The weekly report summarizes the progress of an engineering team working on a product design. In part one, the team installed electronic equipment and components on a PCB board and chassis. In part two, they tested the circuit by inputting power and water, and found the machine operated as intended. Their strong point was taking safety precautions when testing the 220V circuit. Their weak point was limited time to fully test the circuit. Next week they will check everything before their presentation.