In charge (Different position from 1993 – 2002) Employer Sachal Engineering Works Pakistan  Launched in 1972, Sachal Engineering Works (SEW) has successfully executed a number of projects in Sewerage and Effluent Treatment Plant, Roads, bridges, airfields, and Water treatment plants. The phenomenal successes within Pakistan and due recognition of the quality of its work, prompted SEW to look beyond the borders of the count Prepared and negotiated sub-contracts issued and monitored change orders of various trades.  Monitored progress and cost against base-line schedules and budgets.  Reviewed detailed construction work packages for integration with engineering, procurement and construction.  Coordinated inspections with the related municipal building department and interacted with officials from multiple levels of government.  Section in charge Period 2000 to2002 Responsibilities as Section In charge on Road Section in 20 km portion. DesignBy AAA Associats Sachal Engineering Works with China Construction Co Road Construction Project with 80 KM Big Span Bridge on Indus River to Connect two Province Punjab an Pakhtoonkhwah nearly 150 other RCC Structure like Box culverts, , RCC and Steel pipe Conduits Under Passes, Fly over’s and many more Structure involve in mention project  Site Agent Period 1997 to 2000 Building Construction project Designby Load Bearing Capacity under Mott MacDonald Consultant and Designer Total Quantity of Bungalows 240 with four types.  Site Engineer Period 1995 to 1997 Lakhra Power plant Infrastructure, RCC Channel with 4 Stone Load Bearing Bridges and Sewerage Treatment plant Under Water and Power Ministry of Pakistan  Field Engineer Period 1993 to 1995 Effluent Treatment Plant Under Sandoz Chemical Co mention Project treats the Waste and Chemical Water and Re-cycling to use for Agriculture and irrigation purpose mention project design by Environment department Switzerland. Languages  English Reading Writing Speaking Fluently  Urdu Reading Writing Speaking Fluently  Sindhi Reading Writing Speaking Fluently  Arabic Reading fluently & Understand 50% Writing fast & 30% Understand  Computer Knowledge :AutoCAD, Word, Excel, Microsoft PowerPoint REFRENCES Eng Ghulam Mustafa Umrani Senior MEP Engineer AL RASHID TRADING & Contracting Co Mobile# 00966 591377064Eng Mohammad Anees Senior Engineer Mohd Ali Al Suwailem Company Limited Mobile# 0500797877