ASSIGNMENT
DRIVE WINTER 2014
PROGRAM MBADS – (SEM 4/SEM 6) / MBAN2 / MBAFLEX – (SEM 4) /
PGDISMN – (SEM 2)
SUBJECT CODE & NAME OM0017 – ADVANCED PRODUCTION AND PLANNING
CONTROL
BK ID B1342
CREDITS 4
MARKS 60
Note: Answer all questions. Kindly note that answers for 10 marks questions should be
approximately of 400 words. Each question is followed by evaluation scheme.
Q1. a. What is the importance of production planning and control?
b. What factors affect inventory planning and control? c. What is the difference between batch
and mass production?
Answer: Importance of production planning and control: Production planning and control is
important for an organisation in different ways. Let us discuss its importance:
· Reduces cost of production by minimizing wastage of material and economic utilization of
resources
Q2. What is a master schedule? Explain.
Answer: Master Schedule: Master schedule is the presentation of the production schedule at
the summarylevel,depictingvariouskeyelements,resultingfromthe processof master scheduling.
In simple words, it can also be said that the masterschedule is a plan or format that integrates and
relates other production processes such as demand management, inventory planning and
capacity planning.
Features of a master
Q3. What are the different types of planning and scheduling tools? Explain.
Answer: Types of Planning and Scheduling Tools: Depending upon the requirements of the
production process, manufacturing organisations use different types of planning and scheduling
tools. There are no set parameters to opt for a particular tool.
Turnkey or off-the-shelf solutions
Custom systems
Excel and visual basic tools
Turnkey or off-the-shelf solutions:Turnkeyoroff-the-shelf solutionsare ready-made solutions that
a manufacturercan use withoutspendinganytime intheircustomisationor development. It takes a
lotof time forplanningandschedulingtoolstobe customisedif a manufacturer wants to develop it
from the beginning. After the
Q4. a. What are the pillars of lean production? b. What factors should be considered while
implementing a production planning and control system?
Answer: pillars of lean production: The foundation of lean production stands on just-in-time and
Jidoka,which are referredasthe twopillarsof lean production. Both these pillars provide the basis
for leanproductionbyprovidingsome importantconceptsin lean production such as pull system, 3
Ms, 5S, fail proofing system, etc.Let us now discuss
Q5. Case Study: Planning and Scheduling at John Smith Pvt .Ltd
John Smith is a manufacturing organisation of apparels and accessories, specialising in both men
and women segments. The organisation started in the US and gradually extended its different
branches and merchandise to other nations as well. The organisation was not only favoured by
customers but was also loved by its employees for the work environment it provided. Employees
were not only paid well but were also provided good appraisals that motivated them to give their
best to the organisation.
Current planner Mr. Jackson had been working with the organisation for the past 15 years and
now wanted to take retirement from his work due to his age. The organisation bid him farewell
and Mr.Max was hired as the new planner for the organisation on the basis of his qualifications
and experience. After Mr. Max completed 1 year, the organisation observed dissatisfaction
Among its employees. The reason was that employees were not happy with the way production
was carried out. There was too much pressure on employees, and Mr. Max was accepting more
orders than the workers could manage.
This was demotivating workers and employees, and as a result , the company observed the
highest attrition rate in its history. The management immediately reacted to the situation and
called back Mr. Jackson as an external planning consultant to address the issue at the earliest,
Because management was losing its manpower, which was affecting the business.
Mr. Jackson paid a visit to the organisation and studied the records for the past 1 year. He also
Had a discussion with the new planner, Mr. Max, for the current appraisal system. On the basis of
his observations and discussions, Mr. Jackson made certain conclusions. He stated that Mr. Max
was not followingthe appropriate production process, because the number of orders accepted for
production was more than the resources available at the production unit. He also stated that the
problem was not completely Mr. Max’s fault, because the organisation did not train him on the
existing production process and neither did they make him aware of the competitors and the
market.
Question
What is main issue inthe case study? Evaluate why thisissue was caused and provide a solution to
resolve it.
Describe the main issue in the case study.
To evaluate why the issue was caused
 Assess if the recruitment of the new planner was done correctly
 Discuss if the planner has the requisite skills and knowledge
 Argue if training the planner would have resolved the problem, would performance measurement
helped in identifying the issue
 Provide the solution from point of view evaluation made
Answer:
Q6. Write short notes on:
 Ø Cost centre
 Ø Objectives of sales and operations planning
 Ø Bills of Distribution (BOD)
 Ø Advanced scheduling
Answer: Cost centre: According to the Chartered Institute of Management Accountants, London,
a cost centre is“a location, person, or item of equipment (or a group of these) for which costs may
be ascertained and used for the purpose of costcontrol.” In simple words, a cost centre can be
defined as a machine, a department, a person, or a group of persons for which the cost is
ascertained. A cost centre helps in controlling cost by artif
Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :
“ help.mbaassignments@gmail.com ”
or
Call us at : 08263069601

More Related Content

What's hot

Business Simulation – Manufacturing Workshop by Tetrahedron
Business Simulation – Manufacturing Workshop by TetrahedronBusiness Simulation – Manufacturing Workshop by Tetrahedron
Business Simulation – Manufacturing Workshop by TetrahedronSagar Sangam Sahu
 
Questionnaire survey
Questionnaire surveyQuestionnaire survey
Questionnaire surveysiteoffice
 
Customer Requirement template
Customer Requirement templateCustomer Requirement template
Customer Requirement templateNoel Hatch
 
Qm0011 principles & philosophies of quality management
Qm0011   principles & philosophies of quality managementQm0011   principles & philosophies of quality management
Qm0011 principles & philosophies of quality managementsmumbahelp
 
Pm 0017 – project quality management
Pm 0017 – project quality managementPm 0017 – project quality management
Pm 0017 – project quality managementsmumbahelp
 
VTU Syllabus, MBA TQM, Module 8
VTU Syllabus, MBA TQM, Module 8VTU Syllabus, MBA TQM, Module 8
VTU Syllabus, MBA TQM, Module 8Adani University
 
PDCA Cycle
PDCA CyclePDCA Cycle
PDCA Cycleshobhu
 
Pm0017 project quality management
Pm0017  project quality managementPm0017  project quality management
Pm0017 project quality managementsmumbahelp
 
DRIVERS OF PROJECT MANAGEMENT IMPLEMENTATION
DRIVERS OF PROJECT MANAGEMENT IMPLEMENTATIONDRIVERS OF PROJECT MANAGEMENT IMPLEMENTATION
DRIVERS OF PROJECT MANAGEMENT IMPLEMENTATIONAlexander Sorokin
 
Pm0017 project quality management
Pm0017  project quality managementPm0017  project quality management
Pm0017 project quality managementsmumbahelp
 
Pm0017 project quality management
Pm0017  project quality managementPm0017  project quality management
Pm0017 project quality managementsmumbahelp
 
VTU MBA-TQM 12MBA42 Module 3
VTU MBA-TQM 12MBA42 Module 3VTU MBA-TQM 12MBA42 Module 3
VTU MBA-TQM 12MBA42 Module 3Adani University
 
Quality auditor kpi
Quality auditor kpiQuality auditor kpi
Quality auditor kpimecarjom
 
Module 1 basic principles of management
Module   1 basic principles of managementModule   1 basic principles of management
Module 1 basic principles of managementsmumbahelp
 
Developing and implementing workforce plans
Developing and implementing workforce plansDeveloping and implementing workforce plans
Developing and implementing workforce planssdwaltton
 

What's hot (20)

Dmaic
DmaicDmaic
Dmaic
 
Business Simulation – Manufacturing Workshop by Tetrahedron
Business Simulation – Manufacturing Workshop by TetrahedronBusiness Simulation – Manufacturing Workshop by Tetrahedron
Business Simulation – Manufacturing Workshop by Tetrahedron
 
Questionnaire survey
Questionnaire surveyQuestionnaire survey
Questionnaire survey
 
Customer Requirement template
Customer Requirement templateCustomer Requirement template
Customer Requirement template
 
Qm0011 principles & philosophies of quality management
Qm0011   principles & philosophies of quality managementQm0011   principles & philosophies of quality management
Qm0011 principles & philosophies of quality management
 
Pm 0017 – project quality management
Pm 0017 – project quality managementPm 0017 – project quality management
Pm 0017 – project quality management
 
VTU Syllabus, MBA TQM, Module 8
VTU Syllabus, MBA TQM, Module 8VTU Syllabus, MBA TQM, Module 8
VTU Syllabus, MBA TQM, Module 8
 
Quality Improvement Plan.pptx
Quality Improvement Plan.pptxQuality Improvement Plan.pptx
Quality Improvement Plan.pptx
 
Lean transformation
Lean transformationLean transformation
Lean transformation
 
PDCA Cycle
PDCA CyclePDCA Cycle
PDCA Cycle
 
Pm0017 project quality management
Pm0017  project quality managementPm0017  project quality management
Pm0017 project quality management
 
CV
CVCV
CV
 
DRIVERS OF PROJECT MANAGEMENT IMPLEMENTATION
DRIVERS OF PROJECT MANAGEMENT IMPLEMENTATIONDRIVERS OF PROJECT MANAGEMENT IMPLEMENTATION
DRIVERS OF PROJECT MANAGEMENT IMPLEMENTATION
 
Pm0017 project quality management
Pm0017  project quality managementPm0017  project quality management
Pm0017 project quality management
 
Pm0017 project quality management
Pm0017  project quality managementPm0017  project quality management
Pm0017 project quality management
 
VTU MBA-TQM 12MBA42 Module 3
VTU MBA-TQM 12MBA42 Module 3VTU MBA-TQM 12MBA42 Module 3
VTU MBA-TQM 12MBA42 Module 3
 
Quality auditor kpi
Quality auditor kpiQuality auditor kpi
Quality auditor kpi
 
Presentation on Quality Management
Presentation on Quality ManagementPresentation on Quality Management
Presentation on Quality Management
 
Module 1 basic principles of management
Module   1 basic principles of managementModule   1 basic principles of management
Module 1 basic principles of management
 
Developing and implementing workforce plans
Developing and implementing workforce plansDeveloping and implementing workforce plans
Developing and implementing workforce plans
 

Viewers also liked

Mca3020 advanced database management system
Mca3020  advanced database management systemMca3020  advanced database management system
Mca3020 advanced database management systemsmumbahelp
 
Pm0016 –project risk management
Pm0016 –project risk managementPm0016 –project risk management
Pm0016 –project risk managementsmumbahelp
 
Bba302 human resource management
Bba302   human resource managementBba302   human resource management
Bba302 human resource managementsmumbahelp
 
Job, Career, and Study Advice for Graduates and Professionals - the future is...
Job, Career, and Study Advice for Graduates and Professionals - the future is...Job, Career, and Study Advice for Graduates and Professionals - the future is...
Job, Career, and Study Advice for Graduates and Professionals - the future is...Prof. Jonathan A. J. Wilson PhD
 
Introduction to treatment_of_tannery_effluents
Introduction to treatment_of_tannery_effluentsIntroduction to treatment_of_tannery_effluents
Introduction to treatment_of_tannery_effluentssafwan patel
 
SMU MSC IT FALL/ SUMMER - 2013 SOLVED ASSIGNMENTS
SMU MSC IT FALL/ SUMMER - 2013 SOLVED ASSIGNMENTSSMU MSC IT FALL/ SUMMER - 2013 SOLVED ASSIGNMENTS
SMU MSC IT FALL/ SUMMER - 2013 SOLVED ASSIGNMENTSsmumbahelp
 
Qm0012 statistical process control and process capability
Qm0012  statistical process control and process capabilityQm0012  statistical process control and process capability
Qm0012 statistical process control and process capabilitysmumbahelp
 
2014 Business Forecast - what to watch out for in the year ahead
2014 Business Forecast - what to watch out for in the year ahead2014 Business Forecast - what to watch out for in the year ahead
2014 Business Forecast - what to watch out for in the year aheadJames Price
 
Seh62.1 instructions d_installation_xx
Seh62.1 instructions d_installation_xxSeh62.1 instructions d_installation_xx
Seh62.1 instructions d_installation_xxe-genieclimatique
 
Om0013 – advanced production and operations management
Om0013 – advanced production and operations managementOm0013 – advanced production and operations management
Om0013 – advanced production and operations managementsmumbahelp
 
Bba101 communication skills
Bba101   communication skillsBba101   communication skills
Bba101 communication skillssmumbahelp
 
Desenvolvimento Web com PHP parte 5
Desenvolvimento Web com PHP parte 5Desenvolvimento Web com PHP parte 5
Desenvolvimento Web com PHP parte 5Eduardo Mendes
 
Reliable lake dew residency
Reliable lake dew residencyReliable lake dew residency
Reliable lake dew residencyD K Associates
 
Mk0017 e-marketing
Mk0017 e-marketingMk0017 e-marketing
Mk0017 e-marketingsmumbahelp
 
Qm0010 foundation of quality management
Qm0010   foundation of quality managementQm0010   foundation of quality management
Qm0010 foundation of quality managementsmumbahelp
 
Energias Renováveis, Cidadania
Energias Renováveis, CidadaniaEnergias Renováveis, Cidadania
Energias Renováveis, CidadaniaVictor Xavier
 
História da Litertura Brasileira José Veríssimo
História da Litertura Brasileira   José VeríssimoHistória da Litertura Brasileira   José Veríssimo
História da Litertura Brasileira José VeríssimoSol Stabile
 

Viewers also liked (19)

Mca3020 advanced database management system
Mca3020  advanced database management systemMca3020  advanced database management system
Mca3020 advanced database management system
 
Pm0016 –project risk management
Pm0016 –project risk managementPm0016 –project risk management
Pm0016 –project risk management
 
Bba302 human resource management
Bba302   human resource managementBba302   human resource management
Bba302 human resource management
 
Job, Career, and Study Advice for Graduates and Professionals - the future is...
Job, Career, and Study Advice for Graduates and Professionals - the future is...Job, Career, and Study Advice for Graduates and Professionals - the future is...
Job, Career, and Study Advice for Graduates and Professionals - the future is...
 
Introduction to treatment_of_tannery_effluents
Introduction to treatment_of_tannery_effluentsIntroduction to treatment_of_tannery_effluents
Introduction to treatment_of_tannery_effluents
 
SMU MSC IT FALL/ SUMMER - 2013 SOLVED ASSIGNMENTS
SMU MSC IT FALL/ SUMMER - 2013 SOLVED ASSIGNMENTSSMU MSC IT FALL/ SUMMER - 2013 SOLVED ASSIGNMENTS
SMU MSC IT FALL/ SUMMER - 2013 SOLVED ASSIGNMENTS
 
Qm0012 statistical process control and process capability
Qm0012  statistical process control and process capabilityQm0012  statistical process control and process capability
Qm0012 statistical process control and process capability
 
2014 Business Forecast - what to watch out for in the year ahead
2014 Business Forecast - what to watch out for in the year ahead2014 Business Forecast - what to watch out for in the year ahead
2014 Business Forecast - what to watch out for in the year ahead
 
Seh62.1 instructions d_installation_xx
Seh62.1 instructions d_installation_xxSeh62.1 instructions d_installation_xx
Seh62.1 instructions d_installation_xx
 
Om0013 – advanced production and operations management
Om0013 – advanced production and operations managementOm0013 – advanced production and operations management
Om0013 – advanced production and operations management
 
Bba101 communication skills
Bba101   communication skillsBba101   communication skills
Bba101 communication skills
 
Desenvolvimento Web com PHP parte 5
Desenvolvimento Web com PHP parte 5Desenvolvimento Web com PHP parte 5
Desenvolvimento Web com PHP parte 5
 
Treballet xina
Treballet xinaTreballet xina
Treballet xina
 
Reliable lake dew residency
Reliable lake dew residencyReliable lake dew residency
Reliable lake dew residency
 
Poema DíA Del Padre 2º
Poema DíA Del Padre 2ºPoema DíA Del Padre 2º
Poema DíA Del Padre 2º
 
Mk0017 e-marketing
Mk0017 e-marketingMk0017 e-marketing
Mk0017 e-marketing
 
Qm0010 foundation of quality management
Qm0010   foundation of quality managementQm0010   foundation of quality management
Qm0010 foundation of quality management
 
Energias Renováveis, Cidadania
Energias Renováveis, CidadaniaEnergias Renováveis, Cidadania
Energias Renováveis, Cidadania
 
História da Litertura Brasileira José Veríssimo
História da Litertura Brasileira   José VeríssimoHistória da Litertura Brasileira   José Veríssimo
História da Litertura Brasileira José Veríssimo
 

Similar to Om0017 – advanced production and planning control

Bba501 production and operations management
Bba501  production and operations managementBba501  production and operations management
Bba501 production and operations managementsmumbahelp
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and schedulingsmumbahelp
 
Om 0017 – advanced production planning and control winter 2014
Om 0017 – advanced production planning and control winter 2014Om 0017 – advanced production planning and control winter 2014
Om 0017 – advanced production planning and control winter 2014Mba Assignments
 
Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation managementsmumbahelp
 
Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation managementsmumbahelp
 
Pm0010 – interduction to project management
Pm0010 – interduction to project managementPm0010 – interduction to project management
Pm0010 – interduction to project managementsmumbahelp
 
Om0013 advanced production and operations management
Om0013   advanced production and operations managementOm0013   advanced production and operations management
Om0013 advanced production and operations managementsmumbahelp
 
Project Management ORION Systems
Project Management ORION SystemsProject Management ORION Systems
Project Management ORION Systemsreeza fazily
 
Om0017 – advanced production and planning control
Om0017 – advanced production and planning controlOm0017 – advanced production and planning control
Om0017 – advanced production and planning controlsmumbahelp
 
Bba501 production & operations management
Bba501   production & operations managementBba501   production & operations management
Bba501 production & operations managementsmumbahelp
 
Ms 05 management of machines and materials
Ms 05 management of machines and materialsMs 05 management of machines and materials
Ms 05 management of machines and materialssmumbahelp
 
Mb0043 human resource management
Mb0043   human resource managementMb0043   human resource management
Mb0043 human resource managementsmumbahelp
 
Mb0043 human resource management
Mb0043   human resource managementMb0043   human resource management
Mb0043 human resource managementsmumbahelp
 
Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation managementsmumbahelp
 
IGNOU MBA SOLVED ASSIGNMENTS 2019
IGNOU MBA SOLVED ASSIGNMENTS 2019IGNOU MBA SOLVED ASSIGNMENTS 2019
IGNOU MBA SOLVED ASSIGNMENTS 2019AVINASH KAUR
 
Mb0044 production and operation management..
Mb0044   production and operation management..Mb0044   production and operation management..
Mb0044 production and operation management..smumbahelp
 
SEM 4 OM SUMMER 2014 ASSIGNMENTS
SEM 4 OM SUMMER 2014 ASSIGNMENTSSEM 4 OM SUMMER 2014 ASSIGNMENTS
SEM 4 OM SUMMER 2014 ASSIGNMENTSsolved_assignments
 
Pm0011 project planning and scheduling
Pm0011 project planning and schedulingPm0011 project planning and scheduling
Pm0011 project planning and schedulingconsult4solutions
 

Similar to Om0017 – advanced production and planning control (20)

Bba501 production and operations management
Bba501  production and operations managementBba501  production and operations management
Bba501 production and operations management
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
 
Om 0017 – advanced production planning and control winter 2014
Om 0017 – advanced production planning and control winter 2014Om 0017 – advanced production planning and control winter 2014
Om 0017 – advanced production planning and control winter 2014
 
Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation management
 
Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation management
 
Pm0010 – interduction to project management
Pm0010 – interduction to project managementPm0010 – interduction to project management
Pm0010 – interduction to project management
 
Om0013 advanced production and operations management
Om0013   advanced production and operations managementOm0013   advanced production and operations management
Om0013 advanced production and operations management
 
The enParadigm Result Book
The enParadigm Result BookThe enParadigm Result Book
The enParadigm Result Book
 
Project Management ORION Systems
Project Management ORION SystemsProject Management ORION Systems
Project Management ORION Systems
 
Om0017 – advanced production and planning control
Om0017 – advanced production and planning controlOm0017 – advanced production and planning control
Om0017 – advanced production and planning control
 
Bba501 production & operations management
Bba501   production & operations managementBba501   production & operations management
Bba501 production & operations management
 
Ms 05 management of machines and materials
Ms 05 management of machines and materialsMs 05 management of machines and materials
Ms 05 management of machines and materials
 
Mb0043 human resource management
Mb0043   human resource managementMb0043   human resource management
Mb0043 human resource management
 
Mb0043 human resource management
Mb0043   human resource managementMb0043   human resource management
Mb0043 human resource management
 
Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation management
 
IGNOU MBA SOLVED ASSIGNMENTS 2019
IGNOU MBA SOLVED ASSIGNMENTS 2019IGNOU MBA SOLVED ASSIGNMENTS 2019
IGNOU MBA SOLVED ASSIGNMENTS 2019
 
Mb0044 production and operation management..
Mb0044   production and operation management..Mb0044   production and operation management..
Mb0044 production and operation management..
 
SEM 4 OM SUMMER 2014 ASSIGNMENTS
SEM 4 OM SUMMER 2014 ASSIGNMENTSSEM 4 OM SUMMER 2014 ASSIGNMENTS
SEM 4 OM SUMMER 2014 ASSIGNMENTS
 
Assgnmenet
AssgnmenetAssgnmenet
Assgnmenet
 
Pm0011 project planning and scheduling
Pm0011 project planning and schedulingPm0011 project planning and scheduling
Pm0011 project planning and scheduling
 

Om0017 – advanced production and planning control

  • 1. Dear students get fully solved assignments Send your semester & Specialization name to our mail id : “ help.mbaassignments@gmail.com ” or Call us at : 08263069601 ASSIGNMENT DRIVE WINTER 2014 PROGRAM MBADS – (SEM 4/SEM 6) / MBAN2 / MBAFLEX – (SEM 4) / PGDISMN – (SEM 2) SUBJECT CODE & NAME OM0017 – ADVANCED PRODUCTION AND PLANNING CONTROL BK ID B1342 CREDITS 4 MARKS 60 Note: Answer all questions. Kindly note that answers for 10 marks questions should be approximately of 400 words. Each question is followed by evaluation scheme. Q1. a. What is the importance of production planning and control? b. What factors affect inventory planning and control? c. What is the difference between batch and mass production? Answer: Importance of production planning and control: Production planning and control is important for an organisation in different ways. Let us discuss its importance: · Reduces cost of production by minimizing wastage of material and economic utilization of resources Q2. What is a master schedule? Explain. Answer: Master Schedule: Master schedule is the presentation of the production schedule at the summarylevel,depictingvariouskeyelements,resultingfromthe processof master scheduling. In simple words, it can also be said that the masterschedule is a plan or format that integrates and relates other production processes such as demand management, inventory planning and capacity planning. Features of a master Q3. What are the different types of planning and scheduling tools? Explain.
  • 2. Answer: Types of Planning and Scheduling Tools: Depending upon the requirements of the production process, manufacturing organisations use different types of planning and scheduling tools. There are no set parameters to opt for a particular tool. Turnkey or off-the-shelf solutions Custom systems Excel and visual basic tools Turnkey or off-the-shelf solutions:Turnkeyoroff-the-shelf solutionsare ready-made solutions that a manufacturercan use withoutspendinganytime intheircustomisationor development. It takes a lotof time forplanningandschedulingtoolstobe customisedif a manufacturer wants to develop it from the beginning. After the Q4. a. What are the pillars of lean production? b. What factors should be considered while implementing a production planning and control system? Answer: pillars of lean production: The foundation of lean production stands on just-in-time and Jidoka,which are referredasthe twopillarsof lean production. Both these pillars provide the basis for leanproductionbyprovidingsome importantconceptsin lean production such as pull system, 3 Ms, 5S, fail proofing system, etc.Let us now discuss Q5. Case Study: Planning and Scheduling at John Smith Pvt .Ltd John Smith is a manufacturing organisation of apparels and accessories, specialising in both men and women segments. The organisation started in the US and gradually extended its different branches and merchandise to other nations as well. The organisation was not only favoured by customers but was also loved by its employees for the work environment it provided. Employees were not only paid well but were also provided good appraisals that motivated them to give their best to the organisation. Current planner Mr. Jackson had been working with the organisation for the past 15 years and now wanted to take retirement from his work due to his age. The organisation bid him farewell and Mr.Max was hired as the new planner for the organisation on the basis of his qualifications and experience. After Mr. Max completed 1 year, the organisation observed dissatisfaction Among its employees. The reason was that employees were not happy with the way production was carried out. There was too much pressure on employees, and Mr. Max was accepting more orders than the workers could manage. This was demotivating workers and employees, and as a result , the company observed the highest attrition rate in its history. The management immediately reacted to the situation and called back Mr. Jackson as an external planning consultant to address the issue at the earliest, Because management was losing its manpower, which was affecting the business. Mr. Jackson paid a visit to the organisation and studied the records for the past 1 year. He also
  • 3. Had a discussion with the new planner, Mr. Max, for the current appraisal system. On the basis of his observations and discussions, Mr. Jackson made certain conclusions. He stated that Mr. Max was not followingthe appropriate production process, because the number of orders accepted for production was more than the resources available at the production unit. He also stated that the problem was not completely Mr. Max’s fault, because the organisation did not train him on the existing production process and neither did they make him aware of the competitors and the market. Question What is main issue inthe case study? Evaluate why thisissue was caused and provide a solution to resolve it. Describe the main issue in the case study. To evaluate why the issue was caused  Assess if the recruitment of the new planner was done correctly  Discuss if the planner has the requisite skills and knowledge  Argue if training the planner would have resolved the problem, would performance measurement helped in identifying the issue  Provide the solution from point of view evaluation made Answer: Q6. Write short notes on:  Ø Cost centre  Ø Objectives of sales and operations planning  Ø Bills of Distribution (BOD)  Ø Advanced scheduling Answer: Cost centre: According to the Chartered Institute of Management Accountants, London, a cost centre is“a location, person, or item of equipment (or a group of these) for which costs may be ascertained and used for the purpose of costcontrol.” In simple words, a cost centre can be defined as a machine, a department, a person, or a group of persons for which the cost is ascertained. A cost centre helps in controlling cost by artif Dear students get fully solved assignments Send your semester & Specialization name to our mail id : “ help.mbaassignments@gmail.com ” or Call us at : 08263069601