[INC 281 MULTIDISCIPLINARY WORKSHOP WEEKLY REPORT]                            May 9, 2012

 Name-Surname Vorapol charoenkitwasin
    Student ID. 53219008
   Group Name Habithai
    Engineering
                Hack,top,U,Knight,tos,O,Art,Boon,Arm,Ball,Ball
 Team Members



 Product Design
                P”pete,P”ice,P”pae,P”tuang
 Team Members



Weekly Progress
        On this week, Project has 2 problem. Fan is working unstable. This is
 first problem and second problem is sensor unstable. That sensor is photo
 interrupter sensor or mosquito counter sensor. So we must find wrong point
 and modify on PCB. Find that 2 point on PCB not connection. Voltage from
 supply not to motor fan. Because we modify in that point. At second problem
 we modify by change sensor and operation after that. Next I’m take photo
 component of product and find some information for make to report.




       Photo interrupter sensor is assembly
                                                                 PCB Circuit is finish


Engineering Analysis
Strong Point
-My part is completely.
-I help my team and architecture.

Week Point
-It hard to compound every part into product by spend time to much.


Next Week Job
-Presentation at bangkuntain.




                                    Department of Control System and Instrumentation Engineering
                                       KING MONGKUT’s UNIVERSITY OF TECHNOLOGY THONBURI

Weekly report hack

  • 1.
    [INC 281 MULTIDISCIPLINARYWORKSHOP WEEKLY REPORT] May 9, 2012 Name-Surname Vorapol charoenkitwasin Student ID. 53219008 Group Name Habithai Engineering Hack,top,U,Knight,tos,O,Art,Boon,Arm,Ball,Ball Team Members Product Design P”pete,P”ice,P”pae,P”tuang Team Members Weekly Progress On this week, Project has 2 problem. Fan is working unstable. This is first problem and second problem is sensor unstable. That sensor is photo interrupter sensor or mosquito counter sensor. So we must find wrong point and modify on PCB. Find that 2 point on PCB not connection. Voltage from supply not to motor fan. Because we modify in that point. At second problem we modify by change sensor and operation after that. Next I’m take photo component of product and find some information for make to report. Photo interrupter sensor is assembly PCB Circuit is finish Engineering Analysis Strong Point -My part is completely. -I help my team and architecture. Week Point -It hard to compound every part into product by spend time to much. Next Week Job -Presentation at bangkuntain. Department of Control System and Instrumentation Engineering KING MONGKUT’s UNIVERSITY OF TECHNOLOGY THONBURI