Over 28 years of experience working as a piping designer. Experience on various projects such as
chemical plants, ethylene plants, oil refineries, paper mills, compressor stations, separator
facilities, gas plants, pump stations, metering stations and storage terminals. Experience with
laying out conceptual FEED / FEL projects as well as detailed design of piping systems. Layout
and piping design experience working with equipment such as towers, drums, air coolers,
exchangers, skids, pumps, tanks, modular structures and pipe racks. Experience with multiple 3D
modeling programs such as PDS, PASCE and CADWorx.
TRAINING AND EDUCATION:
Stafford High School - Class of 1987
Houston Community College - Manual Drafting and Piping Drafting
Houston Area Safety Council - Basic Plus
OSHA Training - 10-hour General Industry Safety and Health
TWIC Card - Expires March 2019
DETAILED EXPERIENCE:
Burns & McDonnell - Sr. Piping Designer – February 2014 to July 2016
Designed pipe using PDS in the product storage area (OSBL) at a refinery in Corpus Christi, Texas.
Designed piping systems for a crude oil heater in Billings, Montana. LFM was used to model
existing pipe for new tie points in the field and SPR was used to review the model.
Jacobs - Sr. Piping Designer – September 2013 to February 2014
Designed pipe using PDS in the waste water treatment area at a refinery in Whiting, Indiana. SPR
was used to review the model and LFM was used to tie into existing piping.
Spectra Energy - Sr. Piping Designer - February 2009 to September 2013
Created special operational drawings for pipelines, compressor stations, metering stations and
regulating stations using MicroStation. Visited pipeline facilities such as compressor stations and
meter stations, in order to revise as-built drawings for station operations and DOT compliance.
Trained drafters with proper drafting techniques based on company and industry standards.
Technip - Sr. Piping Designer - March 2008 to February 2009
Designed and modeled pipe using PDS in several areas of a new saturated gas unit in a refinery.
Several areas were multilevel structure modules constructed off site for cost purposes. SmartPlant
was used to review additions and changes in the model. Resolved problems with piping isometrics
that would not generate automatically using ISOGEN.
2. Fluor - Sr. Piping Designer - November 2006 to March 2008
Modeled and designed pipe using PDS in several areas of a hydrotreater unit and a crude unit at
two refineries that used off site modular construction for the structures that contained exchangers,
drums and pumps. Assisted with nozzle and platform orientations for towers and drums. Resolved
clash reports and model integrity problems with piping.
Valero LP - Sr. Piping Designer - March 2003 to November 2006
Designed pipe for new piping systems at multiple pipeline pump stations and storage terminals
across the United States. Modeled pipe and in order to create piping drawings using CADWorx
and created P&IDs using CADWorx P&ID.
Dow Chemical - Sr. Piping Designer - June 1995 to September 2002
Laid out and arranged pipe, vessels, towers, tanks, pumps, pipe racks and structures in chemical
plants while working in the front end engineering and design group (FEED / FEL). Designed pipe
and modeled equipment using a 3D CAD program called PASCE. Worked on multiple projects
routing and designing new piping systems.
Nautilus Engineering - Piping Designer - July 1994 to June 1995
Designed pipe for a new long distance natural gas pipeline system with multiple compressor
stations using AutoCAD.
John Brown - Piping Designer - September 1993 to July 1994
Designed pipe on a semi-submersible offshore drilling platform that was being revamped for the
Chinese government using AutoCAD.
Litwin - Piping Designer - March 1992 to September 1993
Designed pipe for a new sulfur recovery unit and a new MTBE reformulated gasoline project.
Modeled pipe and equipment using a 3D CAD program called PASCE.
Williams Brothers - Piping Designer - March 1991 to March 1992
Designed pipe for several tank farms and gasoline loading terminals using AutoCAD.
Morris & Associates Engineering - Piping Designer - November 1990 to March 1991
Designed pipe for several gasoline storage terminals in order to move piping that was underground
to above ground using AutoCAD and Pro-Iso.
Eagleton Engineering - Piping Designer - November 1989 to November 1990
Designed pipe for various pipeline services such as launchers, receivers, meters, separators and
storage facilities using manual drafting.
Brown & Root - Piping Draftsman - August 1987 to November 1989
Created and revised drawings for expansion work at a paper mill. Assisted with the gathering of
information from the field regarding equipment location, dimensions and elevations for the design
of new piping. Manually drafted on the drafting board plans, isometrics and sections.