2. Bottom of roof slab is called
ceiling.
Height of the ceiling from the
finished floor level is called
ceiling height.
Which normally varies from 8
to 12 ft or more.
In other words, the clear height
available inside a building is
known as ceiling height.
Ceiling Height (C.H.)
3. It is the level of bottom of main windows from the top of floor.
Generally 3 ft.
In the past, a sill or slab was provided at the bottom of the windows
projecting from the wall from which the term S.L. is derived.
Now a days this type of sill is not used but the term S.L. is still there and
is also important for some other definitions.
Sill Level (S.L):
4. Top level of floor in any part of the building is called
finished floor level. (Verandah)
Finished Floor Level (F.F.L):
5. It is the level of the ground floor top in main part of the
building.
It is made higher than the ground level by an amount
depending upon the following factors with a minimum of
1 ft.
Rainwater
Drainage
Future trends
Plinth Level (P.L.):
6. You can see here the beam is constructed at
ground level. The void between the
foundation and plinth level is filled with
compacted soil.