1. RESUME
NDT TECHNICIAN
M.SURESH
197/2, West street,
Mobile :+966-577574818 & +91-9487855876 Soundrapandiapuram (Post)
Email ID : msureshndt@gmail.com T.Kallikullam (via)
Skype ID; msureshndt Tirunelveli (Dist)
Tamilnadu.
India
CAREER PROFILE:
Over 7 plus years experience as NDT (UT, PT, MT, ECT) field.
Having Very good Experience with different types of Machines.
Great exposure with different Types of Working Environments, Boiler components inspection, Pipes
and tubes, pressure vessel Jobs Inspection, Heavy Engineering jobs and Earth moving Equipment’s
products Inspection etc.
EDUCATIONAL QULIFICATION
Diploma in Mechanical Engineering
TECHNICAL QUALIFICATION
American Society for Non Destructive Testing- Level -II in
Ultrasonic Testing
Eddy Current (Tube Inspection)
Magnet Particle Testing
Liquid Penetrant Testing
Radiographic Testing
PCN Level-II (PCN No. 333711)
Ultrasonic Testing 3.1 and 3.2 (Plate & Pipe)
Magnetic Particle Testing
Trained by SILVERWING FLOOR MAPPING (MFL)
2. ABROAD WORKING EXPERENCE:
COMPANY : AXIS INSPECTION SERVICE
DURATION : SEP 2014 TO TILL DATE
DESIGNATION : NDT TECHNICIAN
Responsibilities:
Carried out MFL FLOOR MAPPING IN Tank bottom plates, annuler plates.
Tube inspection (ECT).
Carried out UT shear wave on tank shell plates.
Carried out UT shear wave on piping weld joints.
Carried out UT in structural welding in the Reactor.
Borescope, Hardness, Ferrite Testing, Vacuum Box.
Carried out UTT on different types of equipment’s
Carried out corrosion scanning in nozzles, vessels, pipes.
Carried out DPT & MPT in weld areas in Reactor and other equipment.
OVERALL SHUTDOWNS ATTENDED:
Sadaf petrochemical company (STYRENE- II) -Sep 2016 – Oct 2016.
Sadara chemical company (MFC, CHEM-1, POLY ETHYLE, SGU) – April-2016 to
June 2016.
Al-bayroni Fertilizer company - Feb 2016 – Mar 2016.
Hadeed Saudi iron &steel company – Oct 2015 to Jan 2016 (pipe line project).
Al-bayroni Fertilizer company-July 2015 to Aug 2015 (pipe line project).
Sadaf petrochemical Plant (EDC), from May 2015 to June 2015.
IBN Zahr petrochemical plant (MTBE) - April 2015.
Advanced petrochemical company From mar 1 2015 to 28 mar 2015 .
Sadaf petrochemical Plant (STYRENE-I), Feb 1 to Feb 28 2015.
Bin quariah power plant (SEACO) from Jan 1 2015 to Jan 26,2015.
Sadaf petrochemical Plant(MTBE), from Nov 2014 to Dec 2014.
Al-bayroni Fertilizer company - Oct 2014.
3. PREVIOUS WORKING EXPERENCE:
National Inspection Services, Trichy as NDT (UT) Technician
from November 2012 To March 2014.
Escon Technical Services Pvt Limited, Coimbatore as NDT Technician
from January 2011 to October 2012.
M/s Quality inspection services, Goregaon, Mumbai, India from April
2010 to November 2010 (SHUT DOWN).
M/s Blue star ltd, Mumbai as advanced NDT assistant From November 2009 to Feb 2010.
KGB Inspection Services, Trichy as NDT Assistant From August 2009 to October 2009.
.
Job Responsibilities:
Performed Ultrasonic Testing on piping in detection of Corrosion, Erosions and Pitting.
Performed Ultrasonic Testing on piping in detection of Corrosion, Erosions and Pitting
on welded parts, Refinery drums and oil storage tanks.
Carried out UT on wind mill towers and water panel tubes.
Carried out the DPT in the pipe lines and exchangers and vessels heaters.
UT Lamination check on raw materials.
Awarded By Major Company:
M/s. ALTEC FABRICATORS, Thuvakudi, Trichy- Performed UT, MPT and LPI on Weldments
for Wind Mill Tower Shell Butt joints & Flange Joints- Client SUZLON &TPL.
M/s. PRECITECH MANUFACTURING PVT LTD- Trichy - Carried out UT, LPI and MPI on
Casting & Weldments for Wind Mill Tower Assy HUB, Support-I.
M/s. NEYVELI LIGNITE CORPORATION THERMAL – Carried out Ultrasonic Test on
piping in detection of Corrosion, Erosions and Pitting.
Godrej & Boyce ltd, Vikram Ispat Mukand ltd, Enercon India ltd, NPCIL – Ultrasonic flaw
detection of raw materials & welded joints.
4. FAMILIARISATION WITH EQUIPMENT HANDLED
ULTRASONIC TESTING : USM 35,MODSONIC ENSTIN II TFT, EPOCH 4
PLUS
UT THICKNESS GAUGE : MODSONIC EDISON 1, OLYMBUS 45MG,
CYGNUS 6+, PANAMETRIC 37 DL PLUS, DMS-II
MAGNETIC PARTICLE TESTING : MAGNAFLUX YOKE (DC& AC Method)
PENETRANT TESTING : SOLVENT REMOVEL METHOD
EDDY CURRENT : OLYMPUS MS5800
MFL FLOORMARP : SILVERWING FLOORMAP V2
BOROSCOPE/VIDEOSCOPE : GE EVEREST XLG3, GE MENTOR IQ
HARDNESS MACHINE : GE MIC10
FERRITE TEST : FERRITE SCOPE
PERSONAL DETAILS
Father’s Name : E. Murugesan
Date of Birth : 30-05-1992
Marital Status : Single
Nationality : India
Languages Known : English, Hindi, Tamil, Malayalam
PASSPORT DETAILS
Passport No : L2319049
Issued Date : 06-06-2013
Validity : 05-06-2023
Issued Place : Madurai, Tamil Nadu
Declaration
I hereby declare that all the above given information are true to the best of my knowledge
Date: Signature
Place: (M.SURESH)