SlideShare a Scribd company logo
1
CURRICULUM VITAE
Name : Hasan
Place, Date of Birth : Jakarta, March 20th
1983
Address : Jl. Pahlawan Gg. Amalgam No.5 Rt.01/07
Desa Karang Asem Timur, Citeureup-Bogor 16810
Marital Status : Married
Gender : Male
Phone and Email : +628179803464
hasan.sach@gmail.com
Educational Background
Formal Education
2002-March 2007 : Bachelor Degree at Gunadarma University, Depok.
Majoring Electronic Engineering
1999-2002 : Senior High School 1 Ciputat, at Ciputat
1996-1999 : Junior High School Islamic II Tangerang, at Pamulang
1990-1996 : Elementary School 14 Morning Bintaro, at Bintaro
Informal Education
2006 : “Electronic Circuit Analysis” Gunadarma University, Depok
2006 : “Digital System Design Using Xilinx Simulator”
Gunadarma University, Depok
2004 : “HSC Interactive” Gunadarma University, Depok
Ability
- Ability to read and Understanding in Single Line Diagram, Wiring Diagram Electrical,
Instrument and Power Control, Motor Control Center System.
- Understanding in PLC Control such as PLC OMRON (CPM2A, C200H, CS1G-CPU42H,CQM-
1H,CPM1A), ZELIO SCHNEIDER, and KOYO with Communication RS 485, SIEMENS S7-
300 wit MODBUS TCP/IP Protocol.
- Mastering in HMI PLC Omron.
- Mastering in VB Application and DataBase with Microsoft Access.
- Mastering with windows 98, server 2003, XP, Linux and Network
- Mastering in Network Maintenance, TCP/IP, Troubleshooting and build a PC.
- Mastering with Ms. Visio, IR Thermography (Fluke Ti20 for Temperature Maintenance),
RBMNet (For maintenance AC Motor, Vibration, Bearing, Shaft, Missallignment Check &
Analysis), Adobe Photoshop,Corel Draw X3, AUTOCAD 2007, Solid Work 2005.
- Understanding in Level-3 System for Production Line Manufacturing.
- Understanding in Pneumatic and control motor.
- Understanding in SAP (System Application Product) for Maintenance and Logistic.
- Understanding in M3 System (Make - Move - Maintain) for Maintenance and Spare Part
Management.
- Understanding DCS Honneywell Experion PKS R301, Fuji and Centum CS Yokogawa.
- Understanding Management By Olympic System (7 Tools, Small Group Activity, 6R-6S, Key
Performance Indikator, Small Development Activity)
- Understanding about Preventive, Corrective and Predictive Maintenance.
- Understanding instrument calculation such a DP transmitter, RTD, Thermocouple calibration.
- Understanding Housekeeping Program 5R (Ringkas-Rapi-Resik-Rawat-Rajin).
2
Working Experience and Job Responsibility Description:
Mar 2014 – Now : PT. NS BlueScope Indonesia as Electrical and Automation Engineer.
Job Description : - Achievement as Project Cordinator with team for reduce cost 50% from
Yearly budget from IDR 380 million to 187 Million for Development and
Responsibility Preventive Maintenance Contract Service Fire Alarm
System yearly and certification all area factory PT. NS BlueScope
Indonesia for NOHMI system, Independent System, NOTIFIER System
and Troubleshooting for fit and healthy system to operated.
- Achievement as Electrical SPV with team for Project BRI Office
Renovation for supervision electrical Installation and Fire Alarm System
at Cilandak Jakarta.
- Achievement as Electrical SPV with team for project Robotic Installation
with Engineering Team at CPL Line to reduce costumers complaint.
- Achievement as Project Cordinator with team for Upgrading and
improvement Branding System connecting with Level-3 system using
TCP/IP protocol for Production Line MCL-1 (include commissioning
until handover).
- Achievement as Project Cordinator with team for cost saving electricity
for replacement tube lamp using LED lamp around 58% saving with ROI
/BEP 20 month.
- Achievement as Project Cordinator with team for Installation Project
Surface Inspection camera for reduce costumers complaint for MCL-2 and
CPL-1 Line.
- Feasibility Study for Energy Audit MCL-2 Line for effective cost and
reduce energy consumption with PT. Schneider Electric Indonesia
- Achievement as Project Cordinator with team for cost saving electricity
Using EsaTech Current Torque Limit for reduce minimum 15% electricity
consumption in CPL line with BEP 12 Month
- Achievement as Project Cordinator with team for Installation Monitoring
System Electricity Consumption with Engineering and maintenance Team
for 3 Line (MCL-1,CPL-1 and MCl-2 Line) connected to Level-3 System
- Achievement as Project Cordinator with team for Interconnection Genset
2MVA with 705KVA and 250KVA with manual change over switch if
some of genset fail to backup when PLN blackout.
- Achievement as SPV Electrical with team for electrical Design and
Engineering Silicon Project installation new Plant for Shearing Line and
Sliting for new capacity.
- Responsibility in Maintenance Contract and certification MV, LV System
for PT, NSBI.
- Responsibility in for all Modification request by team and Project such as :
a. Installation 1 unit CCTV Camera at Entry Passline MCL-2 for analyzing
production Issue.
b. Installation 1 unit CCTV Wireless Camera at Entry Section MCL-2 for
analyzing production Issue.
c. Installation 4 unit CCTV Camera at Exit Dispatch into site Office using
join network Internal for analyzing production Issue..
3
d. Installation Restricted Safe Access at Exit Inspection MCL-1.
e. Electrical Installation Exit Cabin CPL-1.
f. Electrical Installation Entry Cabin MCL-1.
g. Project Coordinator of Installation Motor Drive roll alkali total 6 unit for
MCL-1 line.
h. Installation 1 unit CCTV Wireless Camera at Entry Section MCL-1 for
trace production Issue and Coil Input defect.
i. Replace COS manual with automatic for CPL Line
j. Installation Restricted Access Exit Horizontal CPL Line.
k. Installation UV/IR 2 set for additional Protection Coater Room Fire
Prevention System.
l. Installation Acces Door Site Office for security acces and company
asset.
Mar 2013 – Mar 2014: PT. NS BlueScope Indonesia as Automation Engineer.
Job Description : - Responsibility for Maintenance Supression system for fire alarm system
Building and Electrical Room for NOHMI system and NOTIFIER System
and Troubleshooting and reduce around 50% maintenance cost
- Responsibility in for all Modification request by Operation Team and
Related Person in Charge such as :
a. Install AutoBlow ON-OFF Scrapper Exit Accummulator MCL-1
b. Install Alarm Brander fault Indication for Exit Pulpit MCL-2
c. Replace Control Roll Changer and Install Limit Switch Okemcoat
MCL-1
d. Install and additional Retricted Safe Acces Welder and Pinch Roll No.3
MCL-1
e. Install 3 Acces Door for New Admin Building and 2 for Electrical
Equipment Room
f. Install PA Communication system for NIR segment 3,4 and IONA
Room MCL-2.
g. Install Level Glass For Fuel Genset to monitor fuel capacity with
minimum range.
h. Install Weighing Truck Scale Unit For Loading, and Dispatch for Entry
receival.
i. Replace Conductivity control cause obsolute with new system
j. Upgrade Steering Unit system cause obsolute with new system with D-
MAX.
k. Install CCTV Camera on Cabin Crane#14 and Monitor connected to
Internaly Network for easy Analyze and record trace back historical.
l. Feasibility Study for Upgrading Automation system from PLC GEM80
Alstom with new system PLC S7-300 and S7-400 for upgrading
productivity Line speed and Output.
m. Install CCTV Camera at In Line Painting Area using High Resolution
and rotated zoom connected to Internaly Network for easy Analyze and
record productivity Issue cause defect.
n. Install Access and indication lamp using rotating lamp for maintenance
in hazard potential high risk at POT Area MCL-2.
o. Install Tap In-Out recording and for absent employment record for
Human Resource Department Team analysis.
p. Install Air Blow syetem for table welder entry MCL-2
q. Install Linisher Scrapper Cleaning System for Hot turn Roll MCL-1
- Responsibility For Critically Procedure Audit for safe people, safe
Equipment and Safe System
- Responsibility For Housekeeping Program in Compound area for Effective
4
part still can used for automation Project using ex-part.
- Development For certification and calibration pressure Transmitter In CPL
Line especially in Exhaust fan Coater Room.
Mar 2012 – Feb2013 : PT. BlueScope Steel Indonesia as Automation and Electrical Supervisor.
Job Description : - Helping Maintenance Team to supervision include helping
Corrective, Preventive and Predictive Maintenance system.
- Responsibility in Automation Maintenance such as PLC Maintenance
scheduling such as Panel cleaning & Fan Cooling for Remote IO, 5R
activity and Housekeeping Program and Layout 5R for PLC Room.
- Responsibility in Workshop Electrical Maintenance for 5R Activity and
Audit.
- Maintenance Discuss Toolbox and Safety Meeting every Day and weeks.
- Together with Maintenance team repair and modification every
equipment failure and need modification by Modification Approval
system
- Together with M3 team, Create M3 System Bill of material part for MCL2
Maintenance System.
- Together with Maintenance Team Create Maintenance Planning,
Preventive, Predictive and Corrective Maintenance.
- Responsible implement of MCL-2 electrical and automation Sparepart
and ensure that all have been insert to M3 system.
- Update skill matriks for contractor and Electrican for Maintenance.
Jan 2011 – Feb2012 : PT. Polychem Indonesia, Tbk as Senior Project Engineer
Measurement Control Electrical Co-Generation Power Plant 2x15 MW.
Job Description : - Helping Maintenance Project Team to supervision include helping
Install, repair and modification instrument system for Co-Generation
Project Power Plant 2x15 MW.
- Responsibility in Demin and Utility water treatment Maintenance.
- Responsibility in Ash Convey system such as Conveyor, Ash Silo
Handling, Electrostatic Precipitator, Pneumatic Transfer Tank, Bulk
Loader, Compressor and Crusher Control Unit.
- Together with MCE maintenance team making and manage preventive,
Predictive, Corrective, working instruction, and calibration sheet for
Maintenance system.
- Together with MCE maintenance team repair instrument and
modification System CoGen Power Plant.
- Buying Part for safety stock maintenance, include modification and new
instalation, which is approved by management.
- Together with MCE maintenance team repair and calibration all
instrument and modification System CoGen Power Plant.
- Together with MCE maintenance team prepare training instrument
System CoGen Power Plant.
2007 – Dec 2010 : PT. Dian Swastatika Sentosa, Tbk (Serang Power Plant) / PT. Indah
Kiat Pulp & Paper SINAR MAS GROUP, as a Junior Engineer Electrical
and Instrument Co-Generation Power Plant 175 MW majoring instrument
utility water treatment plant.
Job Description : - Responsibility in Demin and Utility water treatment Maintenance
- Responsibility in preventive, predictive and corrective include
repair, new installation and modification system with EI Team
- Together with EI team calibration instrument at Overhaul schedule
- Together with EI Team to make sure that preventive already taken
5
and check for an Audit.
- Together with EI Team as a planner maintenance and responsibility
report a technician for working order in SAP system.
- Revision for working instruction, calibration sheet, and prepare
report for Small Group Activity, and Small Development Activity
project.
- Together with EI Team to make sure that spare part is safety stock for
maintenance include buying which is best part for system and include in
budget which approved by management.
2006 – 2007 : Fixed Assistant and Coordinated of Assistant Electro Laboratory, Gunadarma
University
2005 – 2007 : Assistant Advances Electronical Laboratory, Gunadarma University
Assistant Intermediate Electronical Laboratory, Gunadarma University
Assistant Basic Electronical Laboratory, Gunadarma University
Attended Training
2015 : PT. NS BlueScope Indonesia, :
“Safety Supervisor Mindset “
2014 : PT. NS BlueScope Indonesia, :
“Line Of Fire “
2014 : PT. NS BlueScope Indonesia, :
“Safety Project Management “
2014 : PT. NS BlueScope Indonesia, :
“Safety Leadership “
2013 : PT. NS BlueScope Indonesia, :
“Safety Electrical System“
2012 : PT. BlueScope Steel Indonesia, :
“HOT Work PT. BlueScope Steel Indonesia “
2012 : PT. BlueScope Steel Indonesia, :
“Working at Height PT. BlueScope Steel Indonesia “
2012 : PT. BlueScope Steel Indonesia, :
“Safe Access System PT. BlueScope Steel Indonesia “
2012 : PT. BlueScope Steel Indonesia, :
“Gas Safety Induction PT. BlueScope Steel Indonesia “
2012 : PT. BlueScope Steel Indonesia, :
“Isolation Locking System and Hierarchy Control System PT. BlueScope Steel
Indonesia “
2012 : PT. BlueScope Steel Indonesia, :
“HOT Metal Safety Induction PT. BlueScope Steel Indonesia “
2012 : PT. BlueScope Steel Indonesia, :
“Job Safety Analysis and Take 2 PT. BlueScope Steel Indonesia “
2012 : PT. BlueScope Steel Indonesia, :
“ General Safety Induction and HSE Regulation PT. BlueScope Steel Indonesia “
2011 : PT. Polychemical Indonesia Tbk, :
“ Demineralization 2x60 M3/H Co Generation Power Plant “
2011 : PT. Polychemical Indonesia Tbk, :
“ Operational Boiler CFB 3x60 T/H Co Generation Power Plant “
2011 : PT. Polychemical Indonesia Tbk, :
“ K3 For Worker “
2010 : PT. Dian Swastatika Sentosa,Tbk :
“ SAP PM For Maintenance “
2009 : PT. Dian Swastatika Sentosa,Tbk:
“Fundamental Of Electrical Engineering “
6
2009 : PT. Dian Swastatika Sentosa,Tbk:
“Material Management System “
2008 : PT. Dian Swastatika Sentosa,Tbk:
“ Steam & Power Generation “
2008 : PT. Dian Swastatika Sentosa,Tbk :
“ Occupational Safety and Health 1“
2008 : PT. Dian Swastatika Sentosa,Tbk :
“ Interlock and Control System for Boiler “
2008 : PT. Dian Swastatika Sentosa,Tbk :
“ Interlock and control system for Turbine “
2008 : PT. Dian Swastatika Sentosa,Tbk :
“ Learning to use IR Thermography (Fluke Ti20) “
2008 : PT. Dian Swastatika Sentosa,Tbk :
“SF6 Gases Filling Procedure for GCB “
2008 : PT. Dian Swastatika Sentosa,Tbk :
“ISO Standarization “
2008 : PT. Dian Swastatika Sentosa,Tbk :
“Purchase Part and Inventory Control System “
2007 : PT. Dian Swastatika Sentosa,Tbk :
“ Function and Configuration of Card DCS Yokogawa “
Certificate
2011 : LIA TOEFL Test:
“ English Proficiency Test (EPT) “
2008 : PT. Dian Swastatika Sentosa,Tbk :
“ Power and Steam Generation “
2008 : PT. Dian Swastatika Sentosa,Tbk :
“ Occupational Safety and Health “
2007 : Bachelor Thesis:
“ Pencacah Barang Otomatis Berbasis PLC CPM2A 20CDR-A “
2006 : Seminar
“ Seminar Nasional Teknologi Telekomunikasi Masa Depan “
2006 : Diploma Thesis
“ Rangkaian IR Receiver Pengontrol Aplikasi Windows “
2006 : Aptitude Test at Gunadarma University
2006 : Public College
“ Automation Industries and Building Network “
2005 : Public College
“ Renewable Energy “
2003 : Seminar
“Prospek Pengembangan Teknologi VOIP Sebagai Alternatif Teknologi Fixed
Telepon di Indonesia “
Project Experiences
- Silicon Project PT. NS BlueScope Indonesia.
- Co-Generation Power Plant Project 2x15 MW PT. Polychemical Indonesia, Tbk
- Modification PLC and Instrument Control Demin Water System (utility for water
treatment) PT. Polychemical Indonesia, Tbk include Install and helping with MCE
Team, all Instrument and electrical equipment for Co-Generation Power Plant Project
2x15 MW PT. Polychemical Indonesia, Tbk
- Upgrade PLC omron C200H with CS1G-CPU42 with communication link with RS 232
at PT. Dian Swastatika Sentosa,Tbk.
- Instalation Dry Coal Sheed lighting and lightning electrical system at PT.Dian
Swastatika Sentosa, Tbk.
7
- Dearator Feed Water Pump Motor new Instalation 3300V 125KW with control and
protection at PT.Dian Swastatika Sentosa, Tbk.
- New Instalation Chiller 90KW for Replacing Air Conditioner in 20KV, 3300V Panel at
PT.Dian Swastatika Sentosa, Tbk.
Organizations has been followed
2005-2007 : KPLI (Kumpulan Pengguna Linux Indonesia)
2004-2005 : HME (Himpunan Mahasiswa Elektro)
1999-2001 : ROHIS HIGH SCHOOL 1 CIPUTAT
Performance Achievement
Oct 2008 : 2’nd Winner Maintenance Update Presentation Competition at
PT.DSS,Tbk (for all DSS Plant)
Dec 2007 : 1’st Winner Employee Competition By Disnaker Serang
Language
English : Active (Certificated)

More Related Content

What's hot

Deputy Manager Electrical
Deputy Manager ElectricalDeputy Manager Electrical
Deputy Manager Electrical
S.Silambu Selva Siddharthan
 
Muhammad Rizwan.
Muhammad Rizwan.Muhammad Rizwan.
Muhammad Rizwan.
Muhammad Rizwan
 
Skm Nov. 2016
Skm  Nov. 2016Skm  Nov. 2016
Skm Nov. 2016
Syed Kamal Mian
 
Vel Linked In CV
Vel Linked In CVVel Linked In CV
Vel Linked In CV
Velmurugan Subramaniam
 
Resume sg jeffrey perea feb2017
Resume sg jeffrey perea feb2017Resume sg jeffrey perea feb2017
Resume sg jeffrey perea feb2017
Jeffrey Perea
 
Training Report on Automation
Training Report on AutomationTraining Report on Automation
Training Report on Automation
FellowBuddy.com
 
JOHN- Senior Electrical engineer
JOHN- Senior Electrical engineerJOHN- Senior Electrical engineer
JOHN- Senior Electrical engineer
john britto
 
CV
CVCV
Nick Vasiliu Resume Electrical Design Engineer 2017
Nick Vasiliu Resume Electrical Design Engineer 2017Nick Vasiliu Resume Electrical Design Engineer 2017
Nick Vasiliu Resume Electrical Design Engineer 2017
Nicolae Vasiliu
 
Roshan Mishra (Electrical Engineer)
Roshan Mishra (Electrical Engineer)Roshan Mishra (Electrical Engineer)
Roshan Mishra (Electrical Engineer)
Roshan Mishra
 
VY SUNDAR RESUME
VY SUNDAR RESUMEVY SUNDAR RESUME
VY SUNDAR RESUME
Vasant Sundar
 
Automation Engineer r3 2-2015
Automation Engineer r3 2-2015Automation Engineer r3 2-2015
Automation Engineer r3 2-2015
Todd Calvert
 
Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resume
VEERABHARATHI MUNI
 
CV-Electrical-Engineer (1)
CV-Electrical-Engineer (1)CV-Electrical-Engineer (1)
CV-Electrical-Engineer (1)
Kasangili Katongo
 
Resume electrical engineer- for oil & gas
Resume  electrical engineer- for oil & gasResume  electrical engineer- for oil & gas
Resume electrical engineer- for oil & gas
vineeth ravi
 
Profile_SamuelJaideep_05
Profile_SamuelJaideep_05Profile_SamuelJaideep_05
Profile_SamuelJaideep_05
Samuel Joseph
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEER
Mahesh Narayanan
 
CV OF ELECTRICAL ENGINEER
CV OF ELECTRICAL ENGINEERCV OF ELECTRICAL ENGINEER
CV OF ELECTRICAL ENGINEER
SURENDRAN CHANDRASEKARAN
 
Control System Engineer Resume
Control System Engineer ResumeControl System Engineer Resume
Control System Engineer Resume
darshankumartrivedi
 
CV_Meraj_Electrical_Foreman
CV_Meraj_Electrical_ForemanCV_Meraj_Electrical_Foreman
CV_Meraj_Electrical_Foreman
syed meraj
 

What's hot (20)

Deputy Manager Electrical
Deputy Manager ElectricalDeputy Manager Electrical
Deputy Manager Electrical
 
Muhammad Rizwan.
Muhammad Rizwan.Muhammad Rizwan.
Muhammad Rizwan.
 
Skm Nov. 2016
Skm  Nov. 2016Skm  Nov. 2016
Skm Nov. 2016
 
Vel Linked In CV
Vel Linked In CVVel Linked In CV
Vel Linked In CV
 
Resume sg jeffrey perea feb2017
Resume sg jeffrey perea feb2017Resume sg jeffrey perea feb2017
Resume sg jeffrey perea feb2017
 
Training Report on Automation
Training Report on AutomationTraining Report on Automation
Training Report on Automation
 
JOHN- Senior Electrical engineer
JOHN- Senior Electrical engineerJOHN- Senior Electrical engineer
JOHN- Senior Electrical engineer
 
CV
CVCV
CV
 
Nick Vasiliu Resume Electrical Design Engineer 2017
Nick Vasiliu Resume Electrical Design Engineer 2017Nick Vasiliu Resume Electrical Design Engineer 2017
Nick Vasiliu Resume Electrical Design Engineer 2017
 
Roshan Mishra (Electrical Engineer)
Roshan Mishra (Electrical Engineer)Roshan Mishra (Electrical Engineer)
Roshan Mishra (Electrical Engineer)
 
VY SUNDAR RESUME
VY SUNDAR RESUMEVY SUNDAR RESUME
VY SUNDAR RESUME
 
Automation Engineer r3 2-2015
Automation Engineer r3 2-2015Automation Engineer r3 2-2015
Automation Engineer r3 2-2015
 
Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resume
 
CV-Electrical-Engineer (1)
CV-Electrical-Engineer (1)CV-Electrical-Engineer (1)
CV-Electrical-Engineer (1)
 
Resume electrical engineer- for oil & gas
Resume  electrical engineer- for oil & gasResume  electrical engineer- for oil & gas
Resume electrical engineer- for oil & gas
 
Profile_SamuelJaideep_05
Profile_SamuelJaideep_05Profile_SamuelJaideep_05
Profile_SamuelJaideep_05
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEER
 
CV OF ELECTRICAL ENGINEER
CV OF ELECTRICAL ENGINEERCV OF ELECTRICAL ENGINEER
CV OF ELECTRICAL ENGINEER
 
Control System Engineer Resume
Control System Engineer ResumeControl System Engineer Resume
Control System Engineer Resume
 
CV_Meraj_Electrical_Foreman
CV_Meraj_Electrical_ForemanCV_Meraj_Electrical_Foreman
CV_Meraj_Electrical_Foreman
 

Similar to Curriculum Vitae - Hasan

Islam's CV.pdf
Islam's CV.pdfIslam's CV.pdf
Islam's CV.pdf
IslamAzkoul1
 
Khubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan_CV Instrument
Khubaib Khan_CV Instrument
Khubaib Khan
 
CV_AhmadDasuki
CV_AhmadDasukiCV_AhmadDasuki
CV_AhmadDasuki
Ahmad Dasuki
 
Amarjeet Copy
Amarjeet   CopyAmarjeet   Copy
Amarjeet Copy
Amarjeet kumar
 
dinesh techom - with outpic revised
dinesh techom - with outpic reviseddinesh techom - with outpic revised
dinesh techom - with outpic revised
Dinesh Dillikumar
 
Zahid Iqbal Resume
Zahid Iqbal ResumeZahid Iqbal Resume
Zahid Iqbal Resume
zahid iqbal
 
Mohamed_Saad
Mohamed_SaadMohamed_Saad
Mohamed_Saad
Mohamed Saad
 
012416 andrei k_resume_php
012416 andrei k_resume_php012416 andrei k_resume_php
012416 andrei k_resume_php
Andrei Karunungan
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
Rizal Efendi
 
Krishna prasad fm engineer
Krishna prasad fm engineerKrishna prasad fm engineer
Krishna prasad fm engineer
Krishna Prasad
 
hitesh_soniResume (1)
hitesh_soniResume (1)hitesh_soniResume (1)
hitesh_soniResume (1)
Hitesh Soni
 
MuhammadImran(CV)
MuhammadImran(CV)MuhammadImran(CV)
MuhammadImran(CV)
Imran Muhammad Imran
 
Marlon Maisog CV GE 1
Marlon Maisog CV GE 1Marlon Maisog CV GE 1
Marlon Maisog CV GE 1
Marlon Maisog
 
Jawad Ali Khan
Jawad Ali KhanJawad Ali Khan
Jawad Ali Khan
Jawad Khan
 
T.chandramouli O & M_ele
T.chandramouli O & M_eleT.chandramouli O & M_ele
T.chandramouli O & M_ele
Chandramouli Tadepalli
 
T.chandramouli O & M_Electrical
T.chandramouli O & M_ElectricalT.chandramouli O & M_Electrical
T.chandramouli O & M_Electrical
Chandramouli Tadepalli
 
ajay cv new (3)
ajay cv new (3)ajay cv new (3)
ajay cv new (3)
Ajay Gautam
 
SANKET SATKAR4444444444
SANKET SATKAR4444444444SANKET SATKAR4444444444
SANKET SATKAR4444444444
SANKET SATKAR
 
Abdul Mujiono CV1
Abdul Mujiono CV1Abdul Mujiono CV1
Abdul Mujiono CV1
Abdul Mujiono
 
Balu Resume
Balu ResumeBalu Resume
Balu Resume
Balu V
 

Similar to Curriculum Vitae - Hasan (20)

Islam's CV.pdf
Islam's CV.pdfIslam's CV.pdf
Islam's CV.pdf
 
Khubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan_CV Instrument
Khubaib Khan_CV Instrument
 
CV_AhmadDasuki
CV_AhmadDasukiCV_AhmadDasuki
CV_AhmadDasuki
 
Amarjeet Copy
Amarjeet   CopyAmarjeet   Copy
Amarjeet Copy
 
dinesh techom - with outpic revised
dinesh techom - with outpic reviseddinesh techom - with outpic revised
dinesh techom - with outpic revised
 
Zahid Iqbal Resume
Zahid Iqbal ResumeZahid Iqbal Resume
Zahid Iqbal Resume
 
Mohamed_Saad
Mohamed_SaadMohamed_Saad
Mohamed_Saad
 
012416 andrei k_resume_php
012416 andrei k_resume_php012416 andrei k_resume_php
012416 andrei k_resume_php
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
Krishna prasad fm engineer
Krishna prasad fm engineerKrishna prasad fm engineer
Krishna prasad fm engineer
 
hitesh_soniResume (1)
hitesh_soniResume (1)hitesh_soniResume (1)
hitesh_soniResume (1)
 
MuhammadImran(CV)
MuhammadImran(CV)MuhammadImran(CV)
MuhammadImran(CV)
 
Marlon Maisog CV GE 1
Marlon Maisog CV GE 1Marlon Maisog CV GE 1
Marlon Maisog CV GE 1
 
Jawad Ali Khan
Jawad Ali KhanJawad Ali Khan
Jawad Ali Khan
 
T.chandramouli O & M_ele
T.chandramouli O & M_eleT.chandramouli O & M_ele
T.chandramouli O & M_ele
 
T.chandramouli O & M_Electrical
T.chandramouli O & M_ElectricalT.chandramouli O & M_Electrical
T.chandramouli O & M_Electrical
 
ajay cv new (3)
ajay cv new (3)ajay cv new (3)
ajay cv new (3)
 
SANKET SATKAR4444444444
SANKET SATKAR4444444444SANKET SATKAR4444444444
SANKET SATKAR4444444444
 
Abdul Mujiono CV1
Abdul Mujiono CV1Abdul Mujiono CV1
Abdul Mujiono CV1
 
Balu Resume
Balu ResumeBalu Resume
Balu Resume
 

Curriculum Vitae - Hasan

  • 1. 1 CURRICULUM VITAE Name : Hasan Place, Date of Birth : Jakarta, March 20th 1983 Address : Jl. Pahlawan Gg. Amalgam No.5 Rt.01/07 Desa Karang Asem Timur, Citeureup-Bogor 16810 Marital Status : Married Gender : Male Phone and Email : +628179803464 hasan.sach@gmail.com Educational Background Formal Education 2002-March 2007 : Bachelor Degree at Gunadarma University, Depok. Majoring Electronic Engineering 1999-2002 : Senior High School 1 Ciputat, at Ciputat 1996-1999 : Junior High School Islamic II Tangerang, at Pamulang 1990-1996 : Elementary School 14 Morning Bintaro, at Bintaro Informal Education 2006 : “Electronic Circuit Analysis” Gunadarma University, Depok 2006 : “Digital System Design Using Xilinx Simulator” Gunadarma University, Depok 2004 : “HSC Interactive” Gunadarma University, Depok Ability - Ability to read and Understanding in Single Line Diagram, Wiring Diagram Electrical, Instrument and Power Control, Motor Control Center System. - Understanding in PLC Control such as PLC OMRON (CPM2A, C200H, CS1G-CPU42H,CQM- 1H,CPM1A), ZELIO SCHNEIDER, and KOYO with Communication RS 485, SIEMENS S7- 300 wit MODBUS TCP/IP Protocol. - Mastering in HMI PLC Omron. - Mastering in VB Application and DataBase with Microsoft Access. - Mastering with windows 98, server 2003, XP, Linux and Network - Mastering in Network Maintenance, TCP/IP, Troubleshooting and build a PC. - Mastering with Ms. Visio, IR Thermography (Fluke Ti20 for Temperature Maintenance), RBMNet (For maintenance AC Motor, Vibration, Bearing, Shaft, Missallignment Check & Analysis), Adobe Photoshop,Corel Draw X3, AUTOCAD 2007, Solid Work 2005. - Understanding in Level-3 System for Production Line Manufacturing. - Understanding in Pneumatic and control motor. - Understanding in SAP (System Application Product) for Maintenance and Logistic. - Understanding in M3 System (Make - Move - Maintain) for Maintenance and Spare Part Management. - Understanding DCS Honneywell Experion PKS R301, Fuji and Centum CS Yokogawa. - Understanding Management By Olympic System (7 Tools, Small Group Activity, 6R-6S, Key Performance Indikator, Small Development Activity) - Understanding about Preventive, Corrective and Predictive Maintenance. - Understanding instrument calculation such a DP transmitter, RTD, Thermocouple calibration. - Understanding Housekeeping Program 5R (Ringkas-Rapi-Resik-Rawat-Rajin).
  • 2. 2 Working Experience and Job Responsibility Description: Mar 2014 – Now : PT. NS BlueScope Indonesia as Electrical and Automation Engineer. Job Description : - Achievement as Project Cordinator with team for reduce cost 50% from Yearly budget from IDR 380 million to 187 Million for Development and Responsibility Preventive Maintenance Contract Service Fire Alarm System yearly and certification all area factory PT. NS BlueScope Indonesia for NOHMI system, Independent System, NOTIFIER System and Troubleshooting for fit and healthy system to operated. - Achievement as Electrical SPV with team for Project BRI Office Renovation for supervision electrical Installation and Fire Alarm System at Cilandak Jakarta. - Achievement as Electrical SPV with team for project Robotic Installation with Engineering Team at CPL Line to reduce costumers complaint. - Achievement as Project Cordinator with team for Upgrading and improvement Branding System connecting with Level-3 system using TCP/IP protocol for Production Line MCL-1 (include commissioning until handover). - Achievement as Project Cordinator with team for cost saving electricity for replacement tube lamp using LED lamp around 58% saving with ROI /BEP 20 month. - Achievement as Project Cordinator with team for Installation Project Surface Inspection camera for reduce costumers complaint for MCL-2 and CPL-1 Line. - Feasibility Study for Energy Audit MCL-2 Line for effective cost and reduce energy consumption with PT. Schneider Electric Indonesia - Achievement as Project Cordinator with team for cost saving electricity Using EsaTech Current Torque Limit for reduce minimum 15% electricity consumption in CPL line with BEP 12 Month - Achievement as Project Cordinator with team for Installation Monitoring System Electricity Consumption with Engineering and maintenance Team for 3 Line (MCL-1,CPL-1 and MCl-2 Line) connected to Level-3 System - Achievement as Project Cordinator with team for Interconnection Genset 2MVA with 705KVA and 250KVA with manual change over switch if some of genset fail to backup when PLN blackout. - Achievement as SPV Electrical with team for electrical Design and Engineering Silicon Project installation new Plant for Shearing Line and Sliting for new capacity. - Responsibility in Maintenance Contract and certification MV, LV System for PT, NSBI. - Responsibility in for all Modification request by team and Project such as : a. Installation 1 unit CCTV Camera at Entry Passline MCL-2 for analyzing production Issue. b. Installation 1 unit CCTV Wireless Camera at Entry Section MCL-2 for analyzing production Issue. c. Installation 4 unit CCTV Camera at Exit Dispatch into site Office using join network Internal for analyzing production Issue..
  • 3. 3 d. Installation Restricted Safe Access at Exit Inspection MCL-1. e. Electrical Installation Exit Cabin CPL-1. f. Electrical Installation Entry Cabin MCL-1. g. Project Coordinator of Installation Motor Drive roll alkali total 6 unit for MCL-1 line. h. Installation 1 unit CCTV Wireless Camera at Entry Section MCL-1 for trace production Issue and Coil Input defect. i. Replace COS manual with automatic for CPL Line j. Installation Restricted Access Exit Horizontal CPL Line. k. Installation UV/IR 2 set for additional Protection Coater Room Fire Prevention System. l. Installation Acces Door Site Office for security acces and company asset. Mar 2013 – Mar 2014: PT. NS BlueScope Indonesia as Automation Engineer. Job Description : - Responsibility for Maintenance Supression system for fire alarm system Building and Electrical Room for NOHMI system and NOTIFIER System and Troubleshooting and reduce around 50% maintenance cost - Responsibility in for all Modification request by Operation Team and Related Person in Charge such as : a. Install AutoBlow ON-OFF Scrapper Exit Accummulator MCL-1 b. Install Alarm Brander fault Indication for Exit Pulpit MCL-2 c. Replace Control Roll Changer and Install Limit Switch Okemcoat MCL-1 d. Install and additional Retricted Safe Acces Welder and Pinch Roll No.3 MCL-1 e. Install 3 Acces Door for New Admin Building and 2 for Electrical Equipment Room f. Install PA Communication system for NIR segment 3,4 and IONA Room MCL-2. g. Install Level Glass For Fuel Genset to monitor fuel capacity with minimum range. h. Install Weighing Truck Scale Unit For Loading, and Dispatch for Entry receival. i. Replace Conductivity control cause obsolute with new system j. Upgrade Steering Unit system cause obsolute with new system with D- MAX. k. Install CCTV Camera on Cabin Crane#14 and Monitor connected to Internaly Network for easy Analyze and record trace back historical. l. Feasibility Study for Upgrading Automation system from PLC GEM80 Alstom with new system PLC S7-300 and S7-400 for upgrading productivity Line speed and Output. m. Install CCTV Camera at In Line Painting Area using High Resolution and rotated zoom connected to Internaly Network for easy Analyze and record productivity Issue cause defect. n. Install Access and indication lamp using rotating lamp for maintenance in hazard potential high risk at POT Area MCL-2. o. Install Tap In-Out recording and for absent employment record for Human Resource Department Team analysis. p. Install Air Blow syetem for table welder entry MCL-2 q. Install Linisher Scrapper Cleaning System for Hot turn Roll MCL-1 - Responsibility For Critically Procedure Audit for safe people, safe Equipment and Safe System - Responsibility For Housekeeping Program in Compound area for Effective
  • 4. 4 part still can used for automation Project using ex-part. - Development For certification and calibration pressure Transmitter In CPL Line especially in Exhaust fan Coater Room. Mar 2012 – Feb2013 : PT. BlueScope Steel Indonesia as Automation and Electrical Supervisor. Job Description : - Helping Maintenance Team to supervision include helping Corrective, Preventive and Predictive Maintenance system. - Responsibility in Automation Maintenance such as PLC Maintenance scheduling such as Panel cleaning & Fan Cooling for Remote IO, 5R activity and Housekeeping Program and Layout 5R for PLC Room. - Responsibility in Workshop Electrical Maintenance for 5R Activity and Audit. - Maintenance Discuss Toolbox and Safety Meeting every Day and weeks. - Together with Maintenance team repair and modification every equipment failure and need modification by Modification Approval system - Together with M3 team, Create M3 System Bill of material part for MCL2 Maintenance System. - Together with Maintenance Team Create Maintenance Planning, Preventive, Predictive and Corrective Maintenance. - Responsible implement of MCL-2 electrical and automation Sparepart and ensure that all have been insert to M3 system. - Update skill matriks for contractor and Electrican for Maintenance. Jan 2011 – Feb2012 : PT. Polychem Indonesia, Tbk as Senior Project Engineer Measurement Control Electrical Co-Generation Power Plant 2x15 MW. Job Description : - Helping Maintenance Project Team to supervision include helping Install, repair and modification instrument system for Co-Generation Project Power Plant 2x15 MW. - Responsibility in Demin and Utility water treatment Maintenance. - Responsibility in Ash Convey system such as Conveyor, Ash Silo Handling, Electrostatic Precipitator, Pneumatic Transfer Tank, Bulk Loader, Compressor and Crusher Control Unit. - Together with MCE maintenance team making and manage preventive, Predictive, Corrective, working instruction, and calibration sheet for Maintenance system. - Together with MCE maintenance team repair instrument and modification System CoGen Power Plant. - Buying Part for safety stock maintenance, include modification and new instalation, which is approved by management. - Together with MCE maintenance team repair and calibration all instrument and modification System CoGen Power Plant. - Together with MCE maintenance team prepare training instrument System CoGen Power Plant. 2007 – Dec 2010 : PT. Dian Swastatika Sentosa, Tbk (Serang Power Plant) / PT. Indah Kiat Pulp & Paper SINAR MAS GROUP, as a Junior Engineer Electrical and Instrument Co-Generation Power Plant 175 MW majoring instrument utility water treatment plant. Job Description : - Responsibility in Demin and Utility water treatment Maintenance - Responsibility in preventive, predictive and corrective include repair, new installation and modification system with EI Team - Together with EI team calibration instrument at Overhaul schedule - Together with EI Team to make sure that preventive already taken
  • 5. 5 and check for an Audit. - Together with EI Team as a planner maintenance and responsibility report a technician for working order in SAP system. - Revision for working instruction, calibration sheet, and prepare report for Small Group Activity, and Small Development Activity project. - Together with EI Team to make sure that spare part is safety stock for maintenance include buying which is best part for system and include in budget which approved by management. 2006 – 2007 : Fixed Assistant and Coordinated of Assistant Electro Laboratory, Gunadarma University 2005 – 2007 : Assistant Advances Electronical Laboratory, Gunadarma University Assistant Intermediate Electronical Laboratory, Gunadarma University Assistant Basic Electronical Laboratory, Gunadarma University Attended Training 2015 : PT. NS BlueScope Indonesia, : “Safety Supervisor Mindset “ 2014 : PT. NS BlueScope Indonesia, : “Line Of Fire “ 2014 : PT. NS BlueScope Indonesia, : “Safety Project Management “ 2014 : PT. NS BlueScope Indonesia, : “Safety Leadership “ 2013 : PT. NS BlueScope Indonesia, : “Safety Electrical System“ 2012 : PT. BlueScope Steel Indonesia, : “HOT Work PT. BlueScope Steel Indonesia “ 2012 : PT. BlueScope Steel Indonesia, : “Working at Height PT. BlueScope Steel Indonesia “ 2012 : PT. BlueScope Steel Indonesia, : “Safe Access System PT. BlueScope Steel Indonesia “ 2012 : PT. BlueScope Steel Indonesia, : “Gas Safety Induction PT. BlueScope Steel Indonesia “ 2012 : PT. BlueScope Steel Indonesia, : “Isolation Locking System and Hierarchy Control System PT. BlueScope Steel Indonesia “ 2012 : PT. BlueScope Steel Indonesia, : “HOT Metal Safety Induction PT. BlueScope Steel Indonesia “ 2012 : PT. BlueScope Steel Indonesia, : “Job Safety Analysis and Take 2 PT. BlueScope Steel Indonesia “ 2012 : PT. BlueScope Steel Indonesia, : “ General Safety Induction and HSE Regulation PT. BlueScope Steel Indonesia “ 2011 : PT. Polychemical Indonesia Tbk, : “ Demineralization 2x60 M3/H Co Generation Power Plant “ 2011 : PT. Polychemical Indonesia Tbk, : “ Operational Boiler CFB 3x60 T/H Co Generation Power Plant “ 2011 : PT. Polychemical Indonesia Tbk, : “ K3 For Worker “ 2010 : PT. Dian Swastatika Sentosa,Tbk : “ SAP PM For Maintenance “ 2009 : PT. Dian Swastatika Sentosa,Tbk: “Fundamental Of Electrical Engineering “
  • 6. 6 2009 : PT. Dian Swastatika Sentosa,Tbk: “Material Management System “ 2008 : PT. Dian Swastatika Sentosa,Tbk: “ Steam & Power Generation “ 2008 : PT. Dian Swastatika Sentosa,Tbk : “ Occupational Safety and Health 1“ 2008 : PT. Dian Swastatika Sentosa,Tbk : “ Interlock and Control System for Boiler “ 2008 : PT. Dian Swastatika Sentosa,Tbk : “ Interlock and control system for Turbine “ 2008 : PT. Dian Swastatika Sentosa,Tbk : “ Learning to use IR Thermography (Fluke Ti20) “ 2008 : PT. Dian Swastatika Sentosa,Tbk : “SF6 Gases Filling Procedure for GCB “ 2008 : PT. Dian Swastatika Sentosa,Tbk : “ISO Standarization “ 2008 : PT. Dian Swastatika Sentosa,Tbk : “Purchase Part and Inventory Control System “ 2007 : PT. Dian Swastatika Sentosa,Tbk : “ Function and Configuration of Card DCS Yokogawa “ Certificate 2011 : LIA TOEFL Test: “ English Proficiency Test (EPT) “ 2008 : PT. Dian Swastatika Sentosa,Tbk : “ Power and Steam Generation “ 2008 : PT. Dian Swastatika Sentosa,Tbk : “ Occupational Safety and Health “ 2007 : Bachelor Thesis: “ Pencacah Barang Otomatis Berbasis PLC CPM2A 20CDR-A “ 2006 : Seminar “ Seminar Nasional Teknologi Telekomunikasi Masa Depan “ 2006 : Diploma Thesis “ Rangkaian IR Receiver Pengontrol Aplikasi Windows “ 2006 : Aptitude Test at Gunadarma University 2006 : Public College “ Automation Industries and Building Network “ 2005 : Public College “ Renewable Energy “ 2003 : Seminar “Prospek Pengembangan Teknologi VOIP Sebagai Alternatif Teknologi Fixed Telepon di Indonesia “ Project Experiences - Silicon Project PT. NS BlueScope Indonesia. - Co-Generation Power Plant Project 2x15 MW PT. Polychemical Indonesia, Tbk - Modification PLC and Instrument Control Demin Water System (utility for water treatment) PT. Polychemical Indonesia, Tbk include Install and helping with MCE Team, all Instrument and electrical equipment for Co-Generation Power Plant Project 2x15 MW PT. Polychemical Indonesia, Tbk - Upgrade PLC omron C200H with CS1G-CPU42 with communication link with RS 232 at PT. Dian Swastatika Sentosa,Tbk. - Instalation Dry Coal Sheed lighting and lightning electrical system at PT.Dian Swastatika Sentosa, Tbk.
  • 7. 7 - Dearator Feed Water Pump Motor new Instalation 3300V 125KW with control and protection at PT.Dian Swastatika Sentosa, Tbk. - New Instalation Chiller 90KW for Replacing Air Conditioner in 20KV, 3300V Panel at PT.Dian Swastatika Sentosa, Tbk. Organizations has been followed 2005-2007 : KPLI (Kumpulan Pengguna Linux Indonesia) 2004-2005 : HME (Himpunan Mahasiswa Elektro) 1999-2001 : ROHIS HIGH SCHOOL 1 CIPUTAT Performance Achievement Oct 2008 : 2’nd Winner Maintenance Update Presentation Competition at PT.DSS,Tbk (for all DSS Plant) Dec 2007 : 1’st Winner Employee Competition By Disnaker Serang Language English : Active (Certificated)