AGENDA
Correctional Facility Siting - Status Update
• Siting Process
• PRC Assessment Guidelines
• Assessment Guidelines - Results
Siting Process
Siting Process
• Determine Primary Search Area Completed
• PRC Adopts Site Screening Criteria Completed
• Determine Facility Development Plan Completed
• Inventory Prospective Sites Completed
• Screen Prospective Sites Completed
• Community Outreach/Information Underway
• Analyze Highly Ranked Sites Against
PRC Assessment Guidelines Completed
• Detailed Evaluations of Selected Sites Pending
PRC Assessment Guidelines
PRC Assessment Guidelines
Adopted on December 3, 2014
• Have any issues been discovered to date that would make the
site unreasonably difficult or costly to develop?
• Is there an identified, compelling state interest that would likely
be impaired by locating the correctional facility on the site
being assessed?
• Is the proposed site in the path of expected concentrations of
population growth and population density that will likely occur
in the foreseeable future?
• What is contemplated in the land use plan of the local
community where the proposed site is located?
PRC Assessment Guidelines
Highly Ranked Sites
• Airport North (Salt Lake County)
• I-80/7200 West (Salt Lake County)
• SR 112/Depot Boundary Rd (Tooele County)
• Lake Mountains West (Utah County)
• Northwest Utah Valley (Withdrawn by Owners)
• Southwest Valley (Withdrawn by Owners)
Assessment Results – Airport North
Assessment Results – Airport North
Features:
• Access via I-215, I-15
• 508 acres
• Level topography
• Isolated location
• Proximity to infrastructure
Assessment Results – Airport North
Have any issues been discovered to date that would make the site
unreasonably difficult or costly to develop?
• Wetland system covering significantly larger area than anticipated
- Reviewed previous wetland delineations
- Conducted independent field studies
- Field inspection with U.S. Army Corps of Engineers officials
• Outcome
- Under Corps definition, large portion of site likely defined as wetlands
- Rudy Drain expected to be under Corps jurisdiction
- Impacts >10 acres and/or 300 linear feet of stream requires preparation of EIS
Assessment Results – Airport North
Have any issues been discovered to date that would make the site
unreasonably difficult or costly to develop?
Wetlands
Assessment Results – Airport North
Have any issues been discovered to date that would make the site
unreasonably difficult or costly to develop?
• Wetland Permitting Process
- Preparation of Draft/Final EISs requires 12-18 months
- Rigorous analysis of alternatives involving other sites (including Draper)
- Mitigation required as condition of permitting
• Impact Mitigation
- Enhancement, replacement, wetland banking credits or combination
- Potential mitigation costs: $5+ million
• No assurance of permit approval
Assessment Results – Airport North
Have any issues been discovered to date that would make the site
unreasonably difficult or costly to develop?
• Other concerns
- Powerline ROW limits use of northwest corner
- Natural gas line ROW limits use of southern-most portion
- Airport noise (during take-off/landings) potential risk
- Approximately $21 - $26 million in infrastructure improvements
- Residences along eastern boundary
- Closure of 3300 North
Assessment Results – Airport North
Is there an identified, compelling state interest that would likely be
impaired by locating the correctional facility on the site being assessed?
• No known projects identified that represent a compelling state interest likely
to be impaired by prison development (including expansion of Salt Lake City
International Airport)
Assessment Results – Airport North
Is the proposed site in the path of expected concentrations of population
growth and population density that will likely occur in foreseeable future?
1990
Assessment Results – Airport North
Is the proposed site in the path of expected concentrations of population
growth and population density that will likely occur in foreseeable future?
2003
Assessment Results – Airport North
Is the proposed site in the path of expected concentrations of population
growth and population density that will likely occur in foreseeable future?
2014
Assessment Results – Airport North
What is contemplated in the land use plan of the local community where
the proposed site is located?
• Site: Current zoning/land use plan envisions business park
• Lands east: remain residential/agricultural for foreseeable future
• Lands west: unlikely to be developed (wetlands)
• Lands north: limited development potential
• Lands south: intended for airport-related uses
Assessment Results – I-80 / 7200 West
Assessment Results – I-80 / 7200 West
Features:
• Access via I-80, I-15, I-215
• 500+ acres
• Level topography
• Isolated location
• Proximity to infrastructure
Assessment Results – I-80 / 7200 West
Have any issues been discovered to date that would make the site
unreasonably difficult or costly to develop?
• Wetlands cover portions of overall 2,500-acre property
- Reviewed previous wetland studies
- Conducted independent field studies
- Reviewed conditions with U.S. Army Corps of Engineers officials
• Outcome
- Expect to avoid most wetland impacts (<10 acres)
- Mitigation required as condition of permitting (enhancement, replacement,
wetland banking credits or combination)
- Potential mitigation costs: $1+ million
Assessment Results – I-80 / 7200 West
Have any issues been discovered to date that would make the site
unreasonably difficult or costly to develop?
Wetlands
Assessment Results – I-80 / 7200 West
Have any issues been discovered to date that would make the site
unreasonably difficult or costly to develop?
• Proximity to former landfill (confirm absence of contamination)
• Approximately $32 - $37 million in infrastructure improvements
Assessment Results – I-80 / 7200 West
Is there an identified, compelling state interest that would likely be
impaired by locating the correctional facility on the site being assessed?
• No known projects identified that represent a compelling state interest likely
to be impaired by prison development
Assessment Results – I-80 / 7200 West
Is the proposed site in the path of expected concentrations of population
growth and population density that will likely occur in foreseeable future?
1990
Assessment Results – I-80 / 7200 West
Is the proposed site in the path of expected concentrations of population
growth and population density that will likely occur in foreseeable future?
2003
Assessment Results – I-80 / 7200 West
Is the proposed site in the path of expected concentrations of population
growth and population density that will likely occur in foreseeable future?
2014
Assessment Results – I-80 / 7200 West
What is contemplated in the land use plan of the local community where
the proposed site is located?
• No adopted master plan for area (governed by Northwest Community
Master Plan)
• No clear vision on how site and surroundings should be developed
• Site and surroundings: Agricultural holding zone
Assessment Results – SR 112 / DB Road
Assessment Results – SR112 / DB Road
Features:
• Accessible via I-80 to SR 36 to
SR 138 to Sheep Lane
• 500+ acres
• Level topography
• Isolated location
• No environmental constraints
Assessment Results – SR112 / DB Road
Have any issues been discovered to date that would make the site
unreasonably difficult or costly to develop?
• Approximately $25 - $30 million in infrastructure improvements
Assessment Results – SR112 / DB Road
Is there an identified, compelling state interest that would likely be
impaired by locating the correctional facility on the site being assessed?
• Tooele Valley Airport located N-NE; development must avoid impacts to
airport operations
• No known projects identified that represent a compelling state interest likely
to be impaired by prison development
Assessment Results – SR112 / DB Road
Is the proposed site in the path of expected concentrations of population
growth and population density that will likely occur in foreseeable future?
1990
Assessment Results – SR112 / DB Road
Is the proposed site in the path of expected concentrations of population
growth and population density that will likely occur in foreseeable future?
2003
Assessment Results – SR112 / DB Road
Is the proposed site in the path of expected concentrations of population
growth and population density that will likely occur in foreseeable future?
2014
Assessment Results – SR112 / DB Road
What is contemplated in the land use plan of the local community where
the proposed site is located?
• Located in unincorporated Tooele County
• Site zoned for commercial use
• Surrounding lands zoned for commercial and agricultural uses
Assessment Results – Southwest Valley
Assessment Results – Southwest Valley
Features:
• Access via SR 48, SR 111
• 500+ acres
• Relatively level topography
• No environmental limitations
• Proximity to infrastructure
Assessment Results – Southwest Valley
Have any issues been discovered to date that would make the site
unreasonably difficult or costly to develop?
• Approximately $19 - $24 million in utility improvements
Assessment Results – Southwest Valley
Is there an identified, compelling state interest that would likely be
impaired by locating the correctional facility on the site being assessed?
• State/local agencies in various stages of pursuing/negotiating for several
substantial and confidential projects in close proximity to site
• After reviewing confidential information, there are identified compelling
state interests that would likely be impaired by development of prison on
proposed site
Assessment Results – Southwest Valley
Is the proposed site in the path of expected concentrations of population
growth and population density that will likely occur in foreseeable future?
1990
Assessment Results – Southwest Valley
Is the proposed site in the path of expected concentrations of population
growth and population density that will likely occur in foreseeable future?
2003
Assessment Results – Southwest Valley
Is the proposed site in the path of expected concentrations of population
growth and population density that will likely occur in foreseeable future?
2014
Assessment Results – Southwest Valley
Is the proposed site in the path of expected concentrations of population
growth and population density that will likely occur in foreseeable future?
• Proposed site is in path of expected concentrations of population growth
and population density
- West Jordan is fastest-growing community in Utah (2000 - 2014)
- Currently six residential developments proposed in proximity of site
with 1,169 housing units (est. population: 3,510)
Assessment Results – Southwest Valley
Is the proposed site in the path of expected concentrations of population
growth and population density that will likely occur in foreseeable future?
Projected Development
Timeframe
Proposed Development Location Proximity to Site
Near-term (1 – 5 years)
56 housing units West Jordan 0.9 east-northeast
33 housing units West Jordan 1 mile east-southeast
175 housing units West Jordan 0.2 mile north
205 housing units West Jordan 0.1 mile east-northeast
300 housing units West Jordan 0.1 mile east
400 housing units West Jordan 1.2 miles north
Medium-term (6 – 15 years)
West 9000 S extension
West 9400 S extension
West Jordan
West Jordan
Through site
Through site
Long-term (15+ years)
Development of Kennecott
lands (West Bench General
Plan)
West Jordan Immediately west of site
Assessment Results – Southwest Valley
Is the proposed site in the path of expected concentrations of population
growth and population density that will likely occur in foreseeable future?
2015+
Assessment Results – Southwest Valley
What is contemplated in the land use plan of the local community where
the proposed site is located?
• Site: Low, Medium Density Residential
• Lands north: Medium Density Residential, Community Commercial, Mixed
Use, Public Facilities, Parks
• Lands southeast: Industrial
• Lands east: Low, Medium Density Residential, Public Facilities, Parks
• Lands west: Low, Medium Density Residential
Assessment Results – Lake Mountains
West
Assessment Results – Lake Mountains West
Features:
• Up to 640 acres
• Isolated location
• Level topography
• No environmental constraints
• Proximity to infrastructure
Assessment Results – Lake Mountains West
Have any issues been discovered to date that would make the site
unreasonably difficult or costly to develop?
• Establish access from SR 73 that avoids residential areas
• Approximately $24 - $29 million in infrastructure improvements
Assessment Results – Lake Mountains West
Is there an identified, compelling state interest that would likely be
impaired by locating the correctional facility on the site being assessed?
• Vacant parcels north of site promoted to targeted industries
• Reportedly under consideration for confidential project several miles from site
• No known projects identified that represent a compelling state interest likely to
be impaired by prison development
Assessment Results – Lake Mountains West
Is the proposed site in the path of expected concentrations of population
growth and population density that will likely occur in foreseeable future?
1990
Assessment Results – Lake Mountains West
Is the proposed site in the path of expected concentrations of population
growth and population density that will likely occur in foreseeable future?
2003
Assessment Results – Lake Mountains West
Is the proposed site in the path of expected concentrations of population
growth and population density that will likely occur in foreseeable future?
2014
Assessment Results – Lake Mountains West
What is contemplated in the land use plan of the local community where
the proposed site is located?
• Site subject to Master Development Agreement (no land use entitlement/
zoning approvals needed for prison development)
• Lands north: Airstrip, sewage treatment plant; further north in residential use
• Lands east: Commercial uses (major powerline/gas lines to east)
• Lands west: Agricultural use
• Lands south: Agricultural use (unincorporated Utah County)
Assessment Results – NW Utah Valley
Assessment Results – NW Utah Valley
Features:
• 475 acres
• Access via SR 68, SR 73
• Isolated location
• No environmental constraints
• Proximity to infrastructure
Assessment Results – NW Utah Valley
Have any issues been discovered to date that would make the site
unreasonably difficult or costly to develop?
• Land area and configuration severely limits prison development
• Topographic conditions require significant site preparation ($10+ million)
• Approximately $33 - $38 million in infrastructure improvements
Assessment Results – NW Utah Valley
Is there an identified, compelling state interest that would likely be
impaired by locating the correctional facility on the site being assessed?
• No known projects identified that represent a compelling state interest likely to
be impaired by prison development
Assessment Results – NW Utah Valley
Is the proposed site in the path of expected concentrations of population
growth and population density that will likely occur in foreseeable future?
1990
Assessment Results – NW Utah Valley
Is the proposed site in the path of expected concentrations of population
growth and population density that will likely occur in foreseeable future?
2003
Assessment Results – NW Utah Valley
Is the proposed site in the path of expected concentrations of population
growth and population density that will likely occur in foreseeable future?
2014
Assessment Results – NW Utah Valley
Is the proposed site in the path of expected concentrations of population
growth and population density that will likely occur in foreseeable future?
• Proposed site is in path of expected concentrations of population growth
and population density
- Saratoga Springs: 8,872 housing units proposed (est. population: 36,640)
- Eagle Mountain: 1,017 housing units proposed (est. population: 4,200)
Assessment Results – NW Utah Valley
Is the proposed site in the path of expected concentrations of population
growth and population density that will likely occur in foreseeable future?
Projected Development
Timeframe
Proposed Development Location Proximity to Site
Near-term (1 – 5 years)
865 housing units Saratoga Springs 1.5 miles northeast
302 housing units Saratoga Springs 1 mile northeast
669 housing units Saratoga Springs 0.5 mile east
4,996 housing units Saratoga Springs 1.5 miles southeast
2,040 housing units Saratoga Springs 1.5 miles southeast
285 housing units Eagle Mountain 0.25 mile south
126 housing units Eagle Mountain 0.5 mile south
45 housing units Eagle Mountain 0.5 mile south
197 housing units Eagle Mountain 0.5 mile south
74 housing units Eagle Mountain 1 mile south
237 housing units Eagle Mountain 1 mile southwest
53 housing units Eagle Mountain 1 mile southwest
Mixed Use Town Center Saratoga Springs 2.5 miles southeast
Medium-term (6 – 15 years)
Commercial/industrial
development
Saratoga Springs Adjacent to southern
boundary
Assessment Results – NW Utah Valley
Is the proposed site in the path of expected concentrations of population
growth and population density that will likely occur in foreseeable future?
2015+
Assessment Results – NW Utah Valley
What is contemplated in the land use plan of the local community where
the proposed site is located?
• Joint Land Use Study (2012) to ensure future compatibility of Camp
Williams mission and development near installation
- Site located within Military Compatibility Area Overlay District Subzone A (0.5 mile
area around Camp Williams)
- JLUS calls for lower density/intensity development as transitional area between
Camp Williams and surroundings
- Recommends development density of 1.0 DU/acre; no more than 2.0 DU/acre
Assessment Results – NW Utah Valley
What is contemplated in the land use plan of the local community where
the proposed site is located?
• Site being annexed into Saratoga Springs
• Current land use plans for Saratoga Springs and Eagle Mountain envision
mix of residential and commercial development
• Anticipate development of 1,500-2,000 residences on site (violates
objectives of Joint Land Use Study)
Assessment Results
Assessment Results
• Compatible with Assessment Guidelines (continue evaluations)
- I-80 / 7200 West
- Lake Mountains West
- SR 112 / Depot Boundary Road
• Incompatible with Assessment Guidelines (no further evaluations)
- Northwest Utah Valley
- Southwest Valley
- Airport North

More Related Content

Viewers also liked

Free Help for Non Profits
Free Help for Non ProfitsFree Help for Non Profits
Free Help for Non Profits
State of Utah, Salt Lake City
 
Utah's Approach to New Water Quality Criteria for Ammonia
Utah's Approach to New Water Quality Criteria for AmmoniaUtah's Approach to New Water Quality Criteria for Ammonia
Utah's Approach to New Water Quality Criteria for Ammonia
State of Utah, Salt Lake City
 
Trendlines: May-June 2012
Trendlines: May-June 2012Trendlines: May-June 2012
Trendlines: May-June 2012
State of Utah, Salt Lake City
 
Partnering with Business to Reduce the Spread of H1N1
Partnering with Business to Reduce the Spread of H1N1Partnering with Business to Reduce the Spread of H1N1
Partnering with Business to Reduce the Spread of H1N1
State of Utah, Salt Lake City
 
Hospice provider training 10.22.12
Hospice provider training 10.22.12Hospice provider training 10.22.12
Hospice provider training 10.22.12
State of Utah, Salt Lake City
 
Utah Trendlines: January-February 2012
Utah Trendlines: January-February 2012Utah Trendlines: January-February 2012
Utah Trendlines: January-February 2012
State of Utah, Salt Lake City
 
Utah Health Review 2009
Utah Health Review 2009Utah Health Review 2009
Utah Health Review 2009
State of Utah, Salt Lake City
 
Survey Notes September 2010
Survey Notes September 2010Survey Notes September 2010
Survey Notes September 2010
State of Utah, Salt Lake City
 
2011 Utah Real Estate Caravan
2011 Utah Real Estate Caravan2011 Utah Real Estate Caravan
2011 Utah Real Estate Caravan
State of Utah, Salt Lake City
 
2009 10 Furbearer Guidebook
2009 10 Furbearer Guidebook2009 10 Furbearer Guidebook
2009 10 Furbearer Guidebook
State of Utah, Salt Lake City
 
State School Board Selection In the 50 States
State School Board Selection In the 50 States State School Board Selection In the 50 States
State School Board Selection In the 50 States
State of Utah, Salt Lake City
 
Utah Economic Profile 2008
Utah Economic Profile 2008Utah Economic Profile 2008
Utah Economic Profile 2008
State of Utah, Salt Lake City
 
Tercero
TerceroTercero
Uinta Basin baseline water quality study
Uinta Basin baseline water quality studyUinta Basin baseline water quality study
Uinta Basin baseline water quality study
State of Utah, Salt Lake City
 
Utah Regional Repository Program
Utah Regional Repository ProgramUtah Regional Repository Program
Utah Regional Repository Program
State of Utah, Salt Lake City
 
Tercero unidad 2
Tercero unidad 2Tercero unidad 2
Tercero unidad 2
Pnieb Zona Seis
 
2009 Grasshopper and Mormon Cricket Report
2009 Grasshopper and Mormon Cricket Report2009 Grasshopper and Mormon Cricket Report
2009 Grasshopper and Mormon Cricket Report
State of Utah, Salt Lake City
 
Sustainable Infrastructure
Sustainable InfrastructureSustainable Infrastructure
Sustainable Infrastructure
State of Utah, Salt Lake City
 
UCAN Survivorship in Utah Presentation, Part 1
UCAN Survivorship in Utah Presentation, Part 1UCAN Survivorship in Utah Presentation, Part 1
UCAN Survivorship in Utah Presentation, Part 1
State of Utah, Salt Lake City
 
Utah Amber Alert
Utah Amber AlertUtah Amber Alert

Viewers also liked (20)

Free Help for Non Profits
Free Help for Non ProfitsFree Help for Non Profits
Free Help for Non Profits
 
Utah's Approach to New Water Quality Criteria for Ammonia
Utah's Approach to New Water Quality Criteria for AmmoniaUtah's Approach to New Water Quality Criteria for Ammonia
Utah's Approach to New Water Quality Criteria for Ammonia
 
Trendlines: May-June 2012
Trendlines: May-June 2012Trendlines: May-June 2012
Trendlines: May-June 2012
 
Partnering with Business to Reduce the Spread of H1N1
Partnering with Business to Reduce the Spread of H1N1Partnering with Business to Reduce the Spread of H1N1
Partnering with Business to Reduce the Spread of H1N1
 
Hospice provider training 10.22.12
Hospice provider training 10.22.12Hospice provider training 10.22.12
Hospice provider training 10.22.12
 
Utah Trendlines: January-February 2012
Utah Trendlines: January-February 2012Utah Trendlines: January-February 2012
Utah Trendlines: January-February 2012
 
Utah Health Review 2009
Utah Health Review 2009Utah Health Review 2009
Utah Health Review 2009
 
Survey Notes September 2010
Survey Notes September 2010Survey Notes September 2010
Survey Notes September 2010
 
2011 Utah Real Estate Caravan
2011 Utah Real Estate Caravan2011 Utah Real Estate Caravan
2011 Utah Real Estate Caravan
 
2009 10 Furbearer Guidebook
2009 10 Furbearer Guidebook2009 10 Furbearer Guidebook
2009 10 Furbearer Guidebook
 
State School Board Selection In the 50 States
State School Board Selection In the 50 States State School Board Selection In the 50 States
State School Board Selection In the 50 States
 
Utah Economic Profile 2008
Utah Economic Profile 2008Utah Economic Profile 2008
Utah Economic Profile 2008
 
Tercero
TerceroTercero
Tercero
 
Uinta Basin baseline water quality study
Uinta Basin baseline water quality studyUinta Basin baseline water quality study
Uinta Basin baseline water quality study
 
Utah Regional Repository Program
Utah Regional Repository ProgramUtah Regional Repository Program
Utah Regional Repository Program
 
Tercero unidad 2
Tercero unidad 2Tercero unidad 2
Tercero unidad 2
 
2009 Grasshopper and Mormon Cricket Report
2009 Grasshopper and Mormon Cricket Report2009 Grasshopper and Mormon Cricket Report
2009 Grasshopper and Mormon Cricket Report
 
Sustainable Infrastructure
Sustainable InfrastructureSustainable Infrastructure
Sustainable Infrastructure
 
UCAN Survivorship in Utah Presentation, Part 1
UCAN Survivorship in Utah Presentation, Part 1UCAN Survivorship in Utah Presentation, Part 1
UCAN Survivorship in Utah Presentation, Part 1
 
Utah Amber Alert
Utah Amber AlertUtah Amber Alert
Utah Amber Alert
 

Similar to Utah Prison Commission Update on Dec. 22, 2014

Utah Correctional Facility Siting Report
Utah Correctional Facility Siting ReportUtah Correctional Facility Siting Report
Utah Correctional Facility Siting Report
State of Utah, Salt Lake City
 
Complete Proposal
Complete ProposalComplete Proposal
Complete Proposal
Catherine Harmon, MRED
 
Correctional Facility Siting – Comparative Site Evaluation
Correctional Facility Siting – Comparative Site EvaluationCorrectional Facility Siting – Comparative Site Evaluation
Correctional Facility Siting – Comparative Site Evaluation
State of Utah, Salt Lake City
 
GIS-Based Approach to Shoreline Access Mapping
GIS-Based Approach to Shoreline Access MappingGIS-Based Approach to Shoreline Access Mapping
GIS-Based Approach to Shoreline Access Mapping
Hawaii Geographic Information Coordinating Council
 
Site selection
Site selectionSite selection
Site selection
MC Tubera
 
5.0 Site Selection in Landscaping design and Planning.pptx
5.0 Site Selection in Landscaping design and Planning.pptx5.0 Site Selection in Landscaping design and Planning.pptx
5.0 Site Selection in Landscaping design and Planning.pptx
IzriAndaya1
 
The permitting advantages and challenges of green infrastructure
The permitting advantages and challenges of green infrastructureThe permitting advantages and challenges of green infrastructure
The permitting advantages and challenges of green infrastructure
Southern New England American Planning Association
 
Site Selection Criteria
Site Selection CriteriaSite Selection Criteria
Gemmen- Industrial Site Certification & Site Readiness
Gemmen- Industrial Site Certification & Site ReadinessGemmen- Industrial Site Certification & Site Readiness
Gemmen- Industrial Site Certification & Site Readiness
EMRoundtable
 
Nearshore Surveying and Mapping - Alternatives
Nearshore Surveying and Mapping - AlternativesNearshore Surveying and Mapping - Alternatives
Nearshore Surveying and Mapping - Alternatives
Keith VanGraafeiland
 
Ron Sliwoski Dec 2015 Rev1
Ron Sliwoski Dec 2015 Rev1Ron Sliwoski Dec 2015 Rev1
Ron Sliwoski Dec 2015 Rev1
Ron Sliwoski
 
City Council May 15, 2012 Planning
City Council May 15, 2012 PlanningCity Council May 15, 2012 Planning
City Council May 15, 2012 Planning
City of San Angelo Texas
 
2018 Atlantic Builders Convention 18 Green Infrastructure Seminar
2018 Atlantic Builders Convention 18 Green Infrastructure Seminar2018 Atlantic Builders Convention 18 Green Infrastructure Seminar
2018 Atlantic Builders Convention 18 Green Infrastructure Seminar
New Jersey Future
 
Site Planning and Site Analysis for Architectural Projects
Site Planning and Site Analysis for Architectural ProjectsSite Planning and Site Analysis for Architectural Projects
Site Planning and Site Analysis for Architectural Projects
JIT KUMAR GUPTA
 
Saratoga's 12 14-21 Proposed development projects for housing element
Saratoga's 12 14-21 Proposed development projects for housing elementSaratoga's 12 14-21 Proposed development projects for housing element
Saratoga's 12 14-21 Proposed development projects for housing element
Rishi Kumar
 
HRCA Backcountry Wilderness Area Bench
HRCA Backcountry Wilderness Area BenchHRCA Backcountry Wilderness Area Bench
HRCA Backcountry Wilderness Area Bench
HRCA
 
sr 90 sw 8th street at sw 87 avenue pd&e study
sr 90 sw 8th street at sw 87 avenue pd&e studysr 90 sw 8th street at sw 87 avenue pd&e study
sr 90 sw 8th street at sw 87 avenue pd&e study
Miami-Dade Transportation Planning Organization
 
Strafford County Board of Realtors April 2012
Strafford County Board of Realtors April 2012 Strafford County Board of Realtors April 2012
Strafford County Board of Realtors April 2012
Karen Pollard, CEcD, EDP
 
Hearst community meeting 10.02.18 pn_3-30pm
Hearst community meeting   10.02.18 pn_3-30pmHearst community meeting   10.02.18 pn_3-30pm
Hearst community meeting 10.02.18 pn_3-30pm
RamaChilamkurthy
 
Your Vision, Our Future - General Overview Presentation
Your Vision, Our Future - General Overview PresentationYour Vision, Our Future - General Overview Presentation
Your Vision, Our Future - General Overview Presentation
Marti Donley
 

Similar to Utah Prison Commission Update on Dec. 22, 2014 (20)

Utah Correctional Facility Siting Report
Utah Correctional Facility Siting ReportUtah Correctional Facility Siting Report
Utah Correctional Facility Siting Report
 
Complete Proposal
Complete ProposalComplete Proposal
Complete Proposal
 
Correctional Facility Siting – Comparative Site Evaluation
Correctional Facility Siting – Comparative Site EvaluationCorrectional Facility Siting – Comparative Site Evaluation
Correctional Facility Siting – Comparative Site Evaluation
 
GIS-Based Approach to Shoreline Access Mapping
GIS-Based Approach to Shoreline Access MappingGIS-Based Approach to Shoreline Access Mapping
GIS-Based Approach to Shoreline Access Mapping
 
Site selection
Site selectionSite selection
Site selection
 
5.0 Site Selection in Landscaping design and Planning.pptx
5.0 Site Selection in Landscaping design and Planning.pptx5.0 Site Selection in Landscaping design and Planning.pptx
5.0 Site Selection in Landscaping design and Planning.pptx
 
The permitting advantages and challenges of green infrastructure
The permitting advantages and challenges of green infrastructureThe permitting advantages and challenges of green infrastructure
The permitting advantages and challenges of green infrastructure
 
Site Selection Criteria
Site Selection CriteriaSite Selection Criteria
Site Selection Criteria
 
Gemmen- Industrial Site Certification & Site Readiness
Gemmen- Industrial Site Certification & Site ReadinessGemmen- Industrial Site Certification & Site Readiness
Gemmen- Industrial Site Certification & Site Readiness
 
Nearshore Surveying and Mapping - Alternatives
Nearshore Surveying and Mapping - AlternativesNearshore Surveying and Mapping - Alternatives
Nearshore Surveying and Mapping - Alternatives
 
Ron Sliwoski Dec 2015 Rev1
Ron Sliwoski Dec 2015 Rev1Ron Sliwoski Dec 2015 Rev1
Ron Sliwoski Dec 2015 Rev1
 
City Council May 15, 2012 Planning
City Council May 15, 2012 PlanningCity Council May 15, 2012 Planning
City Council May 15, 2012 Planning
 
2018 Atlantic Builders Convention 18 Green Infrastructure Seminar
2018 Atlantic Builders Convention 18 Green Infrastructure Seminar2018 Atlantic Builders Convention 18 Green Infrastructure Seminar
2018 Atlantic Builders Convention 18 Green Infrastructure Seminar
 
Site Planning and Site Analysis for Architectural Projects
Site Planning and Site Analysis for Architectural ProjectsSite Planning and Site Analysis for Architectural Projects
Site Planning and Site Analysis for Architectural Projects
 
Saratoga's 12 14-21 Proposed development projects for housing element
Saratoga's 12 14-21 Proposed development projects for housing elementSaratoga's 12 14-21 Proposed development projects for housing element
Saratoga's 12 14-21 Proposed development projects for housing element
 
HRCA Backcountry Wilderness Area Bench
HRCA Backcountry Wilderness Area BenchHRCA Backcountry Wilderness Area Bench
HRCA Backcountry Wilderness Area Bench
 
sr 90 sw 8th street at sw 87 avenue pd&e study
sr 90 sw 8th street at sw 87 avenue pd&e studysr 90 sw 8th street at sw 87 avenue pd&e study
sr 90 sw 8th street at sw 87 avenue pd&e study
 
Strafford County Board of Realtors April 2012
Strafford County Board of Realtors April 2012 Strafford County Board of Realtors April 2012
Strafford County Board of Realtors April 2012
 
Hearst community meeting 10.02.18 pn_3-30pm
Hearst community meeting   10.02.18 pn_3-30pmHearst community meeting   10.02.18 pn_3-30pm
Hearst community meeting 10.02.18 pn_3-30pm
 
Your Vision, Our Future - General Overview Presentation
Your Vision, Our Future - General Overview PresentationYour Vision, Our Future - General Overview Presentation
Your Vision, Our Future - General Overview Presentation
 

More from State of Utah, Salt Lake City

Utah Veterinary Diagnostic Laboratory
Utah Veterinary Diagnostic LaboratoryUtah Veterinary Diagnostic Laboratory
Utah Veterinary Diagnostic Laboratory
State of Utah, Salt Lake City
 
Health Data Transparency: Utah’s All Payer Claims Database
Health Data Transparency: Utah’s All Payer Claims DatabaseHealth Data Transparency: Utah’s All Payer Claims Database
Health Data Transparency: Utah’s All Payer Claims Database
State of Utah, Salt Lake City
 
Utah Division of Juvenile and Justice Services
Utah Division of Juvenile and Justice ServicesUtah Division of Juvenile and Justice Services
Utah Division of Juvenile and Justice Services
State of Utah, Salt Lake City
 
Health Disparities by Utah Legislative District 2019
Health Disparities by Utah Legislative District 2019Health Disparities by Utah Legislative District 2019
Health Disparities by Utah Legislative District 2019
State of Utah, Salt Lake City
 
Localscapes
LocalscapesLocalscapes
Status of Translocated Tortoises in Southwest Utah
Status of Translocated Tortoises in Southwest UtahStatus of Translocated Tortoises in Southwest Utah
Status of Translocated Tortoises in Southwest Utah
State of Utah, Salt Lake City
 
The Logan River Observatory
The Logan River ObservatoryThe Logan River Observatory
The Logan River Observatory
State of Utah, Salt Lake City
 
Utah Strategic Workforce Presentation
Utah Strategic Workforce PresentationUtah Strategic Workforce Presentation
Utah Strategic Workforce Presentation
State of Utah, Salt Lake City
 
The Utah Geological Survey provides timely scientific information about Utah’...
The Utah Geological Survey provides timely scientific information about Utah’...The Utah Geological Survey provides timely scientific information about Utah’...
The Utah Geological Survey provides timely scientific information about Utah’...
State of Utah, Salt Lake City
 
Utah Forestry, Fire and State Lands 2019
Utah Forestry, Fire and State Lands 2019Utah Forestry, Fire and State Lands 2019
Utah Forestry, Fire and State Lands 2019
State of Utah, Salt Lake City
 
Utah Division of Wildlife Resources Presentation to 2019 Legislature
Utah Division of Wildlife Resources Presentation to 2019 LegislatureUtah Division of Wildlife Resources Presentation to 2019 Legislature
Utah Division of Wildlife Resources Presentation to 2019 Legislature
State of Utah, Salt Lake City
 
UDOT Presentation to 2019 Legislature
UDOT Presentation to 2019 LegislatureUDOT Presentation to 2019 Legislature
UDOT Presentation to 2019 Legislature
State of Utah, Salt Lake City
 
Utah System of Technical Colleges
Utah System of Technical CollegesUtah System of Technical Colleges
Utah System of Technical Colleges
State of Utah, Salt Lake City
 
Public Water System Identification in Utah
Public Water System Identification in UtahPublic Water System Identification in Utah
Public Water System Identification in Utah
State of Utah, Salt Lake City
 
State of Utah Suicide Prevention
State of Utah Suicide PreventionState of Utah Suicide Prevention
State of Utah Suicide Prevention
State of Utah, Salt Lake City
 
Utah Division of Aeronautics Annual Needs and Accomplishments
Utah Division of Aeronautics Annual Needs and AccomplishmentsUtah Division of Aeronautics Annual Needs and Accomplishments
Utah Division of Aeronautics Annual Needs and Accomplishments
State of Utah, Salt Lake City
 
Fourth Quarter FY2018 Quarterly Report from Utah DCFS
Fourth Quarter FY2018 Quarterly Report from Utah DCFSFourth Quarter FY2018 Quarterly Report from Utah DCFS
Fourth Quarter FY2018 Quarterly Report from Utah DCFS
State of Utah, Salt Lake City
 
Update on FirstNet in Utah
Update on FirstNet in UtahUpdate on FirstNet in Utah
Update on FirstNet in Utah
State of Utah, Salt Lake City
 
Energy Incentives in Utah - 2018 Audit
Energy Incentives in Utah - 2018 AuditEnergy Incentives in Utah - 2018 Audit
Energy Incentives in Utah - 2018 Audit
State of Utah, Salt Lake City
 
Transportation Policy and Funding: Historical and Emerging Trends
Transportation Policy and Funding: Historical and Emerging TrendsTransportation Policy and Funding: Historical and Emerging Trends
Transportation Policy and Funding: Historical and Emerging Trends
State of Utah, Salt Lake City
 

More from State of Utah, Salt Lake City (20)

Utah Veterinary Diagnostic Laboratory
Utah Veterinary Diagnostic LaboratoryUtah Veterinary Diagnostic Laboratory
Utah Veterinary Diagnostic Laboratory
 
Health Data Transparency: Utah’s All Payer Claims Database
Health Data Transparency: Utah’s All Payer Claims DatabaseHealth Data Transparency: Utah’s All Payer Claims Database
Health Data Transparency: Utah’s All Payer Claims Database
 
Utah Division of Juvenile and Justice Services
Utah Division of Juvenile and Justice ServicesUtah Division of Juvenile and Justice Services
Utah Division of Juvenile and Justice Services
 
Health Disparities by Utah Legislative District 2019
Health Disparities by Utah Legislative District 2019Health Disparities by Utah Legislative District 2019
Health Disparities by Utah Legislative District 2019
 
Localscapes
LocalscapesLocalscapes
Localscapes
 
Status of Translocated Tortoises in Southwest Utah
Status of Translocated Tortoises in Southwest UtahStatus of Translocated Tortoises in Southwest Utah
Status of Translocated Tortoises in Southwest Utah
 
The Logan River Observatory
The Logan River ObservatoryThe Logan River Observatory
The Logan River Observatory
 
Utah Strategic Workforce Presentation
Utah Strategic Workforce PresentationUtah Strategic Workforce Presentation
Utah Strategic Workforce Presentation
 
The Utah Geological Survey provides timely scientific information about Utah’...
The Utah Geological Survey provides timely scientific information about Utah’...The Utah Geological Survey provides timely scientific information about Utah’...
The Utah Geological Survey provides timely scientific information about Utah’...
 
Utah Forestry, Fire and State Lands 2019
Utah Forestry, Fire and State Lands 2019Utah Forestry, Fire and State Lands 2019
Utah Forestry, Fire and State Lands 2019
 
Utah Division of Wildlife Resources Presentation to 2019 Legislature
Utah Division of Wildlife Resources Presentation to 2019 LegislatureUtah Division of Wildlife Resources Presentation to 2019 Legislature
Utah Division of Wildlife Resources Presentation to 2019 Legislature
 
UDOT Presentation to 2019 Legislature
UDOT Presentation to 2019 LegislatureUDOT Presentation to 2019 Legislature
UDOT Presentation to 2019 Legislature
 
Utah System of Technical Colleges
Utah System of Technical CollegesUtah System of Technical Colleges
Utah System of Technical Colleges
 
Public Water System Identification in Utah
Public Water System Identification in UtahPublic Water System Identification in Utah
Public Water System Identification in Utah
 
State of Utah Suicide Prevention
State of Utah Suicide PreventionState of Utah Suicide Prevention
State of Utah Suicide Prevention
 
Utah Division of Aeronautics Annual Needs and Accomplishments
Utah Division of Aeronautics Annual Needs and AccomplishmentsUtah Division of Aeronautics Annual Needs and Accomplishments
Utah Division of Aeronautics Annual Needs and Accomplishments
 
Fourth Quarter FY2018 Quarterly Report from Utah DCFS
Fourth Quarter FY2018 Quarterly Report from Utah DCFSFourth Quarter FY2018 Quarterly Report from Utah DCFS
Fourth Quarter FY2018 Quarterly Report from Utah DCFS
 
Update on FirstNet in Utah
Update on FirstNet in UtahUpdate on FirstNet in Utah
Update on FirstNet in Utah
 
Energy Incentives in Utah - 2018 Audit
Energy Incentives in Utah - 2018 AuditEnergy Incentives in Utah - 2018 Audit
Energy Incentives in Utah - 2018 Audit
 
Transportation Policy and Funding: Historical and Emerging Trends
Transportation Policy and Funding: Historical and Emerging TrendsTransportation Policy and Funding: Historical and Emerging Trends
Transportation Policy and Funding: Historical and Emerging Trends
 

Recently uploaded

Item #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code AmendmentItem #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code Amendment
ahcitycouncil
 
Item # 10 -- Historical Presv. Districts
Item # 10 -- Historical Presv. DistrictsItem # 10 -- Historical Presv. Districts
Item # 10 -- Historical Presv. Districts
ahcitycouncil
 
Invitation Letter for an alumni association
Invitation Letter for an alumni associationInvitation Letter for an alumni association
Invitation Letter for an alumni association
elmerdalida001
 
Awaken new depths - World Ocean Day 2024, June 8th.
Awaken new depths - World Ocean Day 2024, June 8th.Awaken new depths - World Ocean Day 2024, June 8th.
Awaken new depths - World Ocean Day 2024, June 8th.
Christina Parmionova
 
A Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC Charlotte
A Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC CharlotteA Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC Charlotte
A Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC Charlotte
University of North Carolina at Charlotte
 
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
ii2sh2v
 
Donate to charity during this holiday season
Donate to charity during this holiday seasonDonate to charity during this holiday season
Donate to charity during this holiday season
SERUDS INDIA
 
Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019
Partito democratico
 
State crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public financesState crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public finances
ResolutionFoundation
 
World Food Safety Day 2024- Communication-toolkit.
World Food Safety Day 2024- Communication-toolkit.World Food Safety Day 2024- Communication-toolkit.
World Food Safety Day 2024- Communication-toolkit.
Christina Parmionova
 
Texas Water Development Board Updates June 2024
Texas Water Development Board Updates June 2024Texas Water Development Board Updates June 2024
Texas Water Development Board Updates June 2024
Texas Alliance of Groundwater Districts
 
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
3woawyyl
 
Transit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group MeetingTransit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group Meeting
Cuyahoga County Planning Commission
 
2024: The FAR - Federal Acquisition Regulations, Part 39
2024: The FAR - Federal Acquisition Regulations, Part 392024: The FAR - Federal Acquisition Regulations, Part 39
2024: The FAR - Federal Acquisition Regulations, Part 39
JSchaus & Associates
 
Border towns and spaces of (in)visibility.pdf
Border towns and spaces of (in)visibility.pdfBorder towns and spaces of (in)visibility.pdf
Border towns and spaces of (in)visibility.pdf
Scalabrini Institute for Human Mobility in Africa
 
Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...
Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...
Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...
Jamesadhikaram land matter consultancy 9447464502
 
RFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance CenterRFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance Center
This Is Reno
 
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
ahcitycouncil
 
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptxPUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
Marked12
 
About Potato, The scientific name of the plant is Solanum tuberosum (L).
About Potato, The scientific name of the plant is Solanum tuberosum (L).About Potato, The scientific name of the plant is Solanum tuberosum (L).
About Potato, The scientific name of the plant is Solanum tuberosum (L).
Christina Parmionova
 

Recently uploaded (20)

Item #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code AmendmentItem #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code Amendment
 
Item # 10 -- Historical Presv. Districts
Item # 10 -- Historical Presv. DistrictsItem # 10 -- Historical Presv. Districts
Item # 10 -- Historical Presv. Districts
 
Invitation Letter for an alumni association
Invitation Letter for an alumni associationInvitation Letter for an alumni association
Invitation Letter for an alumni association
 
Awaken new depths - World Ocean Day 2024, June 8th.
Awaken new depths - World Ocean Day 2024, June 8th.Awaken new depths - World Ocean Day 2024, June 8th.
Awaken new depths - World Ocean Day 2024, June 8th.
 
A Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC Charlotte
A Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC CharlotteA Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC Charlotte
A Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC Charlotte
 
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
 
Donate to charity during this holiday season
Donate to charity during this holiday seasonDonate to charity during this holiday season
Donate to charity during this holiday season
 
Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019
 
State crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public financesState crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public finances
 
World Food Safety Day 2024- Communication-toolkit.
World Food Safety Day 2024- Communication-toolkit.World Food Safety Day 2024- Communication-toolkit.
World Food Safety Day 2024- Communication-toolkit.
 
Texas Water Development Board Updates June 2024
Texas Water Development Board Updates June 2024Texas Water Development Board Updates June 2024
Texas Water Development Board Updates June 2024
 
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
 
Transit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group MeetingTransit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group Meeting
 
2024: The FAR - Federal Acquisition Regulations, Part 39
2024: The FAR - Federal Acquisition Regulations, Part 392024: The FAR - Federal Acquisition Regulations, Part 39
2024: The FAR - Federal Acquisition Regulations, Part 39
 
Border towns and spaces of (in)visibility.pdf
Border towns and spaces of (in)visibility.pdfBorder towns and spaces of (in)visibility.pdf
Border towns and spaces of (in)visibility.pdf
 
Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...
Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...
Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...
 
RFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance CenterRFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance Center
 
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
 
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptxPUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
 
About Potato, The scientific name of the plant is Solanum tuberosum (L).
About Potato, The scientific name of the plant is Solanum tuberosum (L).About Potato, The scientific name of the plant is Solanum tuberosum (L).
About Potato, The scientific name of the plant is Solanum tuberosum (L).
 

Utah Prison Commission Update on Dec. 22, 2014

  • 1. Correctional Facility Siting - Status Update Presented to: Prison Relocation Commission December 22, 2014
  • 2. AGENDA Correctional Facility Siting - Status Update • Siting Process • PRC Assessment Guidelines • Assessment Guidelines - Results
  • 4. Siting Process • Determine Primary Search Area Completed • PRC Adopts Site Screening Criteria Completed • Determine Facility Development Plan Completed • Inventory Prospective Sites Completed • Screen Prospective Sites Completed • Community Outreach/Information Underway • Analyze Highly Ranked Sites Against PRC Assessment Guidelines Completed • Detailed Evaluations of Selected Sites Pending
  • 6. PRC Assessment Guidelines Adopted on December 3, 2014 • Have any issues been discovered to date that would make the site unreasonably difficult or costly to develop? • Is there an identified, compelling state interest that would likely be impaired by locating the correctional facility on the site being assessed? • Is the proposed site in the path of expected concentrations of population growth and population density that will likely occur in the foreseeable future? • What is contemplated in the land use plan of the local community where the proposed site is located?
  • 7. PRC Assessment Guidelines Highly Ranked Sites • Airport North (Salt Lake County) • I-80/7200 West (Salt Lake County) • SR 112/Depot Boundary Rd (Tooele County) • Lake Mountains West (Utah County) • Northwest Utah Valley (Withdrawn by Owners) • Southwest Valley (Withdrawn by Owners)
  • 8. Assessment Results – Airport North
  • 9. Assessment Results – Airport North Features: • Access via I-215, I-15 • 508 acres • Level topography • Isolated location • Proximity to infrastructure
  • 10. Assessment Results – Airport North Have any issues been discovered to date that would make the site unreasonably difficult or costly to develop? • Wetland system covering significantly larger area than anticipated - Reviewed previous wetland delineations - Conducted independent field studies - Field inspection with U.S. Army Corps of Engineers officials • Outcome - Under Corps definition, large portion of site likely defined as wetlands - Rudy Drain expected to be under Corps jurisdiction - Impacts >10 acres and/or 300 linear feet of stream requires preparation of EIS
  • 11. Assessment Results – Airport North Have any issues been discovered to date that would make the site unreasonably difficult or costly to develop? Wetlands
  • 12. Assessment Results – Airport North Have any issues been discovered to date that would make the site unreasonably difficult or costly to develop? • Wetland Permitting Process - Preparation of Draft/Final EISs requires 12-18 months - Rigorous analysis of alternatives involving other sites (including Draper) - Mitigation required as condition of permitting • Impact Mitigation - Enhancement, replacement, wetland banking credits or combination - Potential mitigation costs: $5+ million • No assurance of permit approval
  • 13. Assessment Results – Airport North Have any issues been discovered to date that would make the site unreasonably difficult or costly to develop? • Other concerns - Powerline ROW limits use of northwest corner - Natural gas line ROW limits use of southern-most portion - Airport noise (during take-off/landings) potential risk - Approximately $21 - $26 million in infrastructure improvements - Residences along eastern boundary - Closure of 3300 North
  • 14. Assessment Results – Airport North Is there an identified, compelling state interest that would likely be impaired by locating the correctional facility on the site being assessed? • No known projects identified that represent a compelling state interest likely to be impaired by prison development (including expansion of Salt Lake City International Airport)
  • 15. Assessment Results – Airport North Is the proposed site in the path of expected concentrations of population growth and population density that will likely occur in foreseeable future? 1990
  • 16. Assessment Results – Airport North Is the proposed site in the path of expected concentrations of population growth and population density that will likely occur in foreseeable future? 2003
  • 17. Assessment Results – Airport North Is the proposed site in the path of expected concentrations of population growth and population density that will likely occur in foreseeable future? 2014
  • 18. Assessment Results – Airport North What is contemplated in the land use plan of the local community where the proposed site is located? • Site: Current zoning/land use plan envisions business park • Lands east: remain residential/agricultural for foreseeable future • Lands west: unlikely to be developed (wetlands) • Lands north: limited development potential • Lands south: intended for airport-related uses
  • 19. Assessment Results – I-80 / 7200 West
  • 20. Assessment Results – I-80 / 7200 West Features: • Access via I-80, I-15, I-215 • 500+ acres • Level topography • Isolated location • Proximity to infrastructure
  • 21. Assessment Results – I-80 / 7200 West Have any issues been discovered to date that would make the site unreasonably difficult or costly to develop? • Wetlands cover portions of overall 2,500-acre property - Reviewed previous wetland studies - Conducted independent field studies - Reviewed conditions with U.S. Army Corps of Engineers officials • Outcome - Expect to avoid most wetland impacts (<10 acres) - Mitigation required as condition of permitting (enhancement, replacement, wetland banking credits or combination) - Potential mitigation costs: $1+ million
  • 22. Assessment Results – I-80 / 7200 West Have any issues been discovered to date that would make the site unreasonably difficult or costly to develop? Wetlands
  • 23. Assessment Results – I-80 / 7200 West Have any issues been discovered to date that would make the site unreasonably difficult or costly to develop? • Proximity to former landfill (confirm absence of contamination) • Approximately $32 - $37 million in infrastructure improvements
  • 24. Assessment Results – I-80 / 7200 West Is there an identified, compelling state interest that would likely be impaired by locating the correctional facility on the site being assessed? • No known projects identified that represent a compelling state interest likely to be impaired by prison development
  • 25. Assessment Results – I-80 / 7200 West Is the proposed site in the path of expected concentrations of population growth and population density that will likely occur in foreseeable future? 1990
  • 26. Assessment Results – I-80 / 7200 West Is the proposed site in the path of expected concentrations of population growth and population density that will likely occur in foreseeable future? 2003
  • 27. Assessment Results – I-80 / 7200 West Is the proposed site in the path of expected concentrations of population growth and population density that will likely occur in foreseeable future? 2014
  • 28. Assessment Results – I-80 / 7200 West What is contemplated in the land use plan of the local community where the proposed site is located? • No adopted master plan for area (governed by Northwest Community Master Plan) • No clear vision on how site and surroundings should be developed • Site and surroundings: Agricultural holding zone
  • 29. Assessment Results – SR 112 / DB Road
  • 30. Assessment Results – SR112 / DB Road Features: • Accessible via I-80 to SR 36 to SR 138 to Sheep Lane • 500+ acres • Level topography • Isolated location • No environmental constraints
  • 31. Assessment Results – SR112 / DB Road Have any issues been discovered to date that would make the site unreasonably difficult or costly to develop? • Approximately $25 - $30 million in infrastructure improvements
  • 32. Assessment Results – SR112 / DB Road Is there an identified, compelling state interest that would likely be impaired by locating the correctional facility on the site being assessed? • Tooele Valley Airport located N-NE; development must avoid impacts to airport operations • No known projects identified that represent a compelling state interest likely to be impaired by prison development
  • 33. Assessment Results – SR112 / DB Road Is the proposed site in the path of expected concentrations of population growth and population density that will likely occur in foreseeable future? 1990
  • 34. Assessment Results – SR112 / DB Road Is the proposed site in the path of expected concentrations of population growth and population density that will likely occur in foreseeable future? 2003
  • 35. Assessment Results – SR112 / DB Road Is the proposed site in the path of expected concentrations of population growth and population density that will likely occur in foreseeable future? 2014
  • 36. Assessment Results – SR112 / DB Road What is contemplated in the land use plan of the local community where the proposed site is located? • Located in unincorporated Tooele County • Site zoned for commercial use • Surrounding lands zoned for commercial and agricultural uses
  • 37. Assessment Results – Southwest Valley
  • 38. Assessment Results – Southwest Valley Features: • Access via SR 48, SR 111 • 500+ acres • Relatively level topography • No environmental limitations • Proximity to infrastructure
  • 39. Assessment Results – Southwest Valley Have any issues been discovered to date that would make the site unreasonably difficult or costly to develop? • Approximately $19 - $24 million in utility improvements
  • 40. Assessment Results – Southwest Valley Is there an identified, compelling state interest that would likely be impaired by locating the correctional facility on the site being assessed? • State/local agencies in various stages of pursuing/negotiating for several substantial and confidential projects in close proximity to site • After reviewing confidential information, there are identified compelling state interests that would likely be impaired by development of prison on proposed site
  • 41. Assessment Results – Southwest Valley Is the proposed site in the path of expected concentrations of population growth and population density that will likely occur in foreseeable future? 1990
  • 42. Assessment Results – Southwest Valley Is the proposed site in the path of expected concentrations of population growth and population density that will likely occur in foreseeable future? 2003
  • 43. Assessment Results – Southwest Valley Is the proposed site in the path of expected concentrations of population growth and population density that will likely occur in foreseeable future? 2014
  • 44. Assessment Results – Southwest Valley Is the proposed site in the path of expected concentrations of population growth and population density that will likely occur in foreseeable future? • Proposed site is in path of expected concentrations of population growth and population density - West Jordan is fastest-growing community in Utah (2000 - 2014) - Currently six residential developments proposed in proximity of site with 1,169 housing units (est. population: 3,510)
  • 45. Assessment Results – Southwest Valley Is the proposed site in the path of expected concentrations of population growth and population density that will likely occur in foreseeable future? Projected Development Timeframe Proposed Development Location Proximity to Site Near-term (1 – 5 years) 56 housing units West Jordan 0.9 east-northeast 33 housing units West Jordan 1 mile east-southeast 175 housing units West Jordan 0.2 mile north 205 housing units West Jordan 0.1 mile east-northeast 300 housing units West Jordan 0.1 mile east 400 housing units West Jordan 1.2 miles north Medium-term (6 – 15 years) West 9000 S extension West 9400 S extension West Jordan West Jordan Through site Through site Long-term (15+ years) Development of Kennecott lands (West Bench General Plan) West Jordan Immediately west of site
  • 46. Assessment Results – Southwest Valley Is the proposed site in the path of expected concentrations of population growth and population density that will likely occur in foreseeable future? 2015+
  • 47. Assessment Results – Southwest Valley What is contemplated in the land use plan of the local community where the proposed site is located? • Site: Low, Medium Density Residential • Lands north: Medium Density Residential, Community Commercial, Mixed Use, Public Facilities, Parks • Lands southeast: Industrial • Lands east: Low, Medium Density Residential, Public Facilities, Parks • Lands west: Low, Medium Density Residential
  • 48. Assessment Results – Lake Mountains West
  • 49. Assessment Results – Lake Mountains West Features: • Up to 640 acres • Isolated location • Level topography • No environmental constraints • Proximity to infrastructure
  • 50. Assessment Results – Lake Mountains West Have any issues been discovered to date that would make the site unreasonably difficult or costly to develop? • Establish access from SR 73 that avoids residential areas • Approximately $24 - $29 million in infrastructure improvements
  • 51. Assessment Results – Lake Mountains West Is there an identified, compelling state interest that would likely be impaired by locating the correctional facility on the site being assessed? • Vacant parcels north of site promoted to targeted industries • Reportedly under consideration for confidential project several miles from site • No known projects identified that represent a compelling state interest likely to be impaired by prison development
  • 52. Assessment Results – Lake Mountains West Is the proposed site in the path of expected concentrations of population growth and population density that will likely occur in foreseeable future? 1990
  • 53. Assessment Results – Lake Mountains West Is the proposed site in the path of expected concentrations of population growth and population density that will likely occur in foreseeable future? 2003
  • 54. Assessment Results – Lake Mountains West Is the proposed site in the path of expected concentrations of population growth and population density that will likely occur in foreseeable future? 2014
  • 55. Assessment Results – Lake Mountains West What is contemplated in the land use plan of the local community where the proposed site is located? • Site subject to Master Development Agreement (no land use entitlement/ zoning approvals needed for prison development) • Lands north: Airstrip, sewage treatment plant; further north in residential use • Lands east: Commercial uses (major powerline/gas lines to east) • Lands west: Agricultural use • Lands south: Agricultural use (unincorporated Utah County)
  • 56. Assessment Results – NW Utah Valley
  • 57. Assessment Results – NW Utah Valley Features: • 475 acres • Access via SR 68, SR 73 • Isolated location • No environmental constraints • Proximity to infrastructure
  • 58. Assessment Results – NW Utah Valley Have any issues been discovered to date that would make the site unreasonably difficult or costly to develop? • Land area and configuration severely limits prison development • Topographic conditions require significant site preparation ($10+ million) • Approximately $33 - $38 million in infrastructure improvements
  • 59. Assessment Results – NW Utah Valley Is there an identified, compelling state interest that would likely be impaired by locating the correctional facility on the site being assessed? • No known projects identified that represent a compelling state interest likely to be impaired by prison development
  • 60. Assessment Results – NW Utah Valley Is the proposed site in the path of expected concentrations of population growth and population density that will likely occur in foreseeable future? 1990
  • 61. Assessment Results – NW Utah Valley Is the proposed site in the path of expected concentrations of population growth and population density that will likely occur in foreseeable future? 2003
  • 62. Assessment Results – NW Utah Valley Is the proposed site in the path of expected concentrations of population growth and population density that will likely occur in foreseeable future? 2014
  • 63. Assessment Results – NW Utah Valley Is the proposed site in the path of expected concentrations of population growth and population density that will likely occur in foreseeable future? • Proposed site is in path of expected concentrations of population growth and population density - Saratoga Springs: 8,872 housing units proposed (est. population: 36,640) - Eagle Mountain: 1,017 housing units proposed (est. population: 4,200)
  • 64. Assessment Results – NW Utah Valley Is the proposed site in the path of expected concentrations of population growth and population density that will likely occur in foreseeable future? Projected Development Timeframe Proposed Development Location Proximity to Site Near-term (1 – 5 years) 865 housing units Saratoga Springs 1.5 miles northeast 302 housing units Saratoga Springs 1 mile northeast 669 housing units Saratoga Springs 0.5 mile east 4,996 housing units Saratoga Springs 1.5 miles southeast 2,040 housing units Saratoga Springs 1.5 miles southeast 285 housing units Eagle Mountain 0.25 mile south 126 housing units Eagle Mountain 0.5 mile south 45 housing units Eagle Mountain 0.5 mile south 197 housing units Eagle Mountain 0.5 mile south 74 housing units Eagle Mountain 1 mile south 237 housing units Eagle Mountain 1 mile southwest 53 housing units Eagle Mountain 1 mile southwest Mixed Use Town Center Saratoga Springs 2.5 miles southeast Medium-term (6 – 15 years) Commercial/industrial development Saratoga Springs Adjacent to southern boundary
  • 65. Assessment Results – NW Utah Valley Is the proposed site in the path of expected concentrations of population growth and population density that will likely occur in foreseeable future? 2015+
  • 66. Assessment Results – NW Utah Valley What is contemplated in the land use plan of the local community where the proposed site is located? • Joint Land Use Study (2012) to ensure future compatibility of Camp Williams mission and development near installation - Site located within Military Compatibility Area Overlay District Subzone A (0.5 mile area around Camp Williams) - JLUS calls for lower density/intensity development as transitional area between Camp Williams and surroundings - Recommends development density of 1.0 DU/acre; no more than 2.0 DU/acre
  • 67. Assessment Results – NW Utah Valley What is contemplated in the land use plan of the local community where the proposed site is located? • Site being annexed into Saratoga Springs • Current land use plans for Saratoga Springs and Eagle Mountain envision mix of residential and commercial development • Anticipate development of 1,500-2,000 residences on site (violates objectives of Joint Land Use Study)
  • 69. Assessment Results • Compatible with Assessment Guidelines (continue evaluations) - I-80 / 7200 West - Lake Mountains West - SR 112 / Depot Boundary Road • Incompatible with Assessment Guidelines (no further evaluations) - Northwest Utah Valley - Southwest Valley - Airport North