The document outlines a validation master plan for an installation qualification (IQ) test script related to hardware inventory and installation verification. Its primary objective is to ensure that installed hardware meets the specifications detailed in the system design specification. The test procedure includes steps for verifying server specifications and includes logging expected vs. actual results of various hardware components.