Equipment DepartmentEquipment Department
monthly Reportmonthly Report
19-05-2015 1
Prepared by: Engr.Badiea
Mudhsh
Mechanical Engineer
INDEXINDEX
Introduction
…………………………………………3
Abbreviation ……………………………………..
…4
Detailed report of Transport Equipment.5
Detailed heavy equipment ………….……….6
Total equipment report ……………….……….7
Notes
…………………………………………………
…8


 2
IntroductionIntroduction‫المقدمه‬‫المقدمه‬
v Objective
• To analyze weekly activities
or Equipment department
(Operation and
Maintenance).
• To analyze weekly
Operation and
maintenance of equipment
in the Company
v Outcome
• The strategic decisions
required to increase the
operation and
maintenance department
working.
◦
v‫الهدف‬
‫الشنشطه‬ ‫تحليل‬
‫لادارة‬ ‫البسبوعية‬
‫)اادارة‬ ‫المعدات‬
‫التشغيل‬,.(‫والصياشنه‬
‫التشغيل‬ ‫شنسبة‬ ‫تحليل‬
‫البسبوعية‬ ‫والصياشنة‬
.‫الشركة‬ ‫مواقع‬ ‫في‬
v‫النتائج‬
‫البستراتيجية‬ ‫القرارات‬
‫حجم‬ ‫لرفع‬ ‫المطلوبة‬
‫التشغيل‬ ‫قسم‬ ‫عمل‬
.‫والصياشنة‬
3
AbbreviationAbbreviation‫المعدات‬ ‫اختصارات‬‫المعدات‬ ‫اختصارات‬
4
Detailed report for transport equipmentDetailed report for transport equipment





5
HT FB DB WT LB FT
0
20
40
60
80
100
120 ‫النقلحتى‬ ‫بمعدات‬ ‫شامل‬ ‫تقرير‬14-05-2015
Detailed heavy equipmentDetailed heavy equipment





6
DT GN WL EX BD JH BC WM AC MG
0
5
10
15
20
25
30
‫حتى‬ ‫الثقيلة‬ ‫للمعدات‬ ‫شامل‬ ‫تفصيل‬14/05/2015
‫قل‬‫لن‬‫ا‬‫طول‬‫اس‬‫عدد‬
TOTAL EQUIPMENT REPROTTOTAL EQUIPMENT REPROT
42%
6%
48%
4%
otal comparison working equipment between in Tadaruj and outside ren
Working in Tadaruj
Rented outside Tadaruj
Standby
Breakdown
7
‫يرسم‬
NotesNotes
Hoping increase the productivities,
reliabilities and mainabilities
Next report there will include the
service vehicle SV report in this
presentation.

Any notes or remarks you could send
me to my email to improve this report.
(bmodesh@tadaruj.com)
 8
9
Thank you forThank you for
your attentionyour attention
9
Thank you forThank you for
your attentionyour attention

More Related Content

What's hot

Total productive Maintanance
Total productive MaintananceTotal productive Maintanance
Total productive Maintanance
senthamarai kannan
 
คาลิเบรท เครื่องจักร CNC ด้วย Renishaw QC20 Ballbar Calibration
คาลิเบรท เครื่องจักร CNC ด้วย Renishaw QC20 Ballbar Calibrationคาลิเบรท เครื่องจักร CNC ด้วย Renishaw QC20 Ballbar Calibration
คาลิเบรท เครื่องจักร CNC ด้วย Renishaw QC20 Ballbar Calibration
Precision Tooling Services Co., Ltd.
 
Lead Time Reduction in Manufacturing Process of CNC Machines by Lean Principles
Lead Time Reduction in Manufacturing Process of CNC Machines by Lean PrinciplesLead Time Reduction in Manufacturing Process of CNC Machines by Lean Principles
Lead Time Reduction in Manufacturing Process of CNC Machines by Lean Principles
IRJET Journal
 
Actionable information 1
Actionable information 1Actionable information 1
Actionable information 1
LineView Academy (was OFX Academy)
 
Tool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and SchedulingTool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and Scheduling
Ricky Smith CMRP, CMRT
 
Using OEE to Improve Production - Interphex 2012
Using OEE to Improve Production - Interphex 2012Using OEE to Improve Production - Interphex 2012
Using OEE to Improve Production - Interphex 2012
Adrian Pask
 
Day in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance ManagerDay in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance Manager
Ricky Smith CMRP, CMRT
 

What's hot (7)

Total productive Maintanance
Total productive MaintananceTotal productive Maintanance
Total productive Maintanance
 
คาลิเบรท เครื่องจักร CNC ด้วย Renishaw QC20 Ballbar Calibration
คาลิเบรท เครื่องจักร CNC ด้วย Renishaw QC20 Ballbar Calibrationคาลิเบรท เครื่องจักร CNC ด้วย Renishaw QC20 Ballbar Calibration
คาลิเบรท เครื่องจักร CNC ด้วย Renishaw QC20 Ballbar Calibration
 
Lead Time Reduction in Manufacturing Process of CNC Machines by Lean Principles
Lead Time Reduction in Manufacturing Process of CNC Machines by Lean PrinciplesLead Time Reduction in Manufacturing Process of CNC Machines by Lean Principles
Lead Time Reduction in Manufacturing Process of CNC Machines by Lean Principles
 
Actionable information 1
Actionable information 1Actionable information 1
Actionable information 1
 
Tool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and SchedulingTool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and Scheduling
 
Using OEE to Improve Production - Interphex 2012
Using OEE to Improve Production - Interphex 2012Using OEE to Improve Production - Interphex 2012
Using OEE to Improve Production - Interphex 2012
 
Day in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance ManagerDay in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance Manager
 

Similar to Weekly Equipment dept Report 14-05-2015

Scaled agile meets the ground
Scaled agile meets the groundScaled agile meets the ground
Scaled agile meets the ground
India Scrum Enthusiasts Community
 
H0432045055
H0432045055H0432045055
H0432045055
theijes
 
Resume_Balachandru
Resume_BalachandruResume_Balachandru
Resume_Balachandru
balachandru venugopalan
 
Par Stories 6
Par Stories 6Par Stories 6
Par Stories 6
SDuhig
 
GPAllied Capabilities Document
GPAllied Capabilities DocumentGPAllied Capabilities Document
GPAllied Capabilities Document
Ricky Smith CMRP, CMRT
 
TPM: Focused Improvement (Kobetsu Kaizen)
TPM: Focused Improvement (Kobetsu Kaizen)TPM: Focused Improvement (Kobetsu Kaizen)
TPM: Focused Improvement (Kobetsu Kaizen)
Operational Excellence Consulting
 
VDA 6.3 - Process Audit Innovator
VDA 6.3 - Process Audit InnovatorVDA 6.3 - Process Audit Innovator
VDA 6.3 - Process Audit Innovator
Cape Town International Convention Centre
 
Avtec report
Avtec reportAvtec report
Avtec report
Bhavna Verma
 
Plant & Maintenance Engineering
Plant & Maintenance EngineeringPlant & Maintenance Engineering
Plant & Maintenance Engineering
Nirjhar Chakravorti
 
Maintenance system, inspections & audits
Maintenance system, inspections & auditsMaintenance system, inspections & audits
Maintenance system, inspections & audits
Neeraj Kumar
 
Strategy Report
Strategy ReportStrategy Report
Strategy Report
Tom Leggett
 
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
IRJET Journal
 
cv_kuldip[1](1)
cv_kuldip[1](1)cv_kuldip[1](1)
cv_kuldip[1](1)
Anju Narayan
 
Agile Development Lifecycle and Best Practices with Denodo
Agile Development Lifecycle and Best Practices with DenodoAgile Development Lifecycle and Best Practices with Denodo
Agile Development Lifecycle and Best Practices with Denodo
Denodo
 
Resume - Kedar Borgaonkar -6-Apr-16
Resume - Kedar Borgaonkar -6-Apr-16Resume - Kedar Borgaonkar -6-Apr-16
Resume - Kedar Borgaonkar -6-Apr-16
Kedar Borgaonkar
 
Performance measurement of agile teams harold van heeringen
Performance measurement of agile teams   harold van heeringenPerformance measurement of agile teams   harold van heeringen
Performance measurement of agile teams harold van heeringen
IWSM Mensura
 
Productivity measurement of agile teams (IWSM 2015)
Productivity measurement of agile teams (IWSM 2015)Productivity measurement of agile teams (IWSM 2015)
Productivity measurement of agile teams (IWSM 2015)
Harold van Heeringen
 
LEAN STANDARDIZED WORK TOOL
LEAN STANDARDIZED WORK TOOLLEAN STANDARDIZED WORK TOOL
LEAN STANDARDIZED WORK TOOL
Endashaw Yohannes Hailu
 
ISO_6
ISO_6ISO_6
ISO_6
PMI2011
 
Ba questions v1 agile
Ba questions v1 agileBa questions v1 agile
Ba questions v1 agile
PrefectBA
 

Similar to Weekly Equipment dept Report 14-05-2015 (20)

Scaled agile meets the ground
Scaled agile meets the groundScaled agile meets the ground
Scaled agile meets the ground
 
H0432045055
H0432045055H0432045055
H0432045055
 
Resume_Balachandru
Resume_BalachandruResume_Balachandru
Resume_Balachandru
 
Par Stories 6
Par Stories 6Par Stories 6
Par Stories 6
 
GPAllied Capabilities Document
GPAllied Capabilities DocumentGPAllied Capabilities Document
GPAllied Capabilities Document
 
TPM: Focused Improvement (Kobetsu Kaizen)
TPM: Focused Improvement (Kobetsu Kaizen)TPM: Focused Improvement (Kobetsu Kaizen)
TPM: Focused Improvement (Kobetsu Kaizen)
 
VDA 6.3 - Process Audit Innovator
VDA 6.3 - Process Audit InnovatorVDA 6.3 - Process Audit Innovator
VDA 6.3 - Process Audit Innovator
 
Avtec report
Avtec reportAvtec report
Avtec report
 
Plant & Maintenance Engineering
Plant & Maintenance EngineeringPlant & Maintenance Engineering
Plant & Maintenance Engineering
 
Maintenance system, inspections & audits
Maintenance system, inspections & auditsMaintenance system, inspections & audits
Maintenance system, inspections & audits
 
Strategy Report
Strategy ReportStrategy Report
Strategy Report
 
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
 
cv_kuldip[1](1)
cv_kuldip[1](1)cv_kuldip[1](1)
cv_kuldip[1](1)
 
Agile Development Lifecycle and Best Practices with Denodo
Agile Development Lifecycle and Best Practices with DenodoAgile Development Lifecycle and Best Practices with Denodo
Agile Development Lifecycle and Best Practices with Denodo
 
Resume - Kedar Borgaonkar -6-Apr-16
Resume - Kedar Borgaonkar -6-Apr-16Resume - Kedar Borgaonkar -6-Apr-16
Resume - Kedar Borgaonkar -6-Apr-16
 
Performance measurement of agile teams harold van heeringen
Performance measurement of agile teams   harold van heeringenPerformance measurement of agile teams   harold van heeringen
Performance measurement of agile teams harold van heeringen
 
Productivity measurement of agile teams (IWSM 2015)
Productivity measurement of agile teams (IWSM 2015)Productivity measurement of agile teams (IWSM 2015)
Productivity measurement of agile teams (IWSM 2015)
 
LEAN STANDARDIZED WORK TOOL
LEAN STANDARDIZED WORK TOOLLEAN STANDARDIZED WORK TOOL
LEAN STANDARDIZED WORK TOOL
 
ISO_6
ISO_6ISO_6
ISO_6
 
Ba questions v1 agile
Ba questions v1 agileBa questions v1 agile
Ba questions v1 agile
 

Weekly Equipment dept Report 14-05-2015