USELSO
Leader in Elevator and Escalator for Commercial and Domestic Use
Business Requirements
 Customized CRM software with special attention to:
 Managing customer inquiry
 Sales lead follow-up
 Accounting
 Inter-departmental work coordination
 More online visibility via digital platforms and tools
 New website for showcasing products and services
 Website and CRM should be able to run on different platform
Snapshot of Working Sequence
Procure inquiry from customer or sales channel
Arrange on-request site visit
Conduct technical inspection of the site
Submit technical documentation to the client
On approved documentation, complete the installation
Managing Enquiries
 Enquiries can reach to the customer department via:
 Sales and marketing channels
 Digital campaigns
 Referrals
 The customer department route the inquiry to the pre-sales team
 Based on pointers of the customer department, the pre-sales suggest the best
solution to the customer
 On mutual agreement, the pre-sales team coordinates with the technical
team and arrange on-site visit
Role of Technical Team
 On scheduled date, the team of technical department arrives at the site to:
 Assess the capacity requirement for the elevator
 Inspect the floor plan
 Check the installation point
 After completing the visit, a proposal is sent to the client with pricing,
warranty, and terms & conditions
Sales Team and Negotiations
 The sales team comes into action once the customer understands the proposal
 Follow-up is taken from the customer with answers to customer’s queries
 Negotiation is made on the final price offering and order is booked
 A mutually agreed non-refundable amount is procured from the customer as
confirmation of order placed
 The sales team do the necessary documentation on customer’s behalf
 An assurance of 30 days to submit technical/engineering drawings is given to
the customer
Technical Team into Action Again
 Based on order received from the sales team, the technical team prepare
drawings for installing:
 Cabin and cables
 Elevator machine
 Control drive
 Counterweight
 Hoist way
 Guide rails
 Speed governor
 Safety system
 Hydraulics
The Second Last Step
 Technical drawings are submitted to the customer
 The skilled man power prepares the site in 20-25 days
 Dry runs with safety norms are performed before putting elevator into service
 If requested by the customer then chargeable AMC is provided with complete
technical support and regular on site inspection
The Last Step
 After fulfilling all technical and safety standards, elevator put into service
 The final invoice is raised for the customer
 The deal is closed after clearance of the invoice
 Regular follow-ups are maintained with customer for feedback and any
upcoming requirements

More Related Content

Similar to Work Proposal

Interactive Customer Communication Management (CCM)
Interactive Customer Communication Management (CCM)Interactive Customer Communication Management (CCM)
Interactive Customer Communication Management (CCM)
Newgen Software Technologies Limited
 
Purchasing (Procurement) By Starodubtsevtendering
Purchasing (Procurement) By StarodubtsevtenderingPurchasing (Procurement) By Starodubtsevtendering
Purchasing (Procurement) By Starodubtsevtendering
Yuriy Starodubtsev
 
2 mcs cert process
2 mcs cert process2 mcs cert process
2 mcs cert process
edge7557
 
SVisser AFM contribution LinkedIn.docx
SVisser AFM contribution LinkedIn.docxSVisser AFM contribution LinkedIn.docx
SVisser AFM contribution LinkedIn.docxStephan Visser
 
Service channel retail overview latest presentation
Service channel retail overview   latest presentationService channel retail overview   latest presentation
Service channel retail overview latest presentation
Steven Gottfried
 
Chetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical EngineerChetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical EngineerCHETAN SHARMA
 
On-Demand Customer Communication Management (CCM)
On-Demand Customer Communication Management (CCM)On-Demand Customer Communication Management (CCM)
On-Demand Customer Communication Management (CCM)
Newgen Software Technologies Limited
 
Georgeann Wooten Nov Resume
Georgeann Wooten Nov ResumeGeorgeann Wooten Nov Resume
Georgeann Wooten Nov ResumeGeorgeann Wooten
 
Georgeann Wooten Nov Resume
Georgeann Wooten Nov ResumeGeorgeann Wooten Nov Resume
Georgeann Wooten Nov ResumeGeorgeann Wooten
 
Enser slideshare
Enser slideshareEnser slideshare
Enser slideshare
Rajnish Sarna
 
Mechanical Engineer-Mohammed Omer
Mechanical Engineer-Mohammed OmerMechanical Engineer-Mohammed Omer
Mechanical Engineer-Mohammed OmerOmer Mohammed
 
Service Maestro Presentation for Sage 100 ERP
Service Maestro Presentationfor Sage 100 ERP Service Maestro Presentationfor Sage 100 ERP
Service Maestro Presentation for Sage 100 ERP
Information Integration Group
 
Sales process
Sales processSales process
Sales process
Sadiya Naseem
 
Trends in Software Outsourcing: Best Practices
Trends in Software Outsourcing: Best PracticesTrends in Software Outsourcing: Best Practices
Trends in Software Outsourcing: Best Practices
Softheme
 
IIG Presentation for Field Services Automation Built Into Sage 100 ERP
IIG Presentation for Field Services Automation Built Into Sage 100 ERPIIG Presentation for Field Services Automation Built Into Sage 100 ERP
IIG Presentation for Field Services Automation Built Into Sage 100 ERPInformation Integration Group
 
Choosing an HVAC Technician: A Comprehensive Guide by FACT HVAC
Choosing an HVAC Technician: A Comprehensive Guide by FACT HVACChoosing an HVAC Technician: A Comprehensive Guide by FACT HVAC
Choosing an HVAC Technician: A Comprehensive Guide by FACT HVAC
FACT HVAC
 
Ezware erp solutions process flows (all)
Ezware erp solutions process flows (all)Ezware erp solutions process flows (all)
Ezware erp solutions process flows (all)
Ali Shabeer
 
Add Ons Based On Navision For Distribution Industry
Add Ons Based On Navision For Distribution IndustryAdd Ons Based On Navision For Distribution Industry
Add Ons Based On Navision For Distribution Industry
Yogesh Manikpure
 

Similar to Work Proposal (20)

Interactive Customer Communication Management (CCM)
Interactive Customer Communication Management (CCM)Interactive Customer Communication Management (CCM)
Interactive Customer Communication Management (CCM)
 
Purchasing (Procurement) By Starodubtsevtendering
Purchasing (Procurement) By StarodubtsevtenderingPurchasing (Procurement) By Starodubtsevtendering
Purchasing (Procurement) By Starodubtsevtendering
 
2 mcs cert process
2 mcs cert process2 mcs cert process
2 mcs cert process
 
SVisser AFM contribution LinkedIn.docx
SVisser AFM contribution LinkedIn.docxSVisser AFM contribution LinkedIn.docx
SVisser AFM contribution LinkedIn.docx
 
Service channel retail overview latest presentation
Service channel retail overview   latest presentationService channel retail overview   latest presentation
Service channel retail overview latest presentation
 
Service
ServiceService
Service
 
Chetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical EngineerChetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical Engineer
 
On-Demand Customer Communication Management (CCM)
On-Demand Customer Communication Management (CCM)On-Demand Customer Communication Management (CCM)
On-Demand Customer Communication Management (CCM)
 
Georgeann Wooten Nov Resume
Georgeann Wooten Nov ResumeGeorgeann Wooten Nov Resume
Georgeann Wooten Nov Resume
 
Georgeann Wooten Nov Resume
Georgeann Wooten Nov ResumeGeorgeann Wooten Nov Resume
Georgeann Wooten Nov Resume
 
Enser slideshare
Enser slideshareEnser slideshare
Enser slideshare
 
Mechanical Engineer-Mohammed Omer
Mechanical Engineer-Mohammed OmerMechanical Engineer-Mohammed Omer
Mechanical Engineer-Mohammed Omer
 
Service Maestro Presentation for Sage 100 ERP
Service Maestro Presentationfor Sage 100 ERP Service Maestro Presentationfor Sage 100 ERP
Service Maestro Presentation for Sage 100 ERP
 
Sales process
Sales processSales process
Sales process
 
Trends in Software Outsourcing: Best Practices
Trends in Software Outsourcing: Best PracticesTrends in Software Outsourcing: Best Practices
Trends in Software Outsourcing: Best Practices
 
IIG Service Maestro Presentation
IIG Service Maestro PresentationIIG Service Maestro Presentation
IIG Service Maestro Presentation
 
IIG Presentation for Field Services Automation Built Into Sage 100 ERP
IIG Presentation for Field Services Automation Built Into Sage 100 ERPIIG Presentation for Field Services Automation Built Into Sage 100 ERP
IIG Presentation for Field Services Automation Built Into Sage 100 ERP
 
Choosing an HVAC Technician: A Comprehensive Guide by FACT HVAC
Choosing an HVAC Technician: A Comprehensive Guide by FACT HVACChoosing an HVAC Technician: A Comprehensive Guide by FACT HVAC
Choosing an HVAC Technician: A Comprehensive Guide by FACT HVAC
 
Ezware erp solutions process flows (all)
Ezware erp solutions process flows (all)Ezware erp solutions process flows (all)
Ezware erp solutions process flows (all)
 
Add Ons Based On Navision For Distribution Industry
Add Ons Based On Navision For Distribution IndustryAdd Ons Based On Navision For Distribution Industry
Add Ons Based On Navision For Distribution Industry
 

Recently uploaded

CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
Bojamma2
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
fisherameliaisabella
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
Ben Wann
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
Ben Wann
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Lviv Startup Club
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
SynapseIndia
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
techboxsqauremedia
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
Workforce Group
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
 
-- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month ---- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month --
NZSG
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 

Recently uploaded (20)

CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
 
-- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month ---- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month --
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 

Work Proposal

  • 1. USELSO Leader in Elevator and Escalator for Commercial and Domestic Use
  • 2. Business Requirements  Customized CRM software with special attention to:  Managing customer inquiry  Sales lead follow-up  Accounting  Inter-departmental work coordination  More online visibility via digital platforms and tools  New website for showcasing products and services  Website and CRM should be able to run on different platform
  • 3. Snapshot of Working Sequence Procure inquiry from customer or sales channel Arrange on-request site visit Conduct technical inspection of the site Submit technical documentation to the client On approved documentation, complete the installation
  • 4. Managing Enquiries  Enquiries can reach to the customer department via:  Sales and marketing channels  Digital campaigns  Referrals  The customer department route the inquiry to the pre-sales team  Based on pointers of the customer department, the pre-sales suggest the best solution to the customer  On mutual agreement, the pre-sales team coordinates with the technical team and arrange on-site visit
  • 5. Role of Technical Team  On scheduled date, the team of technical department arrives at the site to:  Assess the capacity requirement for the elevator  Inspect the floor plan  Check the installation point  After completing the visit, a proposal is sent to the client with pricing, warranty, and terms & conditions
  • 6. Sales Team and Negotiations  The sales team comes into action once the customer understands the proposal  Follow-up is taken from the customer with answers to customer’s queries  Negotiation is made on the final price offering and order is booked  A mutually agreed non-refundable amount is procured from the customer as confirmation of order placed  The sales team do the necessary documentation on customer’s behalf  An assurance of 30 days to submit technical/engineering drawings is given to the customer
  • 7. Technical Team into Action Again  Based on order received from the sales team, the technical team prepare drawings for installing:  Cabin and cables  Elevator machine  Control drive  Counterweight  Hoist way  Guide rails  Speed governor  Safety system  Hydraulics
  • 8. The Second Last Step  Technical drawings are submitted to the customer  The skilled man power prepares the site in 20-25 days  Dry runs with safety norms are performed before putting elevator into service  If requested by the customer then chargeable AMC is provided with complete technical support and regular on site inspection
  • 9. The Last Step  After fulfilling all technical and safety standards, elevator put into service  The final invoice is raised for the customer  The deal is closed after clearance of the invoice  Regular follow-ups are maintained with customer for feedback and any upcoming requirements