BOYSPI@GMAIL.COM
CRM, MARKETING PRINCIPLES.
 Who is your customer?
Ask my sales for the information
 Where do you store your customer phone number?
Ask my sales for the information
 How can you contact your customer?
Ask my sales to contact them
 How do you measure your customer loyalty?
Let my sales measure it
 How do you set up your marketing strategic?
Ask my sales to do that
BOYSPI@GMAIL.COM
CRM, MARKETING PRINCIPLES.
Existing Sales and Marketing Problems:
Sales
Marketing
Management
System A
System B
System C
System ..
Target LeadsTracking Report1. Lot of Manual processes
2. Data Inconsistency
3. High risk of Human error
BOYSPI@GMAIL.COM
CRM ?
Customers – The heart of your organization.
Relationship – The key to growing your company
through engagement with your prospects,
customers and stakeholders.
Management – Managing these stakeholder
relationship to increase lifetime value.
BOYSPI@GMAIL.COM
WHY IS IT IMPORTANT
Help better understand the needs of every
individual customer.
Reduce customer churn – eg : lower selling cost
Increase leads
Increase revenue per customer – eg : cross sell,
upsell.
Help deliver a consistent experience every time.
BOYSPI@GMAIL.COM
TOP 9 CRM IMPLEMENTATION PITFALLS
 Lack of a compelling vision
 CRM project gets under-resourced
 People see CRM technology as the answer
 Lightweight CRM requirements gathering
 Selecting the wrong CRM technology or vendor
 Lack of attention to detail in the design phase
 Signing up to unrealistic CRM implementation timelines
 Unnecessary conflict with the CRM vendor
 Failure to adapt over time
BOYSPI@GMAIL.COM
CRM ARCHITECTURE
BOYSPI@GMAIL.COM
BEST PRACTICES FOR CRM IMPLEMENT
BOYSPI@GMAIL.COM
HOWTO SET UP
CRM System forYour
BOYSPI@GMAIL.COM
CREATE A CRM STRATEGY & DEFINEYOUR
OBJECTIVES
You need to understand a couple of things about your
customers/clients before you get started with a CRM tool.Ask yourself
some of these questions:
 Do you know why your customers need your product or service?
 Do you understand how your customers find you?
 Do you understand what your customers like most about your
products/services?
 What are your customer’s expectations of you?
 Where is customer information stored
BOYSPI@GMAIL.COM
CONSIDERTHE CUSTOMER LIFECYCLE
BOYSPI@GMAIL.COM
PRIORITIZEYOUR CRM OBJECTIVES
It would be nice to achieve all your CRM objectives in one
fell swoop, however it is not always possible. The best thing to do is
to prioritise your list of objectives into something like this:
 High – Must Have
 Medium
 Low – Nice to Have
You can then concentrate on the high priority objectives
first. Once you have done this, the next step is to define your
current processes.
BOYSPI@GMAIL.COM
DEFINEYOUR BUSINESS PROCESSES
What are your processes when interacting with your
customers? For example, how do you handle phone
enquiries? How do you handle requests for
quotes? Processes are a way for you to deliver a consistent
experience for your customers. The more consistent you are
the more you will build trust.
BOYSPI@GMAIL.COM
ORGANIZE CHART
Officer
Manager
Vice President
CEO CEO
Sale
HO
Officer A Officer B
Up country
Officer
Marketing
HO
Officer
BOYSPI@GMAIL.COM
ROLES MATRIX
Module/Role CEO VP Sale VP Mk M.Sale M.MK Of. Sale Of.Mk
Dashboard R R R R R R R
Accounts R R R R R All All
Contacts R R R U All U All
Leads R R R U All U All
Campaigns R R R R R R All
Opportunities R R X All X All X
Quotes R R R R R All All
Tickets X X X X X X X
Products R R R R R R All
X: Disable
R: Read Only
U: Create/Update
All: Create/update/Delete
BOYSPI@GMAIL.COM
SELECTTHE RIGHT CRMTOOL/SYSTEM
Now that you have understood the processes in your
business the next step is to find the right CRM system that
can cater for these processes. For example, do you regularly
have to prepare quotes for your clients? Do you need to
track the proposals/quotes until the client is won? If so, you
would need a CRM system that can create quotes and plus
track potential sales.
BOYSPI@GMAIL.COM
CRM CRITERIA
BOYSPI@GMAIL.COM
SELECTTHE RIGHT CRM TOOL/SYSTEM
 Zoho
 Salesforce
 SugarCRM
 17 Hats
 Vtiger
 Capsule CRM
 Other
BOYSPI@GMAIL.COM
DEVELOP OR CREATE NEW PROCESSES
Once you have developed your CRM strategy, figured
out what your current processes are and selected a tool, the
next step is to develop or create new processes that can now
be handled by the CRM system.
BOYSPI@GMAIL.COM
CONFIGURE YOUR CRM TOOL
The next step is to configure your CRM tool to handle
your processes as well as importing your existing client
database (if it exists).
BOYSPI@GMAIL.COM
TRAINYOUR PEOPLE
The next step is to train any staff who will be using the
CRM tool. Make CRM a part of your business culture explain
to your staff that ‘The customer is GOD! Explain the benefits
of using the CRM system eg.
BOYSPI@GMAIL.COM
MEASURE AND IMPROVE
The final step is to measure and improve. Identify key metrics
you want to track for eg.
 No. of responses per marketing campaign
 No. of sales per marketing campaign
 Which products/services sell better
 Resolution time for complaints
 Use enquiry data
BOYSPI@GMAIL.COM
VTIGER CRM 6.4
BOYSPI@GMAIL.COM
WHAT ISVTIGER CRM
 Vtiger CRM is as open source CRM
 That was forked from Sugar CRM
 Comparable functionality to Sugar and Saleforce.com
 It offers reporting, a customer portal
 Where as those functions are in paid versions of the other CRM
applications.
 Now version 6.4
BOYSPI@GMAIL.COM
WHAT NEWVTIGER CRM 6.4
 New Layouts
 40+ bug fixes
 Fix SQL Injection & XSSVulnerability
 Errors in Currencies List
 Lead Mapping Issues
 New API
 Support Responsive
BOYSPI@GMAIL.COM
VTIGER CRM FEATURE
Sales force Automation
Marketing Automation
Inventory Automation
Customer Services
Report & Dashboard Analysis
Activity Management
BOYSPI@GMAIL.COM
SALES FORCE AUTOMATION
vtiger CRM offers Sales team the ability to monitor sales
operations briskly.The goal is to bring in the prospects, nurture, and win.
This is what vtiger helps you do, expertly.The operations in the Sales cycle
can be streamlined and automated; Consequently, efforts will be optimized
to see better results.
BOYSPI@GMAIL.COM
MARKETING AUTOMATION
Send out an Email blast to targeted set of an audience as a part of
Email Marketing.You can send customized emails to Leads to advertise
your product; Eventually, your Leads can be happy customers one day.
Trigger emails to your existing Contacts to enhance a relationship with
your customers.Also, convert your website visitors as Lead records in
Vtiger CRM throughWeb forms.
BOYSPI@GMAIL.COM
INVENTORY AUTOMATION
Weed out the risks in categorizing the goods rendered to your
customers and goods procured from your vendors. Modules such as
Products, Services, Price Books,Vendors, Purchase Orders etc will help you
organizing products in stock, forecasting demand, replenishing items in
stock and estimating revenues. By controlling the stock in your Inventory
effectively, you should be able to provide customer service at desired level.
BOYSPI@GMAIL.COM
CUSTOMER SERVICES
Simple, hassle free, easy-to-understand Support features in vtiger
CRM will help you deliver instant and precise customer service.You can
resolve cases faster like never before. User-friendly Customer Portal tool
acts as a great channel to communicate with your customers.With the
exciting support features, you should be able to adopt to the tool very
quickly and enhance level of customer satisfaction.
BOYSPI@GMAIL.COM
REPORT & DASHBOARD ANALYSIS
Analytics will improve performance of your business by
categorizing, predicting and highlighting only meaningful
information of data stored in yourVtiger CRM.You need not
have to depend much upon traditional theories asVtiger CRM
provides you data intelligence and complete analysis of data
through Reports, Dashboards and Home page widgets.
BOYSPI@GMAIL.COM
ACTIVITY MANAGEMENT
A typical day of a sales person includes managing,tracking and
following up activities that are scheduled to be done on present day.You
can do all that with one single Calendar application in vtiger CRM
BOYSPI@GMAIL.COM
HOW TO
CONFIGURATION
Vtiger CRM
BOYSPI@GMAIL.COM
HOW TO CONFIGURATION VTIGER CRM
• Install & Configuration server
• Update company profile
• Select Modules & Fields & Design Layout
• User Administration
• Create Workflows
BOYSPI@GMAIL.COM
INSTALL & CONFIGURATION SERVER
1. System Requirements
2. MYSQL Requirements
3. PHP Extensions
4. PHP Configuration
5. File Permissions
BOYSPI@GMAIL.COM
1. SYSTEM REQUIREMENTS
 Hardware: Hosted.
 Web Server: Apache 2.0.40 or above.
 Database: MySQL version 5.0.x
 PHP:PHP 5.5.x through 5.6.x.
 Web Browser: Firefox 1.5.x and above, IE7
 Operating System: Debian 4.0/5.0, Centos, Ubuntu or Fedora
Core/6/9 orWindows
BOYSPI@GMAIL.COM
2. MYSQL REQUIREMENTS
 Please make sure to review MySQL configuration (my.cnf or server start
parameters)
 SQL_MODE Should not have STRICT_TRANS_TABLE
 ENGINE=InnoDB Should be available. (Turn off --skip-innodb)
BOYSPI@GMAIL.COM
3. PHP EXTENSIONS
 GD Mandatory Charts and graphs generation are dependent on this
library.
 IMAP MandatoryWebmails Module is dependent on this library.
 Zlib Mandatory
 OpenSSL Optional Imap with OpenSSL should be enabled in case Mail
server needs to be connected via SSL
 Curl Optional
BOYSPI@GMAIL.COM
4. PHP CONFIGURATION
 allow_call_time_pass_reference on
 error_reporting E_WARNING & ~E_NOTICE & ~E_DEPRECATED
 safe_mode off
 display_errors on
 file_uploads on
 max_execution_time 600
 memory_limit 64M
 log_errors off
 output_buffering on
 register_globals off
 short_open_tag On
BOYSPI@GMAIL.COM
5. FILE PERMISSIONS
 config.inc.php
 tabdata.php
 install.php
 parent_tabdata.php
 cache
 cache/images/
 cache/import/
 storage/
 install/
 user_privileges/
 Smarty/cache/
 Smarty/templates_c/
 modules/Emails/templates/
 modules/
 cron/modules/
 test/vtlib/
 backup/
 Smarty/templates/modules/
 test/wordtemplatedownload/
 test/product/
 test/user/
 test/contact/
 test/logo/
 logs/
 modules/Webmails/tmp/
 Read andWrite permissions should be enabled for user/group who
owns webserver process
BOYSPI@GMAIL.COM
UPDATE COMPANY PROFILE
BOYSPI@GMAIL.COM
SELECT MODULES
Module Manager configuration tool is found under Settings.With
this you can enable, disable or control settings of vtiger CRM modules.
Modules are categorized as Standard (which are provided as a
core part of vtiger CRM), and Custom (which you have imported or
created) Studio -> Module Manager
BOYSPI@GMAIL.COM
SELECT MODULES
 Edit Fields
 EditWorkflows
 Edit PicklistValues
 Module Sequence Numbering
 SetupWebforms
 Edit Field Mapping ( Module Lead only)
BOYSPI@GMAIL.COM
SELECT FIELDS & DESIGN LAYOUT
 Vtiger CRM offers a set of default fields. Fields and Layout
Editor feature enables you to create custom fields , rearrange fields,
edit field properties, and move fields inside and across blocks.The fields
you create are accessed by all users across yourVtiger CRM account,
unless you've defined permissions through Profiles.
BOYSPI@GMAIL.COM
FIELD TYPE
Field Type Description Fields Information
Text To add text •Label: Provide field name
•Length: Provide field size
•Maximum Characters: 255
Decimal To add decimals •Label: Provide field name
•Length: Provide field size
•Decimal: Provide number of
decimal places
•Maximum Characters: 59
Integer To add integers •Label: Provide field name
•Length: Provide field size
•Maximum Characters: 255
BOYSPI@GMAIL.COM
FIELD TYPE
Field Type Description Fields Information
Percent To add percentage •Label: Provide field name
Currency To add currency values •Label: Provide field name
•Length: Provide field size
•Maximum Characters: 255
Email To add email address •Label: Provide field name
Phone To add Phone number •Label: Provide field name
Pick List To add drop-down fields •Label: Provide field name
•Picklist values: Provide picklist
values
BOYSPI@GMAIL.COM
FIELD TYPE
Field Type Description Fields Information
URL To add website address •Label: Provide field name
Check-Box Enable check-box for true.
Disable for false
•Label: Provide field name
Text Area To add long text •Label: Provide field name
Multi-Select Combo Box Add picklist field to select
multiple values
•Label: Provide field name
•PicklistValues: Provide picklist
values
Skype To add skype id •Label: Provide field name
Time To add time •Label: Provide field name
BOYSPI@GMAIL.COM
FIELD PROPERTY
Field Property Functionality
Mandatory field To make the field mandatory for the Users to
fill in
Active To enable or hide the field for all users
Quick Create To make the field available in Quick Create
popup
SummaryView To display the field in summary view of the
record
Mass Edit To make the field available during mass edit
DefaultValue To set default value for the field
BOYSPI@GMAIL.COM
USER ADMINISTRATION
 Vtiger CRM provides fine-grained access control capabilities
through the use of.
 Profiles
 Roles
 Sharing rules
 Users
 Groups
BOYSPI@GMAIL.COM
USER ADMINISTRATION
BOYSPI@GMAIL.COM
PROFILES
Profiles are used to control actions that users can
perform on records. In addition, profiles can be used to
restrict access to specific fields, modules, and features such as
import, export, etc.When a profile is associated to a role, the
access rights defined in the profile will be applied across all
users in that role.
 Creating Profiles
 Defining Permissions
BOYSPI@GMAIL.COM
PROFILES
Disable or enable checkboxes to revoke or grant access to
appropriate operation(View, Create/Edit, Delete) on all available modules
inVtiger CRM. For instance, if you do not want your sales reps to delete
records, you can disable Delete checkbox.As a result, your sales reps will
be able to create/edit and view records but can't delete.
BOYSPI@GMAIL.COM
ROLES
This feature enables you to create new roles for your
users to mimic your organization-wide hierarchy inVtiger
CRM. Roles like CEO and Sales Manager are provided by
default along withVtiger CRM package.
BOYSPI@GMAIL.COM
USERS
Users are employees in your organization who can log
into theirVtiger CRM accounts, access information, and
perform tasks according to permissions that have been
defined to them. InVtiger, admin users have the ability to
create user accounts.Vtiger CRM supports two types of users:
admin users and standard users.
BOYSPI@GMAIL.COM
GROUPS
Groups can be combination on different users, roles,
roles and subordinates and groups within an organization.
Groups will help you to build teams to share common set of
records.
BOYSPI@GMAIL.COM
SHARING RULES
Sharing Rules are used to configure data sharing rules
across users in role hierarchy. InVtiger CRM, the default
access for CRM records is set to public, which enables
everyone to see all records.When sharing rules are set to
private, users can only view records assigned to them and
records of users below them in role hierarchy. Sharing Rules
also help you to set custom sharing rules to share data with
specific role, role and subordinate, and group.
 Private
 Public Read only
 Public Read, Create/Edit
 Public: Read, Create/Edit, Delete
BOYSPI@GMAIL.COM
WORKFLOWS
Workflows will streamline your business by automating
operations like sending emails, creating activities, updating
fields, etc.As tasks are performed automatically, you need not
have to execute them manually.
BOYSPI@GMAIL.COM
SCHEDULE WORKFLOW
You'll need to provide basic details that include
selecting a module and scheduling workflow.Workflows gives
you the ability to perform different operations on the selected
module such as: sending an email, updating fields, creating a
whole new record in another module, creating an event or
todo, etc.This answers the question why should we select a
module here?.We will discuss the actions that are triggered by
the workflows in detail in Step-3.
BOYSPI@GMAIL.COM
EXECUTE WORKFLOW
 Only on the first save
 Until the first time the condition is true
 Every time the record is saved
 Every time a record is modified
 Schedule
BOYSPI@GMAIL.COM
ADDING CONDITION
Workflows will be executed on the records in the
selected module. More often, you might only need to perform
operations on selected records in that module.This is where
conditions will come into play.Workflow will only be executed
on the records that satisfy the condition specified by you.
BOYSPI@GMAIL.COM
ADDING TASKS
The actions that should be executed with the help of
workflows can be configured through tasks, while previously
defined steps are just to provide directions and inputs.
 Send Mail- To send an email notification
 Invoke Custom Function - To update target fields of records in a module
when actions are performed on source field in a different module
 Create Event-To create a new calendar event
 CreateTo do- To create a new calendar task
 Update fields- To updates field(s) of selected module
 Create Entity- To create or update records when conditions are satisfied
on parent record
 SMSTask - To send SMS notification
BOYSPI@GMAIL.COM
VTIGER CUSTOMER
PORTAL
Contact & Calendar
BOYSPI@GMAIL.COM
CUSTOMER PORTAL
Customer Portal enables self-service to your customers.They can
submit theTickets in case of any issues. It helps you manage a healthy
Customer relationship. It also allows them to view the Knowledge
Base(FAQ), Invoice, Quotes, Products, Services, Documents, Contacts,
Accounts,Assets, and Projects which are related to him/her and his/her
Organization, if enabled.
BOYSPI@GMAIL.COM
HOW TO SET UP
 Download code from sourceforge.net
https://sourceforge.net/projects/vtigercrm/files/vtiger%20CR
M%206.4.0/Add-ons/vtigercrm-customerportal-
6.4.0.zip/download
 Extract zip file to your server
 Config file config.inc.php in you vtiger crm
 Line 87
 $PORTAL_URL = 'http://localhost/customerportal';
 Config file PortalConfig.php in you customer portal
 Server vtiger path $Server_Path = "http://localhost/vtigercrm/";
 Your portal path $Authenticate_Path = "http://localhost/customerportal/";
BOYSPI@GMAIL.COM
HOW TO
 Click CRM Settings
 Click 'Other Settings' drop-down in the left
 Click Customer Portal.You can click on pin icon next to
it to add a shortcut to your settings home page
 Set up Customer Portal according to your Organization's
requirements
BOYSPI@GMAIL.COM
GENERATE USER FORYOU CUSTOMER
 Click Contacts tab.You can find it under All dropdown on
menu bar
 In the create view of new contact record, or edit view of
existing record, enable the check-box Portal User
 Provide Support Start Date and End date; your customers
will only be able to login within span of Support Start and
End dates
BOYSPI@GMAIL.COM
VTIGER CONFIG
SCHEDULE
Contact & Calendar
BOYSPI@GMAIL.COM
CONFIG FOR WINDOWS
 Config file cron/vtigercron.bat
 setVTIGERCRM_ROOTDIR=“C:xampphtdocsvtigercrm"
 set PHP_EXE="C:xamppphpphp.exe"
BOYSPI@GMAIL.COM
CONFIG WINDOW SCHEDULE
 Start -> Accessories -> System tool ->Task Scheduler
BOYSPI@GMAIL.COM
CONFIG WINDOW SCHEDULE
BOYSPI@GMAIL.COM
CONFIG WINDOW SCHEDULE
BOYSPI@GMAIL.COM
CONFIG WINDOW SCHEDULE
BOYSPI@GMAIL.COM
CONFIG WINDOW SCHEDULE
BOYSPI@GMAIL.COM
VTIGER
INTEGRATION
GOOGLE
Contact & Calendar
BOYSPI@GMAIL.COM
VTIGER INTEGRATION GOOGLE FLOW
BOYSPI@GMAIL.COM
VTIGER INTEGRATION GOOGLE
 Go to https://console.developers.google.com/
 Create New Project
BOYSPI@GMAIL.COM
VTIGER INTEGRATION GOOGLE
 Create Credentials
 Select Oauth Clien ID.
BOYSPI@GMAIL.COM
VTIGER INTEGRATION GOOGLE
 Configure consent screen
BOYSPI@GMAIL.COM
VTIGER INTEGRATION GOOGLE
 Select Application type
 Web application
BOYSPI@GMAIL.COM
VTIGER INTEGRATION GOOGLE
BOYSPI@GMAIL.COM
VTIGER INTEGRATION GOOGLE
Authorized JavaScript origins: crm url ของคุณ
Authorized redirect URIs: ใช้ 2 URL
 Google Calendar
Sync: http://{$site_URL}/index.php?module=Google&vie
w=List&operation=sync&sourcemodule=Calendar&servi
ce=GoogleCalendar
 Google Contacts
Sync: http://{$site_URL}/index.php?module=Google&vie
w=List&operation=sync&sourcemodule=Contacts&servi
ce=GoogleContacts
BOYSPI@GMAIL.COM
VTIGER INTEGRATION GOOGLE
 Get Client ID & Client secret
BOYSPI@GMAIL.COM
VTIGER INTEGRATION GOOGLE
 Update google config inVtiger
 Vtiger/modules/Google/connectors/Config.php
BOYSPI@GMAIL.COM
VTIGER INTEGRATION GOOGLE
 Synchronize
 Go to Contacts module
BOYSPI@GMAIL.COM
VTIGER INTEGRATION GOOGLE
 Sync Contact vtiger & google
BOYSPI@GMAIL.COM
VTIGER CONFIG
THAIBULKSMS
BOYSPI@GMAIL.COM
VTIGER CONFIG THAIBULKSMS
 Copy file thaibulksms.php to
vtiger/Modules/SMSNotifier/providers/
 To to CRM Settings -> Module Management
 Click Setting on Module SMSNotifier
 Click Server Configuration
 Click New Configuration
BOYSPI@GMAIL.COM
RITTICHAI SUFU
E-mail : boyspi@gmail.com
Line ID : boyspi
Telephone : 080-0323952
Website :
 www.crm.int.h
 www.marnoi.net
 Fan page : www.facebook.com/crm.in.th
BOYSPI@GMAIL.COM
Thank you.
BOYSPI@GMAIL.COM

Vtiger for implementation

  • 1.
  • 2.
    CRM, MARKETING PRINCIPLES. Who is your customer? Ask my sales for the information  Where do you store your customer phone number? Ask my sales for the information  How can you contact your customer? Ask my sales to contact them  How do you measure your customer loyalty? Let my sales measure it  How do you set up your marketing strategic? Ask my sales to do that BOYSPI@GMAIL.COM
  • 3.
    CRM, MARKETING PRINCIPLES. ExistingSales and Marketing Problems: Sales Marketing Management System A System B System C System .. Target LeadsTracking Report1. Lot of Manual processes 2. Data Inconsistency 3. High risk of Human error BOYSPI@GMAIL.COM
  • 4.
    CRM ? Customers –The heart of your organization. Relationship – The key to growing your company through engagement with your prospects, customers and stakeholders. Management – Managing these stakeholder relationship to increase lifetime value. BOYSPI@GMAIL.COM
  • 5.
    WHY IS ITIMPORTANT Help better understand the needs of every individual customer. Reduce customer churn – eg : lower selling cost Increase leads Increase revenue per customer – eg : cross sell, upsell. Help deliver a consistent experience every time. BOYSPI@GMAIL.COM
  • 6.
    TOP 9 CRMIMPLEMENTATION PITFALLS  Lack of a compelling vision  CRM project gets under-resourced  People see CRM technology as the answer  Lightweight CRM requirements gathering  Selecting the wrong CRM technology or vendor  Lack of attention to detail in the design phase  Signing up to unrealistic CRM implementation timelines  Unnecessary conflict with the CRM vendor  Failure to adapt over time BOYSPI@GMAIL.COM
  • 7.
  • 8.
    BEST PRACTICES FORCRM IMPLEMENT BOYSPI@GMAIL.COM
  • 9.
    HOWTO SET UP CRMSystem forYour BOYSPI@GMAIL.COM
  • 10.
    CREATE A CRMSTRATEGY & DEFINEYOUR OBJECTIVES You need to understand a couple of things about your customers/clients before you get started with a CRM tool.Ask yourself some of these questions:  Do you know why your customers need your product or service?  Do you understand how your customers find you?  Do you understand what your customers like most about your products/services?  What are your customer’s expectations of you?  Where is customer information stored BOYSPI@GMAIL.COM
  • 11.
  • 12.
    PRIORITIZEYOUR CRM OBJECTIVES Itwould be nice to achieve all your CRM objectives in one fell swoop, however it is not always possible. The best thing to do is to prioritise your list of objectives into something like this:  High – Must Have  Medium  Low – Nice to Have You can then concentrate on the high priority objectives first. Once you have done this, the next step is to define your current processes. BOYSPI@GMAIL.COM
  • 13.
    DEFINEYOUR BUSINESS PROCESSES Whatare your processes when interacting with your customers? For example, how do you handle phone enquiries? How do you handle requests for quotes? Processes are a way for you to deliver a consistent experience for your customers. The more consistent you are the more you will build trust. BOYSPI@GMAIL.COM
  • 14.
    ORGANIZE CHART Officer Manager Vice President CEOCEO Sale HO Officer A Officer B Up country Officer Marketing HO Officer BOYSPI@GMAIL.COM
  • 15.
    ROLES MATRIX Module/Role CEOVP Sale VP Mk M.Sale M.MK Of. Sale Of.Mk Dashboard R R R R R R R Accounts R R R R R All All Contacts R R R U All U All Leads R R R U All U All Campaigns R R R R R R All Opportunities R R X All X All X Quotes R R R R R All All Tickets X X X X X X X Products R R R R R R All X: Disable R: Read Only U: Create/Update All: Create/update/Delete BOYSPI@GMAIL.COM
  • 16.
    SELECTTHE RIGHT CRMTOOL/SYSTEM Nowthat you have understood the processes in your business the next step is to find the right CRM system that can cater for these processes. For example, do you regularly have to prepare quotes for your clients? Do you need to track the proposals/quotes until the client is won? If so, you would need a CRM system that can create quotes and plus track potential sales. BOYSPI@GMAIL.COM
  • 17.
  • 18.
    SELECTTHE RIGHT CRMTOOL/SYSTEM  Zoho  Salesforce  SugarCRM  17 Hats  Vtiger  Capsule CRM  Other BOYSPI@GMAIL.COM
  • 19.
    DEVELOP OR CREATENEW PROCESSES Once you have developed your CRM strategy, figured out what your current processes are and selected a tool, the next step is to develop or create new processes that can now be handled by the CRM system. BOYSPI@GMAIL.COM
  • 20.
    CONFIGURE YOUR CRMTOOL The next step is to configure your CRM tool to handle your processes as well as importing your existing client database (if it exists). BOYSPI@GMAIL.COM
  • 21.
    TRAINYOUR PEOPLE The nextstep is to train any staff who will be using the CRM tool. Make CRM a part of your business culture explain to your staff that ‘The customer is GOD! Explain the benefits of using the CRM system eg. BOYSPI@GMAIL.COM
  • 22.
    MEASURE AND IMPROVE Thefinal step is to measure and improve. Identify key metrics you want to track for eg.  No. of responses per marketing campaign  No. of sales per marketing campaign  Which products/services sell better  Resolution time for complaints  Use enquiry data BOYSPI@GMAIL.COM
  • 23.
  • 24.
    WHAT ISVTIGER CRM Vtiger CRM is as open source CRM  That was forked from Sugar CRM  Comparable functionality to Sugar and Saleforce.com  It offers reporting, a customer portal  Where as those functions are in paid versions of the other CRM applications.  Now version 6.4 BOYSPI@GMAIL.COM
  • 25.
    WHAT NEWVTIGER CRM6.4  New Layouts  40+ bug fixes  Fix SQL Injection & XSSVulnerability  Errors in Currencies List  Lead Mapping Issues  New API  Support Responsive BOYSPI@GMAIL.COM
  • 26.
    VTIGER CRM FEATURE Salesforce Automation Marketing Automation Inventory Automation Customer Services Report & Dashboard Analysis Activity Management BOYSPI@GMAIL.COM
  • 27.
    SALES FORCE AUTOMATION vtigerCRM offers Sales team the ability to monitor sales operations briskly.The goal is to bring in the prospects, nurture, and win. This is what vtiger helps you do, expertly.The operations in the Sales cycle can be streamlined and automated; Consequently, efforts will be optimized to see better results. BOYSPI@GMAIL.COM
  • 28.
    MARKETING AUTOMATION Send outan Email blast to targeted set of an audience as a part of Email Marketing.You can send customized emails to Leads to advertise your product; Eventually, your Leads can be happy customers one day. Trigger emails to your existing Contacts to enhance a relationship with your customers.Also, convert your website visitors as Lead records in Vtiger CRM throughWeb forms. BOYSPI@GMAIL.COM
  • 29.
    INVENTORY AUTOMATION Weed outthe risks in categorizing the goods rendered to your customers and goods procured from your vendors. Modules such as Products, Services, Price Books,Vendors, Purchase Orders etc will help you organizing products in stock, forecasting demand, replenishing items in stock and estimating revenues. By controlling the stock in your Inventory effectively, you should be able to provide customer service at desired level. BOYSPI@GMAIL.COM
  • 30.
    CUSTOMER SERVICES Simple, hasslefree, easy-to-understand Support features in vtiger CRM will help you deliver instant and precise customer service.You can resolve cases faster like never before. User-friendly Customer Portal tool acts as a great channel to communicate with your customers.With the exciting support features, you should be able to adopt to the tool very quickly and enhance level of customer satisfaction. BOYSPI@GMAIL.COM
  • 31.
    REPORT & DASHBOARDANALYSIS Analytics will improve performance of your business by categorizing, predicting and highlighting only meaningful information of data stored in yourVtiger CRM.You need not have to depend much upon traditional theories asVtiger CRM provides you data intelligence and complete analysis of data through Reports, Dashboards and Home page widgets. BOYSPI@GMAIL.COM
  • 32.
    ACTIVITY MANAGEMENT A typicalday of a sales person includes managing,tracking and following up activities that are scheduled to be done on present day.You can do all that with one single Calendar application in vtiger CRM BOYSPI@GMAIL.COM
  • 33.
  • 34.
    HOW TO CONFIGURATIONVTIGER CRM • Install & Configuration server • Update company profile • Select Modules & Fields & Design Layout • User Administration • Create Workflows BOYSPI@GMAIL.COM
  • 35.
    INSTALL & CONFIGURATIONSERVER 1. System Requirements 2. MYSQL Requirements 3. PHP Extensions 4. PHP Configuration 5. File Permissions BOYSPI@GMAIL.COM
  • 36.
    1. SYSTEM REQUIREMENTS Hardware: Hosted.  Web Server: Apache 2.0.40 or above.  Database: MySQL version 5.0.x  PHP:PHP 5.5.x through 5.6.x.  Web Browser: Firefox 1.5.x and above, IE7  Operating System: Debian 4.0/5.0, Centos, Ubuntu or Fedora Core/6/9 orWindows BOYSPI@GMAIL.COM
  • 37.
    2. MYSQL REQUIREMENTS Please make sure to review MySQL configuration (my.cnf or server start parameters)  SQL_MODE Should not have STRICT_TRANS_TABLE  ENGINE=InnoDB Should be available. (Turn off --skip-innodb) BOYSPI@GMAIL.COM
  • 38.
    3. PHP EXTENSIONS GD Mandatory Charts and graphs generation are dependent on this library.  IMAP MandatoryWebmails Module is dependent on this library.  Zlib Mandatory  OpenSSL Optional Imap with OpenSSL should be enabled in case Mail server needs to be connected via SSL  Curl Optional BOYSPI@GMAIL.COM
  • 39.
    4. PHP CONFIGURATION allow_call_time_pass_reference on  error_reporting E_WARNING & ~E_NOTICE & ~E_DEPRECATED  safe_mode off  display_errors on  file_uploads on  max_execution_time 600  memory_limit 64M  log_errors off  output_buffering on  register_globals off  short_open_tag On BOYSPI@GMAIL.COM
  • 40.
    5. FILE PERMISSIONS config.inc.php  tabdata.php  install.php  parent_tabdata.php  cache  cache/images/  cache/import/  storage/  install/  user_privileges/  Smarty/cache/  Smarty/templates_c/  modules/Emails/templates/  modules/  cron/modules/  test/vtlib/  backup/  Smarty/templates/modules/  test/wordtemplatedownload/  test/product/  test/user/  test/contact/  test/logo/  logs/  modules/Webmails/tmp/  Read andWrite permissions should be enabled for user/group who owns webserver process BOYSPI@GMAIL.COM
  • 41.
  • 42.
    SELECT MODULES Module Managerconfiguration tool is found under Settings.With this you can enable, disable or control settings of vtiger CRM modules. Modules are categorized as Standard (which are provided as a core part of vtiger CRM), and Custom (which you have imported or created) Studio -> Module Manager BOYSPI@GMAIL.COM
  • 43.
    SELECT MODULES  EditFields  EditWorkflows  Edit PicklistValues  Module Sequence Numbering  SetupWebforms  Edit Field Mapping ( Module Lead only) BOYSPI@GMAIL.COM
  • 44.
    SELECT FIELDS &DESIGN LAYOUT  Vtiger CRM offers a set of default fields. Fields and Layout Editor feature enables you to create custom fields , rearrange fields, edit field properties, and move fields inside and across blocks.The fields you create are accessed by all users across yourVtiger CRM account, unless you've defined permissions through Profiles. BOYSPI@GMAIL.COM
  • 45.
    FIELD TYPE Field TypeDescription Fields Information Text To add text •Label: Provide field name •Length: Provide field size •Maximum Characters: 255 Decimal To add decimals •Label: Provide field name •Length: Provide field size •Decimal: Provide number of decimal places •Maximum Characters: 59 Integer To add integers •Label: Provide field name •Length: Provide field size •Maximum Characters: 255 BOYSPI@GMAIL.COM
  • 46.
    FIELD TYPE Field TypeDescription Fields Information Percent To add percentage •Label: Provide field name Currency To add currency values •Label: Provide field name •Length: Provide field size •Maximum Characters: 255 Email To add email address •Label: Provide field name Phone To add Phone number •Label: Provide field name Pick List To add drop-down fields •Label: Provide field name •Picklist values: Provide picklist values BOYSPI@GMAIL.COM
  • 47.
    FIELD TYPE Field TypeDescription Fields Information URL To add website address •Label: Provide field name Check-Box Enable check-box for true. Disable for false •Label: Provide field name Text Area To add long text •Label: Provide field name Multi-Select Combo Box Add picklist field to select multiple values •Label: Provide field name •PicklistValues: Provide picklist values Skype To add skype id •Label: Provide field name Time To add time •Label: Provide field name BOYSPI@GMAIL.COM
  • 48.
    FIELD PROPERTY Field PropertyFunctionality Mandatory field To make the field mandatory for the Users to fill in Active To enable or hide the field for all users Quick Create To make the field available in Quick Create popup SummaryView To display the field in summary view of the record Mass Edit To make the field available during mass edit DefaultValue To set default value for the field BOYSPI@GMAIL.COM
  • 49.
    USER ADMINISTRATION  VtigerCRM provides fine-grained access control capabilities through the use of.  Profiles  Roles  Sharing rules  Users  Groups BOYSPI@GMAIL.COM
  • 50.
  • 51.
    PROFILES Profiles are usedto control actions that users can perform on records. In addition, profiles can be used to restrict access to specific fields, modules, and features such as import, export, etc.When a profile is associated to a role, the access rights defined in the profile will be applied across all users in that role.  Creating Profiles  Defining Permissions BOYSPI@GMAIL.COM
  • 52.
    PROFILES Disable or enablecheckboxes to revoke or grant access to appropriate operation(View, Create/Edit, Delete) on all available modules inVtiger CRM. For instance, if you do not want your sales reps to delete records, you can disable Delete checkbox.As a result, your sales reps will be able to create/edit and view records but can't delete. BOYSPI@GMAIL.COM
  • 53.
    ROLES This feature enablesyou to create new roles for your users to mimic your organization-wide hierarchy inVtiger CRM. Roles like CEO and Sales Manager are provided by default along withVtiger CRM package. BOYSPI@GMAIL.COM
  • 54.
    USERS Users are employeesin your organization who can log into theirVtiger CRM accounts, access information, and perform tasks according to permissions that have been defined to them. InVtiger, admin users have the ability to create user accounts.Vtiger CRM supports two types of users: admin users and standard users. BOYSPI@GMAIL.COM
  • 55.
    GROUPS Groups can becombination on different users, roles, roles and subordinates and groups within an organization. Groups will help you to build teams to share common set of records. BOYSPI@GMAIL.COM
  • 56.
    SHARING RULES Sharing Rulesare used to configure data sharing rules across users in role hierarchy. InVtiger CRM, the default access for CRM records is set to public, which enables everyone to see all records.When sharing rules are set to private, users can only view records assigned to them and records of users below them in role hierarchy. Sharing Rules also help you to set custom sharing rules to share data with specific role, role and subordinate, and group.  Private  Public Read only  Public Read, Create/Edit  Public: Read, Create/Edit, Delete BOYSPI@GMAIL.COM
  • 57.
    WORKFLOWS Workflows will streamlineyour business by automating operations like sending emails, creating activities, updating fields, etc.As tasks are performed automatically, you need not have to execute them manually. BOYSPI@GMAIL.COM
  • 58.
    SCHEDULE WORKFLOW You'll needto provide basic details that include selecting a module and scheduling workflow.Workflows gives you the ability to perform different operations on the selected module such as: sending an email, updating fields, creating a whole new record in another module, creating an event or todo, etc.This answers the question why should we select a module here?.We will discuss the actions that are triggered by the workflows in detail in Step-3. BOYSPI@GMAIL.COM
  • 59.
    EXECUTE WORKFLOW  Onlyon the first save  Until the first time the condition is true  Every time the record is saved  Every time a record is modified  Schedule BOYSPI@GMAIL.COM
  • 60.
    ADDING CONDITION Workflows willbe executed on the records in the selected module. More often, you might only need to perform operations on selected records in that module.This is where conditions will come into play.Workflow will only be executed on the records that satisfy the condition specified by you. BOYSPI@GMAIL.COM
  • 61.
    ADDING TASKS The actionsthat should be executed with the help of workflows can be configured through tasks, while previously defined steps are just to provide directions and inputs.  Send Mail- To send an email notification  Invoke Custom Function - To update target fields of records in a module when actions are performed on source field in a different module  Create Event-To create a new calendar event  CreateTo do- To create a new calendar task  Update fields- To updates field(s) of selected module  Create Entity- To create or update records when conditions are satisfied on parent record  SMSTask - To send SMS notification BOYSPI@GMAIL.COM
  • 62.
    VTIGER CUSTOMER PORTAL Contact &Calendar BOYSPI@GMAIL.COM
  • 63.
    CUSTOMER PORTAL Customer Portalenables self-service to your customers.They can submit theTickets in case of any issues. It helps you manage a healthy Customer relationship. It also allows them to view the Knowledge Base(FAQ), Invoice, Quotes, Products, Services, Documents, Contacts, Accounts,Assets, and Projects which are related to him/her and his/her Organization, if enabled. BOYSPI@GMAIL.COM
  • 64.
    HOW TO SETUP  Download code from sourceforge.net https://sourceforge.net/projects/vtigercrm/files/vtiger%20CR M%206.4.0/Add-ons/vtigercrm-customerportal- 6.4.0.zip/download  Extract zip file to your server  Config file config.inc.php in you vtiger crm  Line 87  $PORTAL_URL = 'http://localhost/customerportal';  Config file PortalConfig.php in you customer portal  Server vtiger path $Server_Path = "http://localhost/vtigercrm/";  Your portal path $Authenticate_Path = "http://localhost/customerportal/"; BOYSPI@GMAIL.COM
  • 65.
    HOW TO  ClickCRM Settings  Click 'Other Settings' drop-down in the left  Click Customer Portal.You can click on pin icon next to it to add a shortcut to your settings home page  Set up Customer Portal according to your Organization's requirements BOYSPI@GMAIL.COM
  • 66.
    GENERATE USER FORYOUCUSTOMER  Click Contacts tab.You can find it under All dropdown on menu bar  In the create view of new contact record, or edit view of existing record, enable the check-box Portal User  Provide Support Start Date and End date; your customers will only be able to login within span of Support Start and End dates BOYSPI@GMAIL.COM
  • 67.
    VTIGER CONFIG SCHEDULE Contact &Calendar BOYSPI@GMAIL.COM
  • 68.
    CONFIG FOR WINDOWS Config file cron/vtigercron.bat  setVTIGERCRM_ROOTDIR=“C:xampphtdocsvtigercrm"  set PHP_EXE="C:xamppphpphp.exe" BOYSPI@GMAIL.COM
  • 69.
    CONFIG WINDOW SCHEDULE Start -> Accessories -> System tool ->Task Scheduler BOYSPI@GMAIL.COM
  • 70.
  • 71.
  • 72.
  • 73.
  • 74.
  • 75.
    VTIGER INTEGRATION GOOGLEFLOW BOYSPI@GMAIL.COM
  • 76.
    VTIGER INTEGRATION GOOGLE Go to https://console.developers.google.com/  Create New Project BOYSPI@GMAIL.COM
  • 77.
    VTIGER INTEGRATION GOOGLE Create Credentials  Select Oauth Clien ID. BOYSPI@GMAIL.COM
  • 78.
    VTIGER INTEGRATION GOOGLE Configure consent screen BOYSPI@GMAIL.COM
  • 79.
    VTIGER INTEGRATION GOOGLE Select Application type  Web application BOYSPI@GMAIL.COM
  • 80.
  • 81.
    VTIGER INTEGRATION GOOGLE AuthorizedJavaScript origins: crm url ของคุณ Authorized redirect URIs: ใช้ 2 URL  Google Calendar Sync: http://{$site_URL}/index.php?module=Google&vie w=List&operation=sync&sourcemodule=Calendar&servi ce=GoogleCalendar  Google Contacts Sync: http://{$site_URL}/index.php?module=Google&vie w=List&operation=sync&sourcemodule=Contacts&servi ce=GoogleContacts BOYSPI@GMAIL.COM
  • 82.
    VTIGER INTEGRATION GOOGLE Get Client ID & Client secret BOYSPI@GMAIL.COM
  • 83.
    VTIGER INTEGRATION GOOGLE Update google config inVtiger  Vtiger/modules/Google/connectors/Config.php BOYSPI@GMAIL.COM
  • 84.
    VTIGER INTEGRATION GOOGLE Synchronize  Go to Contacts module BOYSPI@GMAIL.COM
  • 85.
    VTIGER INTEGRATION GOOGLE Sync Contact vtiger & google BOYSPI@GMAIL.COM
  • 86.
  • 87.
    VTIGER CONFIG THAIBULKSMS Copy file thaibulksms.php to vtiger/Modules/SMSNotifier/providers/  To to CRM Settings -> Module Management  Click Setting on Module SMSNotifier  Click Server Configuration  Click New Configuration BOYSPI@GMAIL.COM
  • 88.
    RITTICHAI SUFU E-mail :boyspi@gmail.com Line ID : boyspi Telephone : 080-0323952 Website :  www.crm.int.h  www.marnoi.net  Fan page : www.facebook.com/crm.in.th BOYSPI@GMAIL.COM
  • 89.