SlideShare a Scribd company logo
1 of 4
Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :
“ help.mbaassignments@gmail.com ”
or
Call us at : 08263069601
(Prefer mailing. Call in emergency )
ASSIGNMENT
DRIVE FALL 2016
PROGRAM MBA/ MBADS/ MBAFLEX/ MBAHCSN3/ PGDBAN2
SEMESTER II
SUBJECT CODE & NAME MB 0049 - PROJECT MANAGEMENT
BK ID B1632
CREDITS&MARKS 4 CREDITS , 60 MARKS
Note: Answer all questions. Kindly note that answers for 10 marks questions should be
approximately of 400 words. Each question is followed by evaluation scheme.
Question.1 Write Short notes on:
1. PERT model
Answer:The program(or project) evaluationandreview technique,commonlyabbreviatedPERT,isa
statistical tool,usedinprojectmanagement,whichwasdesignedtoanalyze and represent the tasks
involvedincompletinga given project. First developed by the United States Navy in the 1950s, it is
commonly used in conjunction with the critical path method (CPM).
The PERT chart may have multiple pages
2. CPM model
Answer:Cost per impression (CPI), or "Cost per thousand impressions" (CPM), is a term used in
traditional advertisingmedia selection, as well as online advertising and marketing related to web
traffic. It refers to the cost of traditional advertising or internet marketing or email advertising
campaigns, where advertisers pay each time an
Question.2 Explain Project Life Cycle in detail?
Answer:The project manager and project team have one shared goal: to carry out the work of the
projectforthe purpose of meetingthe project’sobjectives. Every project has a beginning, a middle
periodduringwhichactivitiesmove the projecttowardcompletion, andanending(eithersuccessful
or unsuccessful).A standardprojecttypicallyhasthe followingfourmajorphases (each with its own
agenda of tasks and issues): initiation,
Question.3 Answer the following questions:
1. Mention the steps involved in a competitive bid.
Answer:If yourun a small business,youmightengage inthe biddingprocessregularly. Whether you
are the one accepting the bids or you have to bid on jobs, the basic steps are typically the same.
Completingthe biddingprocessinthe propermannercouldbe the difference between getting a bid
or looking for work.
Specifications:The firststepinthe biddingprocessdealswith coming up with the specifications for
the job. The company or
2. Mention the elements/points that must be kept in view when
designing , developing and operating a PMIS (Project Management
Information System)
Answer:His theory, called "Tuckman's Stages" was based on research he conducted on team
dynamics.He believed (as is a common belief today) that these stages are inevitable in order for a
teamto grow to the pointwhere theyare functioningeffectivelytogetheranddeliveringhighquality
results.
In 1977, Tuckman, jointly with Mary Ann Jensen, added a fifth stage to the 4 stages: "Adjourning."
The adjourningstage iswhenthe teamis completing the current project. They will be joining other
teams and moving on to other work in the near future. For a high performing team, the end of a
project brings on feelings of sadness as the team
Question.4. Explain the purpose of Project Final Report. Discuss the
major contents of the project’s final report.
Answer:A Draft Final Reportshouldbe as close to the final report as possible – Stage 1 outlines the
basicstructure.At thisstage the Principal Investigatorshouldhave hadthe reportproof read,edited
and if applicable designed. They should have
Question.5 Write short notes on
1. Role of risk management in overall project management
Answer:Effective risk management strategies allow you to identify your project’s strengths,
weaknesses, opportunities and threats. By planning for unexpected events, you can be ready to
respondif theyarise.Toensure yourproject’ssuccess,define how youwill handle potential risks so
you can identify, mitigate or avoid problems when you need to do. Successful project managers
recognize that risk management is important, because achieving a project’s goals depends on
planning, preparation, results and evaluation that
2. Quality assurance
Answer:Qualityassurance (QA) isawayof preventingmistakesordefectsinmanufacturedproducts
and avoidingproblemswhen delivering solutions or services to customers; which ISO 9000 defines
as "part of qualitymanagementfocused on providing confidence that quality requirements will be
fulfilled". This defect prevention in quality assurance differs subtly from defect detection and
rejectioninqualitycontrol,andhasbeen referred to as a shift left as it focuses on quality earlier in
the process.
Question.6 Explain Earned Value Method (EVM) in detail? How can
a project manager manage the Project Schedule if team members
don’t accurately report when they are behind?
Answer:Earned value management (EVM), or Earned value project/performance management
(EVPM) is a project management technique for measuring project performance and progress in an
objective manner.
Earnedvalue managementis a project management technique for measuring project performance
and progress. It has the ability to combine measurements of the project management triangle:
Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :
“ help.mbaassignments@gmail.com ”
or
Call us at : 08263069601
(Prefer mailing. Call in emergency )

More Related Content

What's hot

Mb0049 project management
Mb0049   project management Mb0049   project management
Mb0049 project management smumbahelp
 
Pm0013 managing human resources in projects
Pm0013   managing human resources in projectsPm0013   managing human resources in projects
Pm0013 managing human resources in projectssmumbahelp
 
Mb0049 project management
Mb0049   project managementMb0049   project management
Mb0049 project managementsmumbahelp
 
Mb0047 – management information systems
Mb0047 – management information systemsMb0047 – management information systems
Mb0047 – management information systemssmumbahelp
 
Qm0011 principles & philosophies of quality management
Qm0011   principles & philosophies of quality managementQm0011   principles & philosophies of quality management
Qm0011 principles & philosophies of quality managementsmumbahelp
 
Bt0092 software project management
Bt0092   software project managementBt0092   software project management
Bt0092 software project managementsmumbahelp
 
Mb0050 research methodology
Mb0050 research methodologyMb0050 research methodology
Mb0050 research methodologysmumbahelp
 
Planning overview2
Planning overview2Planning overview2
Planning overview2Hoda Ghatas
 
Ml0018 project management in retail
Ml0018  project management in retailMl0018  project management in retail
Ml0018 project management in retailsmumbahelp
 
Project management
Project managementProject management
Project managementsmumbahelp
 
Ms 05 management of machines and materials
Ms 05 management of machines and materialsMs 05 management of machines and materials
Ms 05 management of machines and materialssmumbahelp
 
Pm0017 project quality management
Pm0017  project quality managementPm0017  project quality management
Pm0017 project quality managementsmumbahelp
 
Smu mba sem 4 pm spring 2015 assignments
Smu mba sem 4 pm spring 2015  assignmentsSmu mba sem 4 pm spring 2015  assignments
Smu mba sem 4 pm spring 2015 assignmentssolved_assignments
 
Pm0017 project quality management
Pm0017  project quality managementPm0017  project quality management
Pm0017 project quality managementsmumbahelp
 
Pm0017 project quality management
Pm0017  project quality managementPm0017  project quality management
Pm0017 project quality managementsmumbahelp
 
Mb0049 project management....
Mb0049   project management....Mb0049   project management....
Mb0049 project management....smumbahelp
 

What's hot (19)

Mb0049 project management
Mb0049   project management Mb0049   project management
Mb0049 project management
 
Pm0013 managing human resources in projects
Pm0013   managing human resources in projectsPm0013   managing human resources in projects
Pm0013 managing human resources in projects
 
Mb0049 project management
Mb0049   project managementMb0049   project management
Mb0049 project management
 
Mb0047 – management information systems
Mb0047 – management information systemsMb0047 – management information systems
Mb0047 – management information systems
 
Qm0011 principles & philosophies of quality management
Qm0011   principles & philosophies of quality managementQm0011   principles & philosophies of quality management
Qm0011 principles & philosophies of quality management
 
Bt0092 software project management
Bt0092   software project managementBt0092   software project management
Bt0092 software project management
 
Mb0050 research methodology
Mb0050 research methodologyMb0050 research methodology
Mb0050 research methodology
 
Planning overview2
Planning overview2Planning overview2
Planning overview2
 
Ml0018 project management in retail
Ml0018  project management in retailMl0018  project management in retail
Ml0018 project management in retail
 
Project management
Project managementProject management
Project management
 
Ms 05 management of machines and materials
Ms 05 management of machines and materialsMs 05 management of machines and materials
Ms 05 management of machines and materials
 
Pm0017 project quality management
Pm0017  project quality managementPm0017  project quality management
Pm0017 project quality management
 
Smu mba sem 4 pm spring 2015 assignments
Smu mba sem 4 pm spring 2015  assignmentsSmu mba sem 4 pm spring 2015  assignments
Smu mba sem 4 pm spring 2015 assignments
 
Pm0017 project quality management
Pm0017  project quality managementPm0017  project quality management
Pm0017 project quality management
 
Amplify My Pitch
Amplify My PitchAmplify My Pitch
Amplify My Pitch
 
Crm project enabling agility beyond challenges
Crm project enabling agility beyond challengesCrm project enabling agility beyond challenges
Crm project enabling agility beyond challenges
 
Medical Practice Management Training
Medical Practice Management TrainingMedical Practice Management Training
Medical Practice Management Training
 
Pm0017 project quality management
Pm0017  project quality managementPm0017  project quality management
Pm0017 project quality management
 
Mb0049 project management....
Mb0049   project management....Mb0049   project management....
Mb0049 project management....
 

Viewers also liked

Los adolescentes y el uso del internet
Los adolescentes y el uso del internetLos adolescentes y el uso del internet
Los adolescentes y el uso del internetvalentin renga
 
Ees orloff final
Ees orloff finalEes orloff final
Ees orloff finalShareppt34
 
Supporting the Industrial Digital Revolution
Supporting the Industrial Digital RevolutionSupporting the Industrial Digital Revolution
Supporting the Industrial Digital RevolutionVincent Béchard, MASc.
 
Jodo Mission Bulletin - December 2016
Jodo Mission Bulletin - December 2016Jodo Mission Bulletin - December 2016
Jodo Mission Bulletin - December 2016Ryan Ozawa
 
Gerência de redes utilizando o cacti
Gerência de redes utilizando o cactiGerência de redes utilizando o cacti
Gerência de redes utilizando o cactiIsraelCunha
 
Company Profile - Compressed
Company Profile - CompressedCompany Profile - Compressed
Company Profile - CompressedSolly Moeng - APR
 
Formulario autorización intercambio_galicia
Formulario autorización intercambio_galiciaFormulario autorización intercambio_galicia
Formulario autorización intercambio_galiciaCarlos De Andres
 
¿Quién está detrás de CASMADRID?
¿Quién está detrás de CASMADRID?¿Quién está detrás de CASMADRID?
¿Quién está detrás de CASMADRID?sanidadpublica
 
Memorias Webcast Reconozca los Errores típicos en la adopción de procesos ITIL
Memorias Webcast Reconozca los Errores típicos en la adopción de procesos ITILMemorias Webcast Reconozca los Errores típicos en la adopción de procesos ITIL
Memorias Webcast Reconozca los Errores típicos en la adopción de procesos ITILAranda Software
 
Expresiones algebraicas 1_tutorial
Expresiones algebraicas 1_tutorialExpresiones algebraicas 1_tutorial
Expresiones algebraicas 1_tutorialDavid Colotl
 
Ordenanza/reglamento mpal. de movilidad sostenible
Ordenanza/reglamento mpal. de movilidad sostenibleOrdenanza/reglamento mpal. de movilidad sostenible
Ordenanza/reglamento mpal. de movilidad sostenibleEsther Anaya
 
2010 12 guía básica de utilización www saber expresarte com
2010 12 guía básica de utilización www saber expresarte com2010 12 guía básica de utilización www saber expresarte com
2010 12 guía básica de utilización www saber expresarte comPascale Rahmani
 
5. didacticas tecnologicas
5.  didacticas tecnologicas5.  didacticas tecnologicas
5. didacticas tecnologicasAlexandra Ruano
 

Viewers also liked (19)

KHALIL HIDMI CV-8
KHALIL HIDMI CV-8KHALIL HIDMI CV-8
KHALIL HIDMI CV-8
 
Cookbook-Inner_Resized
Cookbook-Inner_ResizedCookbook-Inner_Resized
Cookbook-Inner_Resized
 
Los adolescentes y el uso del internet
Los adolescentes y el uso del internetLos adolescentes y el uso del internet
Los adolescentes y el uso del internet
 
Plandeempresa
PlandeempresaPlandeempresa
Plandeempresa
 
Ees orloff final
Ees orloff finalEes orloff final
Ees orloff final
 
Supporting the Industrial Digital Revolution
Supporting the Industrial Digital RevolutionSupporting the Industrial Digital Revolution
Supporting the Industrial Digital Revolution
 
Jodo Mission Bulletin - December 2016
Jodo Mission Bulletin - December 2016Jodo Mission Bulletin - December 2016
Jodo Mission Bulletin - December 2016
 
Computacion info
Computacion infoComputacion info
Computacion info
 
Gerência de redes utilizando o cacti
Gerência de redes utilizando o cactiGerência de redes utilizando o cacti
Gerência de redes utilizando o cacti
 
Company Profile - Compressed
Company Profile - CompressedCompany Profile - Compressed
Company Profile - Compressed
 
Formulario autorización intercambio_galicia
Formulario autorización intercambio_galiciaFormulario autorización intercambio_galicia
Formulario autorización intercambio_galicia
 
¿Quién está detrás de CASMADRID?
¿Quién está detrás de CASMADRID?¿Quién está detrás de CASMADRID?
¿Quién está detrás de CASMADRID?
 
Memorias Webcast Reconozca los Errores típicos en la adopción de procesos ITIL
Memorias Webcast Reconozca los Errores típicos en la adopción de procesos ITILMemorias Webcast Reconozca los Errores típicos en la adopción de procesos ITIL
Memorias Webcast Reconozca los Errores típicos en la adopción de procesos ITIL
 
Expresiones algebraicas 1_tutorial
Expresiones algebraicas 1_tutorialExpresiones algebraicas 1_tutorial
Expresiones algebraicas 1_tutorial
 
Ordenanza/reglamento mpal. de movilidad sostenible
Ordenanza/reglamento mpal. de movilidad sostenibleOrdenanza/reglamento mpal. de movilidad sostenible
Ordenanza/reglamento mpal. de movilidad sostenible
 
2010 12 guía básica de utilización www saber expresarte com
2010 12 guía básica de utilización www saber expresarte com2010 12 guía básica de utilización www saber expresarte com
2010 12 guía básica de utilización www saber expresarte com
 
0001 argentina-constitución1994
0001 argentina-constitución19940001 argentina-constitución1994
0001 argentina-constitución1994
 
5. didacticas tecnologicas
5.  didacticas tecnologicas5.  didacticas tecnologicas
5. didacticas tecnologicas
 
Second life
Second lifeSecond life
Second life
 

Similar to Mb0049 project management

Mb0049 project management
Mb0049   project managementMb0049   project management
Mb0049 project managementsmumbahelp
 
Mb0049 project management (2)
Mb0049   project management (2)Mb0049   project management (2)
Mb0049 project management (2)smumbahelp
 
Mb0049 project management (2)
Mb0049   project management (2)Mb0049   project management (2)
Mb0049 project management (2)Study Stuff
 
Qm0022 tqm tools and techniques
Qm0022 tqm tools and techniquesQm0022 tqm tools and techniques
Qm0022 tqm tools and techniquessmumbahelp
 
Ml0018 project management in retail
Ml0018 project management in retailMl0018 project management in retail
Ml0018 project management in retailsmumbahelp
 
Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation managementsmumbahelp
 
Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation managementsmumbahelp
 
Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation managementsmumbahelp
 
Pm0016 –project risk management
Pm0016 –project risk managementPm0016 –project risk management
Pm0016 –project risk managementsmumbahelp
 
Pm0016 project risk management
Pm0016  project risk managementPm0016  project risk management
Pm0016 project risk managementsmumbahelp
 
Qm0022 tqm tools and techniques
Qm0022 tqm tools and techniquesQm0022 tqm tools and techniques
Qm0022 tqm tools and techniquesStudy Stuff
 
Mb0049 project management
Mb0049   project management Mb0049   project management
Mb0049 project management smumbahelp
 
Om0017 – advanced production and planning control
Om0017 – advanced production and planning controlOm0017 – advanced production and planning control
Om0017 – advanced production and planning controlsmumbahelp
 
Ml0018 project management in retail
Ml0018 project management in retailMl0018 project management in retail
Ml0018 project management in retailsmumbahelp
 
Mb0049 project management....
Mb0049   project management....Mb0049   project management....
Mb0049 project management....smumbahelp
 
Pm0016 project risk management
Pm0016  project risk managementPm0016  project risk management
Pm0016 project risk managementsmumbahelp
 
Pm0016 –project risk management
Pm0016 –project risk managementPm0016 –project risk management
Pm0016 –project risk managementsmumbahelp
 
Mba206 project management
Mba206   project managementMba206   project management
Mba206 project managementsmumbahelp
 
Pm0015 quantitative methods in project management
Pm0015  quantitative methods in project managementPm0015  quantitative methods in project management
Pm0015 quantitative methods in project managementsmumbahelp
 

Similar to Mb0049 project management (20)

Mb0049 project management
Mb0049   project managementMb0049   project management
Mb0049 project management
 
Mb0049 project management (2)
Mb0049   project management (2)Mb0049   project management (2)
Mb0049 project management (2)
 
Mb0049 project management (2)
Mb0049   project management (2)Mb0049   project management (2)
Mb0049 project management (2)
 
Qm0022 tqm tools and techniques
Qm0022 tqm tools and techniquesQm0022 tqm tools and techniques
Qm0022 tqm tools and techniques
 
Ml0018 project management in retail
Ml0018 project management in retailMl0018 project management in retail
Ml0018 project management in retail
 
Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation management
 
Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation management
 
Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation management
 
Pm0016 –project risk management
Pm0016 –project risk managementPm0016 –project risk management
Pm0016 –project risk management
 
Pm0016 project risk management
Pm0016  project risk managementPm0016  project risk management
Pm0016 project risk management
 
Qm0022 tqm tools and techniques
Qm0022 tqm tools and techniquesQm0022 tqm tools and techniques
Qm0022 tqm tools and techniques
 
Mb0049 project management
Mb0049   project management Mb0049   project management
Mb0049 project management
 
Om0017 – advanced production and planning control
Om0017 – advanced production and planning controlOm0017 – advanced production and planning control
Om0017 – advanced production and planning control
 
Mb0049 project management
Mb0049 project managementMb0049 project management
Mb0049 project management
 
Ml0018 project management in retail
Ml0018 project management in retailMl0018 project management in retail
Ml0018 project management in retail
 
Mb0049 project management....
Mb0049   project management....Mb0049   project management....
Mb0049 project management....
 
Pm0016 project risk management
Pm0016  project risk managementPm0016  project risk management
Pm0016 project risk management
 
Pm0016 –project risk management
Pm0016 –project risk managementPm0016 –project risk management
Pm0016 –project risk management
 
Mba206 project management
Mba206   project managementMba206   project management
Mba206 project management
 
Pm0015 quantitative methods in project management
Pm0015  quantitative methods in project managementPm0015  quantitative methods in project management
Pm0015 quantitative methods in project management
 

Recently uploaded

APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docxPoojaSen20
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...KokoStevan
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxVishalSingh1417
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docxPoojaSen20
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Shubhangi Sonawane
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 

Recently uploaded (20)

APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 

Mb0049 project management

  • 1. Dear students get fully solved assignments Send your semester & Specialization name to our mail id : “ help.mbaassignments@gmail.com ” or Call us at : 08263069601 (Prefer mailing. Call in emergency ) ASSIGNMENT DRIVE FALL 2016 PROGRAM MBA/ MBADS/ MBAFLEX/ MBAHCSN3/ PGDBAN2 SEMESTER II SUBJECT CODE & NAME MB 0049 - PROJECT MANAGEMENT BK ID B1632 CREDITS&MARKS 4 CREDITS , 60 MARKS Note: Answer all questions. Kindly note that answers for 10 marks questions should be approximately of 400 words. Each question is followed by evaluation scheme. Question.1 Write Short notes on: 1. PERT model Answer:The program(or project) evaluationandreview technique,commonlyabbreviatedPERT,isa statistical tool,usedinprojectmanagement,whichwasdesignedtoanalyze and represent the tasks involvedincompletinga given project. First developed by the United States Navy in the 1950s, it is commonly used in conjunction with the critical path method (CPM). The PERT chart may have multiple pages 2. CPM model Answer:Cost per impression (CPI), or "Cost per thousand impressions" (CPM), is a term used in traditional advertisingmedia selection, as well as online advertising and marketing related to web traffic. It refers to the cost of traditional advertising or internet marketing or email advertising campaigns, where advertisers pay each time an
  • 2. Question.2 Explain Project Life Cycle in detail? Answer:The project manager and project team have one shared goal: to carry out the work of the projectforthe purpose of meetingthe project’sobjectives. Every project has a beginning, a middle periodduringwhichactivitiesmove the projecttowardcompletion, andanending(eithersuccessful or unsuccessful).A standardprojecttypicallyhasthe followingfourmajorphases (each with its own agenda of tasks and issues): initiation, Question.3 Answer the following questions: 1. Mention the steps involved in a competitive bid. Answer:If yourun a small business,youmightengage inthe biddingprocessregularly. Whether you are the one accepting the bids or you have to bid on jobs, the basic steps are typically the same. Completingthe biddingprocessinthe propermannercouldbe the difference between getting a bid or looking for work. Specifications:The firststepinthe biddingprocessdealswith coming up with the specifications for the job. The company or 2. Mention the elements/points that must be kept in view when designing , developing and operating a PMIS (Project Management Information System) Answer:His theory, called "Tuckman's Stages" was based on research he conducted on team dynamics.He believed (as is a common belief today) that these stages are inevitable in order for a teamto grow to the pointwhere theyare functioningeffectivelytogetheranddeliveringhighquality results. In 1977, Tuckman, jointly with Mary Ann Jensen, added a fifth stage to the 4 stages: "Adjourning." The adjourningstage iswhenthe teamis completing the current project. They will be joining other teams and moving on to other work in the near future. For a high performing team, the end of a project brings on feelings of sadness as the team Question.4. Explain the purpose of Project Final Report. Discuss the major contents of the project’s final report. Answer:A Draft Final Reportshouldbe as close to the final report as possible – Stage 1 outlines the basicstructure.At thisstage the Principal Investigatorshouldhave hadthe reportproof read,edited and if applicable designed. They should have
  • 3. Question.5 Write short notes on 1. Role of risk management in overall project management Answer:Effective risk management strategies allow you to identify your project’s strengths, weaknesses, opportunities and threats. By planning for unexpected events, you can be ready to respondif theyarise.Toensure yourproject’ssuccess,define how youwill handle potential risks so you can identify, mitigate or avoid problems when you need to do. Successful project managers recognize that risk management is important, because achieving a project’s goals depends on planning, preparation, results and evaluation that 2. Quality assurance Answer:Qualityassurance (QA) isawayof preventingmistakesordefectsinmanufacturedproducts and avoidingproblemswhen delivering solutions or services to customers; which ISO 9000 defines as "part of qualitymanagementfocused on providing confidence that quality requirements will be fulfilled". This defect prevention in quality assurance differs subtly from defect detection and rejectioninqualitycontrol,andhasbeen referred to as a shift left as it focuses on quality earlier in the process. Question.6 Explain Earned Value Method (EVM) in detail? How can a project manager manage the Project Schedule if team members don’t accurately report when they are behind? Answer:Earned value management (EVM), or Earned value project/performance management (EVPM) is a project management technique for measuring project performance and progress in an objective manner. Earnedvalue managementis a project management technique for measuring project performance and progress. It has the ability to combine measurements of the project management triangle: Dear students get fully solved assignments Send your semester & Specialization name to our mail id : “ help.mbaassignments@gmail.com ” or Call us at : 08263069601
  • 4. (Prefer mailing. Call in emergency )