 Introduction
 Component of F.M.S
Processing Station
Material Handling
Computer Control
 Levels of Flexibility
 Types of F.M.S Layout
 Objectives of F.M.S
What is F.M.S ?
-A flexible Manufacturing System (F.M.S) is an
arrangement of machines ,interconnected by a
transport system . The transport carries work to the
machine on pallets or other interface units so the
work-machine registration on is accurate , rapid
and automatic.
OR
-F.M.S consist of a group of Processing work
Stations interconnected by means of an automated
material handling and storage system and
controlled by integrated Computer Control .
Subhasis Kumara Panda MIT BHUBANESWAR
In manufacturing flexibility means-
The Capability of Producing Different parts
without major retooling.
A measure of of how fast the company converts
its process(es) From making an old line of
product to produce a new product.
The ability to change a production schedule ,to
modify a part or to handle multiple parts.
So a flexible manufacturing system is a
manufacturing system in which there is some
amount of flexibility that allows the system to
react in the case of changes whether predicted or
unpredicted. Subhasis kumar panda MIT BHUBANESWAR
Basic component of F.M.S-
Work stations or Processing Stations
Automated material handling
Computer control system
Work station or processing station:-In Present
day, Work station are typically computer
numerical control(C.N.C) Machine tool that
performs different machining operation on
families of parts .Flexible manufacturing system
are being designed with other type of processing
equipment including inspection station ,
assembly work and sheet metal process. The
various types of workstation are:-Subhasis kumar panda MIT BHUBANESWAR
 Machining Center:-It is a Sophisticated CNC
machine that performs milling ,drilling, tapping
and boring operation at the same location with
variety of tools.
or
It is highly automated straight alone machine
which can be used as a component of F.M.S. The
special feature like automated tool changing ,
tool storage ,use of pallatised work parts
,C.N.C contol makes it more compatible with
F.M.S & Milling, drilling, boring and tapping
operation can achieve with this.Subhasis kumar panda MIT BHUBANESWAR
Machining
Center
Subhasis Kumar Panda MIT BHUBANESWAR
 Head Changer:-Head changer is a special
machine tool with the capability of change Tool
heads . Tool heads are usually multiple spindle
tool module that can be stored in a Rake Drum
located on or near the machine.
 Head Indexes:-In this heads are attach semi
permanently to an Indexing mechanism on the
machine tools.eg-Gear Cutting.
Subhasis kumar panda MIT BHUBANESWAR
Indexing plate
Subhasis Kumar Panda MIT BHUBANESWAR
 Assembly Work Station :-Industrial Robots are
usually consider to be the most appropriate
automated assembly work station in the F.M.S
,they can be programmed to perform task with
variation in sequences.
 Inspection Station:-Inspection Station are
designed for inspecting the completed work , In
F.M.S inspection can be happen either at work
station or by designing Special Inspection
Station for this purpose
Industrial Robots assembling the Car:-
Subhasis Kumar Panda MIT BHUBANESWAR
Load and Unload Station:-as identifies from the
name load and unload station are used for
loading and unloading of work parts in the F.M.S.
The various Feature of Load and Unload stations
are:-
-It act as a physical interface between the F.M.S
and rest of the Factory.
-Raw work parts enter the system at load station,
while finished work parts exit at unload station
-Manual loading/unloading is more prevalent
Subhasis Kumar Panda MIT BHUBANESWAR
2. Automated Material Handling & Storage
System:-
The various Automated material
handling system are used to transport work
parts and subassembly parts between the
processing station .The other function of
automatic material handling and storage
system are:-
 Random and Independent movement of work
parts between processing stations.
 Handling of variety of work part configuration
 Temporary storage
 Convenient access for Loading and unloadingSubhasis Kumar Panda MIT BHUBANESWAR
For automated material handling and storage of
work parts is done by A.G.V(Automated Guided
Vehicles),A.S.R.S & Conveyors . we are describing
A.G.V Below:-
Automated Guided Vehicle:-Automated Guided
Vehicles (AGVs) are vehicles that are equipped with
automatic guidance systems and are capable of
following prescribed paths. Unlike traditional
robots, AGVs are not manipulators, they are
driverless vehicles that are programmed to follow
a guide path. In automated factories and facilities
AGV’s move pallets and containers. In offices they
may be used to deliver and pick up the mail.
Subhasis Kumar Panda MIT BHUBANESWAR
Features of A.G.V:-
It transport material from loading to unloading
station.
It Reduces labor cost.
Highly flexible ,intelligent and versatile
material handling system.
Because it is driverless vehicle so it is safe & more
accurate.
Subhasis Kumar panda MIT BHUBANESWAR
Types Of A.G.V:-There are many types of A.G.V but
3 are basic types describe below:-
AGVS Towing Vehicles  :-it was the first type
introduced and are still a very popular type today.
Towing vehicles can pull a multitude of trailer
types and have capacities ranging from 8,000
pounds to 60,000 pounds and are usually manned
by an operator who adds and removes the trailers
at designated stops.
AGVS Unit Load Vehicles :-these are equipped
with decks, which permit unit load transportation
and often automatic load transfer. The decks can
either be lift and lower type, powered of non-
powered roller, chain or belt decks or custom decks.Subhasis Kumar PANDA MIT BHUBANESWAR
Advantages
Reduced Manufacturing Cost.
Lower cost per unit Produced.
Greater Labour Productivity.
Greater Machine Efficiency.
Improved quality
Increased system reliability.
Reduced Parts inventories.
Adaptability to CAD/CAM operations.
Shoter lead times
Subhasis Kumar Panda MIT BHUBANESWAR
Tow Type A.G.V:-
Subhasis Kumar Panda MIT BHUBANESWAR
Unit Load A.G.V:-
Subhasis Kumar Panda MIT BHUBANESWAR
Side Loading and High Lifting Types:-
Side loading vehicle with telescopic
fork for load handling on both sides.
Load capacity up to 3,000 lbs.
Lift heights up to 20 feet
Bi-directional motion
Ideal for material delivery
and finished goods warehousing
It is also a driverless A.G.V.
Subhasis Kumar Panda MIT BHUANESWAR
Third and most important part of F.M.S is
Computer
Control system:-
3. Computer Control System:-It is used to co-
ordinate the activities of processing station and
material handling System in the F.M.S. The various
function of computer control system are:-
Control of each work station.
 Distribution of control instruction to work
station.
Production control.
 Traffic control.
Shuttle control.
Work handling system and monitoring.
SUBHASIS KUMAR PANDA MIT BHUBANESWAR
Levels of Flexibility
There are three basic level of manufacturing
flexibility:-
(a) Basic flexibilities
Machine flexibility: The different operation types
that a machine can Perform is called machine
flexibility . More operation performance more
flexible the machine . Process and product
flexibility are dependent on machine flexibility.
Material handling flexibility: A measure of the
ease with which different part types can be
transported and properly positioned at the various
Subhasis Kumar Panda MIT BHUBANESWAR
 Operation flexibility: A measure of the ease with
which alternative operation sequences can be
used for processing a part type.
Subhasis Kumar Panda MIT BHUBANESWAR
(b) System flexibilities
Volume flexibility: It is the ability of the System
to Varied the production volume of different
product to accommodate changes.
Expansion flexibility: The ability to build a
system and expand it incrementally by volume ,
production or processes.
Routing flexibility: A measure of the alternative
paths that a processing part can effectively follow
through a system for a given process plan.
OR
Subhasis Kumar Panda MIT BHUBANESWAR
It can be defined as a capacity to produce or
make an alternative work station . This Type of
flexibility requires where there is an equipment
break down ,tool failure or other interruption in the
processing.
Process flexibility: A measure of the volume of
the set of part types that a system can produce
without incurring any setup.
Product flexibility: It Refers to ability to change
over to a new set of Product Economically &
quickly Response to the changing market condition
& Requirements. The change over time
Subhasis Kumar Panda MIT BHUBANESWAR
include the Time of designing ,Planning, Tooling
&
Fixing of new product .
(c) Aggregate flexibilities
Program flexibility: The ability of a system to run
for reasonably long periods without external
intervention.
Production flexibility: It is the volume of the set
of part types that a system can produce without
major investment in capital equipment.
Market flexibility: The ability of a system to
efficiently adapt to changing market conditions. It
Subhasis Kumar Panda MIT BHUBANESWAR
-:LAYOUT CONFIGURATION:-
Types of F.M.S Layout
Configuration:-
There are five types of F.M.S Layout Configuration:-
1. Progressive or Line type: The machines and
handling system are arranged in a line as shown in
Fig. It is most appropriate for a system in which the
part progress from one workstation to the next in a
well defined sequence with no back flow. The
operation of this type of system is
very similar to transfer type. Work always flows in
unidirectional path as shown in Fig.Subhasis Kumar Panda MIT BHUBANESWAR
2. Loop Type: The basic loop configuration is as
shown in Fig.. The parts usually move in
one direction around the loop, with the capability
to stop and be transferred to any station. The
loading and unloading station are typically
located at one end of the loop Fig.
Subhasis Kumar Panda MIT BHUBANESWAR
3. Ladder Type: The configuration is as shown in
Fig. The loading and unloading station
is typically located at the same end. The sequence
to the operation/transfer of parts from one machine
tool to another is in the form of ladder steps as
shown in Fig.
Subhasis Kumar Panda MIT BHUBANESWAR
Progressive type Loop Type
Ladder type
Subhasis Kumar Panda MIT BHUBANESWAR
4. Open Field Type: In the open field type, The
loading and unloading station is typically
located at the same end. The parts will go
through all the substations, such as CNC
machines, coordinate measuring machines and
wash station by the help of AGV’s from one
substation to another.
5.Robot Centered Type: Robot centred cell is a
relatively new form of flexible system in which
one or more robots are used as the material
handling systems .Industrial robots can be
equipped with grippers that make them well suited
for handling of rotational parts.
Subhasis Kumar Panda MIT BHUBANESWAR
Subhasis Kumar Panda MIT BHUBANESWAR
Robot Centered cell:-
Subhasis Kumar Panda MIT BHUBANESWAR
Objectives or AIMS of F.M.S:-
Decreased Lead TimesDecreased Lead Times
Increased machine utilizationIncreased machine utilization
Improved Due Date ReliabilityImproved Due Date Reliability
Decreased Store Inventors levelsDecreased Store Inventors levels
Remove Labour CostRemove Labour Cost
Decreased Work in ProgressDecreased Work in Progress
Increased QualityIncreased Quality
Subhasis Kumar Panda MIT BHUBANESWAR
Subhasis Kumar Panda MIT BHUBANESWAR

More Related Content

What's hot

Flexible manufacturing system(FMS).
Flexible manufacturing system(FMS).Flexible manufacturing system(FMS).
Flexible manufacturing system(FMS).Nitin Patil
 
Flexible Manufacturing System
Flexible Manufacturing SystemFlexible Manufacturing System
Flexible Manufacturing SystemAmrut Yadav
 
Flexible manufacturing systems (FMS)
Flexible manufacturing systems (FMS)Flexible manufacturing systems (FMS)
Flexible manufacturing systems (FMS)jntuhcej
 
flexible manufacturing system
flexible manufacturing systemflexible manufacturing system
flexible manufacturing systemPAARTH GUPTA
 
Flexible manufacturing systems
Flexible manufacturing systemsFlexible manufacturing systems
Flexible manufacturing systemsagisanyang dingalo
 
flexible manufacturing systems
flexible manufacturing systemsflexible manufacturing systems
flexible manufacturing systemsShivam Joshi
 
Flexible Manufacturing System
Flexible Manufacturing SystemFlexible Manufacturing System
Flexible Manufacturing SystemDesai Vaishali
 
Flexible manufacturing syatem
Flexible manufacturing syatemFlexible manufacturing syatem
Flexible manufacturing syatemDobariya Gautam
 
Flexible Manufacturing System
Flexible Manufacturing SystemFlexible Manufacturing System
Flexible Manufacturing SystemAkhtar Kamal
 
Lecture 25 flexible manufacturing systems [compatibility mode]
Lecture 25 flexible manufacturing systems [compatibility mode]Lecture 25 flexible manufacturing systems [compatibility mode]
Lecture 25 flexible manufacturing systems [compatibility mode]Dr.Muftooh Ur Rehman Siddiqi
 
Flexible manufacturing systems
Flexible manufacturing systemsFlexible manufacturing systems
Flexible manufacturing systemsravi sherasiya
 
FLEXIBLE MANUFACTURING SYSTEM
FLEXIBLE MANUFACTURING SYSTEMFLEXIBLE MANUFACTURING SYSTEM
FLEXIBLE MANUFACTURING SYSTEMAnand Khare
 
Flexible manufacturing systems (FMS)
Flexible manufacturing systems (FMS)Flexible manufacturing systems (FMS)
Flexible manufacturing systems (FMS)SERCOD
 
Flexible manufacturing systems analysis
Flexible manufacturing systems analysisFlexible manufacturing systems analysis
Flexible manufacturing systems analysisNachiketas Waychal
 
Flexible manufacturing system
Flexible manufacturing  systemFlexible manufacturing  system
Flexible manufacturing systemAayush vohra
 

What's hot (20)

Flexible manufacturing system(FMS).
Flexible manufacturing system(FMS).Flexible manufacturing system(FMS).
Flexible manufacturing system(FMS).
 
Fms
FmsFms
Fms
 
Flexible Manufacturing System
Flexible Manufacturing SystemFlexible Manufacturing System
Flexible Manufacturing System
 
kiran
kirankiran
kiran
 
Flexible manufacturing systems (FMS)
Flexible manufacturing systems (FMS)Flexible manufacturing systems (FMS)
Flexible manufacturing systems (FMS)
 
flexible manufacturing system
flexible manufacturing systemflexible manufacturing system
flexible manufacturing system
 
Flexible manufacturing systems
Flexible manufacturing systemsFlexible manufacturing systems
Flexible manufacturing systems
 
flexible manufacturing systems
flexible manufacturing systemsflexible manufacturing systems
flexible manufacturing systems
 
Flexible Manufacturing System
Flexible Manufacturing SystemFlexible Manufacturing System
Flexible Manufacturing System
 
Flexible manufacturing system
Flexible manufacturing systemFlexible manufacturing system
Flexible manufacturing system
 
Flexible manufacturing syatem
Flexible manufacturing syatemFlexible manufacturing syatem
Flexible manufacturing syatem
 
Flexible Manufacturing Systems V2 090310
Flexible Manufacturing Systems V2 090310Flexible Manufacturing Systems V2 090310
Flexible Manufacturing Systems V2 090310
 
Flexible Manufacturing System
Flexible Manufacturing SystemFlexible Manufacturing System
Flexible Manufacturing System
 
Fms
FmsFms
Fms
 
Lecture 25 flexible manufacturing systems [compatibility mode]
Lecture 25 flexible manufacturing systems [compatibility mode]Lecture 25 flexible manufacturing systems [compatibility mode]
Lecture 25 flexible manufacturing systems [compatibility mode]
 
Flexible manufacturing systems
Flexible manufacturing systemsFlexible manufacturing systems
Flexible manufacturing systems
 
FLEXIBLE MANUFACTURING SYSTEM
FLEXIBLE MANUFACTURING SYSTEMFLEXIBLE MANUFACTURING SYSTEM
FLEXIBLE MANUFACTURING SYSTEM
 
Flexible manufacturing systems (FMS)
Flexible manufacturing systems (FMS)Flexible manufacturing systems (FMS)
Flexible manufacturing systems (FMS)
 
Flexible manufacturing systems analysis
Flexible manufacturing systems analysisFlexible manufacturing systems analysis
Flexible manufacturing systems analysis
 
Flexible manufacturing system
Flexible manufacturing  systemFlexible manufacturing  system
Flexible manufacturing system
 

Similar to Flexiblemanufacturingsystemss 121115132834-phpapp01

FMS IN CAD/CAM TYPES HISTORY ADVANTAGES PPT_final.pptx
FMS IN CAD/CAM  TYPES HISTORY ADVANTAGES PPT_final.pptxFMS IN CAD/CAM  TYPES HISTORY ADVANTAGES PPT_final.pptx
FMS IN CAD/CAM TYPES HISTORY ADVANTAGES PPT_final.pptxPraveenVundrajavarap
 
Design of Production and Service Systems - Facilities
Design of Production and Service Systems - FacilitiesDesign of Production and Service Systems - Facilities
Design of Production and Service Systems - FacilitiesCasey Ordoña
 
Direct numerical control
Direct numerical controlDirect numerical control
Direct numerical controlFarhan Fahim
 
Unit 5 2nd-ME8691 & COMPUTER AIDED DESIGN AND MANUFACTURING
Unit 5 2nd-ME8691 & COMPUTER AIDED DESIGN AND    MANUFACTURINGUnit 5 2nd-ME8691 & COMPUTER AIDED DESIGN AND    MANUFACTURING
Unit 5 2nd-ME8691 & COMPUTER AIDED DESIGN AND MANUFACTURINGMohanumar S
 
Virtual Commissioning of Small to Medium Scale Industry Using the Concepts of...
Virtual Commissioning of Small to Medium Scale Industry Using the Concepts of...Virtual Commissioning of Small to Medium Scale Industry Using the Concepts of...
Virtual Commissioning of Small to Medium Scale Industry Using the Concepts of...IJERA Editor
 
Capabilities brochure 2008
Capabilities brochure 2008Capabilities brochure 2008
Capabilities brochure 2008Mark Netherland
 
MANUFACT SYSTEMS AND AUTOMATION.pptx
MANUFACT SYSTEMS AND AUTOMATION.pptxMANUFACT SYSTEMS AND AUTOMATION.pptx
MANUFACT SYSTEMS AND AUTOMATION.pptxAbhishekChavan77
 
CAD CAM 1 Module-3 Part-A 18ME72
CAD CAM  1 Module-3 Part-A 18ME72CAD CAM  1 Module-3 Part-A 18ME72
CAD CAM 1 Module-3 Part-A 18ME72Mohammed Imran
 
Automated Assembly Systems
Automated Assembly SystemsAutomated Assembly Systems
Automated Assembly Systemschethan kumar
 
Automated Process
Automated ProcessAutomated Process
Automated ProcessMOHD ARISH
 
Flexible manufacturing _system by fateh singh
Flexible manufacturing _system by fateh singhFlexible manufacturing _system by fateh singh
Flexible manufacturing _system by fateh singhFateh Singh
 
Automation in Manufacturing (1).pdf
Automation in Manufacturing (1).pdfAutomation in Manufacturing (1).pdf
Automation in Manufacturing (1).pdfSanjayK560966
 
Introduction to Automation.ppt
Introduction to Automation.pptIntroduction to Automation.ppt
Introduction to Automation.pptPrateek573064
 
01-K-I-Ahmad-AIP.ppt
01-K-I-Ahmad-AIP.ppt01-K-I-Ahmad-AIP.ppt
01-K-I-Ahmad-AIP.pptHarinathC5
 

Similar to Flexiblemanufacturingsystemss 121115132834-phpapp01 (20)

FMS IN CAD/CAM TYPES HISTORY ADVANTAGES PPT_final.pptx
FMS IN CAD/CAM  TYPES HISTORY ADVANTAGES PPT_final.pptxFMS IN CAD/CAM  TYPES HISTORY ADVANTAGES PPT_final.pptx
FMS IN CAD/CAM TYPES HISTORY ADVANTAGES PPT_final.pptx
 
Design of Production and Service Systems - Facilities
Design of Production and Service Systems - FacilitiesDesign of Production and Service Systems - Facilities
Design of Production and Service Systems - Facilities
 
CIM unit-4
CIM  unit-4CIM  unit-4
CIM unit-4
 
MANUFACTURING SYSTEMS PROJECT
MANUFACTURING SYSTEMS PROJECTMANUFACTURING SYSTEMS PROJECT
MANUFACTURING SYSTEMS PROJECT
 
Direct numerical control
Direct numerical controlDirect numerical control
Direct numerical control
 
Unit 4 cim
Unit 4 cimUnit 4 cim
Unit 4 cim
 
Unit 5 2nd-ME8691 & COMPUTER AIDED DESIGN AND MANUFACTURING
Unit 5 2nd-ME8691 & COMPUTER AIDED DESIGN AND    MANUFACTURINGUnit 5 2nd-ME8691 & COMPUTER AIDED DESIGN AND    MANUFACTURING
Unit 5 2nd-ME8691 & COMPUTER AIDED DESIGN AND MANUFACTURING
 
4.resource management
4.resource management4.resource management
4.resource management
 
Virtual Commissioning of Small to Medium Scale Industry Using the Concepts of...
Virtual Commissioning of Small to Medium Scale Industry Using the Concepts of...Virtual Commissioning of Small to Medium Scale Industry Using the Concepts of...
Virtual Commissioning of Small to Medium Scale Industry Using the Concepts of...
 
Capabilities brochure 2008
Capabilities brochure 2008Capabilities brochure 2008
Capabilities brochure 2008
 
MANUFACT SYSTEMS AND AUTOMATION.pptx
MANUFACT SYSTEMS AND AUTOMATION.pptxMANUFACT SYSTEMS AND AUTOMATION.pptx
MANUFACT SYSTEMS AND AUTOMATION.pptx
 
CAD CAM 1 Module-3 Part-A 18ME72
CAD CAM  1 Module-3 Part-A 18ME72CAD CAM  1 Module-3 Part-A 18ME72
CAD CAM 1 Module-3 Part-A 18ME72
 
Automated Production Lines
Automated Production LinesAutomated Production Lines
Automated Production Lines
 
Automated Assembly Systems
Automated Assembly SystemsAutomated Assembly Systems
Automated Assembly Systems
 
Unit6 55
Unit6 55Unit6 55
Unit6 55
 
Automated Process
Automated ProcessAutomated Process
Automated Process
 
Flexible manufacturing _system by fateh singh
Flexible manufacturing _system by fateh singhFlexible manufacturing _system by fateh singh
Flexible manufacturing _system by fateh singh
 
Automation in Manufacturing (1).pdf
Automation in Manufacturing (1).pdfAutomation in Manufacturing (1).pdf
Automation in Manufacturing (1).pdf
 
Introduction to Automation.ppt
Introduction to Automation.pptIntroduction to Automation.ppt
Introduction to Automation.ppt
 
01-K-I-Ahmad-AIP.ppt
01-K-I-Ahmad-AIP.ppt01-K-I-Ahmad-AIP.ppt
01-K-I-Ahmad-AIP.ppt
 

Recently uploaded

High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 

Recently uploaded (20)

🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 

Flexiblemanufacturingsystemss 121115132834-phpapp01

  • 1. -:Submitted By:- -: Guided By:- Subhasis Kumar Panda Prof-P K Jena 1101308245 Mechanical Engineering Maharaja Institute of Technology,Bhubaneswar
  • 2. Content:-  Introduction  Component of F.M.S Processing Station Material Handling Computer Control  Levels of Flexibility  Types of F.M.S Layout  Objectives of F.M.S
  • 3. What is F.M.S ? -A flexible Manufacturing System (F.M.S) is an arrangement of machines ,interconnected by a transport system . The transport carries work to the machine on pallets or other interface units so the work-machine registration on is accurate , rapid and automatic. OR -F.M.S consist of a group of Processing work Stations interconnected by means of an automated material handling and storage system and controlled by integrated Computer Control . Subhasis Kumara Panda MIT BHUBANESWAR
  • 4. In manufacturing flexibility means- The Capability of Producing Different parts without major retooling. A measure of of how fast the company converts its process(es) From making an old line of product to produce a new product. The ability to change a production schedule ,to modify a part or to handle multiple parts. So a flexible manufacturing system is a manufacturing system in which there is some amount of flexibility that allows the system to react in the case of changes whether predicted or unpredicted. Subhasis kumar panda MIT BHUBANESWAR
  • 5. Basic component of F.M.S- Work stations or Processing Stations Automated material handling Computer control system Work station or processing station:-In Present day, Work station are typically computer numerical control(C.N.C) Machine tool that performs different machining operation on families of parts .Flexible manufacturing system are being designed with other type of processing equipment including inspection station , assembly work and sheet metal process. The various types of workstation are:-Subhasis kumar panda MIT BHUBANESWAR
  • 6.  Machining Center:-It is a Sophisticated CNC machine that performs milling ,drilling, tapping and boring operation at the same location with variety of tools. or It is highly automated straight alone machine which can be used as a component of F.M.S. The special feature like automated tool changing , tool storage ,use of pallatised work parts ,C.N.C contol makes it more compatible with F.M.S & Milling, drilling, boring and tapping operation can achieve with this.Subhasis kumar panda MIT BHUBANESWAR
  • 8.  Head Changer:-Head changer is a special machine tool with the capability of change Tool heads . Tool heads are usually multiple spindle tool module that can be stored in a Rake Drum located on or near the machine.  Head Indexes:-In this heads are attach semi permanently to an Indexing mechanism on the machine tools.eg-Gear Cutting. Subhasis kumar panda MIT BHUBANESWAR
  • 9. Indexing plate Subhasis Kumar Panda MIT BHUBANESWAR
  • 10.  Assembly Work Station :-Industrial Robots are usually consider to be the most appropriate automated assembly work station in the F.M.S ,they can be programmed to perform task with variation in sequences.  Inspection Station:-Inspection Station are designed for inspecting the completed work , In F.M.S inspection can be happen either at work station or by designing Special Inspection Station for this purpose
  • 11. Industrial Robots assembling the Car:- Subhasis Kumar Panda MIT BHUBANESWAR
  • 12. Load and Unload Station:-as identifies from the name load and unload station are used for loading and unloading of work parts in the F.M.S. The various Feature of Load and Unload stations are:- -It act as a physical interface between the F.M.S and rest of the Factory. -Raw work parts enter the system at load station, while finished work parts exit at unload station -Manual loading/unloading is more prevalent Subhasis Kumar Panda MIT BHUBANESWAR
  • 13. 2. Automated Material Handling & Storage System:- The various Automated material handling system are used to transport work parts and subassembly parts between the processing station .The other function of automatic material handling and storage system are:-  Random and Independent movement of work parts between processing stations.  Handling of variety of work part configuration  Temporary storage  Convenient access for Loading and unloadingSubhasis Kumar Panda MIT BHUBANESWAR
  • 14. For automated material handling and storage of work parts is done by A.G.V(Automated Guided Vehicles),A.S.R.S & Conveyors . we are describing A.G.V Below:- Automated Guided Vehicle:-Automated Guided Vehicles (AGVs) are vehicles that are equipped with automatic guidance systems and are capable of following prescribed paths. Unlike traditional robots, AGVs are not manipulators, they are driverless vehicles that are programmed to follow a guide path. In automated factories and facilities AGV’s move pallets and containers. In offices they may be used to deliver and pick up the mail. Subhasis Kumar Panda MIT BHUBANESWAR
  • 15. Features of A.G.V:- It transport material from loading to unloading station. It Reduces labor cost. Highly flexible ,intelligent and versatile material handling system. Because it is driverless vehicle so it is safe & more accurate. Subhasis Kumar panda MIT BHUBANESWAR
  • 16. Types Of A.G.V:-There are many types of A.G.V but 3 are basic types describe below:- AGVS Towing Vehicles  :-it was the first type introduced and are still a very popular type today. Towing vehicles can pull a multitude of trailer types and have capacities ranging from 8,000 pounds to 60,000 pounds and are usually manned by an operator who adds and removes the trailers at designated stops. AGVS Unit Load Vehicles :-these are equipped with decks, which permit unit load transportation and often automatic load transfer. The decks can either be lift and lower type, powered of non- powered roller, chain or belt decks or custom decks.Subhasis Kumar PANDA MIT BHUBANESWAR
  • 17. Advantages Reduced Manufacturing Cost. Lower cost per unit Produced. Greater Labour Productivity. Greater Machine Efficiency. Improved quality Increased system reliability. Reduced Parts inventories. Adaptability to CAD/CAM operations. Shoter lead times Subhasis Kumar Panda MIT BHUBANESWAR
  • 18. Tow Type A.G.V:- Subhasis Kumar Panda MIT BHUBANESWAR
  • 19. Unit Load A.G.V:- Subhasis Kumar Panda MIT BHUBANESWAR
  • 20. Side Loading and High Lifting Types:- Side loading vehicle with telescopic fork for load handling on both sides. Load capacity up to 3,000 lbs. Lift heights up to 20 feet Bi-directional motion Ideal for material delivery and finished goods warehousing It is also a driverless A.G.V. Subhasis Kumar Panda MIT BHUANESWAR
  • 21. Third and most important part of F.M.S is Computer Control system:- 3. Computer Control System:-It is used to co- ordinate the activities of processing station and material handling System in the F.M.S. The various function of computer control system are:- Control of each work station.  Distribution of control instruction to work station. Production control.  Traffic control. Shuttle control. Work handling system and monitoring. SUBHASIS KUMAR PANDA MIT BHUBANESWAR
  • 22. Levels of Flexibility There are three basic level of manufacturing flexibility:- (a) Basic flexibilities Machine flexibility: The different operation types that a machine can Perform is called machine flexibility . More operation performance more flexible the machine . Process and product flexibility are dependent on machine flexibility. Material handling flexibility: A measure of the ease with which different part types can be transported and properly positioned at the various Subhasis Kumar Panda MIT BHUBANESWAR
  • 23.  Operation flexibility: A measure of the ease with which alternative operation sequences can be used for processing a part type. Subhasis Kumar Panda MIT BHUBANESWAR
  • 24. (b) System flexibilities Volume flexibility: It is the ability of the System to Varied the production volume of different product to accommodate changes. Expansion flexibility: The ability to build a system and expand it incrementally by volume , production or processes. Routing flexibility: A measure of the alternative paths that a processing part can effectively follow through a system for a given process plan. OR Subhasis Kumar Panda MIT BHUBANESWAR
  • 25. It can be defined as a capacity to produce or make an alternative work station . This Type of flexibility requires where there is an equipment break down ,tool failure or other interruption in the processing. Process flexibility: A measure of the volume of the set of part types that a system can produce without incurring any setup. Product flexibility: It Refers to ability to change over to a new set of Product Economically & quickly Response to the changing market condition & Requirements. The change over time Subhasis Kumar Panda MIT BHUBANESWAR
  • 26. include the Time of designing ,Planning, Tooling & Fixing of new product . (c) Aggregate flexibilities Program flexibility: The ability of a system to run for reasonably long periods without external intervention. Production flexibility: It is the volume of the set of part types that a system can produce without major investment in capital equipment. Market flexibility: The ability of a system to efficiently adapt to changing market conditions. It Subhasis Kumar Panda MIT BHUBANESWAR
  • 27. -:LAYOUT CONFIGURATION:- Types of F.M.S Layout Configuration:- There are five types of F.M.S Layout Configuration:- 1. Progressive or Line type: The machines and handling system are arranged in a line as shown in Fig. It is most appropriate for a system in which the part progress from one workstation to the next in a well defined sequence with no back flow. The operation of this type of system is very similar to transfer type. Work always flows in unidirectional path as shown in Fig.Subhasis Kumar Panda MIT BHUBANESWAR
  • 28. 2. Loop Type: The basic loop configuration is as shown in Fig.. The parts usually move in one direction around the loop, with the capability to stop and be transferred to any station. The loading and unloading station are typically located at one end of the loop Fig. Subhasis Kumar Panda MIT BHUBANESWAR
  • 29. 3. Ladder Type: The configuration is as shown in Fig. The loading and unloading station is typically located at the same end. The sequence to the operation/transfer of parts from one machine tool to another is in the form of ladder steps as shown in Fig. Subhasis Kumar Panda MIT BHUBANESWAR
  • 30. Progressive type Loop Type Ladder type Subhasis Kumar Panda MIT BHUBANESWAR
  • 31. 4. Open Field Type: In the open field type, The loading and unloading station is typically located at the same end. The parts will go through all the substations, such as CNC machines, coordinate measuring machines and wash station by the help of AGV’s from one substation to another. 5.Robot Centered Type: Robot centred cell is a relatively new form of flexible system in which one or more robots are used as the material handling systems .Industrial robots can be equipped with grippers that make them well suited for handling of rotational parts. Subhasis Kumar Panda MIT BHUBANESWAR
  • 32. Subhasis Kumar Panda MIT BHUBANESWAR
  • 33. Robot Centered cell:- Subhasis Kumar Panda MIT BHUBANESWAR
  • 34. Objectives or AIMS of F.M.S:- Decreased Lead TimesDecreased Lead Times Increased machine utilizationIncreased machine utilization Improved Due Date ReliabilityImproved Due Date Reliability Decreased Store Inventors levelsDecreased Store Inventors levels Remove Labour CostRemove Labour Cost Decreased Work in ProgressDecreased Work in Progress Increased QualityIncreased Quality Subhasis Kumar Panda MIT BHUBANESWAR
  • 35. Subhasis Kumar Panda MIT BHUBANESWAR