Victor Oyarce has 19 years of experience in engineering and construction projects for the mining industry in Chile. He has worked on over 25 projects worth over $30 billion total as a mechanical discipline leader, deputy engineering manager, and senior consultant. His experience includes all phases of engineering for large projects in Chile and other countries in South America. He is proficient in Spanish and English.
Sommaire
Ingénieur civil bilingue possédant plusieurs années d'expérience dans la direction et la gestion de projets majeurs ainsi qu’une expérience diversifiée dans les domaines suivants :
• Réalisation et exécution de projets
• Ordonnancement et planification
• Gestion d’équipe de projets
• Gestion des clients
• Contrôle des coûts
• Construction de bâtiments industriels
• Gestion de fabrication manufacturière
• Contrôle de la qualité
• Amélioration de la productivité et la qualité
• Contrôle d'approvisionnement des équipements
• Gestion des réclamations
• Santé et Sécurité
Capacité à diriger et à motiver diverses équipes de professionnels dans la réalisation des objectifs. Maitrise la coordination entres les disciplines suivantes :
• Civil – Structure - Architecture
• Mécanique et électrique
• Contrôle et automatisation
• Télécommunication
• Ferroviaire
• Aéronautique
• Métallurgie
• Minier
• Pétrochimie
• Biotechnologie
Sommaire
Ingénieur civil bilingue possédant plusieurs années d'expérience dans la direction et la gestion de projets majeurs ainsi qu’une expérience diversifiée dans les domaines suivants :
• Réalisation et exécution de projets
• Ordonnancement et planification
• Gestion d’équipe de projets
• Gestion des clients
• Contrôle des coûts
• Construction de bâtiments industriels
• Gestion de fabrication manufacturière
• Contrôle de la qualité
• Amélioration de la productivité et la qualité
• Contrôle d'approvisionnement des équipements
• Gestion des réclamations
• Santé et Sécurité
Capacité à diriger et à motiver diverses équipes de professionnels dans la réalisation des objectifs. Maitrise la coordination entres les disciplines suivantes :
• Civil – Structure - Architecture
• Mécanique et électrique
• Contrôle et automatisation
• Télécommunication
• Ferroviaire
• Aéronautique
• Métallurgie
• Minier
• Pétrochimie
• Biotechnologie
Microfiber Cleaner, Microfiber Antibacterial Towels, MIcrofiber Cloth, Microfiber Mop, Microfiber Fabric, Microfiber Cleaning Cloth, Microfiber Cloth Diaper, Microfiber Bath Towel, Microfiber Robe Womens, Microfiber Bathrobe, PT MIPACKO FARRELA specialize in microfiber products since established, we have been exporting to many countries for more than 10 years ago. Providing various Eco-Towel Models, Designs, Sizes, Colors for any purposes. Providing various Eco-Cleaning cloths for cleaning any surfaces and purposes. Here are some of the product list, but not limited to; Microfiber Cleaner, Microfiber Towels, Microfiber Cloth, Microfiber Mop, Microfiber Fabric, Microfiber Cleaning Cloth, Microfiber Cloth Diaper, Microfiber Bath Towels, Microfiber Robe Women, Microfiber Bathrobe PT MIPACKO FARRELA Jl. Terusan Panyileukan No. 8 Bandung 40614, Jawa Barat, Indonesia. Phone / Fax : +62-22-8782 0422 / 8782 0423 WA / Line : 0822 1768 0990 / 0878 2287 6296 ( XL ) PIN BB = 595B
1. VICTOR OYARCE
Address Alonso de Ercilla 3055, Depto 1406, Ñuñoa, Santiago de
Chile
Zip code 7790935
Phone 56 9 8899 3802
e-mail vdoyarce@gmail.com
RESUME
19 years of professional experience, developed in Engineering and Construction projects for the
mining industry. He has worked as Deputy Manager of Engineering, Mechanical Discipline Leader
and Materials Management, Senior Consultant in Materials Management and Mechanical
Engineering and design studies. His project experience includes all phases of engineering for the
development of proposals, conceptual and basic engineering, detailed engineering and
engineering field. His experience as Assistant Manager of Engineering includes detailed
engineering and engineering of land in an EPC & CM TIC project with a 10,000 million, leading
multidisciplinary groups over 60 engineers and designers. Among its strengths is the ability to
manage and control equipment working under pressure.
WORK EXPERIENCE:
Career Total Number of Projects: 25 projects worth US$ 30+ billion in total installed cost
Relevant Project Experience
GUIÑEZ INGENIERÌA LTDA (March 2016 to date)
• Minera Escondida, Chile, Field Engineer for projects developed for HEAD of Project (HoP).
Responsible for linking between companies Engineering and Build Contractors for Engineering
Management (HoP).
FLUOR (2005 to 2009 / 2010 to 2015)
• Barrick, Pascua-Lama Project, Chile-Argentina (US$ 8.5+ billion). Lead Mechanical Discipline
and Deputy Engineering Manager. Approved technical specification, equipment list management,
technical evaluations and general supervision of engineering team work on site. October 2011 to
December 2013.
• Minera Lumina, Caserones Project, Chile (US$ 2.5+ billion). Mechanical Engineer and Second
Mechanical Discipline Lead for the Infrastructure Area. Prepared, reviewed and approved technical
specification, equipment list management, technical evaluations, coordination with other disciplines
and personnel administration. June 2010 to October 2011.
• Rio Tinto Minera Perú, Test Heap la Granja Project, Perú (US$ 0.4+ billion). Mechanical / Piping
Discipline Lead. September 2008 to January 2009.
• CMDIC, Ampliación Capacidad Planta de Óxidos a 30 ktpd, Chile (US$ 0.4+ billion) Mechanical
Engineer. Prepared, reviewed, and approved technical specification, technical evaluations and
calculation sheet of in plant conveyors and overland conveyors. July 2008 to August 2008.
• Anglo America, Quellaveco Project, Perú (US$ 3.8+ billion). Mechanical Engineer. Prepared,
reviewed, and approved technical specification, equipment list management and technical
evaluations. January 2008 to July 2008.
2. • Xstrata Copper, El Morro Project, Chile (US$ 4.0+ billion). Mechanical Engineer. Prepared,
reviewed, and approved technical specification, equipment list management and technical
evaluations. April 2007 to January 2008.
• CSS (Client Support Service) Project, Chile. Lead Mechanical Discipline. Prepared, reviewed, and
approved technical specification, equipment list management, technical evaluations and lead layout
design. February 2007 to April 2007.
• Manquiri S.A., San Bartolomé Project (US$ 0.8+ billion). Mechanical Engineer. Prepared,
reviewed, and approved technical specification, technical evaluations. December 2006 to February
2007
• Falconbridge, SX/EW Plant, Lomas Bayas, Chile (US$ 0.5+ billion). Mechanical discipline lead.
Supervised the mechanical discipline teams, and prepared, reviewed, and approved technical
specifications, technical evaluations, and others. April 2006 to December 2006
ARA-WORLEYPARSONS (February 2009 Jun 2010)
• Proyectos Ampliación Plantas MOP-H y SOP-H, for SQM (US$ 0.8+ billion), Material Handling
Expert, Reviewed calculation sheet of suppliers, overseeing of the manufacture and assembly of the
in plant conveyor.
AKER KVAERNER (March 2003 to June 2005)
• Boddington Gold Mine (BGM), BGM Expansion Project (US$ 3.5+ billion). Mechanical
Engineering, main responsibilities included administrating engineering works, preparing calculation
sheets, design of in-plant conveyors, and managing equipment lists. charles
• Cerro Matoso, PFS CMSA Lixiviation Pile Project (US$ 0.2+ billion). Mechanical Discipline Lead.
Prepared, reviewed, and approved technical specification, equipment list management, technical
evaluation, and lead design of layout efforts.
• San Cristóbal Mine, San Cristóbal Project (US$ 1.2+ billion). Mechanical Engineering. Prepared
calculation sheets, technical specifications of in-plant overland conveyors and the technical
specification for the dry area equipment.
• Cía. Minera Río Chilex S.A., Spence Project (US$ 2.5+ billion). Mechanical Engineer. Prepared
design layout, technical specification for the dry and wet area equipment, and the sulphuric acid
transfer traversing from railroad cars to the sulphuric acid storage tanks. July 2003 to May 2005
• Codelco Chile Codelco Norte Division, SBL Capacity Increase Project to 22.526 t/a Cuf (US$
1.2+ billion). Mechanical Engineering. Prepared technical specification, equipment list management,
and technical evaluation
OUTOKUMPU (November 2001 to March 2003)
• Codelco Chile Codelco Norte Division, Grinding Mine from Bank E-4 to Bank 2445 Project (US$
0.8+ billion). Mechanical Engineering. As the lead engineer, prepared design layouts. December
2001 to March 2002.
• ENDESA, Ralco Project. Detailed Engineer of the ventilation system of Machine Cavern and
transformers. Mechanical Engineer. Prepared technical specification, equipment list management,
technical evaluation and lead design layoutefforts.
RUBÉN RODRÍGUEZ (February to November 2001)
• Refinería de Petróleo Con-Con S.A. Field Engineer and Quality Control Chief of Con-Con Oil
Refinery at Quintero’s maritime and land terminal. Main responsibility was to lead the floating lines
3. reparation for buoy change, developing procedures for the reparation, reparation and sea launch
supervision.
4. INCONSULT (January to December 2000)
• Codelco Chile Chuquicamata Division, Refining and Casting Modernization Project. Mechanical
Engineering. Prepared technical specifications, equipment list management, technical evaluation, and
lead design layout efforts. September 2000 to December 2000.
• Refinería de Zinc Tres Marías, Brasil, Basic Engineering Water Atomization Project. Lead
Mechanical Discipline. Prepared technical specification, equipment list management, technical
evaluation and lead design layoutefforts. June 2000 to September 2000.
• Los Pelambres Mine, Open Contract Site Engineering Service. Lead Mechanical Discipline.
Prepared technical specification, equipment list management, technical evaluation and lead design
layout efforts. April 2000 to June 2000.
• Laja Mine, San Juan Project, Argentina. Project Engineer. Performed survey of existing equipment
transported from San Luis Mine to San Juan Project. January 2000 to April 2000
SERVIMPORT
• Study Department Chief. Prepared the study proposal and followed through to award of the
contracts. Scope of work included: Mounting of third glasses transportation and concentrated
traversing for smelting and Ventanas Smelting (ENAMI), Drill plug mounting for Electric Furnace for
Fundicion y Refineria Ventanas (ENAMI). March 1998 to May 1999
• North Area Manager (Copiapo Ofice). Managed the Copiapo office, Prepared the study
proposaland followed it through the award of contracts. General supervision of personnel at site at
Paipote Smelting (ENAMI). May 1999 to November 1999.
EDUCATION
Mechanical Engineering, Universidad Católica de Valparaíso. 1987 – 1991
Mechanic Civil Engineering, Universidad Católica de Valparaíso. 1993 – 1997
TRAINING
“Foundations for the design of conveyors”, conducted by David Beckley (Australian expert) at Santiago for
Fluor Chile, 2006
“Contemporary Economic Systems”, conducted by Reinhard Zorn at Universidad Católica de Valparaíso.
1990
“Industrial Furnaces”, conducted by Julio Muñoz A. at Universidad Católica de Valparaíso. 1997
“Technological Process Management”, conducted by Sergio Alvarez S., Universidad Católica de
Valparaíso. 1997
“Internal-combustion Engines Testing ”, conducted by Mr. Juan Rene Roncagliolo.
Universidad Católica de Valparaíso. 1997
“Oleo pneumatic Systems”, conducted by Germán Hoernig A, Universidad Católica de Valparaíso, 1997.
“Terology and welding”, conducted by Mr. Claudio López., Universidad Católica de Valparaíso, 1997.
LANGUAGE
Spanish, Native
English, written and spoken.