EZware Technologies L.L.C.
ERP Solutions and Financial Accounting
Menu:
 Overview of EZware
 EZware Products Modules / ERP Solutions
 Manufacturing / Assembly Cycle
 Construction / Contracting Cycle
 Sales and Receipts Cycle
 Purchase and Payments Cycle
 Inventory / Material Management
 Asset / Fleet Management
 Financial Accounting and Reporting cycle
 Financial Reports
EZware Technologies L.L.C.
EZware Technologies L.L.C.
EZware Technologies L.L.C.
EZware Technologies L.L.C.
EZware Technologies L.L.C.
EZware Technologies L.L.C.
Production Assembly Cycle
1
Process
Plan /
Design
2 Job
Order /
BoM
3
Job Order
Execution
4
Warehou
sing
5
Maintenan
ce / QC
6
Sales /
Dispatch
To Buyer
Manufacturing / Production Process
 Production Management  Process Plan
 Production Management  Bill of
Material , Job Order Creation
 Material Management  Job Order
Execute
 Good Procure /Issue (Job Order)
 Production Management  Daily
Production Entry
 Production Management  Warehousing
 Production Management  QC Approval
/ Maintenance
 Issue / Dispatch – Covered in Sales
Cycle
EZware Technologies L.L.C.
The FIRST Stage in the Production Assembly Cycle : Process Plan Creation :
 Once customer sends order, Process Plan is created in the system with the
specifications required to produce the item
 The design details are included in this stage in the system
 Next, the components required for the Job Order are identified in the Job Order,
which include:
 Materials required
 Labor / resources required
 Sub-contract works, if any required
NOTE - For all items required, the estimated quantity and cost are also identified
Production Assembly Cycle
1
Process
Plan /
Design
EZware Technologies L.L.C.
The SECOND Stage in the Production Assembly Cycle : BoM, Job Order creation :
 Once customer sends order, Job Order and Bill of Material (BoM) are created in
the system with the specifications required to produce the item
 The design details are included in the Process Plan are included in the Job
Order, which include:
 Materials required
 Labor / resources required
 Sub-contract works, if any required
NOTE - For all items required, the estimated quantity and cost are also identified
Production Assembly Cycle
2 Job
Order /
BoM
EZware Technologies L.L.C.
Production Assembly Cycle
The THIRD Stage in the Production Assembly Cycle : Job Order Execution :
 Once the BoM and Job Order are raised, stock availability is checked
 For items not available, inquiries are sent to suppliers and purchase orders are
raised based on quotations received
 Once items are received from suppliers, the system is updated for Inventory
receipts, Purchase Invoice
 Material requisitions are raised against Job Order, BoM
 Stock transfer notes are issued against Material requisitions for issue of
materials from store to the assembly / production site
 Production / assembly progress for the Job order is tracked in the system
through Job Order status - Work in progress reports, Daily Production Reports
3
Job Order
Execution
EZware Technologies L.L.C.
Production Assembly Cycle4
Warehousing
The FOURTH Stage in the Production Assembly Cycle : Warehousing:
 Once the items are assembled as per Job Order / BoM, the finished goods are
dispatched from site to the warehouse for storage
 Inventory records are updated for finished goods received
 Job Order is closed for items finished
 Cost Variance reports for work completed are updated against the Job Order
EZware Technologies L.L.C.
Production Assembly Cycle
The FIFTH Stage in the Production Assembly Cycle : QC / Maintenance
 Once the items are stored in the warehouse, and inventory records are updated
for the finished goods received:
 Quality Check process for measuring in the compliance as per set standard of
fitness and quality of the product
 Inventory issue records are updated for QC
 Preventive maintenance is done periodically for machinery and equipment used
in the production / assembly
5
Maintenan
ce / QC
EZware Technologies L.L.C.
Production Assembly Cycle
1
Process
Plan /
Design
EZware Technologies L.L.C.
Production Assembly Cycle
2 Job
Order /
BoM
EZware Technologies L.L.C.
Production Assembly Cycle
3
Job Order
Execution
EZware Technologies L.L.C.
Production Assembly Cycle
4
Warehou
sing
5
Maintenan
ce / QC
EZware Technologies L.L.C.
Sales Management and Receipts Cycle
Sales Management and Receipts Process
 Sales and Distribution Inquiry from
Customer
 Sales and Distribution Quotation to
Customer
 Sales and Distribution Sales Order
 Sales and Distribution Dispatch Advise
 Sales and Distribution Sales Invoice –
SO
 Financial Accounting  Receipt
Voucher (RV)
EZware Technologies L.L.C.
Sales Management and Receipts Cycle
1
Inquiry
from
Customer
The FIRST Stage in the Sales Cycle : begins with Inquiry from the Customer :
 Inquiry Details are recorded in the system
 Inquiry number is assigned by the system for future reference and use
EZware Technologies L.L.C.
Sales Management and Receipts Cycle
2
Quotation
to
Customer
The SECOND Stage in the Sales Cycle : is our response to the Inquiry from the Customer :
 Quotation is raised in the system in response to the Inquiry
 Inquiry number assigned earlier from the system assigned, is attached to the Quotation
EZware Technologies L.L.C.
Sales Management and Receipts Cycle
3
Sales Order
For
Customer
The THIRD Stage in the Sales Cycle : is Sales Order
 A sales order is created once the client approves our quote or gives approval to proceed with sales
 Stores can issue goods only against a sales order; (which implies Goods Issue Voucher is always
issued against a sales order)
 Sales Order requires approval by proper authority before Sales are made
EZware Technologies L.L.C.
Sales Management and Receipts Cycle
4 & 5
Goods
Issue /
Sales
Invoice
The FOURTH Stage in the Sales Cycle : Goods Issue / Dispatch and Sales invoice
 Once the Sales Order (SO) is approved, items to be issued are reserved against Dispatch Advice
 Sales Order and Dispatch / delivery documents are prepared for dispatch of the finished goods to customer
 Sales Invoice is prepared, with the SO & Dispatch advice references, and issued to the customer
 Inventory issue records are updated for goods issued
 Accounting entries are also recorded in Sales invoice screen which initiates the Sales contract
EZware Technologies L.L.C.
Financial Accounting - Receipts Cycle
The SIXTH Stage in the Sales Cycle is: Financial Accounting  Receipt Voucher (RV)
 Receipt Voucher is raised in the system for payments received form customer
 Inquiry number assigned earlier from the system assigned, is attached to the Quotation
 Accounting entries are passed for payment received from customers on sale of goods
6
Receipt
Voucher
EZware Technologies L.L.C.
Purchase Management and Payments Cycle
Purchase Management and Payments Process
 Purchase Management Inquiry to Supplier
 Purchase Management Quotation from Supplier
 Purchase Management Comparison
 Purchase Management Purchase Order
 Material Management  Goods Received (Inward)
 Material Management  Goods Received (Quality
Check)
 Material Management  Goods Received – Note
(GRN)
 Purchase Management Purchase Invoice – GRN
 Financial Accounting  Payment Voucher (PV)
EZware Technologies L.L.C.
1 & 2
Materials
Request /
Inquiry
This Stage in the Purchase Cycle : begins with Inquiry to the Supplier
 Materials Request is raised by Stores / departments which require materials
 For items not in stock, Inquiry is raised and sent to the Supplier
 Inquiry number is assigned by the system for future reference and use
Purchase Management and Payments Cycle
EZware Technologies L.L.C.
3 & 4
Quotations /
Comparison
This Stage in the Purchase Cycle : begins with Quotations received from Suppliers
 Quotations received are recorded in the system, with reference to Inquiry raised
 Multiple quotations received against the same Inquiry number, are then compared in the system
 The Comparison screen gives the option to select the best offer from all suppliers, it
suggests the best quote on pricing by highlighting it in “Green”. The user can make a final
decision by manually selecting the best quote as per other constraints if any
Purchase Management and Payments Cycle
EZware Technologies L.L.C.
5
Purchase
Order Issue
This Stage in the Purchase Cycle : begins Purchase Order raised on Suppliers
 A Purchase order is made for a particular supplier once the prices and terms of payment
are approved. A Purchase Order is an acknowledgement to the supplier that his Quotation
has been selected for supply of goods to the firm
 Accounting entries are also recorded in this screen which initiates the Purchase contract
Purchase Management and Payments Cycle
EZware Technologies L.L.C.
6
Goods
Received
/ QC
This Stage in the Purchase Cycle : begins with Goods received from Suppliers, QC
 Suppliers issue goods against the Purchase order made on suppliers
 On receipts of goods, QC or Quality check is conducted at Stores before receiving goods
 Stock accounting entries are also recorded by raising a GRN for goods received
Purchase Management and Payments Cycle
EZware Technologies L.L.C.
6
Goods
Received
/ QC
This Stage in the Purchase Cycle is: Financial Accounting  Payment Voucher (PV)
 After GRN is raised for goods received, Purchase Invoice is raised in the system on the
supplier
 Accounting entries are recorded in Purchase invoice screen which initiates the Purchase
contract
 Accounting entries are passed for payment made to suppliers for purchase of goods
Financial Accounting - Payments Cycle
EZware Technologies L.L.C.
Inventory / Material Management Process
Inventory Process / Material Management
 Material management is where all the products/stocks of the organization are managed. Once the materials are properly filled-in,
this module would be automatically updated based on transactions in Sales and Purchase module. Goods Issue and Goods
Receipt (Inward) options in Material management is the base of sales and purchase and this would directly affect the stock. In
addition we also have option to manage stocks, make stock adjustments and stock transfers between two locations. To
summarize, Material Management is a simple and straight forward functionality that deals with stocks of the company
 Note: The section on Goods Receipt (Inward) and Goods Issue were discussed in the respective Purchase and Sales
cycles are not discussed in here
 Material Management Item Master –Defines Materials Type
 Unit Master- Defines basic unit of measurement
 Location Master- Physical location of storage
EZware Technologies L.L.C.
Construction Contracting Cycle
1
Project &
Org. WBS
2 Sub
Contractor
Set up
3
Tender /
Bidding
4
Estimation
5
Project
Set up &
Progress
6 Project
Receipts &
Payments
Construction / Contracting Process
 Project and Organization Work Break
down Structure (WBS)
 Sub-Contractor Set-up
 Project Comprehensive Evaluation
 Project Tender / Bidding
 Project Cost and Time Estimation
 Project Set up
 Project Status Progress Monitoring
 Work Supervision
 Quality Control
 Payment Certificates
 Project Receipts – Covered in Sales
Cycle – RV (Receipts voucher)
 Project Payments – Covered in
Purchase Cycle – PV (Payment
voucher)
EZware Technologies L.L.C.
The FIRST Stage in the Construction / Contracting Cycle :
 Creation of the Organization WBS (O-WBS) – is set up of the standard “type” of resources required for
various stages of the P-WBS
 Creation of the Project work breakdown structure (P-WBS) – breakdown of the stages in any construction
process in terms of smallest activity such as: the work package, tasks, sub-tasks, activity, work package
 BOTH WBS are defined one-time in System Masters for all stages of the construction / contracting process
 Under the smallest process of Work Package, resources, materials, etc required at that stage are attached :
 Materials required – type of items, quantity, cost, etc
 Labor / resources required – type of resources, quantity, cost, etc
 Assets Required – machinery, etc
 Sub-contractors required
NOTE - For all above WBS components, the estimated quantity and estimated cost are also defined
1
Project &
Org WBS Construction Contracting Cycle
EZware Technologies L.L.C.
1
Project &
Org WBS Construction Contracting Cycle
EZware Technologies L.L.C.
The SECOND Stage in the Construction / Contracting Cycle :
 Similar to setting up the PBS and OBS, the next stage is to set up the Sub-contractor Master in the system
 Under Sub-contractor Master we define the following:
 Name of sub-contractor, details about the sub-contractor e.g. Contact details, currency, payment terms, etc
 This is similar to defining our Suppliers in the Supplier Master
 For the sub-contractors set up, sub-contractor agreements are also set up in the Master. These agreements are linked to the
Construction Projects set-up in the system, at a later stage
 Each work tem to be sub-contracted, estimates can be defined by entering the line items as per BoQ OR by selecting the PBS
package created in the PBS master (materials, assets, etc for the selected PBS fill in automatically) For each item of the
selected PBS, quantity, rate, etc can be edited, new items can be added / existing ones deleted
Construction Contracting Cycle
EZware Technologies L.L.C.2 Sub
Contractor
Set up
Construction Contracting Cycle
EZware Technologies L.L.C.
3
Tender /
Bidding
The THIRD Stage in the Construction / Contracting Cycle :
 Once the WBS are set-up and the Sub-contractors are defined in the System, the next stage is entering the Tender
details in the system as per the BoQ (Bill of Quantities)
 The system also has the facility to import the BoQ externally from an excel file
 For each Tender the System generates a unique “Tender Code” which can be selected in the Estimation for that Tender
Construction Contracting Cycle
EZware Technologies L.L.C.4
Estimation
The FOURTH Stage in the Construction / Contracting Cycle :
 After Tender entry, for Estimation of the Tender, select the Tender number against which the Estimation needs to be
created. BoQ line items for the selected Tender number, fill in automatically in the Estimation screen. For each BoQ line
item estimates can be done by:
 Entering the line items for each BoQ OR by
 Selecting the PBS package created in the PBS master (materials, assets, etc for the selected PBS fill in
automatically) For each item of the selected PBS, quantity, rate, etc can be edited, new materials, etc can be
added / existing ones deleted
NOTE - Changes made to the PBS package selected in Estimation does not change the PBS defined in the Master
 Rates in Estimation can be defined from Quotation / PO / PBS. Line items for which rates are not fixed can be marked in
the BoQ column – the system “marks” these in “pink” and also sets up alerts which are displayed on logging in
 Once estimates for each line item of the BoQ are filled in, the system shows the TOTAL estimated cost in the footer of
the Estimation screen with separate estimate totals in the footer for:
 Materials
 Labor / manpower
 Direct costs
 Indirect expenses, overheads
 For each Estimation, the System generates a unique “Estimation code” which can be attached in the Project budget
screen to the relevant construction project
Construction Contracting Cycle
EZware Technologies L.L.C.4
Estimation
The FIFTH Stage in the Construction / Contracting Cycle :
 Once estimation is done for the Tender, next Project is created in the system to which the estimation can be attached
 Setting up the project in the Project set up screen, is similar to entering details in the Supplier/Customer Master
 The system lets user define the “Project Number” for each project set up in the system. Once the project is set up, it
needs to be marked “Active”
 Other details such as: relevant dates for the project, value of the project and approved value are also filled in.
 Once the Project is set up, then the Budget / estimate for this project is created in the Project Budget screen by:
 Selecting the Project number created
 Selecting the Estimation number created – line items for the selected Estimation number, fill in automatically
 For each item of the selected Estimation, quantity, rate, etc can be edited, new materials, etc can be added / existing
ones deleted
 Once the Budget is set up for the Project Number, the system automatically marks that Project “Budgeted” – this can
be seen in the Project set up screen
Construction Contracting Cycle
EZware Technologies L.L.C.
5
Project
Set up &
Progress
Construction Contracting Cycle
EZware Technologies L.L.C.
5
Project
Set up &
Progress
The FIFTH Stage in the Construction / Contracting Cycle :
 Once the Project has been set up, marked “Active” and other details such as: relevant dates for the project, value of the
project and approved value are filled in and the Budget is set up for the Project Number – this Project is now ready in the
system to be managed and be tracked for its progress in terms of cost and time
 To track progress in terms of cost, Payment Certificates are created in the system in the “Client Payment Certificate”
or CPC Screen wherein by selecting the “project number” the details of the project are displayed. The progress of the
project is then entered in terms of “%” or “value” and the system calculates the value of the work done till date
 For the CPC screen, Ledger accounts (defined in the Chart of Accounts) are also selected and “defaulted” for use in the
CPC screen.
 Advances, retention amount, etc are also calculated in the CPC by the system based on details entered in Project set up
 The CPC for each Project, is the Invoice sent to the client – receipts on this are recorded in the Receipts Voucher screen
(covered in Financial Accounting)
 The Project Schedule Management screen facilitates tracking progress of the project in terms of time, wherein by
the selecting the Project Budget code, the line items for the selected Budget code, fill in automatically. Against each line
item following details: start and end date, total number of days, predecessor / successor activities, slack , etc can be
defined to track the progress. In the Project Daily progress screen - progress in terms of “%” for each line item can be
monitored with the start and end dates for that item / activity.
Construction Contracting Cycle
EZware Technologies L.L.C.
5
Project
Set up &
Progress
Construction Contracting Cycle
EZware Technologies L.L.C.
5
Project
Set up &
Progress
Fleet Management Cycle
1
Create
Fleet
Details
2 Create
Maintenance
Schedules
3
Create Job
Card
4 Execute /
Close Job
Card
6 Receipts /
Payments
Fleet / Asset Management Process
 Creation of Fleet Details in System
 Record Fleet Details
 Set up Depreciation Schedule over lifespan
 Set up Maintenance Schedule for each Asset / Fleet
 Define Maintenance Criteria
 Set up Frequency of Maintenance
 Create Job Card for each Fleet’s Maintenance
Schedule
 Attached Materials, Labor required
 Identify Sub-contractor work required (if any)
 Quality Check if required
 Execute Job Card(s)
 Receipts – Covered in Sales Cycle – RV (Receipts
voucher)
 Payments – Covered in Purchase Cycle – PV
(Payment voucher)
EZware Technologies L.L.C.
The FIRST Stage in the Fleet Management Cycle :
Fleet Management is relevant to businesses / companies which :
 Use assets commercially e.g. operators of School Buses, Cranes / Heavy equipment, etc rented out by
the business
 To manage / track their assets used internally within multiple departments / projects
 Fleet management involves FIRST creating details of each type of Fleet in the System - Fleet Pool and related
Masters. Details recorded include:
 Fleet Manufacturer, Origin, Registration details, Insurance details for the fleet / asset
 Fleet Status (Active / Inactive), Location of Fleet (Workshop Garage, etc)
 Recording details of each Asset/ fleet in the Fleet Pool Menu of the system for e.g. Registration data of
the Fleet, physical details (weight, length, etc), Model, Engine and other Identification details
 Other Specifications e.g. Tyre serial number, number of tyres, Kilometer details related to the tyres, etc
NOTE - These details help define the Fleet Maintenance required in subsequent stages of fleet
management through the system
1
Create
Fleet
Details
Fleet Management Cycle
EZware Technologies L.L.C.
1
Create
Fleet
Details
Fleet Management Cycle
EZware Technologies L.L.C.
The SECOND Stage in the Fleet Management Cycle :
 Once the Fleet Details have been recorded in the System Fleet Pool, the next process is to define the Maintenance
schedule required for each fleet. This includes setting up the Maintenance criteria in the Maintenance Menus and
includes defining details of:
 Type of Maintenance (Preventive / corrective)
 Maintenance checklist (Oil change, brakes, repair, etc)
 For each type of maintenance, the system allows defining the items required, cost involved by clicking “F9”
against the line item in the Details grid
Fleet Management Cycle
EZware Technologies L.L.C.2 Create
Maintenance
Schedules
The SECOND Stage in the Fleet Management Cycle :
 Further details defined in the Maintenance schedule for each fleet, include frequency of maintenance (date wise /
mileage wise).
 Based on Maintenance criteria filled in , the Maintenance Schedule screen “fills in” automatically (on clicking the “Fill
Schedule” option
 The system allows defining the items required, cost involved by clicking “F9” against the line item in the grid
(NOTE – Material, other items required for maintenance are defined in Materials Management – Item Masters)
Fleet Management Cycle
EZware Technologies L.L.C.2 Create
Maintenance
Schedules
The THIRD Stage in the Fleet Management Cycle :
 After setting up the Maintenance criteria, the Service Request (SR) for each fleet / asset is created
 In the SR screen, on selecting customer and other details the grid “fills in” automatically with relevant fleet details
 For each line item in the grid, the system allows review of material, labor and cost breakdown. Further material items,
etc can be added / existing ones edited at this stage
 Sub-contracting any line item in the grid is also possible, (on clicking F9 ), and sub-contractor / third party repairs, can
be added and cost defined for the line item
Fleet Management Cycle
EZware Technologies L.L.C.3
Create Job
Card
The THIRD Stage in the Fleet Management Cycle :
 For each SR, the next step is to create Job Card. In the Job card, on selecting the (SR), details “fill in” automatically
from the SR.
 For each line item in the grid, the system allows drill down review of material, labor, third party repairs, etc by clicking
the respective “F6…F9” buttons shown at the bottom of the screen
 Total cost with sub-totals for costs of material, labor are also available at the bottom of the Job Card screen
 The system also generates Purchase Order (PO) automatically for each Job card created
Fleet Management Cycle
EZware Technologies L.L.C.3
Create Job
Card
The FOURTH Stage in the Fleet Management Cycle :
 Executing the Job Card created
 This involves recording the Invoices from sub-contractors, monitoring the materials issued for the job card (via the
Inventory Module – Goods Issued screen)
 For Materials required, the system auto-creates Material Issue from Inventory / Material request in case item is not
available in stock – this is done through the Inventory Management module in the system
 Processing Payments for work executed on the Job card - covered in Financial Accounting module
 Closing the Job Card with QC Check (if required)
Fleet Management Cycle
EZware Technologies L.L.C.4 Execute
Job Card
Financial Accounting and Reporting Cycle
Financial Accounting and Reporting Process
 Chart of Accounts
 Masters
 Payment Voucher / Receipt Voucher
 Debit Note / Credit Note
 Debit Application / Credit Application
 PDC Deposit, Payables and receivables
 Journal Vouchers
 Bank Reconciliation
 Closing JV
 Books - Bank, Cash, Sales, Sales Return, Purchase,
Purchase Return, Journal, Debit Note, Credit Note
 Ledgers – General Ledger, sub-ledgers for Masters
 Financial Statements - Trial Balance, Profit And Loss,
Schedule, Balance Sheet Reports
EZware Technologies L.L.C.
1 & 2
CoA /
Masters
This is the foundation Stage in the Financial Accounting and Reporting Cycle : begins with creation of :
 Creation of Chart of Accounts (CoA) – defines the Groups: B/S (Assets, Liabilities), P&L (Revenue, Expenses).
The CoA also categorizes, links the debit / credit ledger accounts below the Groups
 Groups are identified in “blue” and Ledger accounts are identified in “red” in the CoA
 Creation of Masters – these are sub-ledgers for the ledgers accounts in the CoA for Banks, Suppliers, Customers,
Employees, Currencies, etc
 The CoA ledger accounts with the Masters feed the accounting transactions into transaction reports, final accounts
Financial Accounting and Reporting Cycle
EZware Technologies L.L.C.
Ledger
Opening
Records
This Stage in the Financial Accounting and Reporting Cycle : consists of entering opening ledger balances for
the CoA ledger accounts, in the Opening Balances screen in the system for:
 Ledger Opening Balances - for opening Balances of Miscellaneous accounts that are left post updating the rest
of the below Opening Balances like Employee, Supplier, Customer, LC, Bank/Cash etc.
 Employee Opening Balance - for Opening Balances of Staff related accounts.
 Supplier Opening Balance - for Opening Balances of various Suppliers where accounts are payable. This is the
opening balance of ledger wherein the company enters its bills and pays money it owes.
 Supplier PDC Opening Balance - for Opening Balances of Post-Dated Cheques (PDC) issued to various
suppliers in return for supplies received and credit period enjoyed therein.
 Customer Opening Balance - for Opening Balances of various Customers where accounts are receivable. This
is the opening balance of ledger wherein the company enters money received
 Customer PDC Opening Balance - for Opening Balances of Post-Dated Cheques (PDC) received from various
customers in return for items supplied and credit period granted wherein.
 Bank / Cash Opening Balance – for Opening Balances of various Bank accounts maintained by the organization
for using banking tools and services for transacting business on a daily basis
Financial Accounting and Reporting Cycle
EZware Technologies L.L.C.
Transaction
Documents
/ Vouchers
This Stage in the Financial Accounting, Reporting Cycle : consists of transaction documents / vouchers namely:
 Payment voucher / Receipt Voucher – Refer slides 25 and 28
 Debit Note / Credit Note – these vouchers record sales returns from customers / purchase returns from suppliers
 Debit Application Credit Application – in cases of credit sales and credit purchases – this screen helps to offset
the Dr/Cr balances of any entity having both Dr/Cr balances e.g. a customer returning goods or having paid in
advance, would have a credit balance which can be offset with his debit balance for other sales made to him
 PDC Deposit - Payables and receivables – this screen helps to record PDC cheques received from customers or
PDC cheques issued to suppliers / other entities
 Journal Voucher – for recording transactions which are not covered in above screens e.g. to rectify any transaction
entry in case of errors
Financial Accounting and Reporting Cycle
EZware Technologies L.L.C.
Bank
Reconciliati
on
This Stage in the Financial Accounting, Reporting Cycle : consists of bank reconciliation:
A company's cash balance at bank and its cash balance according to its accounting records usually do not match the
bank records. This is due to the fact that, at any particular date, Cheques may be outstanding; deposits may be in transit
to the bank, errors may have occurred etc. Therefore companies have to carry out bank reconciliation process which
is a statement accounting for the difference between the cash balance in company's cash account and the cash
balance according to its bank statement. Following are the transactions which would be included:
 NSF Cheques -These are the cheques deposited by the company in bank account but the bank is unable to receive
payment on those cheques due to insufficient funds in the payer's account
 Deposits in Transit
 Cheques Outstanding
 Service Charges
 Interest Income
Financial Accounting and Reporting Cycle
EZware Technologies L.L.C.
Ledger
Closing
Records
This Stage in the Financial Accounting and Reporting Cycle : consists of closing ledger balances for
the CoA ledger accounts, in the system for:
 Revenue, Income and Gain Accounts
 Expense and Loss Accounts
 Drawings or Withdrawals Accounts
 Income Summary Account
Financial Accounting and Reporting Cycle
EZware Technologies L.L.C.
Ledger
Reports /
Financial
Statements
This Stage in the Financial Accounting and Reporting Cycle : consists of closing ledger balances for
the CoA ledger accounts, in the system for:
 Books - Bank, Cash, Sales, Sales Return, Purchase, Purchase Return, Journal, Debit Note, Credit Note
 Ledgers – General Ledger, sub-ledgers for Masters
 Financial Statements - Trial Balance, Profit And Loss, Schedule, Balance Sheet Reports
Financial Accounting and Reporting Cycle
EZware Technologies L.L.C.

More Related Content

What's hot

Manish tripathi-erp-bpre
Manish tripathi-erp-bpreManish tripathi-erp-bpre
Manish tripathi-erp-bpreA P
 
Access MRP - Material Requirements Planning
Access MRP - Material Requirements PlanningAccess MRP - Material Requirements Planning
Access MRP - Material Requirements PlanningAntony Hammond
 
Ewm erp qm_basic_inspection_process
Ewm erp qm_basic_inspection_processEwm erp qm_basic_inspection_process
Ewm erp qm_basic_inspection_processManikandanVijayan2
 
Inventory management
Inventory managementInventory management
Inventory managementAhmed Butt AB
 
SAP BASED PLANT MAINTENANCE
SAP BASED PLANT MAINTENANCESAP BASED PLANT MAINTENANCE
SAP BASED PLANT MAINTENANCEPANKAJ TIKEKAR
 
Globe User Group Presentation 11 09
Globe User Group Presentation 11 09Globe User Group Presentation 11 09
Globe User Group Presentation 11 09scirvin
 
Supply chain management in retailing by Mehul Galhotra
Supply chain management in retailing by Mehul GalhotraSupply chain management in retailing by Mehul Galhotra
Supply chain management in retailing by Mehul GalhotraMehul Galhotra
 
What is SAP Quality Management (QM) ? by Murali Nookella
What is SAP Quality Management (QM) ? by Murali NookellaWhat is SAP Quality Management (QM) ? by Murali Nookella
What is SAP Quality Management (QM) ? by Murali Nookellamuralikrishnanookella
 
Lecture 25 conversion cycle -wolrd class companies & lean manufacturing-...
Lecture 25  conversion cycle -wolrd class companies & lean manufacturing-...Lecture 25  conversion cycle -wolrd class companies & lean manufacturing-...
Lecture 25 conversion cycle -wolrd class companies & lean manufacturing-...Habib Ullah Qamar
 
TekWave SBMM Software (made to order manufacturer)
TekWave SBMM Software (made to order manufacturer)TekWave SBMM Software (made to order manufacturer)
TekWave SBMM Software (made to order manufacturer)Coney Development, Inc.
 
Realize the potential of sap material ledger
Realize the potential of sap material ledgerRealize the potential of sap material ledger
Realize the potential of sap material ledgerRajesh Shanbhag
 
Co product costing detailed trng
Co product costing detailed trngCo product costing detailed trng
Co product costing detailed trngVenkat Reddy
 
Inventory Valuation
Inventory ValuationInventory Valuation
Inventory Valuationmscuttle
 

What's hot (19)

Manish tripathi-erp-bpre
Manish tripathi-erp-bpreManish tripathi-erp-bpre
Manish tripathi-erp-bpre
 
Access MRP - Material Requirements Planning
Access MRP - Material Requirements PlanningAccess MRP - Material Requirements Planning
Access MRP - Material Requirements Planning
 
Ewm erp qm_basic_inspection_process
Ewm erp qm_basic_inspection_processEwm erp qm_basic_inspection_process
Ewm erp qm_basic_inspection_process
 
Inventory management
Inventory managementInventory management
Inventory management
 
SAP BASED PLANT MAINTENANCE
SAP BASED PLANT MAINTENANCESAP BASED PLANT MAINTENANCE
SAP BASED PLANT MAINTENANCE
 
Globe User Group Presentation 11 09
Globe User Group Presentation 11 09Globe User Group Presentation 11 09
Globe User Group Presentation 11 09
 
Supply chain management in retailing by Mehul Galhotra
Supply chain management in retailing by Mehul GalhotraSupply chain management in retailing by Mehul Galhotra
Supply chain management in retailing by Mehul Galhotra
 
What is SAP Quality Management (QM) ? by Murali Nookella
What is SAP Quality Management (QM) ? by Murali NookellaWhat is SAP Quality Management (QM) ? by Murali Nookella
What is SAP Quality Management (QM) ? by Murali Nookella
 
Lecture 25 conversion cycle -wolrd class companies & lean manufacturing-...
Lecture 25  conversion cycle -wolrd class companies & lean manufacturing-...Lecture 25  conversion cycle -wolrd class companies & lean manufacturing-...
Lecture 25 conversion cycle -wolrd class companies & lean manufacturing-...
 
TekWave SBMM Software (made to order manufacturer)
TekWave SBMM Software (made to order manufacturer)TekWave SBMM Software (made to order manufacturer)
TekWave SBMM Software (made to order manufacturer)
 
Sap qm overview
Sap qm overviewSap qm overview
Sap qm overview
 
WFX Cloud PLM
WFX Cloud PLMWFX Cloud PLM
WFX Cloud PLM
 
Realize the potential of sap material ledger
Realize the potential of sap material ledgerRealize the potential of sap material ledger
Realize the potential of sap material ledger
 
SAP CBM
SAP CBMSAP CBM
SAP CBM
 
Co product costing detailed trng
Co product costing detailed trngCo product costing detailed trng
Co product costing detailed trng
 
Sap qm ppt
Sap qm  pptSap qm  ppt
Sap qm ppt
 
Inventory Valuation
Inventory ValuationInventory Valuation
Inventory Valuation
 
BatchMaster ERP for Personal Care & Cosmetics
BatchMaster ERP for Personal Care & CosmeticsBatchMaster ERP for Personal Care & Cosmetics
BatchMaster ERP for Personal Care & Cosmetics
 
Qm overview
Qm overview Qm overview
Qm overview
 

Similar to EZware ERP Solutions Guide

Resources-Training-Order-To-Cash- ETON Technologies.pdf
Resources-Training-Order-To-Cash- ETON Technologies.pdfResources-Training-Order-To-Cash- ETON Technologies.pdf
Resources-Training-Order-To-Cash- ETON Technologies.pdfssuserf4597f
 
Resources-Training-Procure-To-Pay.pdf
Resources-Training-Procure-To-Pay.pdfResources-Training-Procure-To-Pay.pdf
Resources-Training-Procure-To-Pay.pdfSuresh426721
 
operationsmanagement-170519174700.pdf
operationsmanagement-170519174700.pdfoperationsmanagement-170519174700.pdf
operationsmanagement-170519174700.pdfprashanthiE3
 
Accounting Information System (AIS) Analysis
Accounting Information System (AIS) AnalysisAccounting Information System (AIS) Analysis
Accounting Information System (AIS) AnalysisRachel Wilcox-Miano
 
Operations management
Operations managementOperations management
Operations managementBharti Kumari
 
RIR cum Purchase Voucher Process
RIR cum Purchase Voucher ProcessRIR cum Purchase Voucher Process
RIR cum Purchase Voucher ProcessRachit Gandhi
 
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...Bhavin Shah
 
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...Bhavin Shah
 
New Procurement Workflows: Communication and Control from Quoting to Billing
New Procurement Workflows: Communication and Control from Quoting to BillingNew Procurement Workflows: Communication and Control from Quoting to Billing
New Procurement Workflows: Communication and Control from Quoting to BillingAutotask
 
mohammad abdelmohsen_BF015_ Ar_V2.DOC
mohammad abdelmohsen_BF015_ Ar_V2.DOCmohammad abdelmohsen_BF015_ Ar_V2.DOC
mohammad abdelmohsen_BF015_ Ar_V2.DOCMohammad Abd-Elmohsen
 
Training _ZK _Rev3_Final
Training _ZK _Rev3_FinalTraining _ZK _Rev3_Final
Training _ZK _Rev3_FinalZiad Khleif
 
Procure to Pay Process
Procure to Pay Process Procure to Pay Process
Procure to Pay Process Sameer Mittal
 
Contract farming agilelabspresentation
Contract farming agilelabspresentationContract farming agilelabspresentation
Contract farming agilelabspresentationAGILE LABS,INDIA
 
ERP Solution for MSMEs by Sumeet Mayor.pdf
ERP Solution for MSMEs by Sumeet Mayor.pdfERP Solution for MSMEs by Sumeet Mayor.pdf
ERP Solution for MSMEs by Sumeet Mayor.pdfSumeet Mayor
 

Similar to EZware ERP Solutions Guide (20)

Resources-Training-Order-To-Cash- ETON Technologies.pdf
Resources-Training-Order-To-Cash- ETON Technologies.pdfResources-Training-Order-To-Cash- ETON Technologies.pdf
Resources-Training-Order-To-Cash- ETON Technologies.pdf
 
Resources-Training-Procure-To-Pay.pdf
Resources-Training-Procure-To-Pay.pdfResources-Training-Procure-To-Pay.pdf
Resources-Training-Procure-To-Pay.pdf
 
Plugin ch05
Plugin ch05Plugin ch05
Plugin ch05
 
Bab4
Bab4Bab4
Bab4
 
operationsmanagement-170519174700.pdf
operationsmanagement-170519174700.pdfoperationsmanagement-170519174700.pdf
operationsmanagement-170519174700.pdf
 
Accounting Information System (AIS) Analysis
Accounting Information System (AIS) AnalysisAccounting Information System (AIS) Analysis
Accounting Information System (AIS) Analysis
 
Operations management
Operations managementOperations management
Operations management
 
RIR cum Purchase Voucher Process
RIR cum Purchase Voucher ProcessRIR cum Purchase Voucher Process
RIR cum Purchase Voucher Process
 
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
 
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
 
New Procurement Workflows: Communication and Control from Quoting to Billing
New Procurement Workflows: Communication and Control from Quoting to BillingNew Procurement Workflows: Communication and Control from Quoting to Billing
New Procurement Workflows: Communication and Control from Quoting to Billing
 
Purchase process
Purchase   processPurchase   process
Purchase process
 
Material Cost.pptx
Material Cost.pptxMaterial Cost.pptx
Material Cost.pptx
 
mohammad abdelmohsen_BF015_ Ar_V2.DOC
mohammad abdelmohsen_BF015_ Ar_V2.DOCmohammad abdelmohsen_BF015_ Ar_V2.DOC
mohammad abdelmohsen_BF015_ Ar_V2.DOC
 
Training _ZK _Rev3_Final
Training _ZK _Rev3_FinalTraining _ZK _Rev3_Final
Training _ZK _Rev3_Final
 
Procure to Pay Process
Procure to Pay Process Procure to Pay Process
Procure to Pay Process
 
Contract farming agilelabspresentation
Contract farming agilelabspresentationContract farming agilelabspresentation
Contract farming agilelabspresentation
 
ERP Solution for MSMEs by Sumeet Mayor.pdf
ERP Solution for MSMEs by Sumeet Mayor.pdfERP Solution for MSMEs by Sumeet Mayor.pdf
ERP Solution for MSMEs by Sumeet Mayor.pdf
 
James hall ch 5
James hall ch 5James hall ch 5
James hall ch 5
 
Accounts payable
Accounts payableAccounts payable
Accounts payable
 

Recently uploaded

AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDGMarianaLemus7
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
Bluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfBluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfngoud9212
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr LapshynFwdays
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsMiki Katsuragi
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 

Recently uploaded (20)

AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDG
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food Manufacturing
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
Bluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfBluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdf
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 

EZware ERP Solutions Guide

  • 2. ERP Solutions and Financial Accounting Menu:  Overview of EZware  EZware Products Modules / ERP Solutions  Manufacturing / Assembly Cycle  Construction / Contracting Cycle  Sales and Receipts Cycle  Purchase and Payments Cycle  Inventory / Material Management  Asset / Fleet Management  Financial Accounting and Reporting cycle  Financial Reports EZware Technologies L.L.C.
  • 8. Production Assembly Cycle 1 Process Plan / Design 2 Job Order / BoM 3 Job Order Execution 4 Warehou sing 5 Maintenan ce / QC 6 Sales / Dispatch To Buyer Manufacturing / Production Process  Production Management  Process Plan  Production Management  Bill of Material , Job Order Creation  Material Management  Job Order Execute  Good Procure /Issue (Job Order)  Production Management  Daily Production Entry  Production Management  Warehousing  Production Management  QC Approval / Maintenance  Issue / Dispatch – Covered in Sales Cycle EZware Technologies L.L.C.
  • 9. The FIRST Stage in the Production Assembly Cycle : Process Plan Creation :  Once customer sends order, Process Plan is created in the system with the specifications required to produce the item  The design details are included in this stage in the system  Next, the components required for the Job Order are identified in the Job Order, which include:  Materials required  Labor / resources required  Sub-contract works, if any required NOTE - For all items required, the estimated quantity and cost are also identified Production Assembly Cycle 1 Process Plan / Design EZware Technologies L.L.C.
  • 10. The SECOND Stage in the Production Assembly Cycle : BoM, Job Order creation :  Once customer sends order, Job Order and Bill of Material (BoM) are created in the system with the specifications required to produce the item  The design details are included in the Process Plan are included in the Job Order, which include:  Materials required  Labor / resources required  Sub-contract works, if any required NOTE - For all items required, the estimated quantity and cost are also identified Production Assembly Cycle 2 Job Order / BoM EZware Technologies L.L.C.
  • 11. Production Assembly Cycle The THIRD Stage in the Production Assembly Cycle : Job Order Execution :  Once the BoM and Job Order are raised, stock availability is checked  For items not available, inquiries are sent to suppliers and purchase orders are raised based on quotations received  Once items are received from suppliers, the system is updated for Inventory receipts, Purchase Invoice  Material requisitions are raised against Job Order, BoM  Stock transfer notes are issued against Material requisitions for issue of materials from store to the assembly / production site  Production / assembly progress for the Job order is tracked in the system through Job Order status - Work in progress reports, Daily Production Reports 3 Job Order Execution EZware Technologies L.L.C.
  • 12. Production Assembly Cycle4 Warehousing The FOURTH Stage in the Production Assembly Cycle : Warehousing:  Once the items are assembled as per Job Order / BoM, the finished goods are dispatched from site to the warehouse for storage  Inventory records are updated for finished goods received  Job Order is closed for items finished  Cost Variance reports for work completed are updated against the Job Order EZware Technologies L.L.C.
  • 13. Production Assembly Cycle The FIFTH Stage in the Production Assembly Cycle : QC / Maintenance  Once the items are stored in the warehouse, and inventory records are updated for the finished goods received:  Quality Check process for measuring in the compliance as per set standard of fitness and quality of the product  Inventory issue records are updated for QC  Preventive maintenance is done periodically for machinery and equipment used in the production / assembly 5 Maintenan ce / QC EZware Technologies L.L.C.
  • 14. Production Assembly Cycle 1 Process Plan / Design EZware Technologies L.L.C.
  • 15. Production Assembly Cycle 2 Job Order / BoM EZware Technologies L.L.C.
  • 16. Production Assembly Cycle 3 Job Order Execution EZware Technologies L.L.C.
  • 18. Sales Management and Receipts Cycle Sales Management and Receipts Process  Sales and Distribution Inquiry from Customer  Sales and Distribution Quotation to Customer  Sales and Distribution Sales Order  Sales and Distribution Dispatch Advise  Sales and Distribution Sales Invoice – SO  Financial Accounting  Receipt Voucher (RV) EZware Technologies L.L.C.
  • 19. Sales Management and Receipts Cycle 1 Inquiry from Customer The FIRST Stage in the Sales Cycle : begins with Inquiry from the Customer :  Inquiry Details are recorded in the system  Inquiry number is assigned by the system for future reference and use EZware Technologies L.L.C.
  • 20. Sales Management and Receipts Cycle 2 Quotation to Customer The SECOND Stage in the Sales Cycle : is our response to the Inquiry from the Customer :  Quotation is raised in the system in response to the Inquiry  Inquiry number assigned earlier from the system assigned, is attached to the Quotation EZware Technologies L.L.C.
  • 21. Sales Management and Receipts Cycle 3 Sales Order For Customer The THIRD Stage in the Sales Cycle : is Sales Order  A sales order is created once the client approves our quote or gives approval to proceed with sales  Stores can issue goods only against a sales order; (which implies Goods Issue Voucher is always issued against a sales order)  Sales Order requires approval by proper authority before Sales are made EZware Technologies L.L.C.
  • 22. Sales Management and Receipts Cycle 4 & 5 Goods Issue / Sales Invoice The FOURTH Stage in the Sales Cycle : Goods Issue / Dispatch and Sales invoice  Once the Sales Order (SO) is approved, items to be issued are reserved against Dispatch Advice  Sales Order and Dispatch / delivery documents are prepared for dispatch of the finished goods to customer  Sales Invoice is prepared, with the SO & Dispatch advice references, and issued to the customer  Inventory issue records are updated for goods issued  Accounting entries are also recorded in Sales invoice screen which initiates the Sales contract EZware Technologies L.L.C.
  • 23. Financial Accounting - Receipts Cycle The SIXTH Stage in the Sales Cycle is: Financial Accounting  Receipt Voucher (RV)  Receipt Voucher is raised in the system for payments received form customer  Inquiry number assigned earlier from the system assigned, is attached to the Quotation  Accounting entries are passed for payment received from customers on sale of goods 6 Receipt Voucher EZware Technologies L.L.C.
  • 24. Purchase Management and Payments Cycle Purchase Management and Payments Process  Purchase Management Inquiry to Supplier  Purchase Management Quotation from Supplier  Purchase Management Comparison  Purchase Management Purchase Order  Material Management  Goods Received (Inward)  Material Management  Goods Received (Quality Check)  Material Management  Goods Received – Note (GRN)  Purchase Management Purchase Invoice – GRN  Financial Accounting  Payment Voucher (PV) EZware Technologies L.L.C.
  • 25. 1 & 2 Materials Request / Inquiry This Stage in the Purchase Cycle : begins with Inquiry to the Supplier  Materials Request is raised by Stores / departments which require materials  For items not in stock, Inquiry is raised and sent to the Supplier  Inquiry number is assigned by the system for future reference and use Purchase Management and Payments Cycle EZware Technologies L.L.C.
  • 26. 3 & 4 Quotations / Comparison This Stage in the Purchase Cycle : begins with Quotations received from Suppliers  Quotations received are recorded in the system, with reference to Inquiry raised  Multiple quotations received against the same Inquiry number, are then compared in the system  The Comparison screen gives the option to select the best offer from all suppliers, it suggests the best quote on pricing by highlighting it in “Green”. The user can make a final decision by manually selecting the best quote as per other constraints if any Purchase Management and Payments Cycle EZware Technologies L.L.C.
  • 27. 5 Purchase Order Issue This Stage in the Purchase Cycle : begins Purchase Order raised on Suppliers  A Purchase order is made for a particular supplier once the prices and terms of payment are approved. A Purchase Order is an acknowledgement to the supplier that his Quotation has been selected for supply of goods to the firm  Accounting entries are also recorded in this screen which initiates the Purchase contract Purchase Management and Payments Cycle EZware Technologies L.L.C.
  • 28. 6 Goods Received / QC This Stage in the Purchase Cycle : begins with Goods received from Suppliers, QC  Suppliers issue goods against the Purchase order made on suppliers  On receipts of goods, QC or Quality check is conducted at Stores before receiving goods  Stock accounting entries are also recorded by raising a GRN for goods received Purchase Management and Payments Cycle EZware Technologies L.L.C.
  • 29. 6 Goods Received / QC This Stage in the Purchase Cycle is: Financial Accounting  Payment Voucher (PV)  After GRN is raised for goods received, Purchase Invoice is raised in the system on the supplier  Accounting entries are recorded in Purchase invoice screen which initiates the Purchase contract  Accounting entries are passed for payment made to suppliers for purchase of goods Financial Accounting - Payments Cycle EZware Technologies L.L.C.
  • 30. Inventory / Material Management Process Inventory Process / Material Management  Material management is where all the products/stocks of the organization are managed. Once the materials are properly filled-in, this module would be automatically updated based on transactions in Sales and Purchase module. Goods Issue and Goods Receipt (Inward) options in Material management is the base of sales and purchase and this would directly affect the stock. In addition we also have option to manage stocks, make stock adjustments and stock transfers between two locations. To summarize, Material Management is a simple and straight forward functionality that deals with stocks of the company  Note: The section on Goods Receipt (Inward) and Goods Issue were discussed in the respective Purchase and Sales cycles are not discussed in here  Material Management Item Master –Defines Materials Type  Unit Master- Defines basic unit of measurement  Location Master- Physical location of storage EZware Technologies L.L.C.
  • 31. Construction Contracting Cycle 1 Project & Org. WBS 2 Sub Contractor Set up 3 Tender / Bidding 4 Estimation 5 Project Set up & Progress 6 Project Receipts & Payments Construction / Contracting Process  Project and Organization Work Break down Structure (WBS)  Sub-Contractor Set-up  Project Comprehensive Evaluation  Project Tender / Bidding  Project Cost and Time Estimation  Project Set up  Project Status Progress Monitoring  Work Supervision  Quality Control  Payment Certificates  Project Receipts – Covered in Sales Cycle – RV (Receipts voucher)  Project Payments – Covered in Purchase Cycle – PV (Payment voucher) EZware Technologies L.L.C.
  • 32. The FIRST Stage in the Construction / Contracting Cycle :  Creation of the Organization WBS (O-WBS) – is set up of the standard “type” of resources required for various stages of the P-WBS  Creation of the Project work breakdown structure (P-WBS) – breakdown of the stages in any construction process in terms of smallest activity such as: the work package, tasks, sub-tasks, activity, work package  BOTH WBS are defined one-time in System Masters for all stages of the construction / contracting process  Under the smallest process of Work Package, resources, materials, etc required at that stage are attached :  Materials required – type of items, quantity, cost, etc  Labor / resources required – type of resources, quantity, cost, etc  Assets Required – machinery, etc  Sub-contractors required NOTE - For all above WBS components, the estimated quantity and estimated cost are also defined 1 Project & Org WBS Construction Contracting Cycle EZware Technologies L.L.C.
  • 33. 1 Project & Org WBS Construction Contracting Cycle EZware Technologies L.L.C.
  • 34. The SECOND Stage in the Construction / Contracting Cycle :  Similar to setting up the PBS and OBS, the next stage is to set up the Sub-contractor Master in the system  Under Sub-contractor Master we define the following:  Name of sub-contractor, details about the sub-contractor e.g. Contact details, currency, payment terms, etc  This is similar to defining our Suppliers in the Supplier Master  For the sub-contractors set up, sub-contractor agreements are also set up in the Master. These agreements are linked to the Construction Projects set-up in the system, at a later stage  Each work tem to be sub-contracted, estimates can be defined by entering the line items as per BoQ OR by selecting the PBS package created in the PBS master (materials, assets, etc for the selected PBS fill in automatically) For each item of the selected PBS, quantity, rate, etc can be edited, new items can be added / existing ones deleted Construction Contracting Cycle EZware Technologies L.L.C.2 Sub Contractor Set up
  • 35. Construction Contracting Cycle EZware Technologies L.L.C. 3 Tender / Bidding The THIRD Stage in the Construction / Contracting Cycle :  Once the WBS are set-up and the Sub-contractors are defined in the System, the next stage is entering the Tender details in the system as per the BoQ (Bill of Quantities)  The system also has the facility to import the BoQ externally from an excel file  For each Tender the System generates a unique “Tender Code” which can be selected in the Estimation for that Tender
  • 36. Construction Contracting Cycle EZware Technologies L.L.C.4 Estimation The FOURTH Stage in the Construction / Contracting Cycle :  After Tender entry, for Estimation of the Tender, select the Tender number against which the Estimation needs to be created. BoQ line items for the selected Tender number, fill in automatically in the Estimation screen. For each BoQ line item estimates can be done by:  Entering the line items for each BoQ OR by  Selecting the PBS package created in the PBS master (materials, assets, etc for the selected PBS fill in automatically) For each item of the selected PBS, quantity, rate, etc can be edited, new materials, etc can be added / existing ones deleted NOTE - Changes made to the PBS package selected in Estimation does not change the PBS defined in the Master  Rates in Estimation can be defined from Quotation / PO / PBS. Line items for which rates are not fixed can be marked in the BoQ column – the system “marks” these in “pink” and also sets up alerts which are displayed on logging in  Once estimates for each line item of the BoQ are filled in, the system shows the TOTAL estimated cost in the footer of the Estimation screen with separate estimate totals in the footer for:  Materials  Labor / manpower  Direct costs  Indirect expenses, overheads  For each Estimation, the System generates a unique “Estimation code” which can be attached in the Project budget screen to the relevant construction project
  • 37. Construction Contracting Cycle EZware Technologies L.L.C.4 Estimation
  • 38. The FIFTH Stage in the Construction / Contracting Cycle :  Once estimation is done for the Tender, next Project is created in the system to which the estimation can be attached  Setting up the project in the Project set up screen, is similar to entering details in the Supplier/Customer Master  The system lets user define the “Project Number” for each project set up in the system. Once the project is set up, it needs to be marked “Active”  Other details such as: relevant dates for the project, value of the project and approved value are also filled in.  Once the Project is set up, then the Budget / estimate for this project is created in the Project Budget screen by:  Selecting the Project number created  Selecting the Estimation number created – line items for the selected Estimation number, fill in automatically  For each item of the selected Estimation, quantity, rate, etc can be edited, new materials, etc can be added / existing ones deleted  Once the Budget is set up for the Project Number, the system automatically marks that Project “Budgeted” – this can be seen in the Project set up screen Construction Contracting Cycle EZware Technologies L.L.C. 5 Project Set up & Progress
  • 39. Construction Contracting Cycle EZware Technologies L.L.C. 5 Project Set up & Progress
  • 40. The FIFTH Stage in the Construction / Contracting Cycle :  Once the Project has been set up, marked “Active” and other details such as: relevant dates for the project, value of the project and approved value are filled in and the Budget is set up for the Project Number – this Project is now ready in the system to be managed and be tracked for its progress in terms of cost and time  To track progress in terms of cost, Payment Certificates are created in the system in the “Client Payment Certificate” or CPC Screen wherein by selecting the “project number” the details of the project are displayed. The progress of the project is then entered in terms of “%” or “value” and the system calculates the value of the work done till date  For the CPC screen, Ledger accounts (defined in the Chart of Accounts) are also selected and “defaulted” for use in the CPC screen.  Advances, retention amount, etc are also calculated in the CPC by the system based on details entered in Project set up  The CPC for each Project, is the Invoice sent to the client – receipts on this are recorded in the Receipts Voucher screen (covered in Financial Accounting)  The Project Schedule Management screen facilitates tracking progress of the project in terms of time, wherein by the selecting the Project Budget code, the line items for the selected Budget code, fill in automatically. Against each line item following details: start and end date, total number of days, predecessor / successor activities, slack , etc can be defined to track the progress. In the Project Daily progress screen - progress in terms of “%” for each line item can be monitored with the start and end dates for that item / activity. Construction Contracting Cycle EZware Technologies L.L.C. 5 Project Set up & Progress
  • 41. Construction Contracting Cycle EZware Technologies L.L.C. 5 Project Set up & Progress
  • 42. Fleet Management Cycle 1 Create Fleet Details 2 Create Maintenance Schedules 3 Create Job Card 4 Execute / Close Job Card 6 Receipts / Payments Fleet / Asset Management Process  Creation of Fleet Details in System  Record Fleet Details  Set up Depreciation Schedule over lifespan  Set up Maintenance Schedule for each Asset / Fleet  Define Maintenance Criteria  Set up Frequency of Maintenance  Create Job Card for each Fleet’s Maintenance Schedule  Attached Materials, Labor required  Identify Sub-contractor work required (if any)  Quality Check if required  Execute Job Card(s)  Receipts – Covered in Sales Cycle – RV (Receipts voucher)  Payments – Covered in Purchase Cycle – PV (Payment voucher) EZware Technologies L.L.C.
  • 43. The FIRST Stage in the Fleet Management Cycle : Fleet Management is relevant to businesses / companies which :  Use assets commercially e.g. operators of School Buses, Cranes / Heavy equipment, etc rented out by the business  To manage / track their assets used internally within multiple departments / projects  Fleet management involves FIRST creating details of each type of Fleet in the System - Fleet Pool and related Masters. Details recorded include:  Fleet Manufacturer, Origin, Registration details, Insurance details for the fleet / asset  Fleet Status (Active / Inactive), Location of Fleet (Workshop Garage, etc)  Recording details of each Asset/ fleet in the Fleet Pool Menu of the system for e.g. Registration data of the Fleet, physical details (weight, length, etc), Model, Engine and other Identification details  Other Specifications e.g. Tyre serial number, number of tyres, Kilometer details related to the tyres, etc NOTE - These details help define the Fleet Maintenance required in subsequent stages of fleet management through the system 1 Create Fleet Details Fleet Management Cycle EZware Technologies L.L.C.
  • 45. The SECOND Stage in the Fleet Management Cycle :  Once the Fleet Details have been recorded in the System Fleet Pool, the next process is to define the Maintenance schedule required for each fleet. This includes setting up the Maintenance criteria in the Maintenance Menus and includes defining details of:  Type of Maintenance (Preventive / corrective)  Maintenance checklist (Oil change, brakes, repair, etc)  For each type of maintenance, the system allows defining the items required, cost involved by clicking “F9” against the line item in the Details grid Fleet Management Cycle EZware Technologies L.L.C.2 Create Maintenance Schedules
  • 46. The SECOND Stage in the Fleet Management Cycle :  Further details defined in the Maintenance schedule for each fleet, include frequency of maintenance (date wise / mileage wise).  Based on Maintenance criteria filled in , the Maintenance Schedule screen “fills in” automatically (on clicking the “Fill Schedule” option  The system allows defining the items required, cost involved by clicking “F9” against the line item in the grid (NOTE – Material, other items required for maintenance are defined in Materials Management – Item Masters) Fleet Management Cycle EZware Technologies L.L.C.2 Create Maintenance Schedules
  • 47. The THIRD Stage in the Fleet Management Cycle :  After setting up the Maintenance criteria, the Service Request (SR) for each fleet / asset is created  In the SR screen, on selecting customer and other details the grid “fills in” automatically with relevant fleet details  For each line item in the grid, the system allows review of material, labor and cost breakdown. Further material items, etc can be added / existing ones edited at this stage  Sub-contracting any line item in the grid is also possible, (on clicking F9 ), and sub-contractor / third party repairs, can be added and cost defined for the line item Fleet Management Cycle EZware Technologies L.L.C.3 Create Job Card
  • 48. The THIRD Stage in the Fleet Management Cycle :  For each SR, the next step is to create Job Card. In the Job card, on selecting the (SR), details “fill in” automatically from the SR.  For each line item in the grid, the system allows drill down review of material, labor, third party repairs, etc by clicking the respective “F6…F9” buttons shown at the bottom of the screen  Total cost with sub-totals for costs of material, labor are also available at the bottom of the Job Card screen  The system also generates Purchase Order (PO) automatically for each Job card created Fleet Management Cycle EZware Technologies L.L.C.3 Create Job Card
  • 49. The FOURTH Stage in the Fleet Management Cycle :  Executing the Job Card created  This involves recording the Invoices from sub-contractors, monitoring the materials issued for the job card (via the Inventory Module – Goods Issued screen)  For Materials required, the system auto-creates Material Issue from Inventory / Material request in case item is not available in stock – this is done through the Inventory Management module in the system  Processing Payments for work executed on the Job card - covered in Financial Accounting module  Closing the Job Card with QC Check (if required) Fleet Management Cycle EZware Technologies L.L.C.4 Execute Job Card
  • 50. Financial Accounting and Reporting Cycle Financial Accounting and Reporting Process  Chart of Accounts  Masters  Payment Voucher / Receipt Voucher  Debit Note / Credit Note  Debit Application / Credit Application  PDC Deposit, Payables and receivables  Journal Vouchers  Bank Reconciliation  Closing JV  Books - Bank, Cash, Sales, Sales Return, Purchase, Purchase Return, Journal, Debit Note, Credit Note  Ledgers – General Ledger, sub-ledgers for Masters  Financial Statements - Trial Balance, Profit And Loss, Schedule, Balance Sheet Reports EZware Technologies L.L.C.
  • 51. 1 & 2 CoA / Masters This is the foundation Stage in the Financial Accounting and Reporting Cycle : begins with creation of :  Creation of Chart of Accounts (CoA) – defines the Groups: B/S (Assets, Liabilities), P&L (Revenue, Expenses). The CoA also categorizes, links the debit / credit ledger accounts below the Groups  Groups are identified in “blue” and Ledger accounts are identified in “red” in the CoA  Creation of Masters – these are sub-ledgers for the ledgers accounts in the CoA for Banks, Suppliers, Customers, Employees, Currencies, etc  The CoA ledger accounts with the Masters feed the accounting transactions into transaction reports, final accounts Financial Accounting and Reporting Cycle EZware Technologies L.L.C.
  • 52. Ledger Opening Records This Stage in the Financial Accounting and Reporting Cycle : consists of entering opening ledger balances for the CoA ledger accounts, in the Opening Balances screen in the system for:  Ledger Opening Balances - for opening Balances of Miscellaneous accounts that are left post updating the rest of the below Opening Balances like Employee, Supplier, Customer, LC, Bank/Cash etc.  Employee Opening Balance - for Opening Balances of Staff related accounts.  Supplier Opening Balance - for Opening Balances of various Suppliers where accounts are payable. This is the opening balance of ledger wherein the company enters its bills and pays money it owes.  Supplier PDC Opening Balance - for Opening Balances of Post-Dated Cheques (PDC) issued to various suppliers in return for supplies received and credit period enjoyed therein.  Customer Opening Balance - for Opening Balances of various Customers where accounts are receivable. This is the opening balance of ledger wherein the company enters money received  Customer PDC Opening Balance - for Opening Balances of Post-Dated Cheques (PDC) received from various customers in return for items supplied and credit period granted wherein.  Bank / Cash Opening Balance – for Opening Balances of various Bank accounts maintained by the organization for using banking tools and services for transacting business on a daily basis Financial Accounting and Reporting Cycle EZware Technologies L.L.C.
  • 53. Transaction Documents / Vouchers This Stage in the Financial Accounting, Reporting Cycle : consists of transaction documents / vouchers namely:  Payment voucher / Receipt Voucher – Refer slides 25 and 28  Debit Note / Credit Note – these vouchers record sales returns from customers / purchase returns from suppliers  Debit Application Credit Application – in cases of credit sales and credit purchases – this screen helps to offset the Dr/Cr balances of any entity having both Dr/Cr balances e.g. a customer returning goods or having paid in advance, would have a credit balance which can be offset with his debit balance for other sales made to him  PDC Deposit - Payables and receivables – this screen helps to record PDC cheques received from customers or PDC cheques issued to suppliers / other entities  Journal Voucher – for recording transactions which are not covered in above screens e.g. to rectify any transaction entry in case of errors Financial Accounting and Reporting Cycle EZware Technologies L.L.C.
  • 54. Bank Reconciliati on This Stage in the Financial Accounting, Reporting Cycle : consists of bank reconciliation: A company's cash balance at bank and its cash balance according to its accounting records usually do not match the bank records. This is due to the fact that, at any particular date, Cheques may be outstanding; deposits may be in transit to the bank, errors may have occurred etc. Therefore companies have to carry out bank reconciliation process which is a statement accounting for the difference between the cash balance in company's cash account and the cash balance according to its bank statement. Following are the transactions which would be included:  NSF Cheques -These are the cheques deposited by the company in bank account but the bank is unable to receive payment on those cheques due to insufficient funds in the payer's account  Deposits in Transit  Cheques Outstanding  Service Charges  Interest Income Financial Accounting and Reporting Cycle EZware Technologies L.L.C.
  • 55. Ledger Closing Records This Stage in the Financial Accounting and Reporting Cycle : consists of closing ledger balances for the CoA ledger accounts, in the system for:  Revenue, Income and Gain Accounts  Expense and Loss Accounts  Drawings or Withdrawals Accounts  Income Summary Account Financial Accounting and Reporting Cycle EZware Technologies L.L.C.
  • 56. Ledger Reports / Financial Statements This Stage in the Financial Accounting and Reporting Cycle : consists of closing ledger balances for the CoA ledger accounts, in the system for:  Books - Bank, Cash, Sales, Sales Return, Purchase, Purchase Return, Journal, Debit Note, Credit Note  Ledgers – General Ledger, sub-ledgers for Masters  Financial Statements - Trial Balance, Profit And Loss, Schedule, Balance Sheet Reports Financial Accounting and Reporting Cycle EZware Technologies L.L.C.