SlideShare a Scribd company logo
1 of 8
Download to read offline
Gulele Sub-City TVET Office Institutional Quality audit
Expert report World Vision Ethiopia
By Berhanu Tadesse Taye
Monday, April 13, 2015
The organization Undertake several activities like expanding educational
institutions, community development work and also graduates trainees from the
institution as well as benefiting them by purchasing machineries and tools to make
the graduate trainees organized in the form of MSEs entrepreneurs or association.
Consequently to bring them in to strong form of organization, sustain enterprise,
associated with micro finance.
The target area of their expansion work is shiro Meda Technical Vocational
Education and Training (TVET) institution. The project donor has agreed to
expand the TVET institution. The special donor of South Korea, the name of
specific place which donate us, it said to be “Chungbuk located in central part of
South Korea”.
The project has been implemented in to three phases.
1. The first phase completed with G+1,
2. The second one also ended with G+4 building hence, beside to this, that is even
now September 2014 the third phases will start after few days.
3. The newly launched construction of B+1 (basement plus ground) building will
be built for the purpose of opening automotive department.
The design, sketch building work finished by sub-city architectural, structural,
electrical and building quantity surveying etc. The work completed by Sub-city
Engineers after carrying out the building design provided for the donors.
In the first phase this project was started (2009 and completed 2012), which is
G+1 building consisted three classrooms, five workshops and two office rooms.
Meanwhile the second phase was started (2012) which they completed and
provided for the college August 22, (2014), i.e. G+4 building with two workshops,
nine classrooms, library, meeting hall, a store and 5 office rooms had been
constructed at a cost of more than 22 million birr. This budget excluded the third
phase of the project. The aim of the building expansion empowering the shiro
Meda area peoples i.e. the youth, the adult and the special needs.
Third phase of the project included The donor provided aggregate budget of
320,302.00 USD (6,406,040.00 Ethiopian birr) for the entire programme
supporting the TVET institution. The initial allocated of budget for building of
basement plus one (B+1) construction 270,000 USD (5,400,000 Ethiopian birr).
Due to this reason the institution department also enhance in number;
1. Construction department including electricity and plumbing offers level III.
2. Metal work fabrication and wood work technology offers level III.
3. Leather garment appropriate to offer training level II
4. This year new department will commence i.e. information communication
technology (ICT) and computer science level III.
5. Automotive technology (repaired car both electrical parts of the car, mechanical
parts…… including others cars’ service), after the end of next year (2015), we
intend to launch this department. Due to the fact that intake rate of the institution
will rise from 1393-2500. It is good achievement of the institution and for the Sub
City TVET office.
This Week’s Brief Work Progress Report About Shiro Meda
TVET Institute based on the donation obtained from World
Vision Ethiopia.
World Vision Ethiopia donates a budget for Shiro Meda TVET institute for the
purpose of opening new automotive department, expansion and upgrading the
institute. The budget includes both capital expenditure and recurrent budget
allocation and execution in 2014/15 fiscal budget year from Septembers on wards.
The donor provided aggregate budget of 320,302.00 USD (6,406,040.00 Ethiopian
birr) for the entire programme supporting the TVET institution. The initial
allocated of budget for building of basement plus one (B+1) construction 270,000
USD (5,400,000 Ethiopian birr). Following this, budget was distributed for the
programme which includes purchasing of heavy duty machineries for a total sum
of 27,865 USD (557,300 Ethiopian birr), tools (Utensils and equipment)
11407USD (228,140 Ethiopian birr) according to world vision.
To fulfill the government standards automotive workshop, World Vision Ethiopia
equipped the institute with benches and shelves with the total sum of 2718 USD
(54360 Ethiopian birr), the donors also allocated the institute with class rooms and
office furniture with expense of 1442 USD (28,840 Ethiopian birr), the allocation
was also distributed for reference books with 755 USD (15,100 Ethiopian birr), the
support goes for IG’s at cost of 1903 USD (38,060 Ethiopian birr), the support
includes expenditures for trainees school fees for centre of occupational
competency assessment and certification (COCAC) with the total amount of 3462
USD (69,240 Ethiopian birr), and also for training for trainees and trainers on
themes of business competency and saving and credit with 750 USD (15,000
Ethiopian birr), Purchased heavy machineries, equipments and tools this fiscal year
for the Shuro Meda TVET in the amount of 1,384,740 Ethiopian birr. Really
thanks for World Vision Ethiopia for its bounteousness work of them!
For the progress of the project, the assigned body worked in such a way that the
task force evaluation was carried out at three TVET colleges for pre test
assessment purpose: namely Entoto, Tegbared, and General Wingate TVET
Colleges automotive workshops for the purpose of selecting the best workshop and
benchmark it. Due to proximity of Entoto TVET Polytechnic College, the task
force visited two G+1 buildings auto workshops. The institute was visited
persistently. After thorough investigation, the task force found out enormous
problems.
To mention some of the core problems: - the automotive workshops visited were
not built in a modern manner, no room for tools (mini-store) for the immediate use
of training in the workshop of the newly, the automotive department had a space
capacity of occupying only one car at a time as other rooms have not served other
cars because of unplanned space of the workshop. It is impossible to use the
forklift as the roofs are low in the over head to move cars from place to place, no
ventilation in the work shop, misused of the allocated capital budget,
The buildings which are deliberately made for automotive department workshops
haven’t enough space for practical teaching and learning processes, if the institute
wants to change in to other department or classroom they can’t change the
workshop in to classrooms because it was built in the forms of castle as it is not
transparent. Therefore the building should be demolished because of the above
problems.
From the experiences of those visited polytechnic colleges, both constructive and
destructive lessons have been obtained. The visit was intended to share the
constructive experiences from them and to be careful not to repeat the
shortcomings of the institutes.
To avoid the quality problem of the training workshop, the task force team has
assessed three TVET colleges design of automotive department. Hence, we have
preferred Tegbareid TVET polytechnic college. The standards criteria to make
selective such as the organization of Auto workshop has enormity (great size) both
the ground and the first floor which is capable and enough space to hold and
accommodates cares.
During the visit, the researchers noticed that the building of the Entoto polytechnic
college not giving service since it was built; therefore, the researcher was
convinced that the two buildings in the compound were not giving service either
because of ignorance or corruption problems of the administrators.
The visit was intended to benchmark the practices of the polytechnic Colleges.
Among these are: there is no proper design two G+1 building, The new buildings
accommodate not more than one car including heavy machinery like fork-lift for
holding the car repair and wash.
The old automotive building of the Entoto TVET polytechnic College is better than
the new one because the workshop has car fork-lifts, accommodate many cars in
the workshop enough space for storage of tools, practical rooms, electric, painting
and decorating workshops are available.
The researcher is confident that the donation granted by the world vision Ethiopia
would resolve the current problems faced by Shouro Meda TVET institute by
helping design a new all rounded building that easily help facilitate the teaching
and learning process.
Consequently, Shiro Meda TVET has been design two building parts i.e. the
ground floor accommodate mechanical parts of the cars and first floor
accommodate electrical parts of the department units. The cars also facilitating
able to climb the first floor but after the donor agreement they omit it.
As we have already requested Gulele Sub City House and Construction
Development Office, among other works or the entire parts of the building the
remaining,
(1) Size of grade beam, basement and roof beams and stirrup size and spacing,
(2) Reinforcement details for car ramp and how it is joined with beams and
columns.
(3) Roof truss detail
(4) Column stirrups size and spacing retaining wall/at least for the three sides of
the building
(5) Retaining wall/at least for the three sides of the building (it is not included in
bill of quantity) (new amendment works ready for bid and tender) the sub-city
House and Construction Development Office completed detail blueprint,
(6) Sewage (water drainage)
Indeed most of the above work finished by the office. I hope that the office would
work hand in hand with Gulele Sub City TVET office and Shiro Meda TVET
institute by solving the problems of the design, monitoring and evaluation work of
the new building of the institute. Therefore, I hope that the office would provide us
with all the necessary support so that we would accomplish the implementation of
the plan based on the schedule.
I would like to acknowledge the great kindness work of South Korea (Chungbuk)
World vision Ethiopia (WVE), that shows their keen related regarding to our
countries Historical and social contact. It’s work place of NGO found around
Gulele sub-city development program office in A.A. around Shiro Meda.

More Related Content

What's hot (9)

Dlw summer training report 2018(1)
Dlw summer training report 2018(1)Dlw summer training report 2018(1)
Dlw summer training report 2018(1)
 
INTERNSHIP REPORT
INTERNSHIP REPORTINTERNSHIP REPORT
INTERNSHIP REPORT
 
IEM is known among the private engineering colleges in Kolkata
IEM is known among the private engineering colleges in KolkataIEM is known among the private engineering colleges in Kolkata
IEM is known among the private engineering colleges in Kolkata
 
Mohamed Ahmed Gado
Mohamed Ahmed GadoMohamed Ahmed Gado
Mohamed Ahmed Gado
 
Internship report of mechanical student
Internship report of mechanical studentInternship report of mechanical student
Internship report of mechanical student
 
Financial Statement Analysis of Eicher Motors
Financial Statement Analysis of Eicher MotorsFinancial Statement Analysis of Eicher Motors
Financial Statement Analysis of Eicher Motors
 
Evaluating Engineering Colleges in Mumbai
Evaluating Engineering Colleges in MumbaiEvaluating Engineering Colleges in Mumbai
Evaluating Engineering Colleges in Mumbai
 
Lakshmanrao A
Lakshmanrao ALakshmanrao A
Lakshmanrao A
 
BBM Report
BBM ReportBBM Report
BBM Report
 

Similar to World vishion shuromeda gulele sub

Similar to World vishion shuromeda gulele sub (20)

Researcher observation observed on the enterprises
Researcher observation observed on the enterprisesResearcher observation observed on the enterprises
Researcher observation observed on the enterprises
 
Persistent researcherobservationatentotovocationaltrainingcollegeedited
Persistent researcherobservationatentotovocationaltrainingcollegeeditedPersistent researcherobservationatentotovocationaltrainingcollegeedited
Persistent researcherobservationatentotovocationaltrainingcollegeedited
 
2004
20042004
2004
 
Alccs brochure
Alccs brochureAlccs brochure
Alccs brochure
 
Project sample
Project sampleProject sample
Project sample
 
Commencing a new polytechnic tvet college gulele sub(1)
Commencing a new polytechnic tvet college gulele sub(1)Commencing a new polytechnic tvet college gulele sub(1)
Commencing a new polytechnic tvet college gulele sub(1)
 
Cloud computing proposal
Cloud computing proposalCloud computing proposal
Cloud computing proposal
 
Jisc fe and skills development and resource programme proposal
Jisc fe and skills development and resource programme proposalJisc fe and skills development and resource programme proposal
Jisc fe and skills development and resource programme proposal
 
aicte presentation.pptx
aicte presentation.pptxaicte presentation.pptx
aicte presentation.pptx
 
Impact of World Bank assisted technician education project iii
 Impact of World Bank assisted technician education project iii Impact of World Bank assisted technician education project iii
Impact of World Bank assisted technician education project iii
 
Id 7 pp ts hyderabad impact of world bank assisted technician education proje...
Id 7 pp ts hyderabad impact of world bank assisted technician education proje...Id 7 pp ts hyderabad impact of world bank assisted technician education proje...
Id 7 pp ts hyderabad impact of world bank assisted technician education proje...
 
BSNL Training Report file
BSNL Training Report fileBSNL Training Report file
BSNL Training Report file
 
Aicte initiatives
Aicte initiativesAicte initiatives
Aicte initiatives
 
Without Responsibility, Accountability and Liability for the Defect / Problem...
Without Responsibility, Accountability and Liability for the Defect / Problem...Without Responsibility, Accountability and Liability for the Defect / Problem...
Without Responsibility, Accountability and Liability for the Defect / Problem...
 
I-TShape Newsletter - 3rd issue
I-TShape Newsletter - 3rd issueI-TShape Newsletter - 3rd issue
I-TShape Newsletter - 3rd issue
 
IT-Shape 3. Newsletter
IT-Shape 3. NewsletterIT-Shape 3. Newsletter
IT-Shape 3. Newsletter
 
Commencing a new polytechnic tvet college gulele sub
Commencing a new polytechnic tvet college gulele subCommencing a new polytechnic tvet college gulele sub
Commencing a new polytechnic tvet college gulele sub
 
III C
III C III C
III C
 
IIIC ppt
IIIC pptIIIC ppt
IIIC ppt
 
Leading e-Learning Adoption in Schools: Human and Technological Structures an...
Leading e-Learning Adoption in Schools: Human and Technological Structures an...Leading e-Learning Adoption in Schools: Human and Technological Structures an...
Leading e-Learning Adoption in Schools: Human and Technological Structures an...
 

More from berhanu taye

1EMIS PPT ADDIS ABABA CITY ADMINISTRATION EDUCATION, AND TRAINING BOLE BRANCH...
1EMIS PPT ADDIS ABABA CITY ADMINISTRATION EDUCATION, AND TRAINING BOLE BRANCH...1EMIS PPT ADDIS ABABA CITY ADMINISTRATION EDUCATION, AND TRAINING BOLE BRANCH...
1EMIS PPT ADDIS ABABA CITY ADMINISTRATION EDUCATION, AND TRAINING BOLE BRANCH...
berhanu taye
 
1EMIS PPT ADDIS ABABA CITY ADMINISTRATION EDUCATION, AND TRAINING BOLE BRANCH...
1EMIS PPT ADDIS ABABA CITY ADMINISTRATION EDUCATION, AND TRAINING BOLE BRANCH...1EMIS PPT ADDIS ABABA CITY ADMINISTRATION EDUCATION, AND TRAINING BOLE BRANCH...
1EMIS PPT ADDIS ABABA CITY ADMINISTRATION EDUCATION, AND TRAINING BOLE BRANCH...
berhanu taye
 
Final Edited Post Accreditation Feedback በአዲ አበባ ከተማ አስተዳደር የትምህርትና ስልጠና ጥራት ...
Final Edited Post Accreditation Feedback በአዲ አበባ ከተማ አስተዳደር የትምህርትና ስልጠና ጥራት ...Final Edited Post Accreditation Feedback በአዲ አበባ ከተማ አስተዳደር የትምህርትና ስልጠና ጥራት ...
Final Edited Post Accreditation Feedback በአዲ አበባ ከተማ አስተዳደር የትምህርትና ስልጠና ጥራት ...
berhanu taye
 
EMD_2016_ብርሃኑ_የስልጠና_ፍላጎት_ዳሰሳ_Pawer_Pont presentation.pdf
EMD_2016_ብርሃኑ_የስልጠና_ፍላጎት_ዳሰሳ_Pawer_Pont presentation.pdfEMD_2016_ብርሃኑ_የስልጠና_ፍላጎት_ዳሰሳ_Pawer_Pont presentation.pdf
EMD_2016_ብርሃኑ_የስልጠና_ፍላጎት_ዳሰሳ_Pawer_Pont presentation.pdf
berhanu taye
 
Comparative study of UK Leadership with Africa Countries Leadership.docx
Comparative study of UK Leadership with Africa Countries Leadership.docxComparative study of UK Leadership with Africa Countries Leadership.docx
Comparative study of UK Leadership with Africa Countries Leadership.docx
berhanu taye
 
Education and Training for All ACTION RESEARCH ET -.pdf
Education and Training for All  ACTION RESEARCH ET -.pdfEducation and Training for All  ACTION RESEARCH ET -.pdf
Education and Training for All ACTION RESEARCH ET -.pdf
berhanu taye
 
Book review and bast practice in tvet institution yeka branch amharic edited ...
Book review and bast practice in tvet institution yeka branch amharic edited ...Book review and bast practice in tvet institution yeka branch amharic edited ...
Book review and bast practice in tvet institution yeka branch amharic edited ...
berhanu taye
 
2013 berhanu training need assessment presentationi
2013 berhanu training need assessment presentationi2013 berhanu training need assessment presentationi
2013 berhanu training need assessment presentationi
berhanu taye
 

More from berhanu taye (20)

1EMIS PPT ADDIS ABABA CITY ADMINISTRATION EDUCATION, AND TRAINING BOLE BRANCH...
1EMIS PPT ADDIS ABABA CITY ADMINISTRATION EDUCATION, AND TRAINING BOLE BRANCH...1EMIS PPT ADDIS ABABA CITY ADMINISTRATION EDUCATION, AND TRAINING BOLE BRANCH...
1EMIS PPT ADDIS ABABA CITY ADMINISTRATION EDUCATION, AND TRAINING BOLE BRANCH...
 
1EMIS PPT ADDIS ABABA CITY ADMINISTRATION EDUCATION, AND TRAINING BOLE BRANCH...
1EMIS PPT ADDIS ABABA CITY ADMINISTRATION EDUCATION, AND TRAINING BOLE BRANCH...1EMIS PPT ADDIS ABABA CITY ADMINISTRATION EDUCATION, AND TRAINING BOLE BRANCH...
1EMIS PPT ADDIS ABABA CITY ADMINISTRATION EDUCATION, AND TRAINING BOLE BRANCH...
 
Final Edited Post Accreditation Feedback በአዲ አበባ ከተማ አስተዳደር የትምህርትና ስልጠና ጥራት ...
Final Edited Post Accreditation Feedback በአዲ አበባ ከተማ አስተዳደር የትምህርትና ስልጠና ጥራት ...Final Edited Post Accreditation Feedback በአዲ አበባ ከተማ አስተዳደር የትምህርትና ስልጠና ጥራት ...
Final Edited Post Accreditation Feedback በአዲ አበባ ከተማ አስተዳደር የትምህርትና ስልጠና ጥራት ...
 
በአዲ አበባ ከተማ አስተዳደር የትምህርትና ስልጠና ጥራት ቁጥጥር.pdf
በአዲ አበባ ከተማ አስተዳደር የትምህርትና ስልጠና ጥራት ቁጥጥር.pdfበአዲ አበባ ከተማ አስተዳደር የትምህርትና ስልጠና ጥራት ቁጥጥር.pdf
በአዲ አበባ ከተማ አስተዳደር የትምህርትና ስልጠና ጥራት ቁጥጥር.pdf
 
T7 Curriculum Development.ppt
T7 Curriculum Development.pptT7 Curriculum Development.ppt
T7 Curriculum Development.ppt
 
EMD_2016_ብርሃኑ_የስልጠና_ፍላጎት_ዳሰሳ_Pawer_Pont presentation.pdf
EMD_2016_ብርሃኑ_የስልጠና_ፍላጎት_ዳሰሳ_Pawer_Pont presentation.pdfEMD_2016_ብርሃኑ_የስልጠና_ፍላጎት_ዳሰሳ_Pawer_Pont presentation.pdf
EMD_2016_ብርሃኑ_የስልጠና_ፍላጎት_ዳሰሳ_Pawer_Pont presentation.pdf
 
Domestic Works Help It is known that the official.docx
Domestic Works Help It is known that the official.docxDomestic Works Help It is known that the official.docx
Domestic Works Help It is known that the official.docx
 
Management, leadership and Synergy.pdf
Management, leadership and Synergy.pdfManagement, leadership and Synergy.pdf
Management, leadership and Synergy.pdf
 
Yeka TVET Institiute information .pdf
Yeka TVET Institiute information .pdfYeka TVET Institiute information .pdf
Yeka TVET Institiute information .pdf
 
የካ ቅርንጫፍ ሚገኙ ተቋማት መረጃ New Microsoft Excel Worksheet (2).pdf
የካ ቅርንጫፍ ሚገኙ ተቋማት መረጃ New Microsoft Excel Worksheet (2).pdfየካ ቅርንጫፍ ሚገኙ ተቋማት መረጃ New Microsoft Excel Worksheet (2).pdf
የካ ቅርንጫፍ ሚገኙ ተቋማት መረጃ New Microsoft Excel Worksheet (2).pdf
 
Comparative study of UK Leadership with Africa Countries Leadership.docx
Comparative study of UK Leadership with Africa Countries Leadership.docxComparative study of UK Leadership with Africa Countries Leadership.docx
Comparative study of UK Leadership with Africa Countries Leadership.docx
 
Education and Training for All ACTION RESEARCH ET -.pdf
Education and Training for All  ACTION RESEARCH ET -.pdfEducation and Training for All  ACTION RESEARCH ET -.pdf
Education and Training for All ACTION RESEARCH ET -.pdf
 
20142022 berhanu training_education_development_need_assessment [read-only]
20142022 berhanu training_education_development_need_assessment [read-only]20142022 berhanu training_education_development_need_assessment [read-only]
20142022 berhanu training_education_development_need_assessment [read-only]
 
The debate over jonas and the debate over his acceptance of the article on hi...
The debate over jonas and the debate over his acceptance of the article on hi...The debate over jonas and the debate over his acceptance of the article on hi...
The debate over jonas and the debate over his acceptance of the article on hi...
 
Belaye zeleke new tvet ngo capital budget berhanu tadesse taye
Belaye zeleke new tvet  ngo capital budget berhanu tadesse taye Belaye zeleke new tvet  ngo capital budget berhanu tadesse taye
Belaye zeleke new tvet ngo capital budget berhanu tadesse taye
 
Sifa skills initiative for africa project and meeting minutes
Sifa skills initiative for africa project and meeting minutesSifa skills initiative for africa project and meeting minutes
Sifa skills initiative for africa project and meeting minutes
 
Kaizen berhanu tadess taye edited
Kaizen berhanu tadess taye editedKaizen berhanu tadess taye edited
Kaizen berhanu tadess taye edited
 
Book review and bast practice in tvet institution yeka branch amharic edited ...
Book review and bast practice in tvet institution yeka branch amharic edited ...Book review and bast practice in tvet institution yeka branch amharic edited ...
Book review and bast practice in tvet institution yeka branch amharic edited ...
 
2013 berhanu training need assessment presentationi
2013 berhanu training need assessment presentationi2013 berhanu training need assessment presentationi
2013 berhanu training need assessment presentationi
 
Presentation tvet 2 edited
Presentation tvet 2 editedPresentation tvet 2 edited
Presentation tvet 2 edited
 

Recently uploaded

2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
MadhuKothuru
 
Competitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptxCompetitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptx
ScottMeyers35
 
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899
Cara Menggugurkan Kandungan 087776558899
 
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
gajnagarg
 

Recently uploaded (20)

Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
 
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
 
Competitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptxCompetitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptx
 
The NAP process & South-South peer learning
The NAP process & South-South peer learningThe NAP process & South-South peer learning
The NAP process & South-South peer learning
 
9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai Escorts
9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai Escorts9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai Escorts
9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai Escorts
 
Financing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCFinancing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCC
 
2024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 322024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 32
 
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899
 
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
 
Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)
 
Call Girls Basheerbagh ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Basheerbagh ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Basheerbagh ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Basheerbagh ( 8250092165 ) Cheap rates call girls | Get low budget
 
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
 
Vivek @ Cheap Call Girls In Kamla Nagar | Book 8448380779 Extreme Call Girls ...
Vivek @ Cheap Call Girls In Kamla Nagar | Book 8448380779 Extreme Call Girls ...Vivek @ Cheap Call Girls In Kamla Nagar | Book 8448380779 Extreme Call Girls ...
Vivek @ Cheap Call Girls In Kamla Nagar | Book 8448380779 Extreme Call Girls ...
 
2024 UN Civil Society Conference in Support of the Summit of the Future.
2024 UN Civil Society Conference in Support of the Summit of the Future.2024 UN Civil Society Conference in Support of the Summit of the Future.
2024 UN Civil Society Conference in Support of the Summit of the Future.
 
Scaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP processScaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP process
 
Kolkata Call Girls Halisahar 💯Call Us 🔝 8005736733 🔝 💃 Top Class Call Girl ...
Kolkata Call Girls Halisahar  💯Call Us 🔝 8005736733 🔝 💃  Top Class Call Girl ...Kolkata Call Girls Halisahar  💯Call Us 🔝 8005736733 🔝 💃  Top Class Call Girl ...
Kolkata Call Girls Halisahar 💯Call Us 🔝 8005736733 🔝 💃 Top Class Call Girl ...
 
Dating Call Girls inBaloda Bazar Bhatapara 9332606886Call Girls Advance Cash...
Dating Call Girls inBaloda Bazar Bhatapara  9332606886Call Girls Advance Cash...Dating Call Girls inBaloda Bazar Bhatapara  9332606886Call Girls Advance Cash...
Dating Call Girls inBaloda Bazar Bhatapara 9332606886Call Girls Advance Cash...
 
Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019
 
tOld settlement register shouldnotaffect BTR
tOld settlement register shouldnotaffect BTRtOld settlement register shouldnotaffect BTR
tOld settlement register shouldnotaffect BTR
 
74th Amendment of India PPT by Piyush(IC).pptx
74th Amendment of India PPT by Piyush(IC).pptx74th Amendment of India PPT by Piyush(IC).pptx
74th Amendment of India PPT by Piyush(IC).pptx
 

World vishion shuromeda gulele sub

  • 1. Gulele Sub-City TVET Office Institutional Quality audit Expert report World Vision Ethiopia By Berhanu Tadesse Taye Monday, April 13, 2015 The organization Undertake several activities like expanding educational institutions, community development work and also graduates trainees from the institution as well as benefiting them by purchasing machineries and tools to make the graduate trainees organized in the form of MSEs entrepreneurs or association. Consequently to bring them in to strong form of organization, sustain enterprise, associated with micro finance. The target area of their expansion work is shiro Meda Technical Vocational Education and Training (TVET) institution. The project donor has agreed to expand the TVET institution. The special donor of South Korea, the name of specific place which donate us, it said to be “Chungbuk located in central part of South Korea”. The project has been implemented in to three phases. 1. The first phase completed with G+1,
  • 2. 2. The second one also ended with G+4 building hence, beside to this, that is even now September 2014 the third phases will start after few days. 3. The newly launched construction of B+1 (basement plus ground) building will be built for the purpose of opening automotive department. The design, sketch building work finished by sub-city architectural, structural, electrical and building quantity surveying etc. The work completed by Sub-city Engineers after carrying out the building design provided for the donors. In the first phase this project was started (2009 and completed 2012), which is G+1 building consisted three classrooms, five workshops and two office rooms. Meanwhile the second phase was started (2012) which they completed and provided for the college August 22, (2014), i.e. G+4 building with two workshops, nine classrooms, library, meeting hall, a store and 5 office rooms had been constructed at a cost of more than 22 million birr. This budget excluded the third phase of the project. The aim of the building expansion empowering the shiro Meda area peoples i.e. the youth, the adult and the special needs. Third phase of the project included The donor provided aggregate budget of 320,302.00 USD (6,406,040.00 Ethiopian birr) for the entire programme supporting the TVET institution. The initial allocated of budget for building of basement plus one (B+1) construction 270,000 USD (5,400,000 Ethiopian birr).
  • 3. Due to this reason the institution department also enhance in number; 1. Construction department including electricity and plumbing offers level III. 2. Metal work fabrication and wood work technology offers level III. 3. Leather garment appropriate to offer training level II 4. This year new department will commence i.e. information communication technology (ICT) and computer science level III. 5. Automotive technology (repaired car both electrical parts of the car, mechanical parts…… including others cars’ service), after the end of next year (2015), we intend to launch this department. Due to the fact that intake rate of the institution will rise from 1393-2500. It is good achievement of the institution and for the Sub City TVET office.
  • 4. This Week’s Brief Work Progress Report About Shiro Meda TVET Institute based on the donation obtained from World Vision Ethiopia. World Vision Ethiopia donates a budget for Shiro Meda TVET institute for the purpose of opening new automotive department, expansion and upgrading the institute. The budget includes both capital expenditure and recurrent budget allocation and execution in 2014/15 fiscal budget year from Septembers on wards. The donor provided aggregate budget of 320,302.00 USD (6,406,040.00 Ethiopian birr) for the entire programme supporting the TVET institution. The initial allocated of budget for building of basement plus one (B+1) construction 270,000 USD (5,400,000 Ethiopian birr). Following this, budget was distributed for the programme which includes purchasing of heavy duty machineries for a total sum of 27,865 USD (557,300 Ethiopian birr), tools (Utensils and equipment) 11407USD (228,140 Ethiopian birr) according to world vision. To fulfill the government standards automotive workshop, World Vision Ethiopia equipped the institute with benches and shelves with the total sum of 2718 USD (54360 Ethiopian birr), the donors also allocated the institute with class rooms and office furniture with expense of 1442 USD (28,840 Ethiopian birr), the allocation was also distributed for reference books with 755 USD (15,100 Ethiopian birr), the support goes for IG’s at cost of 1903 USD (38,060 Ethiopian birr), the support includes expenditures for trainees school fees for centre of occupational competency assessment and certification (COCAC) with the total amount of 3462 USD (69,240 Ethiopian birr), and also for training for trainees and trainers on themes of business competency and saving and credit with 750 USD (15,000 Ethiopian birr), Purchased heavy machineries, equipments and tools this fiscal year
  • 5. for the Shuro Meda TVET in the amount of 1,384,740 Ethiopian birr. Really thanks for World Vision Ethiopia for its bounteousness work of them! For the progress of the project, the assigned body worked in such a way that the task force evaluation was carried out at three TVET colleges for pre test assessment purpose: namely Entoto, Tegbared, and General Wingate TVET Colleges automotive workshops for the purpose of selecting the best workshop and benchmark it. Due to proximity of Entoto TVET Polytechnic College, the task force visited two G+1 buildings auto workshops. The institute was visited persistently. After thorough investigation, the task force found out enormous problems. To mention some of the core problems: - the automotive workshops visited were not built in a modern manner, no room for tools (mini-store) for the immediate use of training in the workshop of the newly, the automotive department had a space capacity of occupying only one car at a time as other rooms have not served other cars because of unplanned space of the workshop. It is impossible to use the forklift as the roofs are low in the over head to move cars from place to place, no ventilation in the work shop, misused of the allocated capital budget, The buildings which are deliberately made for automotive department workshops haven’t enough space for practical teaching and learning processes, if the institute wants to change in to other department or classroom they can’t change the workshop in to classrooms because it was built in the forms of castle as it is not transparent. Therefore the building should be demolished because of the above problems.
  • 6. From the experiences of those visited polytechnic colleges, both constructive and destructive lessons have been obtained. The visit was intended to share the constructive experiences from them and to be careful not to repeat the shortcomings of the institutes. To avoid the quality problem of the training workshop, the task force team has assessed three TVET colleges design of automotive department. Hence, we have preferred Tegbareid TVET polytechnic college. The standards criteria to make selective such as the organization of Auto workshop has enormity (great size) both the ground and the first floor which is capable and enough space to hold and accommodates cares. During the visit, the researchers noticed that the building of the Entoto polytechnic college not giving service since it was built; therefore, the researcher was convinced that the two buildings in the compound were not giving service either because of ignorance or corruption problems of the administrators. The visit was intended to benchmark the practices of the polytechnic Colleges. Among these are: there is no proper design two G+1 building, The new buildings accommodate not more than one car including heavy machinery like fork-lift for holding the car repair and wash. The old automotive building of the Entoto TVET polytechnic College is better than the new one because the workshop has car fork-lifts, accommodate many cars in the workshop enough space for storage of tools, practical rooms, electric, painting and decorating workshops are available. The researcher is confident that the donation granted by the world vision Ethiopia would resolve the current problems faced by Shouro Meda TVET institute by
  • 7. helping design a new all rounded building that easily help facilitate the teaching and learning process. Consequently, Shiro Meda TVET has been design two building parts i.e. the ground floor accommodate mechanical parts of the cars and first floor accommodate electrical parts of the department units. The cars also facilitating able to climb the first floor but after the donor agreement they omit it. As we have already requested Gulele Sub City House and Construction Development Office, among other works or the entire parts of the building the remaining, (1) Size of grade beam, basement and roof beams and stirrup size and spacing, (2) Reinforcement details for car ramp and how it is joined with beams and columns. (3) Roof truss detail (4) Column stirrups size and spacing retaining wall/at least for the three sides of the building (5) Retaining wall/at least for the three sides of the building (it is not included in bill of quantity) (new amendment works ready for bid and tender) the sub-city House and Construction Development Office completed detail blueprint, (6) Sewage (water drainage) Indeed most of the above work finished by the office. I hope that the office would work hand in hand with Gulele Sub City TVET office and Shiro Meda TVET institute by solving the problems of the design, monitoring and evaluation work of
  • 8. the new building of the institute. Therefore, I hope that the office would provide us with all the necessary support so that we would accomplish the implementation of the plan based on the schedule. I would like to acknowledge the great kindness work of South Korea (Chungbuk) World vision Ethiopia (WVE), that shows their keen related regarding to our countries Historical and social contact. It’s work place of NGO found around Gulele sub-city development program office in A.A. around Shiro Meda.