Conf idential document. KLB Group (Barcelona) KLB Group (Madrid) Page 1/5
Reproduction or communication, Av da. Can Fatjó dels Aurons, 9 - 4ª planta Alberto Alcocer 46B,3ª planta 11/03/2015
ev en partial, is f orbidden without 08174 Sant Cugat del Vallès – Barcelona 28016 Madrid Tel: (+34) 902 027 928
prior written approv al of KLB Group www.klbgroup.com www.klbgroup.com Fax: (+34) 902 027 938
Mechanical / Proposal
Senior Engineer
PROFILE
_ _________________________________________________________________________________
Mechanical engineerwithmore than29 yearsof experienceasMechanical Leader,proposal engineer
and application Engineer in Pipe System (Piping), Static Equipment and Rotating Equipment.
Professional experience in the development and coordination of projects for the oil industry,
petrochemical refining,energyandchemistry package and static equipment required in projects for
the Oil&Gas and Power Generation plants.
Overall experience as Mechanical leader and Application engineer, review of P&ID's, elaborating
technical specification,,datasheets,purchase order,bidtechnical tabulation,engineering following
and reviewof the manufacturer'sdocuments issued during detail engineering, technical support to
management,customerTechnicalanalysisoffers.Documentreview of manufacturers. Coordination
and developmentof requirementsanddevelopmentactivities Constructability studies, HAZOP, Risk
AnalysisandCostEstimate Responsible for ensuring compliance with quality processes in line with
the guidelines of the quality policy of the company, Management of Technical Office to work.
Management of multidisciplinary teams of engineering design and technical supervision of
construction contractors. Experience in personnel management, planning and resource allocation,
monitoring,technical reviews,preparationof technical offers,recruitmentandpersonnelevaluation.
Management Standards and standards.
Involvedequipment:API610multistage,vertical high-speed, extended shaft centrifugal pumps, API
674 Positive Displacement Pumps – Reciprocating, API 617 centrifugal Gas Compressor, TEMA heat
exchanger, multitubularsteamcondenser,API650 fixedandfloatingroof steeltanks,ASMEsect.VIII,
div 1 pressure vessels, HVAC systems, NFPA stationary fire pumps, Liquid ring vacuum pumps, ,
Instrument and service Air compressor packages, Chemical dosing packages, screw pumps, among
others.
Writing and read English, Spanish spoken and written.
STRENGHTS
_________________________________________________________________________________
 OverTwenty nine yearsof experience inEngineerProjectforthe Oil,Gas, Chemical industry
and AirConditioningContractor.
REF: 151293
Conf idential document. KLB Group (Barcelona) KLB Group (Madrid) Page 2/5
Reproduction or communication, Av da. Can Fatjó dels Aurons, 9 - 4ª planta Alberto Alcocer 46B,3ª planta 11/03/2015
ev en partial, is f orbidden without 08174 Sant Cugat del Vallès – Barcelona 28016 Madrid Tel: (+34) 902 027 928
prior written approv al of KLB Group www.klbgroup.com www.klbgroup.com Fax: (+34) 902 027 938
 Experience in Detail andBasicEngineerProjects, proposals, purchasing,specifyingand
reviewingvendorDocumentsof Mechanical Equipment’sandSystemsforRefineryand
Industrial Facilities.
 Experience inBasicandDetail engineerProjects forRefinery andpetrochemical.FlowStation,
pumpingstations,compressorplants,Oil andgaspipelines.
 Highknowledge of Oil &Gas Market and suppliers
EXPERIENCE
_________________________________________________________________________________
Project Engineer
SENER , 1 years
Main Activities:
 ProjectandPipe SupportEngineer assignedwithSENER,"New Unitsforthe reductionof Fuel Oil
PETRONOR"pipingflexibilityanalysis(Stress)Selectionof bidders
 Designof supports.
 Interconnectionsresponsible forthe areaof the U3, NF3,AK3, P / N,G4, F3.VB3 plants Suppliers
Development
 Preparationof technical proposals
 Interface Supplier-ProcessEngineeringDepartament
Projects:
 New Units for the reduction of Fuel Oil PETRONOR
Equipment:
Piping
Head of technical department - INTECSA.
OFFHORE RECRUITMENT, S.L INTECSA , 1 year
Main Activities:
 Headof technical department - INTECSA.
 Hydraulictestcircuits,isometric
 Supportof piping,modificationof plansforconstructionanddevelopmentof the revisions"AsBuilt.
 Modificationof plansforconstructionanddevelopmentof the revisions "As Built." BOMchanges in
place.
Projects:
 Proyecto Coquización Retardada Refinería de Castellón (BP OIL).
Equipments:
Hydraulictestcircuits,isometric,Supportof piping
Conf idential document. KLB Group (Barcelona) KLB Group (Madrid) Page 3/5
Reproduction or communication, Av da. Can Fatjó dels Aurons, 9 - 4ª planta Alberto Alcocer 46B,3ª planta 11/03/2015
ev en partial, is f orbidden without 08174 Sant Cugat del Vallès – Barcelona 28016 Madrid Tel: (+34) 902 027 928
prior written approv al of KLB Group www.klbgroup.com www.klbgroup.com Fax: (+34) 902 027 938
Project Coordinator
IDS Consultores , 2 years
Main Activities:
 Mechanical leader,supportingthe CommercialTeamtoprepare,Offertechnical mechanicsand
pipes
 Mechanical ApplicationEngineer forseveral equipmentof the SINCOR,
 Selectionof bidders
 Estimatingprojectmanhoursinthe offerphase,multidisciplinarycoordination,managementof
projectresources,technical meetingswiththe client.
 Seekingnewpotentialssuppliers.
 Preparationof requisitionandpurchasingorders.
 Evaluationof technical and economicproposalsincollaborationwithProcessEngineering
Department.
 SuppliersDevelopment
 Preparationof technical proposals
 Interface Supplier-ProcessEngineeringDepartament
 Estimateddevelopmentcostsof the basicanddetail engineering
 Projects:
 HDT-2 Debottlenecking Project Extended Process design Package-Refinería Cardon CRP-PDVSA.
 Modification System Recirculation Pumps 04-P-10-32 A / S and 04-P-10-31 A / S.- SINCOR,PDVSA.
 Installing a Condensing Unit Cooling Water Condensation. SINCOR,PDVSA.
 Installing A/A Redundant in Buildings: Clinic, Cafeteria, Laboratory, Control of access to the best"
Customer SINCOR,PDVSA.
 UD-627 (CN-08) Fluid Power Line,
 Expansion of ICA and ICD platforms. Client SHELL
 Revival FieldManresa:AdaptationFlow Station Manresa. Customer: PDVSA Gas Station Relocation
Caripito
Equipment:
centrifugal pumps, reciprocatingpumps,calculationandselectionof compressors, Pressure vessels,
Calculationof APItank,Chemical DosingPackages.
Mechanical Engineer for Rotating and Packaged Equipment
INELECTRA – TECNOCONSULT – PCI Ingenieros
Main Activities:
 Mechanical DisciplineLeaderand ApplicationEngineer formany equipmentof Oil&Gas andPower
Generation plants.
 CoordinationwithConstructiondepartment,Inspection,customersupport.
 Selectionof bidders
 Negotiationwithinternational suppliers.
 Seekingnewpotentialssuppliers.
 Preparationof requisitionandpurchasingorders.
Conf idential document. KLB Group (Barcelona) KLB Group (Madrid) Page 4/5
Reproduction or communication, Av da. Can Fatjó dels Aurons, 9 - 4ª planta Alberto Alcocer 46B,3ª planta 11/03/2015
ev en partial, is f orbidden without 08174 Sant Cugat del Vallès – Barcelona 28016 Madrid Tel: (+34) 902 027 928
prior written approv al of KLB Group www.klbgroup.com www.klbgroup.com Fax: (+34) 902 027 938
 Evaluationof technical andeconomicproposalsincollaborationwithProcessEngineering
Department.
 SuppliersDevelopment
 Preparationof technical proposals
 Interface Supplier-ProcessEngineeringDepartament
Projects:
 Gas fired Power Plants: Termobarrancas 150 MW, La Raisa 100 MW, Ezequiel Zamora 150 MW,
Pedro Camejo 150 MW, San Diego de Cabrutica.
 SINCOR Debottlenecking and Main Shutdown.
 PTO ( Patio Tanque Oficinas ) for PDVSA.
 ACEMA – MATA for Perez Compnac.
 SENECA 80 MW Power Plant expansion.
 Oscar Augusto Machado ( O.A.M. ) 100 MW, unit 13 power plant expansion.
 New Muelle de Jose, Ship Unload facilities.
 HAMACA Oil Crude Upgrader, AMERIVEN.
 CERRO NEGRO, MOBIL, technical support.
 YAGUA’s PROPANODUCTO, LPG plant reception facilities and LPG truck loading.
 LAMA plant, MARAVEN , offshore gas compression plant.
 COMSIGUA, Iron briquettes manufacturing plant.
 EL FURRIAL, LAGOVEN-WILLIAMSERVICES, high pressure gas injection for oil wells stimulation.
 SUAY III, LAGOVEN, exit stream gas desulphurization plant.
 METANOL 2000, SNAMPROGETTI, methanol refinery plant.
 PROPANODUCTO, CORPOVEN, 200 Km buried liquid propane pipeline.
 HVAC contractor on several projects.
Equipments:
150 MW SiemensDual fuel poweredTurbogenerators( 12 unitsintotal ).
100 MW General ElectricDual fuel poweredTurbogenerators( 1 unitsintotal ).
2500 HP ARIEL Reciprocating GasCompressor. ( 12 unitsintotal ).
API610, extendedshaft,betweenbeari ngs,OH2 centrifugal pumps.
InstrumentationandService Air compressorstations.
Fuel Oil Trucksunloadingfacilities.
Fuel Oil scrubbing,filteringandtankstorage facilities.
50 Tons top overrunningbridge cranes.
Chemical DosingPackages.
API650 steel tanks,cone andfloatingroof.
Thermal OxidizerFurnaces
ReactionCoolerFurnaces.
SaltBath indirectfiredHeaters.
HVACsystems.
Buriedliquidpropanepipelines,valve shut-downandreserve flow preventionstations.
InspectionandCleaningPiglaunchingandreceivingstations.
EDUCATION
___________________________________________________________________________________
1980- 1988. Mechanical Engineer. U.C.V. ( Universidad Central de Venezuela ), Caracas
Conf idential document. KLB Group (Barcelona) KLB Group (Madrid) Page 5/5
Reproduction or communication, Av da. Can Fatjó dels Aurons, 9 - 4ª planta Alberto Alcocer 46B,3ª planta 11/03/2015
ev en partial, is f orbidden without 08174 Sant Cugat del Vallès – Barcelona 28016 Madrid Tel: (+34) 902 027 928
prior written approv al of KLB Group www.klbgroup.com www.klbgroup.com Fax: (+34) 902 027 938
- Venezuela.
TECHNICAL SKILLS
___________________________________________________________________________________
Systems : WINDOWS
Tools: Office, MS project, Photoshop 6.
Languages: English (Upper Intermediate C1)
Spanish (mother tongue)
Italian (mother tongue)

Cr klb oil&gas proposal engineer

  • 1.
    Conf idential document.KLB Group (Barcelona) KLB Group (Madrid) Page 1/5 Reproduction or communication, Av da. Can Fatjó dels Aurons, 9 - 4ª planta Alberto Alcocer 46B,3ª planta 11/03/2015 ev en partial, is f orbidden without 08174 Sant Cugat del Vallès – Barcelona 28016 Madrid Tel: (+34) 902 027 928 prior written approv al of KLB Group www.klbgroup.com www.klbgroup.com Fax: (+34) 902 027 938 Mechanical / Proposal Senior Engineer PROFILE _ _________________________________________________________________________________ Mechanical engineerwithmore than29 yearsof experienceasMechanical Leader,proposal engineer and application Engineer in Pipe System (Piping), Static Equipment and Rotating Equipment. Professional experience in the development and coordination of projects for the oil industry, petrochemical refining,energyandchemistry package and static equipment required in projects for the Oil&Gas and Power Generation plants. Overall experience as Mechanical leader and Application engineer, review of P&ID's, elaborating technical specification,,datasheets,purchase order,bidtechnical tabulation,engineering following and reviewof the manufacturer'sdocuments issued during detail engineering, technical support to management,customerTechnicalanalysisoffers.Documentreview of manufacturers. Coordination and developmentof requirementsanddevelopmentactivities Constructability studies, HAZOP, Risk AnalysisandCostEstimate Responsible for ensuring compliance with quality processes in line with the guidelines of the quality policy of the company, Management of Technical Office to work. Management of multidisciplinary teams of engineering design and technical supervision of construction contractors. Experience in personnel management, planning and resource allocation, monitoring,technical reviews,preparationof technical offers,recruitmentandpersonnelevaluation. Management Standards and standards. Involvedequipment:API610multistage,vertical high-speed, extended shaft centrifugal pumps, API 674 Positive Displacement Pumps – Reciprocating, API 617 centrifugal Gas Compressor, TEMA heat exchanger, multitubularsteamcondenser,API650 fixedandfloatingroof steeltanks,ASMEsect.VIII, div 1 pressure vessels, HVAC systems, NFPA stationary fire pumps, Liquid ring vacuum pumps, , Instrument and service Air compressor packages, Chemical dosing packages, screw pumps, among others. Writing and read English, Spanish spoken and written. STRENGHTS _________________________________________________________________________________  OverTwenty nine yearsof experience inEngineerProjectforthe Oil,Gas, Chemical industry and AirConditioningContractor. REF: 151293
  • 2.
    Conf idential document.KLB Group (Barcelona) KLB Group (Madrid) Page 2/5 Reproduction or communication, Av da. Can Fatjó dels Aurons, 9 - 4ª planta Alberto Alcocer 46B,3ª planta 11/03/2015 ev en partial, is f orbidden without 08174 Sant Cugat del Vallès – Barcelona 28016 Madrid Tel: (+34) 902 027 928 prior written approv al of KLB Group www.klbgroup.com www.klbgroup.com Fax: (+34) 902 027 938  Experience in Detail andBasicEngineerProjects, proposals, purchasing,specifyingand reviewingvendorDocumentsof Mechanical Equipment’sandSystemsforRefineryand Industrial Facilities.  Experience inBasicandDetail engineerProjects forRefinery andpetrochemical.FlowStation, pumpingstations,compressorplants,Oil andgaspipelines.  Highknowledge of Oil &Gas Market and suppliers EXPERIENCE _________________________________________________________________________________ Project Engineer SENER , 1 years Main Activities:  ProjectandPipe SupportEngineer assignedwithSENER,"New Unitsforthe reductionof Fuel Oil PETRONOR"pipingflexibilityanalysis(Stress)Selectionof bidders  Designof supports.  Interconnectionsresponsible forthe areaof the U3, NF3,AK3, P / N,G4, F3.VB3 plants Suppliers Development  Preparationof technical proposals  Interface Supplier-ProcessEngineeringDepartament Projects:  New Units for the reduction of Fuel Oil PETRONOR Equipment: Piping Head of technical department - INTECSA. OFFHORE RECRUITMENT, S.L INTECSA , 1 year Main Activities:  Headof technical department - INTECSA.  Hydraulictestcircuits,isometric  Supportof piping,modificationof plansforconstructionanddevelopmentof the revisions"AsBuilt.  Modificationof plansforconstructionanddevelopmentof the revisions "As Built." BOMchanges in place. Projects:  Proyecto Coquización Retardada Refinería de Castellón (BP OIL). Equipments: Hydraulictestcircuits,isometric,Supportof piping
  • 3.
    Conf idential document.KLB Group (Barcelona) KLB Group (Madrid) Page 3/5 Reproduction or communication, Av da. Can Fatjó dels Aurons, 9 - 4ª planta Alberto Alcocer 46B,3ª planta 11/03/2015 ev en partial, is f orbidden without 08174 Sant Cugat del Vallès – Barcelona 28016 Madrid Tel: (+34) 902 027 928 prior written approv al of KLB Group www.klbgroup.com www.klbgroup.com Fax: (+34) 902 027 938 Project Coordinator IDS Consultores , 2 years Main Activities:  Mechanical leader,supportingthe CommercialTeamtoprepare,Offertechnical mechanicsand pipes  Mechanical ApplicationEngineer forseveral equipmentof the SINCOR,  Selectionof bidders  Estimatingprojectmanhoursinthe offerphase,multidisciplinarycoordination,managementof projectresources,technical meetingswiththe client.  Seekingnewpotentialssuppliers.  Preparationof requisitionandpurchasingorders.  Evaluationof technical and economicproposalsincollaborationwithProcessEngineering Department.  SuppliersDevelopment  Preparationof technical proposals  Interface Supplier-ProcessEngineeringDepartament  Estimateddevelopmentcostsof the basicanddetail engineering  Projects:  HDT-2 Debottlenecking Project Extended Process design Package-Refinería Cardon CRP-PDVSA.  Modification System Recirculation Pumps 04-P-10-32 A / S and 04-P-10-31 A / S.- SINCOR,PDVSA.  Installing a Condensing Unit Cooling Water Condensation. SINCOR,PDVSA.  Installing A/A Redundant in Buildings: Clinic, Cafeteria, Laboratory, Control of access to the best" Customer SINCOR,PDVSA.  UD-627 (CN-08) Fluid Power Line,  Expansion of ICA and ICD platforms. Client SHELL  Revival FieldManresa:AdaptationFlow Station Manresa. Customer: PDVSA Gas Station Relocation Caripito Equipment: centrifugal pumps, reciprocatingpumps,calculationandselectionof compressors, Pressure vessels, Calculationof APItank,Chemical DosingPackages. Mechanical Engineer for Rotating and Packaged Equipment INELECTRA – TECNOCONSULT – PCI Ingenieros Main Activities:  Mechanical DisciplineLeaderand ApplicationEngineer formany equipmentof Oil&Gas andPower Generation plants.  CoordinationwithConstructiondepartment,Inspection,customersupport.  Selectionof bidders  Negotiationwithinternational suppliers.  Seekingnewpotentialssuppliers.  Preparationof requisitionandpurchasingorders.
  • 4.
    Conf idential document.KLB Group (Barcelona) KLB Group (Madrid) Page 4/5 Reproduction or communication, Av da. Can Fatjó dels Aurons, 9 - 4ª planta Alberto Alcocer 46B,3ª planta 11/03/2015 ev en partial, is f orbidden without 08174 Sant Cugat del Vallès – Barcelona 28016 Madrid Tel: (+34) 902 027 928 prior written approv al of KLB Group www.klbgroup.com www.klbgroup.com Fax: (+34) 902 027 938  Evaluationof technical andeconomicproposalsincollaborationwithProcessEngineering Department.  SuppliersDevelopment  Preparationof technical proposals  Interface Supplier-ProcessEngineeringDepartament Projects:  Gas fired Power Plants: Termobarrancas 150 MW, La Raisa 100 MW, Ezequiel Zamora 150 MW, Pedro Camejo 150 MW, San Diego de Cabrutica.  SINCOR Debottlenecking and Main Shutdown.  PTO ( Patio Tanque Oficinas ) for PDVSA.  ACEMA – MATA for Perez Compnac.  SENECA 80 MW Power Plant expansion.  Oscar Augusto Machado ( O.A.M. ) 100 MW, unit 13 power plant expansion.  New Muelle de Jose, Ship Unload facilities.  HAMACA Oil Crude Upgrader, AMERIVEN.  CERRO NEGRO, MOBIL, technical support.  YAGUA’s PROPANODUCTO, LPG plant reception facilities and LPG truck loading.  LAMA plant, MARAVEN , offshore gas compression plant.  COMSIGUA, Iron briquettes manufacturing plant.  EL FURRIAL, LAGOVEN-WILLIAMSERVICES, high pressure gas injection for oil wells stimulation.  SUAY III, LAGOVEN, exit stream gas desulphurization plant.  METANOL 2000, SNAMPROGETTI, methanol refinery plant.  PROPANODUCTO, CORPOVEN, 200 Km buried liquid propane pipeline.  HVAC contractor on several projects. Equipments: 150 MW SiemensDual fuel poweredTurbogenerators( 12 unitsintotal ). 100 MW General ElectricDual fuel poweredTurbogenerators( 1 unitsintotal ). 2500 HP ARIEL Reciprocating GasCompressor. ( 12 unitsintotal ). API610, extendedshaft,betweenbeari ngs,OH2 centrifugal pumps. InstrumentationandService Air compressorstations. Fuel Oil Trucksunloadingfacilities. Fuel Oil scrubbing,filteringandtankstorage facilities. 50 Tons top overrunningbridge cranes. Chemical DosingPackages. API650 steel tanks,cone andfloatingroof. Thermal OxidizerFurnaces ReactionCoolerFurnaces. SaltBath indirectfiredHeaters. HVACsystems. Buriedliquidpropanepipelines,valve shut-downandreserve flow preventionstations. InspectionandCleaningPiglaunchingandreceivingstations. EDUCATION ___________________________________________________________________________________ 1980- 1988. Mechanical Engineer. U.C.V. ( Universidad Central de Venezuela ), Caracas
  • 5.
    Conf idential document.KLB Group (Barcelona) KLB Group (Madrid) Page 5/5 Reproduction or communication, Av da. Can Fatjó dels Aurons, 9 - 4ª planta Alberto Alcocer 46B,3ª planta 11/03/2015 ev en partial, is f orbidden without 08174 Sant Cugat del Vallès – Barcelona 28016 Madrid Tel: (+34) 902 027 928 prior written approv al of KLB Group www.klbgroup.com www.klbgroup.com Fax: (+34) 902 027 938 - Venezuela. TECHNICAL SKILLS ___________________________________________________________________________________ Systems : WINDOWS Tools: Office, MS project, Photoshop 6. Languages: English (Upper Intermediate C1) Spanish (mother tongue) Italian (mother tongue)