In this training pptx you have to learn about storage of waste material and waste management system. hope this training guide you very clearly and neatly.
This document provides information on site waste management, including:
- What site waste management plans are, who they affect, and why they are required by law for construction projects over ยฃ300,000 in England.
- Simple steps to create a site waste management plan, including allocating responsibilities, identifying waste types and how to manage them, and measuring and reviewing waste.
- Case studies on waste reduction at major projects like Kings Cross and Olympic Park redevelopment through techniques like off-site construction, consolidation centers, and high recycling rates.
- Emerging waste policies around landfill restrictions and increased recovery targets for materials like packaging.
- New developments in East London focusing on sustainable industries and synergies
The document provides information about Hierarchy Makers, a UK-based construction company. It discusses the company's vision, team members, past projects including Maggie's Cancer Caring Centre and Greenhill Primarycare Centre, milestones, policies, and an introduction to site management practices. The document emphasizes the importance of health and safety plans in the construction industry and outlines Hierarchy Makers' objectives to ensure worker safety and compliance with relevant regulations.
Plant location and layout planning are important considerations. The main factors to consider for plant location include proximity to marketing areas and raw materials, availability of transportation, labor, utilities, and suitable land, and minimizing environmental impact. The objectives of plant layout are to facilitate manufacturing processes, utilize space efficiently, avoid bottlenecks, and improve supervision and control. The main types of plant layouts are product layout, process layout, and fixed position layout.
Plant location and layout planning are important considerations. Key factors in determining plant location include proximity to markets and raw materials, transportation access, available labor, utilities, environmental regulations, and community impact. The objectives of plant layout are to facilitate manufacturing processes, optimize space utilization, and improve supervision, quality, capacity, safety, and material handling. There are three main types of layouts: product layout organizes machines by the sequence of operations for a product; process layout groups similar machines together; and fixed position layout keeps large/heavy products stationary while bringing processes to them.
TSDF has played a vital role in hazardous waste management (HWM) includes transporting hazardous waste from a generator's site to disposal facility for recycling, treat, store, or dispose of the waste. The waste which cannot be used for any purpose, the safe and environmentally sound disposal has been adopted depending upon the nature of hazardous waste. TSDF follows the generator and transporter in the chain of waste management activities. These include general facility standards as well as unit-specific design and operating criteria. The general facility standards consist of good housekeeping provisions for any facility that handles hazardous waste.
The document discusses material management in construction projects. It describes material management as an important process to reduce waste, improve productivity, and follow sustainable development practices. It discusses how material management involves planning materials use from the design phase through delivery, handling, and waste management. Effective material management through planning and proper handling can significantly reduce construction costs by minimizing waste.
Andrew Carige_Resume_Detailed Version 25-02-16Carige Andrew
ย
Andrew has over 17 years of experience in construction management. He has managed logistics on several large and complex projects including an LNG project in Darwin with an estimated value of $750 million. He is currently the Logistics Manager on this project. Previously, he was the Logistics Manager on a $350 million accommodation village project in Darwin and a $49 million hospital project in Cairns. He has also worked internationally as the Head of Logistics on a $22.5 billion development in Abu Dhabi. Andrew has a proven track record of effective planning and scheduling, innovation, and team management to deliver projects on time and under budget while ensuring safety.
This document provides information on site waste management, including:
- What site waste management plans are, who they affect, and why they are required by law for construction projects over ยฃ300,000 in England.
- Simple steps to create a site waste management plan, including allocating responsibilities, identifying waste types and how to manage them, and measuring and reviewing waste.
- Case studies on waste reduction at major projects like Kings Cross and Olympic Park redevelopment through techniques like off-site construction, consolidation centers, and high recycling rates.
- Emerging waste policies around landfill restrictions and increased recovery targets for materials like packaging.
- New developments in East London focusing on sustainable industries and synergies
The document provides information about Hierarchy Makers, a UK-based construction company. It discusses the company's vision, team members, past projects including Maggie's Cancer Caring Centre and Greenhill Primarycare Centre, milestones, policies, and an introduction to site management practices. The document emphasizes the importance of health and safety plans in the construction industry and outlines Hierarchy Makers' objectives to ensure worker safety and compliance with relevant regulations.
Plant location and layout planning are important considerations. The main factors to consider for plant location include proximity to marketing areas and raw materials, availability of transportation, labor, utilities, and suitable land, and minimizing environmental impact. The objectives of plant layout are to facilitate manufacturing processes, utilize space efficiently, avoid bottlenecks, and improve supervision and control. The main types of plant layouts are product layout, process layout, and fixed position layout.
Plant location and layout planning are important considerations. Key factors in determining plant location include proximity to markets and raw materials, transportation access, available labor, utilities, environmental regulations, and community impact. The objectives of plant layout are to facilitate manufacturing processes, optimize space utilization, and improve supervision, quality, capacity, safety, and material handling. There are three main types of layouts: product layout organizes machines by the sequence of operations for a product; process layout groups similar machines together; and fixed position layout keeps large/heavy products stationary while bringing processes to them.
TSDF has played a vital role in hazardous waste management (HWM) includes transporting hazardous waste from a generator's site to disposal facility for recycling, treat, store, or dispose of the waste. The waste which cannot be used for any purpose, the safe and environmentally sound disposal has been adopted depending upon the nature of hazardous waste. TSDF follows the generator and transporter in the chain of waste management activities. These include general facility standards as well as unit-specific design and operating criteria. The general facility standards consist of good housekeeping provisions for any facility that handles hazardous waste.
The document discusses material management in construction projects. It describes material management as an important process to reduce waste, improve productivity, and follow sustainable development practices. It discusses how material management involves planning materials use from the design phase through delivery, handling, and waste management. Effective material management through planning and proper handling can significantly reduce construction costs by minimizing waste.
Andrew Carige_Resume_Detailed Version 25-02-16Carige Andrew
ย
Andrew has over 17 years of experience in construction management. He has managed logistics on several large and complex projects including an LNG project in Darwin with an estimated value of $750 million. He is currently the Logistics Manager on this project. Previously, he was the Logistics Manager on a $350 million accommodation village project in Darwin and a $49 million hospital project in Cairns. He has also worked internationally as the Head of Logistics on a $22.5 billion development in Abu Dhabi. Andrew has a proven track record of effective planning and scheduling, innovation, and team management to deliver projects on time and under budget while ensuring safety.
Joseph Alston has over 15 years of experience in environmental health and safety management. He has worked as an EHS manager and corporate SHEC manager, where he developed and implemented health, safety, environmental, and regulatory compliance programs. Alston is skilled in areas like employee safety, cost reduction, quality evaluation, and strategic planning. He holds various safety certifications and has a background in business administration.
Pemexglobal has positioned itself amongst the topmost recruitment service providers, since 2006. We are the primary job consultancy service providers in various domains including medical, oil, refinery, petrochemical, hospitality, marine and many others.
Eric Spencer Ostrom has over 10 years of experience in environmental compliance and hazardous waste management. He currently oversees environmental compliance for over 140 PG&E facilities as an Environmental Program Manager. Previously, he worked as an Environmental Technician for PG&E, managing environmental compliance and hazardous waste operations for 12 facilities. He holds a Bachelor's degree in Architecture and Environmental Design.
Muhammad Jamil has over 21 years of experience in material management, warehouse management, and vendor management. He currently works as the Material-in-Charge for Descon Engineering in Abu Dhabi, UAE. He has extensive experience managing warehouses and inventory for large construction projects in oil, gas, and power industries. He is skilled in vendor evaluation, inventory control, warehouse operations, and process improvement.
This CV summarizes the professional experience and qualifications of an individual with 17 years of experience in oil refinery and petrochemical operations, inventory management, supply chain, and logistics. The candidate has held roles such as Operations Supervisor, Shipment Officer, Assistant Manager, and Officer in various companies. Their experience includes overseeing warehouse operations, inventory control, transportation planning, and distribution. They also have skills in areas like MS Office, ERP systems, communication, and safety training.
David johnson Project Operations 2017..cv..Dave Johnson
ย
A fairly brief discription of my career to date, Seeking a new position that plays to my strengths . willing to travel for the right project, please contact me if you require more infomation
This document outlines Schlumberger's environmental policies and standards. It establishes that Schlumberger will conduct business in a way that protects the environment, comply with laws, efficiently use resources, and reduce waste. The document also details Schlumberger's standards for environmental management, including regulatory compliance, assessments, waste management, discharges monitoring, spill prevention controls, hazardous storage, and continuous improvement.
The document outlines Daewoo Engineering & Construction Co.'s environmental policy and management practices. It discusses minimizing waste, preventing pollution, training employees on environmental performance, and complying with regulations to protect the environment for current and future generations. It also details specific waste management strategies like segregation, storage, transfer, and disposal of different waste streams as well as spill response procedures. Environmental controls for issues like dust, water protection, noise, soil erosion, and operating procedures are also addressed.
Shabeer P. Ameer has over 12 years of experience in project material coordination and management. He has worked as a Project Material Manager for Saipem in Angola and as a Material Controller and SAP MM Core Team Lead for Mohammad Al Mojil Group in Saudi Arabia. He is proficient in SAP, Oracle, and other ERP systems and seeks a position where he can utilize his skills and experience in material management.
The document summarizes the Tampa Scrap Site Remediation project. It details the site history, contaminants present, planned future use, and total project costs. It also outlines the key project management knowledge areas of scope, time, cost, communication, and risk that will be important to the successful completion of the project. The project involves remediating contamination at a former scrap metal recycling site in two phases: free product remediation and installing a liner, cap and stormwater system.
- Over 3 billion pounds of toxic waste is released into the environment each year from sources like chemical manufacturing, metal production, and petroleum processing.
- Hazardous waste is solid, liquid, or gaseous material that can harm human health or the environment. It is defined by the EPA as waste that appears on hazardous waste lists or displays hazardous characteristics like ignitability, corrosivity, reactivity, or toxicity.
- Companies that generate or handle hazardous waste are regulated and must have waste management and emergency response plans to properly dispose of waste and respond to spills to prevent environmental contamination. Trained workers are required for hazardous waste handling and cleanup.
1.Material Handling
2.What is material handling?
3.Objectives of material handling
4.significance of material handling
5.Principles of material handling
6.Scope of material handling in different field
7.Handling Standards of materials
8.Classification of material handling equipment
9.Types of material handling equipment
The document is a newsletter from Green Circle Inc. that provides various environmental, health and safety updates. It includes:
1. News items on pollution control board initiatives in India, decreased time for environmental clearances, record low Arctic sea ice levels, and India signing the Paris Agreement.
2. Tips on effective fire protection systems including complying with fire codes, using distributed network systems, and improving evacuation routes.
3. A case study on a company that underwent modernization and a cleaner production assessment, investing 5.5 lakh and saving 11.5 lakh annually.
This document discusses reclaimed asphalt pavement (RAP) - material removed during road resurfacing that contains bitumen and aggregate. It notes that RAP was often considered waste, but can be reused. It proposes increasing RAP reuse by developing management systems to track quantities and quality, and control how much is reintroduced into new asphalt. The document also notes that some old asphalt may contain carcinogenic tar, so those materials require separate treatment.
Okwordu Augustine Okechukwu is seeking a position as an HSE Professional or Maintenance Field Engineer. He has over 7 years of experience in roles such as QHSE Coordinator, Field Engineer, and Industrial Trainee. His responsibilities have included monitoring safety compliance, developing HSE plans, accident investigations, and overseeing maintenance tasks. He holds several safety certifications and has a Higher National Diploma in Environmental Technology.
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptxEduSkills OECD
ย
Ivรกn Bornacelly, Policy Analyst at the OECD Centre for Skills, OECD, presents at the webinar 'Tackling job market gaps with a skills-first approach' on 12 June 2024
Joseph Alston has over 15 years of experience in environmental health and safety management. He has worked as an EHS manager and corporate SHEC manager, where he developed and implemented health, safety, environmental, and regulatory compliance programs. Alston is skilled in areas like employee safety, cost reduction, quality evaluation, and strategic planning. He holds various safety certifications and has a background in business administration.
Pemexglobal has positioned itself amongst the topmost recruitment service providers, since 2006. We are the primary job consultancy service providers in various domains including medical, oil, refinery, petrochemical, hospitality, marine and many others.
Eric Spencer Ostrom has over 10 years of experience in environmental compliance and hazardous waste management. He currently oversees environmental compliance for over 140 PG&E facilities as an Environmental Program Manager. Previously, he worked as an Environmental Technician for PG&E, managing environmental compliance and hazardous waste operations for 12 facilities. He holds a Bachelor's degree in Architecture and Environmental Design.
Muhammad Jamil has over 21 years of experience in material management, warehouse management, and vendor management. He currently works as the Material-in-Charge for Descon Engineering in Abu Dhabi, UAE. He has extensive experience managing warehouses and inventory for large construction projects in oil, gas, and power industries. He is skilled in vendor evaluation, inventory control, warehouse operations, and process improvement.
This CV summarizes the professional experience and qualifications of an individual with 17 years of experience in oil refinery and petrochemical operations, inventory management, supply chain, and logistics. The candidate has held roles such as Operations Supervisor, Shipment Officer, Assistant Manager, and Officer in various companies. Their experience includes overseeing warehouse operations, inventory control, transportation planning, and distribution. They also have skills in areas like MS Office, ERP systems, communication, and safety training.
David johnson Project Operations 2017..cv..Dave Johnson
ย
A fairly brief discription of my career to date, Seeking a new position that plays to my strengths . willing to travel for the right project, please contact me if you require more infomation
This document outlines Schlumberger's environmental policies and standards. It establishes that Schlumberger will conduct business in a way that protects the environment, comply with laws, efficiently use resources, and reduce waste. The document also details Schlumberger's standards for environmental management, including regulatory compliance, assessments, waste management, discharges monitoring, spill prevention controls, hazardous storage, and continuous improvement.
The document outlines Daewoo Engineering & Construction Co.'s environmental policy and management practices. It discusses minimizing waste, preventing pollution, training employees on environmental performance, and complying with regulations to protect the environment for current and future generations. It also details specific waste management strategies like segregation, storage, transfer, and disposal of different waste streams as well as spill response procedures. Environmental controls for issues like dust, water protection, noise, soil erosion, and operating procedures are also addressed.
Shabeer P. Ameer has over 12 years of experience in project material coordination and management. He has worked as a Project Material Manager for Saipem in Angola and as a Material Controller and SAP MM Core Team Lead for Mohammad Al Mojil Group in Saudi Arabia. He is proficient in SAP, Oracle, and other ERP systems and seeks a position where he can utilize his skills and experience in material management.
The document summarizes the Tampa Scrap Site Remediation project. It details the site history, contaminants present, planned future use, and total project costs. It also outlines the key project management knowledge areas of scope, time, cost, communication, and risk that will be important to the successful completion of the project. The project involves remediating contamination at a former scrap metal recycling site in two phases: free product remediation and installing a liner, cap and stormwater system.
- Over 3 billion pounds of toxic waste is released into the environment each year from sources like chemical manufacturing, metal production, and petroleum processing.
- Hazardous waste is solid, liquid, or gaseous material that can harm human health or the environment. It is defined by the EPA as waste that appears on hazardous waste lists or displays hazardous characteristics like ignitability, corrosivity, reactivity, or toxicity.
- Companies that generate or handle hazardous waste are regulated and must have waste management and emergency response plans to properly dispose of waste and respond to spills to prevent environmental contamination. Trained workers are required for hazardous waste handling and cleanup.
1.Material Handling
2.What is material handling?
3.Objectives of material handling
4.significance of material handling
5.Principles of material handling
6.Scope of material handling in different field
7.Handling Standards of materials
8.Classification of material handling equipment
9.Types of material handling equipment
The document is a newsletter from Green Circle Inc. that provides various environmental, health and safety updates. It includes:
1. News items on pollution control board initiatives in India, decreased time for environmental clearances, record low Arctic sea ice levels, and India signing the Paris Agreement.
2. Tips on effective fire protection systems including complying with fire codes, using distributed network systems, and improving evacuation routes.
3. A case study on a company that underwent modernization and a cleaner production assessment, investing 5.5 lakh and saving 11.5 lakh annually.
This document discusses reclaimed asphalt pavement (RAP) - material removed during road resurfacing that contains bitumen and aggregate. It notes that RAP was often considered waste, but can be reused. It proposes increasing RAP reuse by developing management systems to track quantities and quality, and control how much is reintroduced into new asphalt. The document also notes that some old asphalt may contain carcinogenic tar, so those materials require separate treatment.
Okwordu Augustine Okechukwu is seeking a position as an HSE Professional or Maintenance Field Engineer. He has over 7 years of experience in roles such as QHSE Coordinator, Field Engineer, and Industrial Trainee. His responsibilities have included monitoring safety compliance, developing HSE plans, accident investigations, and overseeing maintenance tasks. He holds several safety certifications and has a Higher National Diploma in Environmental Technology.
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptxEduSkills OECD
ย
Ivรกn Bornacelly, Policy Analyst at the OECD Centre for Skills, OECD, presents at the webinar 'Tackling job market gaps with a skills-first approach' on 12 June 2024
Chapter wise All Notes of First year Basic Civil Engineering.pptxDenish Jangid
ย
Chapter wise All Notes of First year Basic Civil Engineering
Syllabus
Chapter-1
Introduction to objective, scope and outcome the subject
Chapter 2
Introduction: Scope and Specialization of Civil Engineering, Role of civil Engineer in Society, Impact of infrastructural development on economy of country.
Chapter 3
Surveying: Object Principles & Types of Surveying; Site Plans, Plans & Maps; Scales & Unit of different Measurements.
Linear Measurements: Instruments used. Linear Measurement by Tape, Ranging out Survey Lines and overcoming Obstructions; Measurements on sloping ground; Tape corrections, conventional symbols. Angular Measurements: Instruments used; Introduction to Compass Surveying, Bearings and Longitude & Latitude of a Line, Introduction to total station.
Levelling: Instrument used Object of levelling, Methods of levelling in brief, and Contour maps.
Chapter 4
Buildings: Selection of site for Buildings, Layout of Building Plan, Types of buildings, Plinth area, carpet area, floor space index, Introduction to building byelaws, concept of sun light & ventilation. Components of Buildings & their functions, Basic concept of R.C.C., Introduction to types of foundation
Chapter 5
Transportation: Introduction to Transportation Engineering; Traffic and Road Safety: Types and Characteristics of Various Modes of Transportation; Various Road Traffic Signs, Causes of Accidents and Road Safety Measures.
Chapter 6
Environmental Engineering: Environmental Pollution, Environmental Acts and Regulations, Functional Concepts of Ecology, Basics of Species, Biodiversity, Ecosystem, Hydrological Cycle; Chemical Cycles: Carbon, Nitrogen & Phosphorus; Energy Flow in Ecosystems.
Water Pollution: Water Quality standards, Introduction to Treatment & Disposal of Waste Water. Reuse and Saving of Water, Rain Water Harvesting. Solid Waste Management: Classification of Solid Waste, Collection, Transportation and Disposal of Solid. Recycling of Solid Waste: Energy Recovery, Sanitary Landfill, On-Site Sanitation. Air & Noise Pollution: Primary and Secondary air pollutants, Harmful effects of Air Pollution, Control of Air Pollution. . Noise Pollution Harmful Effects of noise pollution, control of noise pollution, Global warming & Climate Change, Ozone depletion, Greenhouse effect
Text Books:
1. Palancharmy, Basic Civil Engineering, McGraw Hill publishers.
2. Satheesh Gopi, Basic Civil Engineering, Pearson Publishers.
3. Ketki Rangwala Dalal, Essentials of Civil Engineering, Charotar Publishing House.
4. BCP, Surveying volume 1
This document provides an overview of wound healing, its functions, stages, mechanisms, factors affecting it, and complications.
A wound is a break in the integrity of the skin or tissues, which may be associated with disruption of the structure and function.
Healing is the bodyโs response to injury in an attempt to restore normal structure and functions.
Healing can occur in two ways: Regeneration and Repair
There are 4 phases of wound healing: hemostasis, inflammation, proliferation, and remodeling. This document also describes the mechanism of wound healing. Factors that affect healing include infection, uncontrolled diabetes, poor nutrition, age, anemia, the presence of foreign bodies, etc.
Complications of wound healing like infection, hyperpigmentation of scar, contractures, and keloid formation.
How Barcodes Can Be Leveraged Within Odoo 17Celine George
ย
In this presentation, we will explore how barcodes can be leveraged within Odoo 17 to streamline our manufacturing processes. We will cover the configuration steps, how to utilize barcodes in different manufacturing scenarios, and the overall benefits of implementing this technology.
Gender and Mental Health - Counselling and Family Therapy Applications and In...PsychoTech Services
ย
A proprietary approach developed by bringing together the best of learning theories from Psychology, design principles from the world of visualization, and pedagogical methods from over a decade of training experience, that enables you to: Learn better, faster!
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) CurriculumMJDuyan
ย
(๐๐๐ ๐๐๐) (๐๐๐ฌ๐ฌ๐จ๐ง ๐)-๐๐ซ๐๐ฅ๐ข๐ฆ๐ฌ
๐๐ข๐ฌ๐๐ฎ๐ฌ๐ฌ ๐ญ๐ก๐ ๐๐๐ ๐๐ฎ๐ซ๐ซ๐ข๐๐ฎ๐ฅ๐ฎ๐ฆ ๐ข๐ง ๐ญ๐ก๐ ๐๐ก๐ข๐ฅ๐ข๐ฉ๐ฉ๐ข๐ง๐๐ฌ:
- Understand the goals and objectives of the Edukasyong Pantahanan at Pangkabuhayan (EPP) curriculum, recognizing its importance in fostering practical life skills and values among students. Students will also be able to identify the key components and subjects covered, such as agriculture, home economics, industrial arts, and information and communication technology.
๐๐ฑ๐ฉ๐ฅ๐๐ข๐ง ๐ญ๐ก๐ ๐๐๐ญ๐ฎ๐ซ๐ ๐๐ง๐ ๐๐๐จ๐ฉ๐ ๐จ๐ ๐๐ง ๐๐ง๐ญ๐ซ๐๐ฉ๐ซ๐๐ง๐๐ฎ๐ซ:
-Define entrepreneurship, distinguishing it from general business activities by emphasizing its focus on innovation, risk-taking, and value creation. Students will describe the characteristics and traits of successful entrepreneurs, including their roles and responsibilities, and discuss the broader economic and social impacts of entrepreneurial activities on both local and global scales.
A Visual Guide to 1 Samuel | A Tale of Two HeartsSteve Thomason
ย
These slides walk through the story of 1 Samuel. Samuel is the last judge of Israel. The people reject God and want a king. Saul is anointed as the first king, but he is not a good king. David, the shepherd boy is anointed and Saul is envious of him. David shows honor while Saul continues to self destruct.
BIOLOGY NATIONAL EXAMINATION COUNCIL (NECO) 2024 PRACTICAL MANUAL.pptx
ย
Waste Management Safety Training
1. Material Storage
&Waste Management
Waste Material storge and cleaining
Raja Dur Mohammad - HSE Supervisor
Raja Dur Mohammad - HSE Supervisor-Chinese Translator-China Power Hub Operating-CPHO
2. Raja Dur Mohammad - HSE Supervisor-Chinese Translator-China Power Hub Operating-CPHO
Material management can help to
reduce waste, lower expenses, and
improve site safety while also helping
to protect the environment.
Need to Know
Meeting about waste material
3. Raja Dur Mohammad - HSE Supervisor-Chinese Translator-China Power Hub Operating-CPHO
Material Storage
Meeting arrange for good result
Contractors and the project clients
should discuss and agree on
material storage solutions for every
project. Materials storage options
should be included in the Project
plan for larger notifiable projects.
4. Raja Dur Mohammad - HSE Supervisor-Chinese Translator-China Power Hub Operating-CPHO
Storage area
Plants, materials,
debris, combustible
items such as foam
plastics, flammable
liquids and gases such
as propane, and
hazardous
compounds such as
insecticides and
timber treatment
chemicals should all
be stored in
designated places.
Material Storage
5. Raja Dur Mohammad - HSE Supervisor-Chinese Translator-China Power Hub Operating-CPHO
Construction Pedestrian routes
Having allowed
storage to 'spread'
uncontrollably on
to pavements and
other pathways is
not a good idea.
Do not keep
goods in places
where they restrict
access routes or
might obstruct
emergency exits;
Pedestrian routes
6. Raja Dur Mohammad - HSE Supervisor-Chinese Translator-China Power Hub Operating-CPHO
Flammable Material Storage
Flammable
materials, Oil
paint buckets,
Should almost
always need
to be kept
separate from
other
materials and
kept safe
from
accidental
ignition.
Flammable materials
7. Raja Dur Mohammad - HSE Supervisor-Chinese Translator-China Power Hub Operating-CPHO
Must be Arrange Guard Railing System
If items are kept
at a height,
such as on top
of a container,
ensure that the
appropriate
guard rails are
in place in case
individuals fall
while stacking
or collecting
materials or
equipment.
Storage at height
8. Raja Dur Mohammad - HSE Supervisor-Chinese Translator-China Power Hub Operating-CPHO
Material should be place in order wise
Maintain
order in
all
storage
areas,
whether
in the
issues
facing or
on the
job site;
Tidiness
9. Raja Dur Mohammad - HSE Supervisor-Chinese Translator-China Power Hub Operating-CPHO
Firstly, make better plan for delivering
Make a
strong
plan to
maintain
delivering
materials,
especially
in certain
situations.
Deliveries
10. Raja Dur Mohammad - HSE Supervisor-Chinese Translator-China Power Hub Operating-CPHO
Waste material tins
Other regulation
governs the correct
disposal of garbage,
which varies from low-
risk waste to
hazardous waste. The
Environment Agency
and local governments
are in responsible for
administering these
rules.
Waste management
11. Raja Dur Mohammad - HSE Supervisor-Chinese Translator-China Power Hub Operating-CPHO
Improper placement
However, if
garbage is not
properly managed
during the project,
it can pose a
serious safety
danger to
personnel on site.
You must decide
early on:
Waste management
12. Raja Dur Mohammad - HSE Supervisor-Chinese Translator-China Power Hub Operating-CPHO
Removing waste material
Wastes
streams
produced
during
building work
will be
managed in a
timely and
effective way;
and
How
13. Raja Dur Mohammad - HSE Supervisor-Chinese Translator-China Power Hub Operating-CPHO
Removing waste material
Who is
responsible for
collecting and
disposal of
specific wastes
produced on site.
Problems often
arise when
company and
individual duties
are not made clear
before work starts.
Who
14. Raja Dur Mohammad - HSE Supervisor-Chinese Translator-China Power Hub Operating-CPHO
Flammable Material Storage
Make sure
that all
flammable
waste
materials
(such as
packaging
and timber
offcuts) are
cleared away
regularly to
reduce fire
risks;
Flammable materials
15. Raja Dur Mohammad - HSE Supervisor-Chinese Translator-China Power Hub Operating-CPHO
Pictorial proof
Make waste
removal a
top priority
for all
disciplines.
Check that
everyone is
aware of the
requirements
and that they
are being
followed;
Work areas
16. Raja Dur Mohammad - HSE Supervisor-Chinese Translator-China Power Hub Operating-CPHO
Garbage bin
Consider waste
generated
inside the
building and
whether you
need to provide
wheeled bins or
chutes etc. to
enable it to be
brought out of
the building
safely;
Waste within buildings
17. Thank You
Raja Dur Mohammad - HSE Supervisor-Chinese Translator-China Power Hub Operating-CPHO