(cover)
Web 2.0 Interactive Tools:
A Quick Guide
MOHAMED AMIN EMBI
Centre for Academic Advancement
Universiti Kebangsaan Malaysia
2013
Table of Contents i
TABLE OF CONTENTS
Page
CHAPTER 1 SOCRATIVE
What is Socrative?…………………………………………………...16
Benefits of Socrative……...………………………………………………
Ways of using Socrative……………………………….…………………
Get started with Socrative.…………………………………………….
References……………………………………………………………22
CHAPTER 2 EDISTORM
What is Edistorm?..………………………………………………………
Benefits of Edistorm………....……………………………………..……..
Using Edistorm in the classroom…………………………………...……
Get started with Edistorm………………………………………………
References……………………………………………………………….
CHAPTER 3 TWIDDLA
What is Twiddla?……………………………………………....................
Advantages of Twiddla……………….…………………………………
Ways of using Twiddla for teaching……………………………………..
Get started with Twiddla………………………………………………...
References………………………………………………………………
1
1
2
3
15
10
10
12
19
25
25
26
28
34
16
17
17
19
24
ii Table of Contents
CHAPTER 4 WALLWISHER
What is Wallwisher?…………………………………………………70
Benefits of using Wallwisher.…………………………………………….
Using Wallwisher as a research tool………………………………..
Get started with Wallwisher…………………………………………72
References……………………………………………………………80
CHAPTER 5 TYPEWITH.ME
What is TypeWith.me?........................................................................................
Ways for students and teachers to use TypeWith.me………………..
Get started with TypeWith.me…………..………………………………
References……………………………………………………………….
CHAPTER 6 VOICETHREAD
What is a Voicethread?………………………………………………..1
Benefits of using Voicethread………………………………………....1
Ways of using Voicethread…………………..………………………….
Usage in teaching and learning…………………………………………...
Get started with Voicethread.…………………………………………2
References………………………………………………………………
CHAPTER 7 MIND42
What is a Mind42?....……………………………………………...……..1
Advantages of Mind42..…..…………………………………………....1
Using Mind42……………………………..……………………………....
Get started with Mind42…….…………………………………………2
References…………………………………………………………….6
35
35
36
37
45
46
46
48
51
1
52
53
54
54
57
63
64
64
65
66
76
Table of Contents iii
CHAPTER 8 SYNC.IN
What is Sync.In?………………………………………………………….
Advantages of Sync.In.……………………………………………………
Get started with Sync.In………………………………………………..
References………………………………………………………………..
CHAPTER 9 POLL EVERYWHERE
What is Poll Everywhere?……………………………………………..1
Ideas for usage in class...………………………………………………..1
Benefits of Poll Everywhere…………………………………………..….
Get started with Poll Everywhere…………………………………......
References………………………………………………………………8
CHAPTER 10 SCRIBLAR
What is Scribblar?....…………………………………………………1
Benefits of Scribblar………………………………………………
Example of how Scribblar support learning…………………………….
Get started with Scribblar…………………………………………...3
References………………………………………………………………
77
77
78
83
84
84
85
86
94
95
95
96
98
105
Chapter 1: Socrative 1
WHAT IS SOCRATIVE?
Socrative is a smart student response system that empowers teachers to
engage their classrooms through a series of educational exercises and games
via smartphones, laptops, and tablets.
(Source: http://www.socrative.com/)
BENEFITS OF SORATIVE
The following are some benefits for using Socrative:
 Socrative was created by a group of teachers.
 It is interactive and engaging.
 It provides immediate feedback via formative assessments.
 It is paperless.
 It saves time when grading assignments.
 Students can use Socratic on any device, on any platform.
(Source: http://www.thelandscapeoflearning.com/2012/02/11-ways-to-use-
socrative-as-formative.html)
Chapter 1
SOCRATIVE
2 Chapter 1: Socrative
WAYS OF USING SOCRATIVE
The following are ways of using Socrative as formative assessment:
 True or False Questions
 Multiple Choice Questions
 Short Response
 Visual Data (Bar graphs and visual short responses)
 Exit Ticket
 Pre-Assessment
 Post-Assesment
 Create Short Quizzes
 Upload Premade Quizzes
 Reflection
 Collect Background Knowledge
 Quick Check for Understanding
 Voting on best responses
(Source: http://www.thelandscapeoflearning.com/2012/02/11-ways-to-use-
socrative-as-formative.html)
Chapter 1: Socrative 3
GET STARTED WITH SOCRATIVE
Go to: http://www.socrative.com/
Starting the RoomSTEP 2
STEP 1
Before you can start
using Socrative, you
need to ‘Sign Up’
first.
If you are
student, you
can log in
using
‘Student Log
In’.
If you are
teacher, you
can log in
using
‘Teacher Log
In’.
4 Chapter 1: Socrative
Then, click the ‘Create
Account’ button. Then, you
need to fill up another form
regarding your personal
details.
Or, you can click
the ‘Get started
now!” button at
the Socrative
Home page.
After that, you can
start using your
Socrative by
clicking this button.
Insert your
email and
password.
Chapter 1:Socrative 5
(a) Teacher login
(b) Student login
Once you are logged
in as teacher, you
will have your own
room number.
Edit your profile,
remove users from
your room and log
out from Socrative.
When the
students log in,
they need to
insert the room
number that you
have created.
Use the activities to
create and manage
your questions and
quizzes.
Then, click the
‘Join Room’
button.
6 Chapter 1: Socrative
Single Question Activities
(Teacher) (Student)
STEP 3
Teacher’s room
number and the
number of
students in the
room.
Student will log in
using the given room
number and wait for
the question to be
prompted by the
teacher.
The teacher can ask
the question verbally
and choose the type
of answer to be
responded by the
students.
Chapter 1:Socrative 7
(teacher) (student)
(teacher) (student)
The students will choose
the answers based on the
type of answers the
teacher chooses.
The teacher will wait
for the response from
the students.
This is the result of the
responses from the students.
The teacher can end the
activity or proceed with
another activity.
Students will wait the
next activity from
teacher.
8 Chapter 1: Socrative
Creating QuizzeSTEP 4
Then, go to
‘Create a
Quiz’.
Click at the
‘Manage Quizzes’
button.
Chapter 1:Socrative 9
Choose the type
of questions.
Insert the
Quiz name.
Type your question
and the possible
answers.
Then, click the
‘Save’ button.
10 Chapter 1: Socrative
This is an
example of a quiz
created.
Chapter 1:Socrative 11
Starting the QuizSTEP 5
Go to ‘Start
Quiz’.
12 Chapter 1: Socrative
(Teacher) (Student)
(Teacher) (Student)
The teacher will
select the quiz.
The teacher will send
each question to the
students and wait for their
responses.
The student will start
responding to the
questions posed by the
teacher, and then click the
‘Submit’ button.
The student will wait
for the question to be
prompted by the
teacher.
Chapter 1:Socrative 13
(Teacher) (Student)
(Teacher) (Student)
The teacher will receive the
response from the students and
then can click the ‘Send Next
Questions to Students’.
The students will received the
next question from teacher and
can choose the right answer.
The teacher will
wait for the
response from the
students.
The students will
wait for the next
question from
teacher.
14 Chapter 1: Socrative
(Teacher) (Student)
Students will click
the ‘Done’ button.
This is the
response
received by
teacher.
The teacher can
click the ‘End
Activity’ button if
she/he does not
have any more
questions to ask.
Chapter 1:Socrative 15
REFERENCES
http://www.socrative.com/ [13 February 2013]
http://www.thelandscapeoflearning.com/2012/02/11-ways-to-use-socrative-as-
formative.html [13 February 2013]
16 Chapter 2: Edistorm
WHAT IS EDISTORM?
The name Edistorm is a mash-up of the name Thomas Edison and
brainstorm. It is inspired by Edison’s idea factories. Edistorm is an incredible
brainstorming and collaboration tool. Edistorm has some additional features
and abilities that make it very useful in the classroom. You can brainstorm
and collaborate using virtual sticky notes. Edistorm gives you a place to
organize ideas in a real-time interactive wall. Virtual sticky notes can have
their own color and can be organized in vertical or horizontal
groupings. Edistorm can be created independently or with others in a
collaborative effort. Edistorm features an idea works at the bottom of the
screen offering suggested ideas based on what students add to the sticky
notes in the work space. Public and individual Edistorm are free to create,
but premium accounts are available for private Edistorm.
(Source: http://ilearntechnology.com/?p=2434)
Chapter 2
EDISTORM
16 Chapter 2: Edistorm
WHAT IS EDISTORM?
The name Edistorm is a mash-up of the name Thomas Edison and
brainstorm. It is inspired by Edison’s idea factories. Edistorm is an incredible
brainstorming and collaboration tool. Edistorm has some additional features
and abilities that make it very useful in the classroom. You can brainstorm
and collaborate using virtual sticky notes. Edistorm gives you a place to
organize ideas in a real-time interactive wall. Virtual sticky notes can have
their own color and can be organized in vertical or horizontal
groupings. Edistorm can be created independently or with others in a
collaborative effort. Edistorm features an idea works at the bottom of the
screen offering suggested ideas based on what students add to the sticky
notes in the work space. Public and individual Edistorm are free to create,
but premium accounts are available for private Edistorm.
(Source: http://ilearntechnology.com/?p=2434)
Chapter 2
EDISTORM
Chapter 2: Edistorm 17
BENEFITS OF EDISTORM
The following are some benefits you can get by using Edistorm:
1. No hastle because of known concept of 'sticky notes'.
2. Understandable for everyone.
3. Easy way to brainstorm and plan.
4. Makes brainstorming and planning much easier and more pleasant.
5. Possible to use from different locations and work together in real-
time.
6. No longer bound to location.
7. Measure results.
8. Can share images, videos and links.
9. No need to install software.
10. It is free.
(Source: http://2012digitalmediatrends.blogspot.com/2012/04/edistorm-
online-brainstorming-and.html)
USING EDISTORM IN THE CLASSROOM
The following are some ideas of using Edistorm in the classroom:
 Edistorm offers an exceptional opportunity for students to
brainstorm, collaborate, and group ideas.
 Students can use Edistorm to brainstorm ideas for writing, research,
for grouping ideas, and collaborating on group projects.
18 Chapter 2: Edistorm
 Create an Edistorm for your students and ask them to group like
ideas, sort, and expand on thoughts. This could be done for any
historical event, literature, science concept, and even phonics.
 Students could practice spelling by typing out their spelling words
along with a sentence or synonyms on sticky notes. Then, they can
group words by spelling pattern or common phoneme blends.
 Create an Edistorm of sticky notes with English words and sticky
notes with a foreign language word on them. Students can work
together to group words with their meanings.
 In math, create Edistorm with word problems on one color of sticky
note and answers on another set of sticky notes.
 Students can work to create groups of problems and their solutions.
 Edistorm can be used for whole class activities using an interactive
whiteboard, the class can brainstorm together and collect ideas or
use the grouping feature in an activity created by the teacher or
students.
(Source: http://ilearntechnology.com/?p=2434)
Chapter 2: Edistorm 19
GET STARTED WITH EDISTORM
Go to http://www.edistorm.com/
Creating an Account
Then, click
the ‘Sign
Up’ button.
Click at this
button.
STEP 2
STEP 1
Fill in the
required
information.
20 Chapter 2: Edistorm
Creating a Strom
To know more
about Edistorm,
you can watch
the introductory
Edistrom video
here.
STEP 3
Or you can continue
using Edistorm by
clicking the ‘Create
New Storm’ button.
Fill in the
required
information.
Open your Edistorm
and click at the
‘Create a Storm’
button.
Chapter 2: Edistorm 21
(a) Adding Sticky Notes
Then, click the
‘Create’
button’.
Click at the
‘STICKY’ tab.
This is an
example of your
‘Storm’ being
displayed.
Type your
notes here. Then, click at
the ‘Add Idea’
button’.
Select the
color of sticky
notes.
22 Chapter 2: Edistorm
(b) Adding Photos
(c) Inserting Videos
Enter the
video URL
from
youtube or
vimoe.
Click at the
‘VIDEO’ tab.
Select the picture
you want to
insert.
Click at the
‘PHOTO’ tab.
Then, click the
‘Open’ button.
Then, click the
‘Upload Image’
button’.
Then, click at
the ‘Add
Video’
button’.
Chapter 2: Edistorm 23
An example of a storm created.
Sharing
Sticky notes.
Image
Video
STEP 4
Go to
‘Share’.
Click at the
‘Invite Users’
button.
Then, click at the
‘Send Invites’
button.
You can
invite others
by sending
the URL
address of
your storm
or you can
invite them
via email
address.
24 Chapter 2: Edistorm
REFERENCES
http://ilearntechnology.com/?p=2434 [16 October 2012]
http://2012digitalmediatrends.blogspot.com/2012/04/edistorm-online-
brainstorming-and.html [16 October 2012]
Chapter 1: Scrible 25
Chapter 3: Twiddla 25
WHAT IS TWIDDLA?
Twiddla is an online collaboration tool that is easy to use, does not require
any downloads or complicated firewall stuff, and is free for anybody. It is like
having a whiteboard skin on top of any web page or uploaded image. Users
can mark up this whiteboard layer and interact with the web page at the
same time and in real time, with people from all over the world.
(Source: http://www.twiddla.com/About/FAQ.aspx)
ADVANTAGES OF TWIDDLA
The following are some advantages of Twiddla:
 It is free.
 It is available to anyone, anytime.
 No plug ins – only web browser needed.
 Interact with the web (or any uploaded picture, document or widget)
and mark it up at the same time.

(Source: http://www.twiddla.com/About/FAQ.aspx)
Chapter 3
TWIDDLA
26 Chapter 3: Twiddla
WAYS OF USING TWIDDLA FOR TEACHING
1. When holding in person office hours is not possible, Twiddla would
be excellent for holding online office hours. Online tutoring typically
uses shared whiteboards, and helping students during office hours is
very similar to tutoring. Tutors generally have to provide help
without advance preparation, and Twiddla is excellent for quick,
impromptu interaction using both words and drawings. The student’s
access to the whiteboard would make it easier for the teacher to lead
the student into finding his own answers. To set up online office
hours, a teacher could communicate the time and the URL to his
students, then wait for them to navigate to the Twiddla session
during the scheduled time period.
2. Another scenario where Twiddla would be useful would be in
instructing students on how to use a particular website, for example
their course's website. The instructor could lead the students
webpage by webpage within Twiddla, using the drawing tools to point
out the important buttons, links and other features. The drawings
would disappear when navigating away from each page, but if the
markings are just simple pointers and highlights, this should not be a
major drawback.
3. A teacher could give an effective live online presentation using
Twiddla. Twiddla sessions cannot be saved and reloaded like a
PowerPoint presentation. However, an instructor could save a set of
image files in a folder, and upload each of them to Twiddla before
Chapter 3: Twiddla 27
giving the presentation. Besides drawings and photos, the images
could be snippets of text or mathematical functions. Ideally, these
would be PNG files with a transparent background to avoid obscuring
the view of other images on the whiteboard. he Etherpad
background could be used to allow the teacher to make impromptu
notes. This would probably be best combined with an audio feature
so that the teacher can speak while manipulating the images for the
lecture. Twiddla does include voice channel.
4. A lecture given by Twiddla would be more dynamic than a slide
presentation. It would give the lecturer the power to move and
interact the images on his board in different ways. It would also give
him the opportunity to ask a student to complete a figure using the
elements on the whiteboard.
(Source: http://mikescandi.blogspot.com/2011/02/web-20-tool-review-
twiddla.html)
28 Chapter 3: Twiddla
GET STARTED WITH TWIDDLA
Go to: http://www.twiddla.com/
Start Using a TwiddlaSTEP 2
To get access to
Professional Level
features such as unlimited
document storage, private
meetings, presentations,
custom urls and more,
click “Start your 30 Day
Free Trial” and create
account.
STEP 1
If you do not want to
sign up and directly
start a new meeting,
you can click here.
If you want to
try using the
Twiddla, click
here.
Chapter 3: Twiddla 29
Click here to
open
Twiddla’s
main home
page.
Twiddla tools for
editing a whiteboard.
Tools to insert images,
documents, widgets &
codes and
mathematical
formulas.
Click here to
change your
meeting room
setting.
Save the
whiteboard
view.
Invite others to this
meeting by
inserting their email
addresses.
Copy and send
this link to
invite people to
this meeting.
Write here to
chat or start a
conversation.
30 Chapter 3: Twiddla
Twiddla ToolsSTEP 3
Clean and
go to new
whiteboard.
Insert url
address to
view the web
page on the
whiteboard.
Open the
EtherPad to
create pad text. It
can synchronized
and view by
everyone.
Insert
document such
as doc., ppt.,
xls. or pdf.
Upload
images on the
whiteboard.
Use pencil
tool to draw
on whiteboard.
Tool to
erase.
Insert
shapes.
Add and
edit text.
You can view
this toolbar at the
bottom of your
whiteboard.
Chapter 3: Twiddla 31
a) Inserting Images
b) Inserting Documents
To insert
images on
your
whiteboard,
click ‘Images’.
You can choose any
images you want
here.
Then, choose
the documents
from your file.
To insert documents
on your whiteboard,
click ‘Documents’.
Your uploaded
document will appear
here. Click at the icon
and it will be inserted
on your whiteboard.
32 Chapter 3: Twiddla
c) Inserting Widgets & Codes
d) Inserting Mathematical Formulas
Click at
‘Widgets &
Code’.
Copy and
paste the
embed code
here.
You can
view the
item you
embed here.
Click the
‘Embed!’ button
to insert the item
you embed on
the whiteboard.
Then click
‘click to
embed’ to
insert on the
whiteboard.
Click at
‘Mathematical
formulas’.
Choose the
mathematical
formulas.
The formula you
choose will appear
here. You can edit
and insert the
number.
Chapter 3: Twiddla 33
This is an example of the
mathematical formula you
have inserted. You can
collaborate and ask your
student to do the solution
online.
34 Chapter 3: Twiddla
REFERENCES
http://www.twiddla.com/About/FAQ.aspx [5 Januari 2012]
http://mikescandi.blogspot.com/2011/02/web-20-tool-review-twiddla.html [5
January 2012]
Chapter 4: Wallwisher 35
WHAT IS WALLWISHER?
Wallwisher is a collaborative tool that lets users be prosumers rather
consumers (Sharon Tonner 2011). It allow users to post their thoughts on a
common topic using electronic sticky notes on a shared digital wall. The
sticky note can incorporate an image, audio or video using the appropriate
web address link (Sharon Tonner 2011). Wallwisher can be also used for
personal note taking, to-do lists, feedback collection, etc. Best of all there is
no signup needed- simply create a wall and start posting (Anon. 2011).
BENEFITS OF USING WALLWISHER
The following are some benefits of using Wallwisher:
1. To allow in a collaborative conversation.
2. To brainstorm an idea.
3. To access discussions and ideas.
4. To provide an interactive area that incorporates text, audio and visual
materials.
5. To make the survey interactive through responding using mobile
devices that has internet accessibility.
Chapter 4
WALLWISHER
36 Chapter 4: Wallwisher
6. A wall that offers individual feedback when determining a decision
that needs a group vote.
7. A wall that tracks the completion status for each group member's
task (Anon. 2011).
USING WALLWISHER AS A RESEARCH TOOL
 Collaborative research by working in small groups to find information
(http://year6wykeham.blogspot.com/2012/01/science-wallwisher-
research.html).
 Provides a very simple way to gather feedback from
respondents (http://staffweb2tools.wordpress.com/walls/).
 Brainstormed and shared short simple ideas of research among
research group (http://www.teachmaths-
inthinking.co.uk/conferences/harare-2012-what-is-ibl.htm).
 Received and record the feedback of the research.
Chapter 4: Wallwisher 37
GET STARTED WITH WALLWISHER
Go to:http://www.wallwisher.com/
Log in/Register
Click ‘Build a wall’
if you do not want to
go at login/register
page.
Click the login
button at the top
right hand corner.
STEP 2
STEP 1
38 Chapter 4: Wallwisher
Building & Customizing Walls
Then click the
‘SIGN UP’ button.
Fill in the the
Wallwisher
account.
If you already have
an account, just click
‘LOG IN’.
STEP 3
Click at the ‘Build a
wall’ button.
Chapter 4: Wallwisher 39
Choose the existing
image you want or you
can browse the image
you like from your
computer or website.
Choose your privacy setting.
You can control who can
read, write and post notes
into your wall.
You can delete the
wall you have
created.
Choose a theme
for your wall.
Change your
wall URL
address.
Insert your
wall title and
description.
40 Chapter 4: Wallwisher
Typing Sticky Notes
Inserting Images
Double click
the wall to
add sticky
notes.
Enter your
name.
Write your message
here.
Add any item or format from a web link
or upload from your computer or you
can take a photo from your webcam.
Insert an image
URL location
here.
STEP 4
STEP 5
Chapter 4: Wallwisher 41
Inserting Videos
An example of an
image added.
Click to zoom the
image.
Insert a URL location
of a video link here.
STEP 6
42 Chapter 4: Wallwisher
Inserting Documents
Click at the video
to view and play.
Click this icon to
upload a file from
your computer.
STEP 7
Chapter 4: Wallwisher 43
Click here to
browse the file.
An example of
a document
viewed.
Click at the
document to
view.
44 Chapter 4: Wallwisher
Sharing WallwisherSTEP 8
Mobilize your
wall using the
scan code.
Copy and paste
the embed code
onto your blog
or web page.
Share your wall
using social
tools or you can
subscribe, snap
and email the
wall to others.
Click ‘Share’.
Chapter 4: Wallwisher 45
REFERENCES
Anon. 2011. Wallwisher: A new way to promote student collaboration for
online colleges. http://blog.ecollegefinder.org/post/Wallwisher-A-New-
Way-to-Promote-Student-Collaboration-for-Online-Colleges.aspx [14
March 2011]
Sharon Tonner. 2011. Wallwisher. http://i-c-t.wikispaces.com/WALLWISHER
[14 March 2011]
http://year6wykeham.blogspot.com/2012/01/science-wallwisher-research.html
[17 May 2012]
http://staffweb2tools.wordpress.com/walls/ [17 May 2012]
http://www.teachmaths-inthinking.co.uk/conferences/harare-2012-what-is-
ibl.htm [17 May 2012]
46 Chapter 5: TypeWith.me
WHAT IS TYPEWITH.ME?
TypeWith.me is an online document collaboration tool which works in real
time. It is a very important web2.0 tool for teachers and educators .it is free ,
easy, simple to use and above all does not need any registration .It has a cool
functionality that allows users to work on the same document and at the
same time.
(Source: http://educationaltech-med.blogspot.com/2011/01/type-with-me-
quick-educative-online.html)
WAYS FOR STUDENTS & TEACHERS TO USE TYPEWITH.ME
The following are some ways how TypeWith.me can be used by students and
teachers:
1. Students paired in groups can work on a single document with each
one adding and editing is content
2. Teacher provides a neutral piece of writing for students to work on it
online; they can add explanations and embed it in the document
3. Teacher can use it with students to get the whole class answers on a
subject pertaining to their content-area study
Chapter 5
TYPEWITH.ME
Chapter 5: TypeWith.me 47
4. Teach students how to write a piece of writing , a resume , a letter
ect
5. Teachers can use it to collaborate between each other, setting on a
meeting time/place.
(Source: http://educationaltech-med.blogspot.com/2011/01/type-with-me-
quick-educative-online.html)
48 Chapter 5: TypeWith.me
GET STARTED WITH TYPEWITH.ME
Go to: http://willyou.typewith.me/
Start Using TypeWith.meSTEP 2
At the
TypeWith.me
page, click ‘New
Pad’ to create new
document.
STEP 1
Or, you can
create/open a new
document with the
name by typing the
title of the document
here and then click
‘OK’.
Chapter 5: TypeWith.me 49
Use these tools to
edit your
document.
To modify your
document, type
the text area.
50 Chapter 5: TypeWith.me
You can Import/Export
the pad from/to
different format.
Share and embed this
pad using the link and
embed code given.
Show the number of
connected users.
Show the
history of this
pad.
Chapter 5: TypeWith.me 51
REFERENCES
http://educationaltech-med.blogspot.com/2011/01/type-with-me-quick-
educative-online.html [6 January 2012].
52 Chapter 6: Voicethread
WHAT IS VOICETHREAD?
VoiceThread is an Internet-based application that allows users to create a
shared presentation as a media album that visitors can asynchronously
comment on either by text, voice, or video. The presentation can include
any form of digital media, including images, audio, video, and text. The
resulting output of this combination of the digital presentation and
accumulated viewer comments is called a “VoiceThread.” Completed
VoiceThreads can then be shared on the VoiceThread site or embedded into
Web pages or blogs. They can also be exported for offline consumption
running from a computer hard drive, a DVD, a video-enabled MP3 player, or
a mobile phone. In short, VoiceThread allows an entire group conversation
to be collected from anywhere in the world and then shared for playback in
one place. VoiceThread has been referred to as a “group audio blog”
because, like a blog, it fosters comments on a topic but goes further by
allowing these comments to be offered in audio format. (Penn State 2009).
Chapter 6
VOICETHREAD
52 Chapter 6: Voicethread
WHAT IS VOICETHREAD?
VoiceThread is an Internet-based application that allows users to create a
shared presentation as a media album that visitors can asynchronously
comment on either by text, voice, or video. The presentation can include
any form of digital media, including images, audio, video, and text. The
resulting output of this combination of the digital presentation and
accumulated viewer comments is called a “VoiceThread.” Completed
VoiceThreads can then be shared on the VoiceThread site or embedded into
Web pages or blogs. They can also be exported for offline consumption
running from a computer hard drive, a DVD, a video-enabled MP3 player, or
a mobile phone. In short, VoiceThread allows an entire group conversation
to be collected from anywhere in the world and then shared for playback in
one place. VoiceThread has been referred to as a “group audio blog”
because, like a blog, it fosters comments on a topic but goes further by
allowing these comments to be offered in audio format. (Penn State 2009).
Chapter 6
VOICETHREAD
Chapter 6: Voicethread 53
BENEFITS OF USING VOICETHREAD
InfoTech4Lrng (2008) suggest the following benefits of using Voicethread:
1. Simple and easy.
2. Focus on the content instead of the tool; can serve as a form of free
writing.
3. Requires simple hardware and minimal memory requirements,
minimal tech-barrier.
4. Encourages collaborative storytelling.
5. Ability to use powerful images - one or many.
6. Users can zoom in to see detail and out to see big picture.
7. Ability to add text.
8. Easy to capture voices.
9. Inspires ongoing conversation about each image.
10. Build fluency, precision and voice in second language.
11. New dimension for creative analysis of historical photographs, maps
and artifacts.
12. Ability to give and receive feedback from peers, teachers [formative
and summative assessment], parents and other relatives, local and
global community.
13. Can be used “as a storytelling tool, a deep thinking tool, a research
tool, an expository communication tool, and even an assessment
tool”.
14. Allows for differentiation to accomodate different learning needs and
styles, another option for struggling or reluctant writers.
15. Allows the teachers to seamlessly integrate digital collaboration into
the curriculum.
54 Chapter 6: Voicethread
WAYS OF USING VOICETHREAD?
A VoiceThread allows every student in a class to easily record audio
commentary about the ideas and experiences that are important to them.
Whether it’s an event, a project, or a milestone, students can tell their story
in their own voice,and then share it with the world. For educators, a
VoiceThread offers a way to teach the principles of good digital citizenship as
well as providing a single vessel to capture and then share all the diverse
personalities of an entire class. A VoiceThread can be managed with little
effort, creating digital heirlooms that can be shared by students, parents, and
educators alike. Pride and excitement is clearly evident in student voices as
they “publish” and archive their work.
(Source: http://voicethread.com/image/voicethreads_in_the_classroom.pdf)
USAGE IN TEACHING AND LEARNING
VoiceThread is an application that makes it easy to assemble visual media in a
presentation. In providing a simple venue for sharing, creating, and assessing
media projects, such applications may promote greater digital literacy and
greater enthusiasm for multimedia creation. What sets VoiceThread apart
from these other applications is its easy integration of voice and other types
of media for commenting on an original artifact. VoiceThread offers a natural
online interaction that lends itself to students presenting and defending their
work before experts and peers. It seems reasonable that an environment
that provides an easy way for students to listen to and add to the work of
their peers may encourage more authentic peer assessment. Evaluations that
Chapter 6: Voicethread 55
include verbal and visual cues in each student’s own voice may be easier for
students to interpret. In disciplines where students create a portfolio of their
work, VoiceThread provides the opportunity to build annotated
presentations that include voice, video, and text explanations of what they
have done. Group and personal reflections can also be collected and
preserved. By far the greatest potential of VoiceThread lies in the creative
oppor tunity it provides for students to tell their own stories and to
contribute to or directly critique the narratives of their peers (Educause
2009).
The following are some ideas for using Voicethread in teaching and learning
(InfoTech4Lrng 2008):
1. Create or select images to accompany original poetry, poetic
devices or research.
2. Record personal, family or community history, historic events or an
oral history project, documentaries or essays.
3. Create an photo album of your school or library narrated by
students.
4. Share oral reports about research through digital story.
5. Opportunity for students to develop interview skills.
6. Interview techniques.
7. Build confidence with peers.
8. Asking open ended questions.
9. Providing interviewee time to elaborate.
10. Follow up questions.
11. Develop editing skills – eliminate errors and pauses.
12. Collaborate with a school in another location.
56 Chapter 6: Voicethread
13. Illustrated booktalks.
14. Students record thoughts while previewing document or draft
comments.
15. Exploring science material to demonstrate their use in labs,
innovation and space exploration.
Chapter 6: Voicethread 57
GET STARTED WITH VOICETHREAD
Go to: http://www.voicethread.com
Signing/Registering with VoiceThread
STEP 3
Start uploading image/video
Click here
to sign in or
register.
You will see this
basic account
navigation page once
you are signed in.
STEP 1
STEP 2
Chapter 6: Voicethread 57
GET STARTED WITH VOICETHREAD
Go to: http://www.voicethread.com
Signing/Registering with VoiceThread
STEP 3
Start uploading image/video
Click here
to sign in or
register.
You will see this
basic account
navigation page once
you are signed in.
STEP 1
STEP 2
58 Chapter 6: Voicethread
Creating VoiceThreads
a) Uploading Images & Videos
Click ‘Create’
tab.
Click ‘Upload’ to
start uploading your
images, documents
or videos.
Upload
files from
your
computer.
Upload a file
hosted online
at a specific
URL.
Upload an image
or video using
webcam.
STEP 3
58 Chapter 6: Voicethread
Creating VoiceThreads
a) Uploading Images & Videos
Click ‘Create’
tab.
Click ‘Upload’ to
start uploading your
images, documents
or videos.
Upload
files from
your
computer.
Upload a file
hosted online
at a specific
URL.
Upload an image
or video using
webcam.
STEP 3
Chapter 6: Voicethread 59
b) Comment
Once you have
uploaded your images
or videos, you can
start commenting
them. You also can
delete your own
comments anytime.
Now, you can start giving comments to your own or others VoiceThread. You
can choose either to give text, audio or video comments.
Chapter 6: Voicethread 59
b) Comment
Once you have
uploaded your images
or videos, you can
start commenting
them. You also can
delete your own
comments anytime.
Now, you can start giving comments to your own or others VoiceThread. You
can choose either to give text, audio or video comments.
60 Chapter 6: Voicethread
c) Share VoiceThread
Click ‘Share’ to
share your
VoiceThread with
others.
Invite your
friends through
email.
You can add friends
by creating group.
Click here and
copy the URL
link.
60 Chapter 6: Voicethread
c) Share VoiceThread
Click ‘Share’ to
share your
VoiceThread with
others.
Invite your
friends through
email.
You can add friends
by creating group.
Click here and
copy the URL
link.
Chapter 6: Voicethread 61
Publishing option is a
very important to ensure
your VoiceThread is
viewable to other users.
Everyone can view
your Voice Thread.
Comments
being accepted.
After each comment is
made, you must
approve it before it is
visible to others.
Viewable in the
"Browse" section on
VoiceThread's
homepage.
Then click ‘save’.
Chapter 6: Voicethread 61
Publishing option is a
very important to ensure
your VoiceThread is
viewable to other users.
Everyone can view
your Voice Thread.
Comments
being accepted.
After each comment is
made, you must
approve it before it is
visible to others.
Viewable in the
"Browse" section on
VoiceThread's
homepage.
Then click ‘save’.
62 Chapter 6: Voicethread
Viewing VoiceThreads
Click ‘MyVoice’ tab to
view the VoiceThread
you have created.
Click ‘Menu’ to edit the
VoiceThread you have
created.
STEP 4
62 Chapter 6: Voicethread
Viewing VoiceThreads
Click ‘MyVoice’ tab to
view the VoiceThread
you have created.
Click ‘Menu’ to edit the
VoiceThread you have
created.
STEP 4
Chapter 6: Voicethread 63
REFERENCES
Educause. .2009. 7 things you should know about voicethread.
http://net.educause.edu/ir/library/pdf/ELI7050.pdf [6 April 2011]
Penn State. 2009. 7 Things You Need to Know about VoiceThread.
http://www.personal.psu.edu/mnm14/blogs/meyerviews/VoiceThread_
whitepaper.pdf [6 April 2011]
InfoTech4Lrng. 2008. Voicethread in Teaching and Learning.
http://arllennium.wordpress.com/2008/03/20/voicethread-in-teaching-
and-learning/ [6 April 2011]
VoiceThread in The Classroom.
http://voicethread.com/image/voicethreads_in_the_classroom.pdf [6
April 2011]
64 Chapter 7: Mind42
WHAT IS MIND42?
Mind42 is a browser-based free mindmapping application which allows
private, public or group shared maps to be created. Nodes are automatically
arranged in space, but each node can be enriched with colours, icons, links to
websites, notes and so on. Collaboration is easily arranged, using email
addresses to invite viewers or participants.
(Source:
http://www.knowledgenetworklearning.net/tools/10greattools/mind42/)
ADVANTAGES OF MIND42
Some advantages for using mind42 include:
 No installation needed.
 Accessible everywhere.
 Intuitive interface.
 Many nodes attribute (icons, colors, images, text styles, and links).
 Collaboration (simultaneous editing).
 Easy publishing and distribution of maps.
(Source: http://wssdshares.wikispaces.com/Mind42)
Chapter 7
MIND42
64 Chapter 7: Mind42
WHAT IS MIND42?
Mind42 is a browser-based free mindmapping application which allows
private, public or group shared maps to be created. Nodes are automatically
arranged in space, but each node can be enriched with colours, icons, links to
websites, notes and so on. Collaboration is easily arranged, using email
addresses to invite viewers or participants.
(Source:
http://www.knowledgenetworklearning.net/tools/10greattools/mind42/)
ADVANTAGES OF MIND42
Some advantages for using mind42 include:
 No installation needed.
 Accessible everywhere.
 Intuitive interface.
 Many nodes attribute (icons, colors, images, text styles, and links).
 Collaboration (simultaneous editing).
 Easy publishing and distribution of maps.
(Source: http://wssdshares.wikispaces.com/Mind42)
Chapter 7
MIND42
Chapter 7: Mind42 65
USING MIND42
(a) Affordance
 Mind42 successfully links all streams of thought without cluttering the
workspace.
 The simplicity of this application benefits a user by getting straight to
it and providing focus.
 These tools enable a user to attach different forms of external
information. This incorporates an opportunity to clearly depict,
better explain or deepen thoughts.
 The attachment of notes, images or linking to external web content, a
map of thinking is revealed. A user is now presented with a full and
contextualised visualisation of thinking.
(b) Group application
 Mind42 has the potential to be very effective in the visualisation of a
groups overall objectives and activity.
 With the commitment of all members to update and contribute to a
mind map, group activity can be easily monitored.
 Any members that may not be contributing are quickly identified. Any
areas or ideas that may have been over looked can also be quickly
identified by the group and acted upon.
 If a group implement’s icons for each member, ideas can be voted
upon and highlighted for further research.
 Mind42.com offers groups a shared platform with an easy to use
interface.
(Source: http://net205-2011-curtin.wikidot.com/hartnett-mind42)
66 Chapter 7: Mind42
GET STARTED WITH MIND42
Go to: http://www.mind42.com/
Signing UpSTEP 2
STEP 1
Fill in the
required
information.
At the mind42
homepage, click at the
‘Sign up’ button.
Then, click the
‘Sign up’ button.
Chapter 7: Mind42 67
Creating Mind MappingSTEP 3
Now you can start
login. Insert your
registered
username and
password.
Mind42 will send an
email to your
registered email
account.
Check your email
and click at the
link given.
Then, click the
‘Signin’ button.
When you launch
mind42, the ‘Mind map
manager’ dialogue box
will appear. Go to
‘New mind map’.
Type your
mind map
title.
Next, click
the ‘Create’
button.
68 Chapter 7: Mind42
This is how
your mind42
sheet will
look like.
Chapter 7: Mind42 69
(a) Adding Nodes
Click once
at your
node.You will see this
tool. To add
another node,
click at this icon.
Retype the
name of your
new node.
If you want to add
another sibling of
the node, click
this icon.
Then click
‘Apply’ button.
This is an example
of a mind mapping
you have created.
Chapter 7: Mind42 69
(a) Adding Nodes
Click once
at your
node.You will see this
tool. To add
another node,
click at this icon.
Retype the
name of your
new node.
If you want to add
another sibling of
the node, click
this icon.
Then click
‘Apply’ button.
This is an example
of a mind mapping
you have created.
70 Chapter 7: Mind42
(b) Adding Links to a Node
Click at this icon.
‘Add new link’
dialogue box will
appear. Go to
‘External’ tab. Insert the selected URL
address here. Then,
click the ‘Apply’
button.
Or, you can search for
links by inserting the
keyword here.
This is the preview
of your added link.
Chapter 7: Mind42 71
(c) Adding an attachment to a node
You can type a
short note here.
You can attach the
Wikipedia article at
your selected node.
You can attach the
‘Todo-list’ or the
progress of your
selected node.
To add an attachment
in your selected node,
click this icon.
You can add three types of attachment.
72 Chapter 7: Mind42
(d) Convert a Text Node to an Image
You can insert the
URL address of the
image, or you can
search by inserting
the keyword.
To change the text
node to an image, click
this icon.
This is an example
of a text node
changed into an
image.
Chapter 7: Mind42 73
Inviting & Managing CollaboratorsSTEP 4
To invite and
manage
collaborators,
click at this icon.
You can enter
one or more
email addresses
here.
Then, click the
‘Invite’ button.
74 Chapter 7: Mind42
Viewing Revisions
Publishing Mind Maps
STEP 5
This is the list of
your mind
mapping
revision. Select
the revision you
want to view.
To view the revision of
your mind mapping you
have created, click at this
icon.
Then, click this icon to
load the mind mapping
you want to view.
STEP 6
To publish your
mind mapping,
click this icon.
Chapter 7: Mind42 75
Copy this URL
and send it to
your friends or
colleagues.
Copy this text into
your blog or website
if you want to
display the mind
map embedded in the
blog or website.
Copy this text and integrate
it into your blog or website
- you will see a link which
will bring the visitors to
your mind map after
clicking it.
Then,
mark this
box.
Chapter 7: Mind42 75
Copy this URL
and send it to
your friends or
colleagues.
Copy this text into
your blog or website
if you want to
display the mind
map embedded in the
blog or website.
Copy this text and integrate
it into your blog or website
- you will see a link which
will bring the visitors to
your mind map after
clicking it.
Then,
mark this
box.
76 Chapter 7: Mind42
REFERENCES
http://www.knowledgenetworklearning.net/tools/10greattools/mind42/ [12
April 2012]
http://wssdshares.wikispaces.com/Mind42 [12 April 2012]
http://net205-2011-curtin.wikidot.com/hartnett-mind42 [17 May 2012]
Chapter 1: Scrible 77
Chapter 8: Sync.In 77
WHAT IS SYNC.IN?
Sync.in is a web based word processor for people to collaborate in real-time.
When multiple people edit the same document simultaneously, any changes
are instantly reflected on everyone's screen. The result is a new and
productive way to collaborate with text documents, useful for meeting notes,
brainstorming, project planning, training, and more (http://sync.in/).
ADVANTAGES OF SYNC.IN
The following are some advantages of using Sync.in:
1. Easily make collaborative notes.
2. Plan events with the team.
3. Conduct interviews.
4. Gather feedback on presentations.
5. Draft and edit documents with colleagues.
6. Brainstorm ideas.
7. Discuss and reach consensus on a document/task.
(Source: http://www.cynapse.com/community/home/sync.in-users/sync.in-
usage-scenarios/view)
Chapter 8
SYNC.IN
78 Chapter 8: Sync.In
GET STARTED WITH SYNC.IN
Go to: http://sync.in/
Creating Public NotesSTEP 2
Click the ‘Create a new
PUBLIC NOTE’ button to
start create a note for free
and no need to sign
up/register.
STEP 1
If you want to have
more features and
secure, click ‘Get
Sync.in PRO
SIGNUP NOW’.
Chapter 8: Sync.In 79
Editing ToolsSTEP 3
Insert
bullet list.
This is your Public
note. Now you can
start using it.
Tools to edit
your writing.
Undo and redo
what you have
written.
80 Chapter 8: Sync.In
Sync.In ToolsSTEP 4
Show the
timeline of the
edited note.
Note view option.
Export note in
different format.
Save note.
Chapter 8: Sync.In 81
Sharing NotesSTEP 5
List of users. You
can change your
name here.
Click the
‘Invite’ or
‘Share this note’
button to invite
and collaborate
with other users.
Then click the
‘Share Now’
button.
Copy this link and
send it to people
with whom you
want to share this
note.
You can send the link
given by inserting
email address or other
sharing application.
82 Chapter 8: Sync.In
ChattingSTEP 6
Type your ideas
in this box to
start a chat.
You can view
what you have
chatted here.
Chapter 8: Sync.In 83
REFERENCES
http://sync.in/ [11 January 2012]
http://www.cynapse.com/community/home/sync.in-users/sync.in-usage-
scenarios/view [11 January 2012]
84 Chapter 9: Poll Everywhere
WHAT IS POLL EVERYWHERE?
Poll Everywhere is a text message polling and audience response system. It is
simple enough for anyone to use and flexible enough for a wide range of
scenarios to interact with audiences and collect data.
(Source: http://blog.polleverywhere.com/)
IDEAS FOR USAGE IN CLASS
The following are some activities that can be done using Poll Everywhere in
class:
 Quizzes
 Attendance
 Teacher feedback
 Group evaluations
 Class discussions
(Source: http://www.slideshare.net/amysuesue/a-guide-to-poll-everywhere)
Chapter 9
POLL EVERYWHERE
84 Chapter 9: Poll Everywhere
WHAT IS POLL EVERYWHERE?
Poll Everywhere is a text message polling and audience response system. It is
simple enough for anyone to use and flexible enough for a wide range of
scenarios to interact with audiences and collect data.
(Source: http://blog.polleverywhere.com/)
IDEAS FOR USAGE IN CLASS
The following are some activities that can be done using Poll Everywhere in
class:
 Quizzes
 Attendance
 Teacher feedback
 Group evaluations
 Class discussions
(Source: http://www.slideshare.net/amysuesue/a-guide-to-poll-everywhere)
Chapter 9
POLL EVERYWHERE
Chapter 9: Poll Everywhere 85
BENEFITS OF POLL EVERYWHERE
The following are some benefits for using Poll Everywhere:
 Ease of use
 Live results
 Low cost or free to students
 Affordable for the instructor
 Option to select multiple devices to respond
 Students engaged
 Ability to identify and address challenging problems
(Source:
http://nercomp.org/corecode/uploads/event/uploaded_pdfs/Will%20Textin
g%20Help%20Improve%20Student%20Learning-
Fabienne%20Miller%20&%20Jianyu%20Liang%20-%20WPI_55.pdf)
Chapter 9: Poll Everywhere 86
GET STARTED WITH POLL EVERYWHERE
Go to: http://www.polleverywhere.com/
Creating PollsSTEP 2
STEP 1
At the Poll
Everywhere home
page, click ‘Create
your first poll’
button.
Type your
question here.
Click this icon to
preview your
poll.
Chapter 9: Poll Everywhere 87
Insert the possible
answers for your
multiple choice
question.
If you want to
convert your
questions to
multiple choice
questions, click
here.
If you want to stay
as open ended
questions, you need
to click the
‘Continue’ button.
Click here if you
want to delete the
answers selected.
Then, click
‘Continue’.
88 Chapter 9: Poll Everywhere
This is how
your poll
will appear.
88 Chapter 9: Poll Everywhere
This is how
your poll
will appear.
Chapter 9: Poll Everywhere 89
Poll SettingSTEP 3
Showing all the
public polls created
by other users.
You can use these
functions when
you upgrade your
account.
Chapter 9: Poll Everywhere 89
Poll SettingSTEP 3
Showing all the
public polls created
by other users.
You can use these
functions when
you upgrade your
account.
90 Chapter 9: Poll Everywhere
(a) Visual Setting
(b) Show Instruction/Show Chart
To change the
appearance, go to
‘visual setting’ and
select the appearance,
instruction and chart
you like to change your
poll view.
Click here to view
your poll as chart
or instruction.
Chapter 9: Poll Everywhere 91
(c) Fullscreen
People RespondingSTEP 4
To enable and
disable fullscreen
view, click this
icon.
Select the
response
types you
prefer.
The response
types will be
shown here.
92 Chapter 9: Poll Everywhere
Downloading as a SlideSTEP 5
Select the
presentation types
you would prefer
to download.
You can use the downloaded slide for your
presentation. The respondent respond will in-sync
with the poll you created in the slide.
Chapter 9: Poll Everywhere 93
Sharing & PublishingSTEP 6
You can share and publish
your poll by embedding it
in your blog or web page,
or email to others and, or
download the flash file to
upload it in Prezi.
94 Chapter 9: Poll Everywhere
REFERENCES
http://blog.polleverywhere.com/ [14 February 2012]
http://www.slideshare.net/amysuesue/a-guide-to-poll-everywhere [14
February 2012]
http://nercomp.org/corecode/uploads/event/uploaded_pdfs/Will%20Textin
g%20Help%20Improve%20Student%20Learning-
Fabienne%20Miller%20&%20Jianyu%20Liang%20-%20WPI_55.pdf
[17 February 2012].
Chapter 10: Scribblar 95
WHAT IS SCRIBBLAR?
Scribblar is designed to be an online collaborative effort that empowers users
to develop and maintain a scholarly conversation at any time. Several tools
are optimal for the use of the online whiteboard, while the audio and text
messaging features facilitate collaboration among users. This is an ideal tool
for groups of students and teachers to brainstorm and plan outside of class
hours, but with some forethought Scribblar also has the potential of being
used as a virtual classroom.
(Source: http://teachinghistory.org/digital-classroom/tech-for-teachers/24475)
BENEFITS OF SCRIBBLAR
The following are some benefits for using Sribblar:
 Real-time and multi-user whiteboard
 Image upload and download
 Text chat with user list
 Crystal-clear live audio
 No user or session limits
(Source: http://www.scribblar.com/index.cfm)
Chapter 10
SCRIBBLAR
96 Chapter 10: Scribblar
EXAMPLES OF HOW SCRIBBLAR SUPPORT LEARNING
Here are a few examples of how this versatile tool may support learning:
 Math & Science Courses
o Math and science teachers may use the Scribblar whiteboard
to show students how to directly work out complicated
equations and problems. The program also includes a number
of built in equations editors and tools. After the teacher
demonstrates how to complete a problem, the teacher could
also observe the students working out the problems either on
their own or in groups. This allows the instructor to monitor
and correct student(s) and every step of the process. The
online student is effectively able to “show their work” in the
online environment without using a paper and pencil.
 English & Liberal Arts
o Liberal arts and English students may use Scribblar to upload
portion of their papers and/or presentations for review by the
teacher or other group members. The program would allow
the instructor to highlight problem areas and discuss how to
fix any issues in real-time. Instead of working on project and
sharing information asynchronously, Scribblar allows users to
update and alter information in real time without submitting
multiple drafts and using a lot of paper and ink.
 Photography Courses
o Students in an online or hybrid photography course may use
the Scribblar tool to share a number of their photos with the
instructor and other students using this tool. With this
Chapter 10:Scribblar 97
program, the educator is able to point out specific strengths
and weaknesses of the photographs and provide instruction.
 Higher Education-Online Courses
o Educators may also separate students into small groups in
several rooms and give them case studies, articles, or topics
to review and discuss Following the small group activity, the
students may return to one large classroom and discuss what
they learned in the small group. Using Scribblar, the instructor
would be able to monitor and provide feedback much easier
than in a traditional classroom.
(Source: https://sites.google.com/site/usmscribblar/home/classroom-
examples)
98 Chapter 10:Scribblar
GET STARTED WITH SCRIBBLAR
Go to: http://www.scribblar.com/
Creating an AccountSTEP 2
STEP 1
Go to ‘Create
Account’.
Or you can click here
to create an
account/sign up.
Chapter 10:Scribblar 99
Next, you need to
verify your email
address by clicking the
link given.
Click at the
‘Submit’
button.
Fill in the
required
information.
100 Chapter 10: Scribblar
Creating RoomsSTEP 3
Once you have
created a Scribblar
account, you can
create a room.
Click ‘Create New
Room’.
Insert your
room name.
Then, click the
‘Create This
Room’ button.
Select the
settings.
Chapter 10:Scribblar 101
Starting the WhiteboardSTEP 4
Now, you have
successfully
created a room.
At your Scribblar
‘Room List’, go
to ‘Options’
column and click
‘visit’.
You can chat
with other users
here.
Use the Scribblar
tools and start your
tutoring at this blank
whiteboard.
Click this icon to
start the audio
recording.
Click this button
to go to next
page.
102 Chapter 10: Scribblar
Inviting UsersSTEP 5
Go to ‘Room
Options’ and
select ‘Send
Invite’.
An example of an
online tutoring.
Chapter 10:Scribblar 103
EmbeddingSTEP 6
Click at the
‘Send Invite’
button.
Go to ‘Room
Options’ and
select ‘Embed
this Room’.
Fill in the
required
information.
104 Chapter 10: Scribblar
Click this button
to copy the
embed code of
the room created
into your blog or
website.
Click this button
to copy the
embed code of
the image button
into your blog or
website.
Chapter 10:Scribblar 105
REFERENCES
http://teachinghistory.org/digital-classroom/tech-for-teachers/24475 [26
February 2013]
http://www.scribblar.com/index.cfm [26 February 2013]
https://sites.google.com/site/usmscribblar/home/classroom-examples [26
February 2013]

Web 2.0 Interactive Tools: A Quick Guide

  • 1.
  • 2.
    Web 2.0 InteractiveTools: A Quick Guide MOHAMED AMIN EMBI Centre for Academic Advancement Universiti Kebangsaan Malaysia 2013
  • 3.
    Table of Contentsi TABLE OF CONTENTS Page CHAPTER 1 SOCRATIVE What is Socrative?…………………………………………………...16 Benefits of Socrative……...……………………………………………… Ways of using Socrative……………………………….………………… Get started with Socrative.……………………………………………. References……………………………………………………………22 CHAPTER 2 EDISTORM What is Edistorm?..……………………………………………………… Benefits of Edistorm………....……………………………………..…….. Using Edistorm in the classroom…………………………………...…… Get started with Edistorm……………………………………………… References………………………………………………………………. CHAPTER 3 TWIDDLA What is Twiddla?…………………………………………….................... Advantages of Twiddla……………….………………………………… Ways of using Twiddla for teaching…………………………………….. Get started with Twiddla………………………………………………... References……………………………………………………………… 1 1 2 3 15 10 10 12 19 25 25 26 28 34 16 17 17 19 24
  • 4.
    ii Table ofContents CHAPTER 4 WALLWISHER What is Wallwisher?…………………………………………………70 Benefits of using Wallwisher.……………………………………………. Using Wallwisher as a research tool……………………………….. Get started with Wallwisher…………………………………………72 References……………………………………………………………80 CHAPTER 5 TYPEWITH.ME What is TypeWith.me?........................................................................................ Ways for students and teachers to use TypeWith.me……………….. Get started with TypeWith.me…………..……………………………… References………………………………………………………………. CHAPTER 6 VOICETHREAD What is a Voicethread?………………………………………………..1 Benefits of using Voicethread………………………………………....1 Ways of using Voicethread…………………..…………………………. Usage in teaching and learning…………………………………………... Get started with Voicethread.…………………………………………2 References……………………………………………………………… CHAPTER 7 MIND42 What is a Mind42?....……………………………………………...……..1 Advantages of Mind42..…..…………………………………………....1 Using Mind42……………………………..…………………………….... Get started with Mind42…….…………………………………………2 References…………………………………………………………….6 35 35 36 37 45 46 46 48 51 1 52 53 54 54 57 63 64 64 65 66 76
  • 5.
    Table of Contentsiii CHAPTER 8 SYNC.IN What is Sync.In?…………………………………………………………. Advantages of Sync.In.…………………………………………………… Get started with Sync.In……………………………………………….. References……………………………………………………………….. CHAPTER 9 POLL EVERYWHERE What is Poll Everywhere?……………………………………………..1 Ideas for usage in class...………………………………………………..1 Benefits of Poll Everywhere…………………………………………..…. Get started with Poll Everywhere…………………………………...... References………………………………………………………………8 CHAPTER 10 SCRIBLAR What is Scribblar?....…………………………………………………1 Benefits of Scribblar……………………………………………… Example of how Scribblar support learning……………………………. Get started with Scribblar…………………………………………...3 References……………………………………………………………… 77 77 78 83 84 84 85 86 94 95 95 96 98 105
  • 6.
    Chapter 1: Socrative1 WHAT IS SOCRATIVE? Socrative is a smart student response system that empowers teachers to engage their classrooms through a series of educational exercises and games via smartphones, laptops, and tablets. (Source: http://www.socrative.com/) BENEFITS OF SORATIVE The following are some benefits for using Socrative:  Socrative was created by a group of teachers.  It is interactive and engaging.  It provides immediate feedback via formative assessments.  It is paperless.  It saves time when grading assignments.  Students can use Socratic on any device, on any platform. (Source: http://www.thelandscapeoflearning.com/2012/02/11-ways-to-use- socrative-as-formative.html) Chapter 1 SOCRATIVE
  • 7.
    2 Chapter 1:Socrative WAYS OF USING SOCRATIVE The following are ways of using Socrative as formative assessment:  True or False Questions  Multiple Choice Questions  Short Response  Visual Data (Bar graphs and visual short responses)  Exit Ticket  Pre-Assessment  Post-Assesment  Create Short Quizzes  Upload Premade Quizzes  Reflection  Collect Background Knowledge  Quick Check for Understanding  Voting on best responses (Source: http://www.thelandscapeoflearning.com/2012/02/11-ways-to-use- socrative-as-formative.html)
  • 8.
    Chapter 1: Socrative3 GET STARTED WITH SOCRATIVE Go to: http://www.socrative.com/ Starting the RoomSTEP 2 STEP 1 Before you can start using Socrative, you need to ‘Sign Up’ first. If you are student, you can log in using ‘Student Log In’. If you are teacher, you can log in using ‘Teacher Log In’.
  • 9.
    4 Chapter 1:Socrative Then, click the ‘Create Account’ button. Then, you need to fill up another form regarding your personal details. Or, you can click the ‘Get started now!” button at the Socrative Home page. After that, you can start using your Socrative by clicking this button. Insert your email and password.
  • 10.
    Chapter 1:Socrative 5 (a)Teacher login (b) Student login Once you are logged in as teacher, you will have your own room number. Edit your profile, remove users from your room and log out from Socrative. When the students log in, they need to insert the room number that you have created. Use the activities to create and manage your questions and quizzes. Then, click the ‘Join Room’ button.
  • 11.
    6 Chapter 1:Socrative Single Question Activities (Teacher) (Student) STEP 3 Teacher’s room number and the number of students in the room. Student will log in using the given room number and wait for the question to be prompted by the teacher. The teacher can ask the question verbally and choose the type of answer to be responded by the students.
  • 12.
    Chapter 1:Socrative 7 (teacher)(student) (teacher) (student) The students will choose the answers based on the type of answers the teacher chooses. The teacher will wait for the response from the students. This is the result of the responses from the students. The teacher can end the activity or proceed with another activity. Students will wait the next activity from teacher.
  • 13.
    8 Chapter 1:Socrative Creating QuizzeSTEP 4 Then, go to ‘Create a Quiz’. Click at the ‘Manage Quizzes’ button.
  • 14.
    Chapter 1:Socrative 9 Choosethe type of questions. Insert the Quiz name. Type your question and the possible answers. Then, click the ‘Save’ button.
  • 15.
    10 Chapter 1:Socrative This is an example of a quiz created.
  • 16.
    Chapter 1:Socrative 11 Startingthe QuizSTEP 5 Go to ‘Start Quiz’.
  • 17.
    12 Chapter 1:Socrative (Teacher) (Student) (Teacher) (Student) The teacher will select the quiz. The teacher will send each question to the students and wait for their responses. The student will start responding to the questions posed by the teacher, and then click the ‘Submit’ button. The student will wait for the question to be prompted by the teacher.
  • 18.
    Chapter 1:Socrative 13 (Teacher)(Student) (Teacher) (Student) The teacher will receive the response from the students and then can click the ‘Send Next Questions to Students’. The students will received the next question from teacher and can choose the right answer. The teacher will wait for the response from the students. The students will wait for the next question from teacher.
  • 19.
    14 Chapter 1:Socrative (Teacher) (Student) Students will click the ‘Done’ button. This is the response received by teacher. The teacher can click the ‘End Activity’ button if she/he does not have any more questions to ask.
  • 20.
    Chapter 1:Socrative 15 REFERENCES http://www.socrative.com/[13 February 2013] http://www.thelandscapeoflearning.com/2012/02/11-ways-to-use-socrative-as- formative.html [13 February 2013]
  • 21.
    16 Chapter 2:Edistorm WHAT IS EDISTORM? The name Edistorm is a mash-up of the name Thomas Edison and brainstorm. It is inspired by Edison’s idea factories. Edistorm is an incredible brainstorming and collaboration tool. Edistorm has some additional features and abilities that make it very useful in the classroom. You can brainstorm and collaborate using virtual sticky notes. Edistorm gives you a place to organize ideas in a real-time interactive wall. Virtual sticky notes can have their own color and can be organized in vertical or horizontal groupings. Edistorm can be created independently or with others in a collaborative effort. Edistorm features an idea works at the bottom of the screen offering suggested ideas based on what students add to the sticky notes in the work space. Public and individual Edistorm are free to create, but premium accounts are available for private Edistorm. (Source: http://ilearntechnology.com/?p=2434) Chapter 2 EDISTORM 16 Chapter 2: Edistorm WHAT IS EDISTORM? The name Edistorm is a mash-up of the name Thomas Edison and brainstorm. It is inspired by Edison’s idea factories. Edistorm is an incredible brainstorming and collaboration tool. Edistorm has some additional features and abilities that make it very useful in the classroom. You can brainstorm and collaborate using virtual sticky notes. Edistorm gives you a place to organize ideas in a real-time interactive wall. Virtual sticky notes can have their own color and can be organized in vertical or horizontal groupings. Edistorm can be created independently or with others in a collaborative effort. Edistorm features an idea works at the bottom of the screen offering suggested ideas based on what students add to the sticky notes in the work space. Public and individual Edistorm are free to create, but premium accounts are available for private Edistorm. (Source: http://ilearntechnology.com/?p=2434) Chapter 2 EDISTORM
  • 22.
    Chapter 2: Edistorm17 BENEFITS OF EDISTORM The following are some benefits you can get by using Edistorm: 1. No hastle because of known concept of 'sticky notes'. 2. Understandable for everyone. 3. Easy way to brainstorm and plan. 4. Makes brainstorming and planning much easier and more pleasant. 5. Possible to use from different locations and work together in real- time. 6. No longer bound to location. 7. Measure results. 8. Can share images, videos and links. 9. No need to install software. 10. It is free. (Source: http://2012digitalmediatrends.blogspot.com/2012/04/edistorm- online-brainstorming-and.html) USING EDISTORM IN THE CLASSROOM The following are some ideas of using Edistorm in the classroom:  Edistorm offers an exceptional opportunity for students to brainstorm, collaborate, and group ideas.  Students can use Edistorm to brainstorm ideas for writing, research, for grouping ideas, and collaborating on group projects.
  • 23.
    18 Chapter 2:Edistorm  Create an Edistorm for your students and ask them to group like ideas, sort, and expand on thoughts. This could be done for any historical event, literature, science concept, and even phonics.  Students could practice spelling by typing out their spelling words along with a sentence or synonyms on sticky notes. Then, they can group words by spelling pattern or common phoneme blends.  Create an Edistorm of sticky notes with English words and sticky notes with a foreign language word on them. Students can work together to group words with their meanings.  In math, create Edistorm with word problems on one color of sticky note and answers on another set of sticky notes.  Students can work to create groups of problems and their solutions.  Edistorm can be used for whole class activities using an interactive whiteboard, the class can brainstorm together and collect ideas or use the grouping feature in an activity created by the teacher or students. (Source: http://ilearntechnology.com/?p=2434)
  • 24.
    Chapter 2: Edistorm19 GET STARTED WITH EDISTORM Go to http://www.edistorm.com/ Creating an Account Then, click the ‘Sign Up’ button. Click at this button. STEP 2 STEP 1 Fill in the required information.
  • 25.
    20 Chapter 2:Edistorm Creating a Strom To know more about Edistorm, you can watch the introductory Edistrom video here. STEP 3 Or you can continue using Edistorm by clicking the ‘Create New Storm’ button. Fill in the required information. Open your Edistorm and click at the ‘Create a Storm’ button.
  • 26.
    Chapter 2: Edistorm21 (a) Adding Sticky Notes Then, click the ‘Create’ button’. Click at the ‘STICKY’ tab. This is an example of your ‘Storm’ being displayed. Type your notes here. Then, click at the ‘Add Idea’ button’. Select the color of sticky notes.
  • 27.
    22 Chapter 2:Edistorm (b) Adding Photos (c) Inserting Videos Enter the video URL from youtube or vimoe. Click at the ‘VIDEO’ tab. Select the picture you want to insert. Click at the ‘PHOTO’ tab. Then, click the ‘Open’ button. Then, click the ‘Upload Image’ button’. Then, click at the ‘Add Video’ button’.
  • 28.
    Chapter 2: Edistorm23 An example of a storm created. Sharing Sticky notes. Image Video STEP 4 Go to ‘Share’. Click at the ‘Invite Users’ button. Then, click at the ‘Send Invites’ button. You can invite others by sending the URL address of your storm or you can invite them via email address.
  • 29.
    24 Chapter 2:Edistorm REFERENCES http://ilearntechnology.com/?p=2434 [16 October 2012] http://2012digitalmediatrends.blogspot.com/2012/04/edistorm-online- brainstorming-and.html [16 October 2012]
  • 30.
  • 31.
    Chapter 3: Twiddla25 WHAT IS TWIDDLA? Twiddla is an online collaboration tool that is easy to use, does not require any downloads or complicated firewall stuff, and is free for anybody. It is like having a whiteboard skin on top of any web page or uploaded image. Users can mark up this whiteboard layer and interact with the web page at the same time and in real time, with people from all over the world. (Source: http://www.twiddla.com/About/FAQ.aspx) ADVANTAGES OF TWIDDLA The following are some advantages of Twiddla:  It is free.  It is available to anyone, anytime.  No plug ins – only web browser needed.  Interact with the web (or any uploaded picture, document or widget) and mark it up at the same time.
 (Source: http://www.twiddla.com/About/FAQ.aspx) Chapter 3 TWIDDLA
  • 32.
    26 Chapter 3:Twiddla WAYS OF USING TWIDDLA FOR TEACHING 1. When holding in person office hours is not possible, Twiddla would be excellent for holding online office hours. Online tutoring typically uses shared whiteboards, and helping students during office hours is very similar to tutoring. Tutors generally have to provide help without advance preparation, and Twiddla is excellent for quick, impromptu interaction using both words and drawings. The student’s access to the whiteboard would make it easier for the teacher to lead the student into finding his own answers. To set up online office hours, a teacher could communicate the time and the URL to his students, then wait for them to navigate to the Twiddla session during the scheduled time period. 2. Another scenario where Twiddla would be useful would be in instructing students on how to use a particular website, for example their course's website. The instructor could lead the students webpage by webpage within Twiddla, using the drawing tools to point out the important buttons, links and other features. The drawings would disappear when navigating away from each page, but if the markings are just simple pointers and highlights, this should not be a major drawback. 3. A teacher could give an effective live online presentation using Twiddla. Twiddla sessions cannot be saved and reloaded like a PowerPoint presentation. However, an instructor could save a set of image files in a folder, and upload each of them to Twiddla before
  • 33.
    Chapter 3: Twiddla27 giving the presentation. Besides drawings and photos, the images could be snippets of text or mathematical functions. Ideally, these would be PNG files with a transparent background to avoid obscuring the view of other images on the whiteboard. he Etherpad background could be used to allow the teacher to make impromptu notes. This would probably be best combined with an audio feature so that the teacher can speak while manipulating the images for the lecture. Twiddla does include voice channel. 4. A lecture given by Twiddla would be more dynamic than a slide presentation. It would give the lecturer the power to move and interact the images on his board in different ways. It would also give him the opportunity to ask a student to complete a figure using the elements on the whiteboard. (Source: http://mikescandi.blogspot.com/2011/02/web-20-tool-review- twiddla.html)
  • 34.
    28 Chapter 3:Twiddla GET STARTED WITH TWIDDLA Go to: http://www.twiddla.com/ Start Using a TwiddlaSTEP 2 To get access to Professional Level features such as unlimited document storage, private meetings, presentations, custom urls and more, click “Start your 30 Day Free Trial” and create account. STEP 1 If you do not want to sign up and directly start a new meeting, you can click here. If you want to try using the Twiddla, click here.
  • 35.
    Chapter 3: Twiddla29 Click here to open Twiddla’s main home page. Twiddla tools for editing a whiteboard. Tools to insert images, documents, widgets & codes and mathematical formulas. Click here to change your meeting room setting. Save the whiteboard view. Invite others to this meeting by inserting their email addresses. Copy and send this link to invite people to this meeting. Write here to chat or start a conversation.
  • 36.
    30 Chapter 3:Twiddla Twiddla ToolsSTEP 3 Clean and go to new whiteboard. Insert url address to view the web page on the whiteboard. Open the EtherPad to create pad text. It can synchronized and view by everyone. Insert document such as doc., ppt., xls. or pdf. Upload images on the whiteboard. Use pencil tool to draw on whiteboard. Tool to erase. Insert shapes. Add and edit text. You can view this toolbar at the bottom of your whiteboard.
  • 37.
    Chapter 3: Twiddla31 a) Inserting Images b) Inserting Documents To insert images on your whiteboard, click ‘Images’. You can choose any images you want here. Then, choose the documents from your file. To insert documents on your whiteboard, click ‘Documents’. Your uploaded document will appear here. Click at the icon and it will be inserted on your whiteboard.
  • 38.
    32 Chapter 3:Twiddla c) Inserting Widgets & Codes d) Inserting Mathematical Formulas Click at ‘Widgets & Code’. Copy and paste the embed code here. You can view the item you embed here. Click the ‘Embed!’ button to insert the item you embed on the whiteboard. Then click ‘click to embed’ to insert on the whiteboard. Click at ‘Mathematical formulas’. Choose the mathematical formulas. The formula you choose will appear here. You can edit and insert the number.
  • 39.
    Chapter 3: Twiddla33 This is an example of the mathematical formula you have inserted. You can collaborate and ask your student to do the solution online.
  • 40.
    34 Chapter 3:Twiddla REFERENCES http://www.twiddla.com/About/FAQ.aspx [5 Januari 2012] http://mikescandi.blogspot.com/2011/02/web-20-tool-review-twiddla.html [5 January 2012]
  • 41.
    Chapter 4: Wallwisher35 WHAT IS WALLWISHER? Wallwisher is a collaborative tool that lets users be prosumers rather consumers (Sharon Tonner 2011). It allow users to post their thoughts on a common topic using electronic sticky notes on a shared digital wall. The sticky note can incorporate an image, audio or video using the appropriate web address link (Sharon Tonner 2011). Wallwisher can be also used for personal note taking, to-do lists, feedback collection, etc. Best of all there is no signup needed- simply create a wall and start posting (Anon. 2011). BENEFITS OF USING WALLWISHER The following are some benefits of using Wallwisher: 1. To allow in a collaborative conversation. 2. To brainstorm an idea. 3. To access discussions and ideas. 4. To provide an interactive area that incorporates text, audio and visual materials. 5. To make the survey interactive through responding using mobile devices that has internet accessibility. Chapter 4 WALLWISHER
  • 42.
    36 Chapter 4:Wallwisher 6. A wall that offers individual feedback when determining a decision that needs a group vote. 7. A wall that tracks the completion status for each group member's task (Anon. 2011). USING WALLWISHER AS A RESEARCH TOOL  Collaborative research by working in small groups to find information (http://year6wykeham.blogspot.com/2012/01/science-wallwisher- research.html).  Provides a very simple way to gather feedback from respondents (http://staffweb2tools.wordpress.com/walls/).  Brainstormed and shared short simple ideas of research among research group (http://www.teachmaths- inthinking.co.uk/conferences/harare-2012-what-is-ibl.htm).  Received and record the feedback of the research.
  • 43.
    Chapter 4: Wallwisher37 GET STARTED WITH WALLWISHER Go to:http://www.wallwisher.com/ Log in/Register Click ‘Build a wall’ if you do not want to go at login/register page. Click the login button at the top right hand corner. STEP 2 STEP 1
  • 44.
    38 Chapter 4:Wallwisher Building & Customizing Walls Then click the ‘SIGN UP’ button. Fill in the the Wallwisher account. If you already have an account, just click ‘LOG IN’. STEP 3 Click at the ‘Build a wall’ button.
  • 45.
    Chapter 4: Wallwisher39 Choose the existing image you want or you can browse the image you like from your computer or website. Choose your privacy setting. You can control who can read, write and post notes into your wall. You can delete the wall you have created. Choose a theme for your wall. Change your wall URL address. Insert your wall title and description.
  • 46.
    40 Chapter 4:Wallwisher Typing Sticky Notes Inserting Images Double click the wall to add sticky notes. Enter your name. Write your message here. Add any item or format from a web link or upload from your computer or you can take a photo from your webcam. Insert an image URL location here. STEP 4 STEP 5
  • 47.
    Chapter 4: Wallwisher41 Inserting Videos An example of an image added. Click to zoom the image. Insert a URL location of a video link here. STEP 6
  • 48.
    42 Chapter 4:Wallwisher Inserting Documents Click at the video to view and play. Click this icon to upload a file from your computer. STEP 7
  • 49.
    Chapter 4: Wallwisher43 Click here to browse the file. An example of a document viewed. Click at the document to view.
  • 50.
    44 Chapter 4:Wallwisher Sharing WallwisherSTEP 8 Mobilize your wall using the scan code. Copy and paste the embed code onto your blog or web page. Share your wall using social tools or you can subscribe, snap and email the wall to others. Click ‘Share’.
  • 51.
    Chapter 4: Wallwisher45 REFERENCES Anon. 2011. Wallwisher: A new way to promote student collaboration for online colleges. http://blog.ecollegefinder.org/post/Wallwisher-A-New- Way-to-Promote-Student-Collaboration-for-Online-Colleges.aspx [14 March 2011] Sharon Tonner. 2011. Wallwisher. http://i-c-t.wikispaces.com/WALLWISHER [14 March 2011] http://year6wykeham.blogspot.com/2012/01/science-wallwisher-research.html [17 May 2012] http://staffweb2tools.wordpress.com/walls/ [17 May 2012] http://www.teachmaths-inthinking.co.uk/conferences/harare-2012-what-is- ibl.htm [17 May 2012]
  • 52.
    46 Chapter 5:TypeWith.me WHAT IS TYPEWITH.ME? TypeWith.me is an online document collaboration tool which works in real time. It is a very important web2.0 tool for teachers and educators .it is free , easy, simple to use and above all does not need any registration .It has a cool functionality that allows users to work on the same document and at the same time. (Source: http://educationaltech-med.blogspot.com/2011/01/type-with-me- quick-educative-online.html) WAYS FOR STUDENTS & TEACHERS TO USE TYPEWITH.ME The following are some ways how TypeWith.me can be used by students and teachers: 1. Students paired in groups can work on a single document with each one adding and editing is content 2. Teacher provides a neutral piece of writing for students to work on it online; they can add explanations and embed it in the document 3. Teacher can use it with students to get the whole class answers on a subject pertaining to their content-area study Chapter 5 TYPEWITH.ME
  • 53.
    Chapter 5: TypeWith.me47 4. Teach students how to write a piece of writing , a resume , a letter ect 5. Teachers can use it to collaborate between each other, setting on a meeting time/place. (Source: http://educationaltech-med.blogspot.com/2011/01/type-with-me- quick-educative-online.html)
  • 54.
    48 Chapter 5:TypeWith.me GET STARTED WITH TYPEWITH.ME Go to: http://willyou.typewith.me/ Start Using TypeWith.meSTEP 2 At the TypeWith.me page, click ‘New Pad’ to create new document. STEP 1 Or, you can create/open a new document with the name by typing the title of the document here and then click ‘OK’.
  • 55.
    Chapter 5: TypeWith.me49 Use these tools to edit your document. To modify your document, type the text area.
  • 56.
    50 Chapter 5:TypeWith.me You can Import/Export the pad from/to different format. Share and embed this pad using the link and embed code given. Show the number of connected users. Show the history of this pad.
  • 57.
    Chapter 5: TypeWith.me51 REFERENCES http://educationaltech-med.blogspot.com/2011/01/type-with-me-quick- educative-online.html [6 January 2012].
  • 58.
    52 Chapter 6:Voicethread WHAT IS VOICETHREAD? VoiceThread is an Internet-based application that allows users to create a shared presentation as a media album that visitors can asynchronously comment on either by text, voice, or video. The presentation can include any form of digital media, including images, audio, video, and text. The resulting output of this combination of the digital presentation and accumulated viewer comments is called a “VoiceThread.” Completed VoiceThreads can then be shared on the VoiceThread site or embedded into Web pages or blogs. They can also be exported for offline consumption running from a computer hard drive, a DVD, a video-enabled MP3 player, or a mobile phone. In short, VoiceThread allows an entire group conversation to be collected from anywhere in the world and then shared for playback in one place. VoiceThread has been referred to as a “group audio blog” because, like a blog, it fosters comments on a topic but goes further by allowing these comments to be offered in audio format. (Penn State 2009). Chapter 6 VOICETHREAD 52 Chapter 6: Voicethread WHAT IS VOICETHREAD? VoiceThread is an Internet-based application that allows users to create a shared presentation as a media album that visitors can asynchronously comment on either by text, voice, or video. The presentation can include any form of digital media, including images, audio, video, and text. The resulting output of this combination of the digital presentation and accumulated viewer comments is called a “VoiceThread.” Completed VoiceThreads can then be shared on the VoiceThread site or embedded into Web pages or blogs. They can also be exported for offline consumption running from a computer hard drive, a DVD, a video-enabled MP3 player, or a mobile phone. In short, VoiceThread allows an entire group conversation to be collected from anywhere in the world and then shared for playback in one place. VoiceThread has been referred to as a “group audio blog” because, like a blog, it fosters comments on a topic but goes further by allowing these comments to be offered in audio format. (Penn State 2009). Chapter 6 VOICETHREAD
  • 59.
    Chapter 6: Voicethread53 BENEFITS OF USING VOICETHREAD InfoTech4Lrng (2008) suggest the following benefits of using Voicethread: 1. Simple and easy. 2. Focus on the content instead of the tool; can serve as a form of free writing. 3. Requires simple hardware and minimal memory requirements, minimal tech-barrier. 4. Encourages collaborative storytelling. 5. Ability to use powerful images - one or many. 6. Users can zoom in to see detail and out to see big picture. 7. Ability to add text. 8. Easy to capture voices. 9. Inspires ongoing conversation about each image. 10. Build fluency, precision and voice in second language. 11. New dimension for creative analysis of historical photographs, maps and artifacts. 12. Ability to give and receive feedback from peers, teachers [formative and summative assessment], parents and other relatives, local and global community. 13. Can be used “as a storytelling tool, a deep thinking tool, a research tool, an expository communication tool, and even an assessment tool”. 14. Allows for differentiation to accomodate different learning needs and styles, another option for struggling or reluctant writers. 15. Allows the teachers to seamlessly integrate digital collaboration into the curriculum.
  • 60.
    54 Chapter 6:Voicethread WAYS OF USING VOICETHREAD? A VoiceThread allows every student in a class to easily record audio commentary about the ideas and experiences that are important to them. Whether it’s an event, a project, or a milestone, students can tell their story in their own voice,and then share it with the world. For educators, a VoiceThread offers a way to teach the principles of good digital citizenship as well as providing a single vessel to capture and then share all the diverse personalities of an entire class. A VoiceThread can be managed with little effort, creating digital heirlooms that can be shared by students, parents, and educators alike. Pride and excitement is clearly evident in student voices as they “publish” and archive their work. (Source: http://voicethread.com/image/voicethreads_in_the_classroom.pdf) USAGE IN TEACHING AND LEARNING VoiceThread is an application that makes it easy to assemble visual media in a presentation. In providing a simple venue for sharing, creating, and assessing media projects, such applications may promote greater digital literacy and greater enthusiasm for multimedia creation. What sets VoiceThread apart from these other applications is its easy integration of voice and other types of media for commenting on an original artifact. VoiceThread offers a natural online interaction that lends itself to students presenting and defending their work before experts and peers. It seems reasonable that an environment that provides an easy way for students to listen to and add to the work of their peers may encourage more authentic peer assessment. Evaluations that
  • 61.
    Chapter 6: Voicethread55 include verbal and visual cues in each student’s own voice may be easier for students to interpret. In disciplines where students create a portfolio of their work, VoiceThread provides the opportunity to build annotated presentations that include voice, video, and text explanations of what they have done. Group and personal reflections can also be collected and preserved. By far the greatest potential of VoiceThread lies in the creative oppor tunity it provides for students to tell their own stories and to contribute to or directly critique the narratives of their peers (Educause 2009). The following are some ideas for using Voicethread in teaching and learning (InfoTech4Lrng 2008): 1. Create or select images to accompany original poetry, poetic devices or research. 2. Record personal, family or community history, historic events or an oral history project, documentaries or essays. 3. Create an photo album of your school or library narrated by students. 4. Share oral reports about research through digital story. 5. Opportunity for students to develop interview skills. 6. Interview techniques. 7. Build confidence with peers. 8. Asking open ended questions. 9. Providing interviewee time to elaborate. 10. Follow up questions. 11. Develop editing skills – eliminate errors and pauses. 12. Collaborate with a school in another location.
  • 62.
    56 Chapter 6:Voicethread 13. Illustrated booktalks. 14. Students record thoughts while previewing document or draft comments. 15. Exploring science material to demonstrate their use in labs, innovation and space exploration.
  • 63.
    Chapter 6: Voicethread57 GET STARTED WITH VOICETHREAD Go to: http://www.voicethread.com Signing/Registering with VoiceThread STEP 3 Start uploading image/video Click here to sign in or register. You will see this basic account navigation page once you are signed in. STEP 1 STEP 2 Chapter 6: Voicethread 57 GET STARTED WITH VOICETHREAD Go to: http://www.voicethread.com Signing/Registering with VoiceThread STEP 3 Start uploading image/video Click here to sign in or register. You will see this basic account navigation page once you are signed in. STEP 1 STEP 2
  • 64.
    58 Chapter 6:Voicethread Creating VoiceThreads a) Uploading Images & Videos Click ‘Create’ tab. Click ‘Upload’ to start uploading your images, documents or videos. Upload files from your computer. Upload a file hosted online at a specific URL. Upload an image or video using webcam. STEP 3 58 Chapter 6: Voicethread Creating VoiceThreads a) Uploading Images & Videos Click ‘Create’ tab. Click ‘Upload’ to start uploading your images, documents or videos. Upload files from your computer. Upload a file hosted online at a specific URL. Upload an image or video using webcam. STEP 3
  • 65.
    Chapter 6: Voicethread59 b) Comment Once you have uploaded your images or videos, you can start commenting them. You also can delete your own comments anytime. Now, you can start giving comments to your own or others VoiceThread. You can choose either to give text, audio or video comments. Chapter 6: Voicethread 59 b) Comment Once you have uploaded your images or videos, you can start commenting them. You also can delete your own comments anytime. Now, you can start giving comments to your own or others VoiceThread. You can choose either to give text, audio or video comments.
  • 66.
    60 Chapter 6:Voicethread c) Share VoiceThread Click ‘Share’ to share your VoiceThread with others. Invite your friends through email. You can add friends by creating group. Click here and copy the URL link. 60 Chapter 6: Voicethread c) Share VoiceThread Click ‘Share’ to share your VoiceThread with others. Invite your friends through email. You can add friends by creating group. Click here and copy the URL link.
  • 67.
    Chapter 6: Voicethread61 Publishing option is a very important to ensure your VoiceThread is viewable to other users. Everyone can view your Voice Thread. Comments being accepted. After each comment is made, you must approve it before it is visible to others. Viewable in the "Browse" section on VoiceThread's homepage. Then click ‘save’. Chapter 6: Voicethread 61 Publishing option is a very important to ensure your VoiceThread is viewable to other users. Everyone can view your Voice Thread. Comments being accepted. After each comment is made, you must approve it before it is visible to others. Viewable in the "Browse" section on VoiceThread's homepage. Then click ‘save’.
  • 68.
    62 Chapter 6:Voicethread Viewing VoiceThreads Click ‘MyVoice’ tab to view the VoiceThread you have created. Click ‘Menu’ to edit the VoiceThread you have created. STEP 4 62 Chapter 6: Voicethread Viewing VoiceThreads Click ‘MyVoice’ tab to view the VoiceThread you have created. Click ‘Menu’ to edit the VoiceThread you have created. STEP 4
  • 69.
    Chapter 6: Voicethread63 REFERENCES Educause. .2009. 7 things you should know about voicethread. http://net.educause.edu/ir/library/pdf/ELI7050.pdf [6 April 2011] Penn State. 2009. 7 Things You Need to Know about VoiceThread. http://www.personal.psu.edu/mnm14/blogs/meyerviews/VoiceThread_ whitepaper.pdf [6 April 2011] InfoTech4Lrng. 2008. Voicethread in Teaching and Learning. http://arllennium.wordpress.com/2008/03/20/voicethread-in-teaching- and-learning/ [6 April 2011] VoiceThread in The Classroom. http://voicethread.com/image/voicethreads_in_the_classroom.pdf [6 April 2011]
  • 70.
    64 Chapter 7:Mind42 WHAT IS MIND42? Mind42 is a browser-based free mindmapping application which allows private, public or group shared maps to be created. Nodes are automatically arranged in space, but each node can be enriched with colours, icons, links to websites, notes and so on. Collaboration is easily arranged, using email addresses to invite viewers or participants. (Source: http://www.knowledgenetworklearning.net/tools/10greattools/mind42/) ADVANTAGES OF MIND42 Some advantages for using mind42 include:  No installation needed.  Accessible everywhere.  Intuitive interface.  Many nodes attribute (icons, colors, images, text styles, and links).  Collaboration (simultaneous editing).  Easy publishing and distribution of maps. (Source: http://wssdshares.wikispaces.com/Mind42) Chapter 7 MIND42 64 Chapter 7: Mind42 WHAT IS MIND42? Mind42 is a browser-based free mindmapping application which allows private, public or group shared maps to be created. Nodes are automatically arranged in space, but each node can be enriched with colours, icons, links to websites, notes and so on. Collaboration is easily arranged, using email addresses to invite viewers or participants. (Source: http://www.knowledgenetworklearning.net/tools/10greattools/mind42/) ADVANTAGES OF MIND42 Some advantages for using mind42 include:  No installation needed.  Accessible everywhere.  Intuitive interface.  Many nodes attribute (icons, colors, images, text styles, and links).  Collaboration (simultaneous editing).  Easy publishing and distribution of maps. (Source: http://wssdshares.wikispaces.com/Mind42) Chapter 7 MIND42
  • 71.
    Chapter 7: Mind4265 USING MIND42 (a) Affordance  Mind42 successfully links all streams of thought without cluttering the workspace.  The simplicity of this application benefits a user by getting straight to it and providing focus.  These tools enable a user to attach different forms of external information. This incorporates an opportunity to clearly depict, better explain or deepen thoughts.  The attachment of notes, images or linking to external web content, a map of thinking is revealed. A user is now presented with a full and contextualised visualisation of thinking. (b) Group application  Mind42 has the potential to be very effective in the visualisation of a groups overall objectives and activity.  With the commitment of all members to update and contribute to a mind map, group activity can be easily monitored.  Any members that may not be contributing are quickly identified. Any areas or ideas that may have been over looked can also be quickly identified by the group and acted upon.  If a group implement’s icons for each member, ideas can be voted upon and highlighted for further research.  Mind42.com offers groups a shared platform with an easy to use interface. (Source: http://net205-2011-curtin.wikidot.com/hartnett-mind42)
  • 72.
    66 Chapter 7:Mind42 GET STARTED WITH MIND42 Go to: http://www.mind42.com/ Signing UpSTEP 2 STEP 1 Fill in the required information. At the mind42 homepage, click at the ‘Sign up’ button. Then, click the ‘Sign up’ button.
  • 73.
    Chapter 7: Mind4267 Creating Mind MappingSTEP 3 Now you can start login. Insert your registered username and password. Mind42 will send an email to your registered email account. Check your email and click at the link given. Then, click the ‘Signin’ button. When you launch mind42, the ‘Mind map manager’ dialogue box will appear. Go to ‘New mind map’. Type your mind map title. Next, click the ‘Create’ button.
  • 74.
    68 Chapter 7:Mind42 This is how your mind42 sheet will look like.
  • 75.
    Chapter 7: Mind4269 (a) Adding Nodes Click once at your node.You will see this tool. To add another node, click at this icon. Retype the name of your new node. If you want to add another sibling of the node, click this icon. Then click ‘Apply’ button. This is an example of a mind mapping you have created. Chapter 7: Mind42 69 (a) Adding Nodes Click once at your node.You will see this tool. To add another node, click at this icon. Retype the name of your new node. If you want to add another sibling of the node, click this icon. Then click ‘Apply’ button. This is an example of a mind mapping you have created.
  • 76.
    70 Chapter 7:Mind42 (b) Adding Links to a Node Click at this icon. ‘Add new link’ dialogue box will appear. Go to ‘External’ tab. Insert the selected URL address here. Then, click the ‘Apply’ button. Or, you can search for links by inserting the keyword here. This is the preview of your added link.
  • 77.
    Chapter 7: Mind4271 (c) Adding an attachment to a node You can type a short note here. You can attach the Wikipedia article at your selected node. You can attach the ‘Todo-list’ or the progress of your selected node. To add an attachment in your selected node, click this icon. You can add three types of attachment.
  • 78.
    72 Chapter 7:Mind42 (d) Convert a Text Node to an Image You can insert the URL address of the image, or you can search by inserting the keyword. To change the text node to an image, click this icon. This is an example of a text node changed into an image.
  • 79.
    Chapter 7: Mind4273 Inviting & Managing CollaboratorsSTEP 4 To invite and manage collaborators, click at this icon. You can enter one or more email addresses here. Then, click the ‘Invite’ button.
  • 80.
    74 Chapter 7:Mind42 Viewing Revisions Publishing Mind Maps STEP 5 This is the list of your mind mapping revision. Select the revision you want to view. To view the revision of your mind mapping you have created, click at this icon. Then, click this icon to load the mind mapping you want to view. STEP 6 To publish your mind mapping, click this icon.
  • 81.
    Chapter 7: Mind4275 Copy this URL and send it to your friends or colleagues. Copy this text into your blog or website if you want to display the mind map embedded in the blog or website. Copy this text and integrate it into your blog or website - you will see a link which will bring the visitors to your mind map after clicking it. Then, mark this box. Chapter 7: Mind42 75 Copy this URL and send it to your friends or colleagues. Copy this text into your blog or website if you want to display the mind map embedded in the blog or website. Copy this text and integrate it into your blog or website - you will see a link which will bring the visitors to your mind map after clicking it. Then, mark this box.
  • 82.
    76 Chapter 7:Mind42 REFERENCES http://www.knowledgenetworklearning.net/tools/10greattools/mind42/ [12 April 2012] http://wssdshares.wikispaces.com/Mind42 [12 April 2012] http://net205-2011-curtin.wikidot.com/hartnett-mind42 [17 May 2012]
  • 83.
  • 84.
    Chapter 8: Sync.In77 WHAT IS SYNC.IN? Sync.in is a web based word processor for people to collaborate in real-time. When multiple people edit the same document simultaneously, any changes are instantly reflected on everyone's screen. The result is a new and productive way to collaborate with text documents, useful for meeting notes, brainstorming, project planning, training, and more (http://sync.in/). ADVANTAGES OF SYNC.IN The following are some advantages of using Sync.in: 1. Easily make collaborative notes. 2. Plan events with the team. 3. Conduct interviews. 4. Gather feedback on presentations. 5. Draft and edit documents with colleagues. 6. Brainstorm ideas. 7. Discuss and reach consensus on a document/task. (Source: http://www.cynapse.com/community/home/sync.in-users/sync.in- usage-scenarios/view) Chapter 8 SYNC.IN
  • 85.
    78 Chapter 8:Sync.In GET STARTED WITH SYNC.IN Go to: http://sync.in/ Creating Public NotesSTEP 2 Click the ‘Create a new PUBLIC NOTE’ button to start create a note for free and no need to sign up/register. STEP 1 If you want to have more features and secure, click ‘Get Sync.in PRO SIGNUP NOW’.
  • 86.
    Chapter 8: Sync.In79 Editing ToolsSTEP 3 Insert bullet list. This is your Public note. Now you can start using it. Tools to edit your writing. Undo and redo what you have written.
  • 87.
    80 Chapter 8:Sync.In Sync.In ToolsSTEP 4 Show the timeline of the edited note. Note view option. Export note in different format. Save note.
  • 88.
    Chapter 8: Sync.In81 Sharing NotesSTEP 5 List of users. You can change your name here. Click the ‘Invite’ or ‘Share this note’ button to invite and collaborate with other users. Then click the ‘Share Now’ button. Copy this link and send it to people with whom you want to share this note. You can send the link given by inserting email address or other sharing application.
  • 89.
    82 Chapter 8:Sync.In ChattingSTEP 6 Type your ideas in this box to start a chat. You can view what you have chatted here.
  • 90.
    Chapter 8: Sync.In83 REFERENCES http://sync.in/ [11 January 2012] http://www.cynapse.com/community/home/sync.in-users/sync.in-usage- scenarios/view [11 January 2012]
  • 91.
    84 Chapter 9:Poll Everywhere WHAT IS POLL EVERYWHERE? Poll Everywhere is a text message polling and audience response system. It is simple enough for anyone to use and flexible enough for a wide range of scenarios to interact with audiences and collect data. (Source: http://blog.polleverywhere.com/) IDEAS FOR USAGE IN CLASS The following are some activities that can be done using Poll Everywhere in class:  Quizzes  Attendance  Teacher feedback  Group evaluations  Class discussions (Source: http://www.slideshare.net/amysuesue/a-guide-to-poll-everywhere) Chapter 9 POLL EVERYWHERE 84 Chapter 9: Poll Everywhere WHAT IS POLL EVERYWHERE? Poll Everywhere is a text message polling and audience response system. It is simple enough for anyone to use and flexible enough for a wide range of scenarios to interact with audiences and collect data. (Source: http://blog.polleverywhere.com/) IDEAS FOR USAGE IN CLASS The following are some activities that can be done using Poll Everywhere in class:  Quizzes  Attendance  Teacher feedback  Group evaluations  Class discussions (Source: http://www.slideshare.net/amysuesue/a-guide-to-poll-everywhere) Chapter 9 POLL EVERYWHERE
  • 92.
    Chapter 9: PollEverywhere 85 BENEFITS OF POLL EVERYWHERE The following are some benefits for using Poll Everywhere:  Ease of use  Live results  Low cost or free to students  Affordable for the instructor  Option to select multiple devices to respond  Students engaged  Ability to identify and address challenging problems (Source: http://nercomp.org/corecode/uploads/event/uploaded_pdfs/Will%20Textin g%20Help%20Improve%20Student%20Learning- Fabienne%20Miller%20&%20Jianyu%20Liang%20-%20WPI_55.pdf)
  • 93.
    Chapter 9: PollEverywhere 86 GET STARTED WITH POLL EVERYWHERE Go to: http://www.polleverywhere.com/ Creating PollsSTEP 2 STEP 1 At the Poll Everywhere home page, click ‘Create your first poll’ button. Type your question here. Click this icon to preview your poll.
  • 94.
    Chapter 9: PollEverywhere 87 Insert the possible answers for your multiple choice question. If you want to convert your questions to multiple choice questions, click here. If you want to stay as open ended questions, you need to click the ‘Continue’ button. Click here if you want to delete the answers selected. Then, click ‘Continue’.
  • 95.
    88 Chapter 9:Poll Everywhere This is how your poll will appear. 88 Chapter 9: Poll Everywhere This is how your poll will appear.
  • 96.
    Chapter 9: PollEverywhere 89 Poll SettingSTEP 3 Showing all the public polls created by other users. You can use these functions when you upgrade your account. Chapter 9: Poll Everywhere 89 Poll SettingSTEP 3 Showing all the public polls created by other users. You can use these functions when you upgrade your account.
  • 97.
    90 Chapter 9:Poll Everywhere (a) Visual Setting (b) Show Instruction/Show Chart To change the appearance, go to ‘visual setting’ and select the appearance, instruction and chart you like to change your poll view. Click here to view your poll as chart or instruction.
  • 98.
    Chapter 9: PollEverywhere 91 (c) Fullscreen People RespondingSTEP 4 To enable and disable fullscreen view, click this icon. Select the response types you prefer. The response types will be shown here.
  • 99.
    92 Chapter 9:Poll Everywhere Downloading as a SlideSTEP 5 Select the presentation types you would prefer to download. You can use the downloaded slide for your presentation. The respondent respond will in-sync with the poll you created in the slide.
  • 100.
    Chapter 9: PollEverywhere 93 Sharing & PublishingSTEP 6 You can share and publish your poll by embedding it in your blog or web page, or email to others and, or download the flash file to upload it in Prezi.
  • 101.
    94 Chapter 9:Poll Everywhere REFERENCES http://blog.polleverywhere.com/ [14 February 2012] http://www.slideshare.net/amysuesue/a-guide-to-poll-everywhere [14 February 2012] http://nercomp.org/corecode/uploads/event/uploaded_pdfs/Will%20Textin g%20Help%20Improve%20Student%20Learning- Fabienne%20Miller%20&%20Jianyu%20Liang%20-%20WPI_55.pdf [17 February 2012].
  • 102.
    Chapter 10: Scribblar95 WHAT IS SCRIBBLAR? Scribblar is designed to be an online collaborative effort that empowers users to develop and maintain a scholarly conversation at any time. Several tools are optimal for the use of the online whiteboard, while the audio and text messaging features facilitate collaboration among users. This is an ideal tool for groups of students and teachers to brainstorm and plan outside of class hours, but with some forethought Scribblar also has the potential of being used as a virtual classroom. (Source: http://teachinghistory.org/digital-classroom/tech-for-teachers/24475) BENEFITS OF SCRIBBLAR The following are some benefits for using Sribblar:  Real-time and multi-user whiteboard  Image upload and download  Text chat with user list  Crystal-clear live audio  No user or session limits (Source: http://www.scribblar.com/index.cfm) Chapter 10 SCRIBBLAR
  • 103.
    96 Chapter 10:Scribblar EXAMPLES OF HOW SCRIBBLAR SUPPORT LEARNING Here are a few examples of how this versatile tool may support learning:  Math & Science Courses o Math and science teachers may use the Scribblar whiteboard to show students how to directly work out complicated equations and problems. The program also includes a number of built in equations editors and tools. After the teacher demonstrates how to complete a problem, the teacher could also observe the students working out the problems either on their own or in groups. This allows the instructor to monitor and correct student(s) and every step of the process. The online student is effectively able to “show their work” in the online environment without using a paper and pencil.  English & Liberal Arts o Liberal arts and English students may use Scribblar to upload portion of their papers and/or presentations for review by the teacher or other group members. The program would allow the instructor to highlight problem areas and discuss how to fix any issues in real-time. Instead of working on project and sharing information asynchronously, Scribblar allows users to update and alter information in real time without submitting multiple drafts and using a lot of paper and ink.  Photography Courses o Students in an online or hybrid photography course may use the Scribblar tool to share a number of their photos with the instructor and other students using this tool. With this
  • 104.
    Chapter 10:Scribblar 97 program,the educator is able to point out specific strengths and weaknesses of the photographs and provide instruction.  Higher Education-Online Courses o Educators may also separate students into small groups in several rooms and give them case studies, articles, or topics to review and discuss Following the small group activity, the students may return to one large classroom and discuss what they learned in the small group. Using Scribblar, the instructor would be able to monitor and provide feedback much easier than in a traditional classroom. (Source: https://sites.google.com/site/usmscribblar/home/classroom- examples)
  • 105.
    98 Chapter 10:Scribblar GETSTARTED WITH SCRIBBLAR Go to: http://www.scribblar.com/ Creating an AccountSTEP 2 STEP 1 Go to ‘Create Account’. Or you can click here to create an account/sign up.
  • 106.
    Chapter 10:Scribblar 99 Next,you need to verify your email address by clicking the link given. Click at the ‘Submit’ button. Fill in the required information.
  • 107.
    100 Chapter 10:Scribblar Creating RoomsSTEP 3 Once you have created a Scribblar account, you can create a room. Click ‘Create New Room’. Insert your room name. Then, click the ‘Create This Room’ button. Select the settings.
  • 108.
    Chapter 10:Scribblar 101 Startingthe WhiteboardSTEP 4 Now, you have successfully created a room. At your Scribblar ‘Room List’, go to ‘Options’ column and click ‘visit’. You can chat with other users here. Use the Scribblar tools and start your tutoring at this blank whiteboard. Click this icon to start the audio recording. Click this button to go to next page.
  • 109.
    102 Chapter 10:Scribblar Inviting UsersSTEP 5 Go to ‘Room Options’ and select ‘Send Invite’. An example of an online tutoring.
  • 110.
    Chapter 10:Scribblar 103 EmbeddingSTEP6 Click at the ‘Send Invite’ button. Go to ‘Room Options’ and select ‘Embed this Room’. Fill in the required information.
  • 111.
    104 Chapter 10:Scribblar Click this button to copy the embed code of the room created into your blog or website. Click this button to copy the embed code of the image button into your blog or website.
  • 112.
    Chapter 10:Scribblar 105 REFERENCES http://teachinghistory.org/digital-classroom/tech-for-teachers/24475[26 February 2013] http://www.scribblar.com/index.cfm [26 February 2013] https://sites.google.com/site/usmscribblar/home/classroom-examples [26 February 2013]