Arnuco, Daron Ruscer
Caasi, Jonica Valerie
Loon, Dabie Lee
Sumang, Razzel Kristine
Natural, Environmental, Physical Factors
CRITERIA %
SITES
A
Makati
B
Ortigas
C
Taguig
Criteria Ranking Equivalent Percentage Criteria Ranking Equivalent Percentage Criteria Ranking Equivalent Percentage
Land Area/Lot Size 20
Accessibility (Modes of Transportation) 10
Soil Characteristic & Condition 10
Accessibility of Utility and Service Needs (Electricity,
Water, Communication Service, Waste Management)
10
Vulnerabilities to Natural Hazards (Flooding, Site
Erosion, Seismologic Activity)
10
Site Drainage 5
Topography 10
Climate 10
Orientation 5
Existing Vegetation 5
Future Expansion Plan 5
TOTAL 100
Socio-Economic and Cultural Factor
CRITERIA %
SITES
A
Makati
B
Ortigas
C
Taguig
Criteria Ranking
Ave. per Criteria
Ranking x %
Criteria Ranking
Ave. per Criteria
Ranking x %
Criteria Ranking
Ave. per Criteria
Ranking x %
Site Potential 20
Accessibility to major roads 30
Must be within urban area 20
Accessibility to important existing facilities 15
Pedestrian Access and Circulation 15
TOTAL 100
Legal, Institutional, Administrative, and Aesthetic Factor
CRITERIA %
SITES
A
Makati
B
Ortigas
C
Taguig
Criteria Ranking
Equivalent
Percentage
Criteria Ranking
Equivalent
Percentage
Criteria Ranking
Equivalent
Percentage
Proper Land Use & Zoning 20
Ease of Ownership 25
Land Cost 35
Compatibility with Adjacent Land Use 20
TOTAL 100
 Evaluation (for Land area Criteria):
1 – Lot size is inadequate to meet the suggested minimum lot size requirement set in the national building code
2 – Lot size is adequate to meet the suggested minimum lot size requirement set in the national building code
3 – Lot size exceeds 50% of the suggested minimum lot size requirement set in the national building code and provides area for
another expansion or provision of another adjacent amenities and activities
4 – Lot size exceeds 75% of the suggested minimum lot size requirement set in the national building code and provides area for
another expansion or provision of another adjacent amenities and activities
5 – Lot size exceeds more than 100% of the suggested minimum lot size requirement set in the national building code and
provides area for another expansion or provision of another adjacent amenities and activities
 Evaluation (for Accessibility Network Criteria):
1 – Accessed by taxis and private vehicles
2 – Accessed by PUVs, taxis and private vehicles
3 – Accessed by jeepney, PUVs, taxis, and private vehicles
4 – Accessed by public bus, jeepney, PUVs, taxis, and private vehicles
5 – Near an airport terminal and accessible through public, buses, jeepneys, PUVs, and private vehicles
 Evaluation (for Soil Characteristic and Condition Criteria):
1 – Soil is unstable all over and soil is mostly consists of made ground or fill
2 – Soil is unstable for most parts of site and is mostly consists of peat and organic soil
3 – Some remote area of the site have unstable soils and is mostly consists of cohesive soils (hard, firm and soft clays)
4 – Most areas of the site have stable soils and is mostly consists of non-cohesive soils (hard clays, gravel and sand)
5 – Soils are stable and mostly consists of rocks (igneous, gneissic, limestone, sandstone, schist, slate, mustone)
 Ratings for Natural, Environmental and
Physical Factors
 Evaluation (for Accessibility to Utility and Services Criteria):
1 – No existing utilities and services and has known difficulties of access on site
2 – No existing utilities and services but is far from the site
3 – No existing utilities and services but is accessible near the site
4 – Existing utilities and services are available adjacent to or near the site
5 – Existing utilities and services are available within the site
 Evaluation (for Vulnerabilities to Natural Hazard Criteria):
1 – Site in proximity to hazards
2 – Site is in proximity to three or more hazards
3 – Site is in proximity to two hazards
4 – Site is in proximity to one hazard
5 – Site free of any potential damage/injury from natural hazards
 Evaluation (for Site Drainage Criteria):
1 – Site is mostly low and the neighboring areas drain into it
2 – Drainage accumulates in some portion of the site
3 – Drainage accumulates in the neighborhood near the site
4 – Site has definite drainage with water coming from adjacent properties but can merely be contained
5 – Site has definite drainage with no unnecessary water coming from adjacent properties
 Evaluation (for Topography Criteria):
1 – Site contains major topographic irregularity and cannot hold possible uses
2 – Site is not even, and can only hold certain possible use
3 – Site is not even, but can still hold all possible uses
4 – Site is chiefly even and can hold all possible uses
5 – Site is relatively flat and can hold all possible use
 Ratings for Natural, Environmental and
Physical Factors
 Evaluation (for Climate Criteria):
1 – The site has irregular dry and wet season
2 – Site experiences greater wet season than dry season
3 – Site experiences greater dry season than wet season
4 – Site has fair climate and weather condition
5 – Site has good climate and weather condition
 Evaluation (for Orientation Criteria):
1 – The site does not have good sun and wind orientation
2 – The site has satisfactory sun and wind orientation
3 – The site has good sun orientation but satisfactory wind orientation
4 – The site has both good sun and wind orientation
5 – The site has both excellent sun and wind orientation
 Evaluation (for Existing Vegetation Criteria):
1 – The site has no existing vegetation
2 – The site has 10% existing vegetation
3 – The site has 20% existing vegetation
4 – The site has 30% existing vegetation
5 – The site has 40% existing vegetation
 Evaluation (for Future Expansion Plan Criteria):
1 – The site has no potential for future expansion
2 – Relevant variances are approved to future expansion
3 – Some variances are approved to future expansion
4 – Has enough area for additional amenities for the property development
5 – Has larger area for additional amenities for the property development
 Ratings for Natural, Environmental and
Physical Factors
 Evaluation (for Proper Land Use and Zoning Criteria):
1 – Land’s present/future zoning does not allow use for a skyscraper
2 – Land’s current zoning does not allow skyscraper but exemption can be appealed
3 – Land’s current zoning permits skyscraper with provision on the usage
4 – Land is currently within a C-3 zone and but will probably change
5 – Land is within a C-3 zoning classification set in the National Building Code or within a Central Business District and
present/future zoning permits skyscraper or no zoning restrictions exist
 Evaluation (for Ease of Ownership Criteria):
1 – The site is divided with many property owners.
2 – The site is divided with a moderate number of property owners.
3 – The site is divided with few property owners.
4 – The site is relatively undivided.
 Evaluation (for Land Cost Criteria):
1 – Site is high-priced
2 – Site is above the reasonable value but is still affordable
3 – Site is at reasonable value
4 – Site is below the reasonable value
 Evaluation (for Compatibility with Adjacent Land Use Criteria):
1 – Incompatible with the adjacent land use and the surrounding context
2 – Considerable differences with the adjacent land use and surrounding context
3 – Certain differences with the adjacent land use and surrounding context
4 – Relatively fit with the adjacent land use and surrounding context
5 – Perfectly relates with the adjacent land use and surrounding context
 Legal, Institutional and Aesthetic
Factors
 Evaluation (for Site Potential Criteria):
1 – Site is potential for job opportunities and rationalized residential plan
2 – Site is potential for local business sectors and agencies, job opportunities and rationalized residential plan
3 – Site is potential for local and international business sectors and agencies, tourism development, job opportunities and rationalized residential planning
 Evaluation (for Accessibility to main road Criteria):
1 – Site is more than 5km away or 1 hour vehicle ride
2 – Site is within 4 km away or 1 hour vehicle ride
3 – Site is within 3km away or 30 minutes vehicle ride
4 – Site is within 2km away or 10 minutes vehicle ride
5 – Site is within reasonable walking distance or 1km and less
 Evaluation (for Must be within urban area Criteria):
1 – Site is not within an urban area
2 – Site is within an urbanizing area
3 – Site is within an urbanized area
4 – Site is a progressive urbanized area
5 – Site is within highly developed urbanized area
 Evaluation (for Accessibility to Important Existing Facilities Criteria):
1 – Necessary existing establishments are within 5km and above
2 – Necessary existing establishments are within 3-5km from the site
3 – Necessary existing establishments are within 3km from the site
4 – Necessary existing establishments are within 1-2km from the site
5 – Necessary existing establishments are within less than a kilometer from the site
 Evaluation (for Pedestrian Access and Circulation Criteria):
1 – No existing pedestrian access are available that can reasonably be constructed
2 – Pedestrian access can be constructed, but pathway work is required and traffic control system should be provided
3 – Pedestrian access can be constructed without major road work
4 – Site has existing pedestrian access that is suitable for 1/2 kilometer travel and has existing traffic control system
5 – Site has existing pedestrian access that is suitable for 1/4 kilometer travel and has existing traffic control system
 Socio-Economic and Cultural Factors
SELECTION ELEMENTS SITES
Natural, Environmental, Physical Factors
Legal, Institutional, Administrative, and Aesthetic
Factor
Socio-Economic and Cultural Factor
GRAND TOTAL
 Proposed Site A :
Makati
SITE PROFILE
Location:
Along Antonio Arnaiz Ave. ,
Makati City
Land Area:
Approx. 1.7 Ha.
Site Land Cost:
P200,000-250,000/ sq.m.
Land Owner:
Ayala Land Corporation
 Accessibility
Modes of Transportation
Ayala Buses, Jeepneys, Tamaraw FXs/ vans & Taxi Cubs
Rail Network
The Philippine National Railways (PNR)
(MRT3) Guadalupe, Ayala and Magallanes
(LRT1) Sen. Gil Puyat
Other Transport Facilities
Makati City is easily accessible from the domestic and international
airport of Metro Manila. It is 8 kilometers away from the city via South
Expressway and 6 kilometers through the EDSA-Tramo route. Helicopter
service from most of the city's hotels is also available
Road
EDSA, Antonio Arnaiz Avenue
 Vicinity Map
 Zoning Map
 Proximity to existing Facilities
School
MAPUA Institute of Technology – Makati
Don Bosco Technical School
Information and Communication Technology Academy
Hospital
Makati Medical Center
Church
Greenbelt Church
Don Bosco Parish
Mall
Glorietta
SM Makati
Rustan’s
Landmark
Landmarks
Glorietta
Dusit Thani
 Proposed Site C :
Ortigas
SITE PROFILE
Location:
Exchange Road, Cor. Jade
Drive, Ortigas Center, Pasig
City
Land Area:
Approx. 1.8 Ha.
Land Cost:
P200,000/ sq.m.
Land Owner:
-Amberland Corporation
-Johnson & Johnson
- Ayala Land, Inc.
 Accessibility
Possible Access to the Site
From EDSA:
- By taking the bus – both northbound and southbound buses stop in
front of Robinson’s Galleria, or the Metro Rail Transit that stops at the
Ortigas Station from which Robinson’s Galleria is.
- From Manila:
The Filipino ride known as the “jeepney” goes the Pasig-Quiapo (and vice
versa) route, which travels from the western side of Shaw Boulevard.
Modes of Transport
-Taxi -Bus
-MRT -FX
-Jeepney
Ortigas is also accessible from the domestic and international airport of
Metro Manila.
Roads
Jade Drive from Doña Julia Vargas Avenue, Exchange Road from ADB
Ave. and Meralco Avenue
 Vicinity Map
 Proximity to existing Facilities
School
University of Asia and the Pacific (approx. 400m)
Lourdes School of Mandaluyong (approx.600m)
St. Paul College-Pasig (approx. 1km)
STI College-Shaw (approx. 1km)
Ateneo School of Medicine and Public Health (approx. 1.5 km)
Hospital
The MedicalCity (approx. 1.4 km)
Mary Immaculate Hospital (approx. 2.3km)
Church
St. Francis of Assisi Church (approx. 700 m)
St. Paul Church (approx. 900m)
Word Community Church (approx. 1.4km)
Mall
SM Megamall (approx. 500m)
Edsa Central Mall (approx. 1.1km)
Starmall Edsa-Shaw (approx. 1.3km)
Landmarks
SM Megamall (approx. 500m)
MRT Ortigas (approx. 1.1km)
MRT Shaw Boulevard (approx. 1.1km)
 Proposed Site C:
Taguig City
Location:
Bonifacio Global City,
Taguig City, Metro Manila
Land Area:
Approx. 2.5 Has.
Land Cost:
P200,000/ sq.m.
Land Owner:
Fort Bonifacio
Development Corporation
 Vicinity Map
 Proximity
School
Philippine Public Safety College
British School Manila
Manila Japanese School
Trace College
Hospital
St.Lukes Medical center
Church
St. Michael Archangel Church
Mall
Market Market
Piazza
Serendra
Bonifacio High Street
The Fort Strip
Landmarks
Serendra
Bonifacio High Street
Market Market
 Accessibility
Possible Access to the Site
Modes of Transport
-Taxi -Bus
-MRT -FX
-Jeepney
Taguig is also accessible from the domestic and international airport of
Metro Manila.
Roads
32nd St., 9th Avenue
Natural, Environmental, Physical Factors
CRITERIA %
SITES
A
Makati
B
Ortigas
C
Taguig
Criteria Ranking Equivalent Percentage Criteria Ranking Equivalent Percentage Criteria Ranking Equivalent Percentage
Land Area/Lot Size 20 4
16 4.5 18 5 20
Accessibility (Modes of Transportation) 10 5 10 5 10 5 10
Soil Characteristic & Condition 10 5 10 4 8 5 10
Accessibility of Utility and Service Needs (Electricity,
Water, Communication Service, Waste Management)
10 4 8 4 8 5 10
Vulnerabilities to Natural Hazards (Flooding, Site
Erosion, Seismologic Activity)
10 4 8 4 8 4 8
Site Drainage 5 5 5 5 5 5 5
Topography 10 5 10 5 10 5 10
Climate 10 5 10 5 10 5 10
Orientation 5 4 4 4 4 5 5
Existing Vegetation 5 1
1
2 2 2 2
Future Expansion Plan 5 5
5 5 5 5 5
TOTAL 100
87 88 94
Socio-Economic and Cultural Factor
CRITERIA %
SITES
A
Makati
B
Ortigas
C
Taguig
Criteria Ranking
Ave. per Criteria
Ranking x %
Criteria Ranking
Ave. per Criteria
Ranking x %
Criteria Ranking
Ave. per Criteria
Ranking x %
Site Potential 20 3 20 3 20 3 20
Accessibility to major roads 30 5 30 4 21 4 24
Must be within urban area 20 5 20 5 20 4 16
Accessibility to important existing facilities 15 4
12 5 1 5
4
12
Pedestrian Access and Circulation 15 4 12 4 12 5 15
TOTAL 100 94 88 87
Legal, Institutional, Administrative, and Aesthetic Factor
CRITERIA %
SITES
A
Makati
B
Ortigas
C
Taguig
Criteria Ranking
Equivalent
Percentage
Criteria Ranking
Equivalent
Percentage
Criteria Ranking
Equivalent
Percentage
Proper Land Use & Zoning 20 5
20 5 20
5
20
Ease of Ownership 25 4
25 3 18.75
4
25
Land Cost 35 2
17.5 3 21
3
21
Compatibility with Adjacent Land Use 20 4 16 5 20 4 16
TOTAL 100
78.5 79.75 82
SELECTION ELEMENTS SITES
Natural, Environmental, Physical
Factors
87 88 94
Legal, Institutional, Administrative,
and Aesthetic Factor
78.5 79.75 82
Socio-Economic and Cultural Factor 94 88 87
GRAND TOTAL 259.5 255.75 263
 Conclusion
The site selection table shows that points added from the three
major factors, summarizes the highest and most suitable site for the
proposed project is Site C in Fort Bonifacio, Taguig City.

More Related Content

What's hot

Site analysis-example
Site analysis-exampleSite analysis-example
Site analysis-example
Anu PA
 
research methodologies in architecture
research methodologies in architectureresearch methodologies in architecture
research methodologies in architecture
Samanth kumar
 

What's hot (20)

Architectural thesis-manual
Architectural thesis-manualArchitectural thesis-manual
Architectural thesis-manual
 
Shopping mall.
Shopping mall.Shopping mall.
Shopping mall.
 
Economic and Socialized Housing BP 220 (02)
Economic and Socialized Housing BP 220 (02)Economic and Socialized Housing BP 220 (02)
Economic and Socialized Housing BP 220 (02)
 
Site analysis-example
Site analysis-exampleSite analysis-example
Site analysis-example
 
Site planning
Site planningSite planning
Site planning
 
Site Planning
Site PlanningSite Planning
Site Planning
 
Site planing
Site planingSite planing
Site planing
 
Site analysis
Site analysisSite analysis
Site analysis
 
Parking final
Parking finalParking final
Parking final
 
Public Spaces - PH Legal Bases and provisions in the New Urban Agenda
Public Spaces - PH Legal Bases and provisions in the New Urban AgendaPublic Spaces - PH Legal Bases and provisions in the New Urban Agenda
Public Spaces - PH Legal Bases and provisions in the New Urban Agenda
 
Architectural Design Concepts Approaches - كونسيبت التصميم المعمارى و الفكرة ...
Architectural Design Concepts Approaches - كونسيبت التصميم المعمارى و الفكرة ...Architectural Design Concepts Approaches - كونسيبت التصميم المعمارى و الفكرة ...
Architectural Design Concepts Approaches - كونسيبت التصميم المعمارى و الفكرة ...
 
EKISTICS
EKISTICSEKISTICS
EKISTICS
 
Regulations (for apartments design)
Regulations (for apartments design)Regulations (for apartments design)
Regulations (for apartments design)
 
Cultural Beliefs in Housing
Cultural Beliefs in HousingCultural Beliefs in Housing
Cultural Beliefs in Housing
 
Urban Planning Site Analysis and Selection
Urban Planning Site Analysis and SelectionUrban Planning Site Analysis and Selection
Urban Planning Site Analysis and Selection
 
Parking System analysis
Parking System analysisParking System analysis
Parking System analysis
 
research methodologies in architecture
research methodologies in architectureresearch methodologies in architecture
research methodologies in architecture
 
Taguig City - CLUP vol.1
Taguig City - CLUP vol.1Taguig City - CLUP vol.1
Taguig City - CLUP vol.1
 
Architectural Design Project Site Analysis
Architectural Design Project Site AnalysisArchitectural Design Project Site Analysis
Architectural Design Project Site Analysis
 
Lift form slab construction
Lift form slab constructionLift form slab construction
Lift form slab construction
 

Viewers also liked

Site selection, site planning, site divelepment
Site selection, site planning, site divelepmentSite selection, site planning, site divelepment
Site selection, site planning, site divelepment
Sidharth Ravva
 

Viewers also liked (11)

Construction of earthquake resistance building by shaswat das
Construction of earthquake resistance building by shaswat dasConstruction of earthquake resistance building by shaswat das
Construction of earthquake resistance building by shaswat das
 
Introduction to the Waffle-Crete Precast Concrete Building System
Introduction to the Waffle-Crete Precast Concrete Building SystemIntroduction to the Waffle-Crete Precast Concrete Building System
Introduction to the Waffle-Crete Precast Concrete Building System
 
Architecture for Disaster Resistant Systems @I TAKE Unconference 29 05 2015
Architecture for Disaster Resistant Systems @I TAKE Unconference 29 05 2015Architecture for Disaster Resistant Systems @I TAKE Unconference 29 05 2015
Architecture for Disaster Resistant Systems @I TAKE Unconference 29 05 2015
 
Earthquake resistant structure
Earthquake resistant structureEarthquake resistant structure
Earthquake resistant structure
 
Earthquake resistant construction
Earthquake resistant constructionEarthquake resistant construction
Earthquake resistant construction
 
Structural design including disaster (wind & cyclone land slide_eq_ resistan...
Structural design including disaster (wind & cyclone  land slide_eq_ resistan...Structural design including disaster (wind & cyclone  land slide_eq_ resistan...
Structural design including disaster (wind & cyclone land slide_eq_ resistan...
 
Disaster Resist house , with stand cyclone and earthquake
Disaster Resist house , with stand cyclone and earthquake Disaster Resist house , with stand cyclone and earthquake
Disaster Resist house , with stand cyclone and earthquake
 
Design Steps for Earthquake Resistant Structures
Design Steps for Earthquake Resistant StructuresDesign Steps for Earthquake Resistant Structures
Design Steps for Earthquake Resistant Structures
 
Disaster resistant architecture
Disaster resistant architectureDisaster resistant architecture
Disaster resistant architecture
 
Site selection, site planning, site divelepment
Site selection, site planning, site divelepmentSite selection, site planning, site divelepment
Site selection, site planning, site divelepment
 
Earthquake resistant structure
Earthquake resistant structureEarthquake resistant structure
Earthquake resistant structure
 

Similar to Site Selection Criteria

The Evaluation of Green Infrastructure Elements to Enhance Green Neighbourhoo...
The Evaluation of Green Infrastructure Elements to Enhance Green Neighbourhoo...The Evaluation of Green Infrastructure Elements to Enhance Green Neighbourhoo...
The Evaluation of Green Infrastructure Elements to Enhance Green Neighbourhoo...
Rijal Saffuan
 
5.0 Site Selection in Landscaping design and Planning.pptx
5.0 Site Selection in Landscaping design and Planning.pptx5.0 Site Selection in Landscaping design and Planning.pptx
5.0 Site Selection in Landscaping design and Planning.pptx
IzriAndaya1
 
An Overview of the Indian Green Building Council Rating SystemIGBC.pptx
An Overview of the Indian Green Building Council Rating SystemIGBC.pptxAn Overview of the Indian Green Building Council Rating SystemIGBC.pptx
An Overview of the Indian Green Building Council Rating SystemIGBC.pptx
imsuraj2309
 
Location and Transportation Final
Location and Transportation FinalLocation and Transportation Final
Location and Transportation Final
Danielle Gavin
 
Haiti Challenge
Haiti ChallengeHaiti Challenge
Haiti Challenge
D+E|E+D
 
Site analysis check list
Site analysis check listSite analysis check list
Site analysis check list
Nicky Wong
 

Similar to Site Selection Criteria (20)

Site selection
Site selectionSite selection
Site selection
 
The Evaluation of Green Infrastructure Elements to Enhance Green Neighbourhoo...
The Evaluation of Green Infrastructure Elements to Enhance Green Neighbourhoo...The Evaluation of Green Infrastructure Elements to Enhance Green Neighbourhoo...
The Evaluation of Green Infrastructure Elements to Enhance Green Neighbourhoo...
 
5.0 Site Selection in Landscaping design and Planning.pptx
5.0 Site Selection in Landscaping design and Planning.pptx5.0 Site Selection in Landscaping design and Planning.pptx
5.0 Site Selection in Landscaping design and Planning.pptx
 
Utah Prison Commission Update on Dec. 22, 2014
Utah Prison Commission Update on Dec. 22, 2014Utah Prison Commission Update on Dec. 22, 2014
Utah Prison Commission Update on Dec. 22, 2014
 
04 LT and SS
04 LT and SS04 LT and SS
04 LT and SS
 
An Overview of the Indian Green Building Council Rating SystemIGBC.pptx
An Overview of the Indian Green Building Council Rating SystemIGBC.pptxAn Overview of the Indian Green Building Council Rating SystemIGBC.pptx
An Overview of the Indian Green Building Council Rating SystemIGBC.pptx
 
Contaminated land management in Malaysia: Policies and legal framework
Contaminated land management in Malaysia: Policies and legal frameworkContaminated land management in Malaysia: Policies and legal framework
Contaminated land management in Malaysia: Policies and legal framework
 
Location and Transportation Final
Location and Transportation FinalLocation and Transportation Final
Location and Transportation Final
 
Site selection and site planning
Site selection and site planningSite selection and site planning
Site selection and site planning
 
GIS tools for transmission line routing
GIS tools for transmission line routingGIS tools for transmission line routing
GIS tools for transmission line routing
 
B-Team in Vilnius 2012: [lt, en] Choosing a rational living place
B-Team in Vilnius 2012: [lt, en] Choosing a rational living placeB-Team in Vilnius 2012: [lt, en] Choosing a rational living place
B-Team in Vilnius 2012: [lt, en] Choosing a rational living place
 
Mark Mac Auley Data Center Marketplace Event
Mark Mac Auley Data Center Marketplace EventMark Mac Auley Data Center Marketplace Event
Mark Mac Auley Data Center Marketplace Event
 
Haiti Challenge
Haiti ChallengeHaiti Challenge
Haiti Challenge
 
Site analysis check list
Site analysis check listSite analysis check list
Site analysis check list
 
Guide: Managing roadside environments 1 - Assessment
Guide: Managing roadside environments 1 - AssessmentGuide: Managing roadside environments 1 - Assessment
Guide: Managing roadside environments 1 - Assessment
 
Final 360 stakeholder_presentation_110515
Final 360 stakeholder_presentation_110515Final 360 stakeholder_presentation_110515
Final 360 stakeholder_presentation_110515
 
garaduation
garaduation garaduation
garaduation
 
Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2
 
Brownfields in Mississippi
Brownfields in MississippiBrownfields in Mississippi
Brownfields in Mississippi
 
The permitting advantages and challenges of green infrastructure
The permitting advantages and challenges of green infrastructureThe permitting advantages and challenges of green infrastructure
The permitting advantages and challenges of green infrastructure
 

Recently uploaded

National-Learning-Camp 2024 deped....pptx
National-Learning-Camp 2024 deped....pptxNational-Learning-Camp 2024 deped....pptx
National-Learning-Camp 2024 deped....pptx
AlecAnidul
 
Research about Venice ppt for grade 6f anas
Research about Venice ppt for grade 6f anasResearch about Venice ppt for grade 6f anas
Research about Venice ppt for grade 6f anas
anasabutalha2013
 
Heuristic Evaluation of System & Application
Heuristic Evaluation of System & ApplicationHeuristic Evaluation of System & Application
Heuristic Evaluation of System & Application
Jaime Brown
 

Recently uploaded (16)

Common Designing Mistakes and How to avoid them
Common Designing Mistakes and How to avoid themCommon Designing Mistakes and How to avoid them
Common Designing Mistakes and How to avoid them
 
The Evolution of Fashion Trends: History to Fashion
The Evolution of Fashion Trends: History to FashionThe Evolution of Fashion Trends: History to Fashion
The Evolution of Fashion Trends: History to Fashion
 
Extended Reality(XR) Development in immersive design
Extended Reality(XR) Development in immersive designExtended Reality(XR) Development in immersive design
Extended Reality(XR) Development in immersive design
 
Claire's designing portfolio presentation
Claire's designing portfolio presentationClaire's designing portfolio presentation
Claire's designing portfolio presentation
 
CA OFFICE office office office _VIEWS.pdf
CA OFFICE office office office _VIEWS.pdfCA OFFICE office office office _VIEWS.pdf
CA OFFICE office office office _VIEWS.pdf
 
National-Learning-Camp 2024 deped....pptx
National-Learning-Camp 2024 deped....pptxNational-Learning-Camp 2024 deped....pptx
National-Learning-Camp 2024 deped....pptx
 
Pitch Presentation for Service Design in Technology
Pitch Presentation for Service Design in TechnologyPitch Presentation for Service Design in Technology
Pitch Presentation for Service Design in Technology
 
Spring 2024 wkrm_Enhancing Campus Mobility.pdf
Spring 2024 wkrm_Enhancing Campus Mobility.pdfSpring 2024 wkrm_Enhancing Campus Mobility.pdf
Spring 2024 wkrm_Enhancing Campus Mobility.pdf
 
Research about Venice ppt for grade 6f anas
Research about Venice ppt for grade 6f anasResearch about Venice ppt for grade 6f anas
Research about Venice ppt for grade 6f anas
 
Design lessons from Singapore | Volume 3
Design lessons from Singapore | Volume 3Design lessons from Singapore | Volume 3
Design lessons from Singapore | Volume 3
 
BIT- Pinal .H. Prajapati Graphic Designer
BIT- Pinal .H. Prajapati  Graphic DesignerBIT- Pinal .H. Prajapati  Graphic Designer
BIT- Pinal .H. Prajapati Graphic Designer
 
Art Nouveau Movement Presentation for Art History.
Art Nouveau Movement Presentation for Art History.Art Nouveau Movement Presentation for Art History.
Art Nouveau Movement Presentation for Art History.
 
Dos And Dont's Of Logo Design For 2024..
Dos And Dont's Of Logo Design For 2024..Dos And Dont's Of Logo Design For 2024..
Dos And Dont's Of Logo Design For 2024..
 
The Design Code Google Developer Student Club.pptx
The Design Code Google Developer Student Club.pptxThe Design Code Google Developer Student Club.pptx
The Design Code Google Developer Student Club.pptx
 
Heuristic Evaluation of System & Application
Heuristic Evaluation of System & ApplicationHeuristic Evaluation of System & Application
Heuristic Evaluation of System & Application
 
FW25-26 Fashion Key Items Trend Book Peclers Paris
FW25-26 Fashion Key Items Trend Book Peclers ParisFW25-26 Fashion Key Items Trend Book Peclers Paris
FW25-26 Fashion Key Items Trend Book Peclers Paris
 

Site Selection Criteria

  • 1. Arnuco, Daron Ruscer Caasi, Jonica Valerie Loon, Dabie Lee Sumang, Razzel Kristine
  • 2. Natural, Environmental, Physical Factors CRITERIA % SITES A Makati B Ortigas C Taguig Criteria Ranking Equivalent Percentage Criteria Ranking Equivalent Percentage Criteria Ranking Equivalent Percentage Land Area/Lot Size 20 Accessibility (Modes of Transportation) 10 Soil Characteristic & Condition 10 Accessibility of Utility and Service Needs (Electricity, Water, Communication Service, Waste Management) 10 Vulnerabilities to Natural Hazards (Flooding, Site Erosion, Seismologic Activity) 10 Site Drainage 5 Topography 10 Climate 10 Orientation 5 Existing Vegetation 5 Future Expansion Plan 5 TOTAL 100
  • 3. Socio-Economic and Cultural Factor CRITERIA % SITES A Makati B Ortigas C Taguig Criteria Ranking Ave. per Criteria Ranking x % Criteria Ranking Ave. per Criteria Ranking x % Criteria Ranking Ave. per Criteria Ranking x % Site Potential 20 Accessibility to major roads 30 Must be within urban area 20 Accessibility to important existing facilities 15 Pedestrian Access and Circulation 15 TOTAL 100 Legal, Institutional, Administrative, and Aesthetic Factor CRITERIA % SITES A Makati B Ortigas C Taguig Criteria Ranking Equivalent Percentage Criteria Ranking Equivalent Percentage Criteria Ranking Equivalent Percentage Proper Land Use & Zoning 20 Ease of Ownership 25 Land Cost 35 Compatibility with Adjacent Land Use 20 TOTAL 100
  • 4.  Evaluation (for Land area Criteria): 1 – Lot size is inadequate to meet the suggested minimum lot size requirement set in the national building code 2 – Lot size is adequate to meet the suggested minimum lot size requirement set in the national building code 3 – Lot size exceeds 50% of the suggested minimum lot size requirement set in the national building code and provides area for another expansion or provision of another adjacent amenities and activities 4 – Lot size exceeds 75% of the suggested minimum lot size requirement set in the national building code and provides area for another expansion or provision of another adjacent amenities and activities 5 – Lot size exceeds more than 100% of the suggested minimum lot size requirement set in the national building code and provides area for another expansion or provision of another adjacent amenities and activities  Evaluation (for Accessibility Network Criteria): 1 – Accessed by taxis and private vehicles 2 – Accessed by PUVs, taxis and private vehicles 3 – Accessed by jeepney, PUVs, taxis, and private vehicles 4 – Accessed by public bus, jeepney, PUVs, taxis, and private vehicles 5 – Near an airport terminal and accessible through public, buses, jeepneys, PUVs, and private vehicles  Evaluation (for Soil Characteristic and Condition Criteria): 1 – Soil is unstable all over and soil is mostly consists of made ground or fill 2 – Soil is unstable for most parts of site and is mostly consists of peat and organic soil 3 – Some remote area of the site have unstable soils and is mostly consists of cohesive soils (hard, firm and soft clays) 4 – Most areas of the site have stable soils and is mostly consists of non-cohesive soils (hard clays, gravel and sand) 5 – Soils are stable and mostly consists of rocks (igneous, gneissic, limestone, sandstone, schist, slate, mustone)  Ratings for Natural, Environmental and Physical Factors
  • 5.  Evaluation (for Accessibility to Utility and Services Criteria): 1 – No existing utilities and services and has known difficulties of access on site 2 – No existing utilities and services but is far from the site 3 – No existing utilities and services but is accessible near the site 4 – Existing utilities and services are available adjacent to or near the site 5 – Existing utilities and services are available within the site  Evaluation (for Vulnerabilities to Natural Hazard Criteria): 1 – Site in proximity to hazards 2 – Site is in proximity to three or more hazards 3 – Site is in proximity to two hazards 4 – Site is in proximity to one hazard 5 – Site free of any potential damage/injury from natural hazards  Evaluation (for Site Drainage Criteria): 1 – Site is mostly low and the neighboring areas drain into it 2 – Drainage accumulates in some portion of the site 3 – Drainage accumulates in the neighborhood near the site 4 – Site has definite drainage with water coming from adjacent properties but can merely be contained 5 – Site has definite drainage with no unnecessary water coming from adjacent properties  Evaluation (for Topography Criteria): 1 – Site contains major topographic irregularity and cannot hold possible uses 2 – Site is not even, and can only hold certain possible use 3 – Site is not even, but can still hold all possible uses 4 – Site is chiefly even and can hold all possible uses 5 – Site is relatively flat and can hold all possible use  Ratings for Natural, Environmental and Physical Factors
  • 6.  Evaluation (for Climate Criteria): 1 – The site has irregular dry and wet season 2 – Site experiences greater wet season than dry season 3 – Site experiences greater dry season than wet season 4 – Site has fair climate and weather condition 5 – Site has good climate and weather condition  Evaluation (for Orientation Criteria): 1 – The site does not have good sun and wind orientation 2 – The site has satisfactory sun and wind orientation 3 – The site has good sun orientation but satisfactory wind orientation 4 – The site has both good sun and wind orientation 5 – The site has both excellent sun and wind orientation  Evaluation (for Existing Vegetation Criteria): 1 – The site has no existing vegetation 2 – The site has 10% existing vegetation 3 – The site has 20% existing vegetation 4 – The site has 30% existing vegetation 5 – The site has 40% existing vegetation  Evaluation (for Future Expansion Plan Criteria): 1 – The site has no potential for future expansion 2 – Relevant variances are approved to future expansion 3 – Some variances are approved to future expansion 4 – Has enough area for additional amenities for the property development 5 – Has larger area for additional amenities for the property development  Ratings for Natural, Environmental and Physical Factors
  • 7.  Evaluation (for Proper Land Use and Zoning Criteria): 1 – Land’s present/future zoning does not allow use for a skyscraper 2 – Land’s current zoning does not allow skyscraper but exemption can be appealed 3 – Land’s current zoning permits skyscraper with provision on the usage 4 – Land is currently within a C-3 zone and but will probably change 5 – Land is within a C-3 zoning classification set in the National Building Code or within a Central Business District and present/future zoning permits skyscraper or no zoning restrictions exist  Evaluation (for Ease of Ownership Criteria): 1 – The site is divided with many property owners. 2 – The site is divided with a moderate number of property owners. 3 – The site is divided with few property owners. 4 – The site is relatively undivided.  Evaluation (for Land Cost Criteria): 1 – Site is high-priced 2 – Site is above the reasonable value but is still affordable 3 – Site is at reasonable value 4 – Site is below the reasonable value  Evaluation (for Compatibility with Adjacent Land Use Criteria): 1 – Incompatible with the adjacent land use and the surrounding context 2 – Considerable differences with the adjacent land use and surrounding context 3 – Certain differences with the adjacent land use and surrounding context 4 – Relatively fit with the adjacent land use and surrounding context 5 – Perfectly relates with the adjacent land use and surrounding context  Legal, Institutional and Aesthetic Factors
  • 8.  Evaluation (for Site Potential Criteria): 1 – Site is potential for job opportunities and rationalized residential plan 2 – Site is potential for local business sectors and agencies, job opportunities and rationalized residential plan 3 – Site is potential for local and international business sectors and agencies, tourism development, job opportunities and rationalized residential planning  Evaluation (for Accessibility to main road Criteria): 1 – Site is more than 5km away or 1 hour vehicle ride 2 – Site is within 4 km away or 1 hour vehicle ride 3 – Site is within 3km away or 30 minutes vehicle ride 4 – Site is within 2km away or 10 minutes vehicle ride 5 – Site is within reasonable walking distance or 1km and less  Evaluation (for Must be within urban area Criteria): 1 – Site is not within an urban area 2 – Site is within an urbanizing area 3 – Site is within an urbanized area 4 – Site is a progressive urbanized area 5 – Site is within highly developed urbanized area  Evaluation (for Accessibility to Important Existing Facilities Criteria): 1 – Necessary existing establishments are within 5km and above 2 – Necessary existing establishments are within 3-5km from the site 3 – Necessary existing establishments are within 3km from the site 4 – Necessary existing establishments are within 1-2km from the site 5 – Necessary existing establishments are within less than a kilometer from the site  Evaluation (for Pedestrian Access and Circulation Criteria): 1 – No existing pedestrian access are available that can reasonably be constructed 2 – Pedestrian access can be constructed, but pathway work is required and traffic control system should be provided 3 – Pedestrian access can be constructed without major road work 4 – Site has existing pedestrian access that is suitable for 1/2 kilometer travel and has existing traffic control system 5 – Site has existing pedestrian access that is suitable for 1/4 kilometer travel and has existing traffic control system  Socio-Economic and Cultural Factors
  • 9. SELECTION ELEMENTS SITES Natural, Environmental, Physical Factors Legal, Institutional, Administrative, and Aesthetic Factor Socio-Economic and Cultural Factor GRAND TOTAL
  • 10.  Proposed Site A : Makati SITE PROFILE Location: Along Antonio Arnaiz Ave. , Makati City Land Area: Approx. 1.7 Ha. Site Land Cost: P200,000-250,000/ sq.m. Land Owner: Ayala Land Corporation
  • 11.  Accessibility Modes of Transportation Ayala Buses, Jeepneys, Tamaraw FXs/ vans & Taxi Cubs Rail Network The Philippine National Railways (PNR) (MRT3) Guadalupe, Ayala and Magallanes (LRT1) Sen. Gil Puyat Other Transport Facilities Makati City is easily accessible from the domestic and international airport of Metro Manila. It is 8 kilometers away from the city via South Expressway and 6 kilometers through the EDSA-Tramo route. Helicopter service from most of the city's hotels is also available Road EDSA, Antonio Arnaiz Avenue
  • 14.  Proximity to existing Facilities School MAPUA Institute of Technology – Makati Don Bosco Technical School Information and Communication Technology Academy Hospital Makati Medical Center Church Greenbelt Church Don Bosco Parish Mall Glorietta SM Makati Rustan’s Landmark Landmarks Glorietta Dusit Thani
  • 15.  Proposed Site C : Ortigas SITE PROFILE Location: Exchange Road, Cor. Jade Drive, Ortigas Center, Pasig City Land Area: Approx. 1.8 Ha. Land Cost: P200,000/ sq.m. Land Owner: -Amberland Corporation -Johnson & Johnson - Ayala Land, Inc.
  • 16.  Accessibility Possible Access to the Site From EDSA: - By taking the bus – both northbound and southbound buses stop in front of Robinson’s Galleria, or the Metro Rail Transit that stops at the Ortigas Station from which Robinson’s Galleria is. - From Manila: The Filipino ride known as the “jeepney” goes the Pasig-Quiapo (and vice versa) route, which travels from the western side of Shaw Boulevard. Modes of Transport -Taxi -Bus -MRT -FX -Jeepney Ortigas is also accessible from the domestic and international airport of Metro Manila. Roads Jade Drive from Doña Julia Vargas Avenue, Exchange Road from ADB Ave. and Meralco Avenue
  • 18.
  • 19.  Proximity to existing Facilities School University of Asia and the Pacific (approx. 400m) Lourdes School of Mandaluyong (approx.600m) St. Paul College-Pasig (approx. 1km) STI College-Shaw (approx. 1km) Ateneo School of Medicine and Public Health (approx. 1.5 km) Hospital The MedicalCity (approx. 1.4 km) Mary Immaculate Hospital (approx. 2.3km) Church St. Francis of Assisi Church (approx. 700 m) St. Paul Church (approx. 900m) Word Community Church (approx. 1.4km) Mall SM Megamall (approx. 500m) Edsa Central Mall (approx. 1.1km) Starmall Edsa-Shaw (approx. 1.3km) Landmarks SM Megamall (approx. 500m) MRT Ortigas (approx. 1.1km) MRT Shaw Boulevard (approx. 1.1km)
  • 20.  Proposed Site C: Taguig City Location: Bonifacio Global City, Taguig City, Metro Manila Land Area: Approx. 2.5 Has. Land Cost: P200,000/ sq.m. Land Owner: Fort Bonifacio Development Corporation
  • 22.
  • 23.  Proximity School Philippine Public Safety College British School Manila Manila Japanese School Trace College Hospital St.Lukes Medical center Church St. Michael Archangel Church Mall Market Market Piazza Serendra Bonifacio High Street The Fort Strip Landmarks Serendra Bonifacio High Street Market Market
  • 24.  Accessibility Possible Access to the Site Modes of Transport -Taxi -Bus -MRT -FX -Jeepney Taguig is also accessible from the domestic and international airport of Metro Manila. Roads 32nd St., 9th Avenue
  • 25. Natural, Environmental, Physical Factors CRITERIA % SITES A Makati B Ortigas C Taguig Criteria Ranking Equivalent Percentage Criteria Ranking Equivalent Percentage Criteria Ranking Equivalent Percentage Land Area/Lot Size 20 4 16 4.5 18 5 20 Accessibility (Modes of Transportation) 10 5 10 5 10 5 10 Soil Characteristic & Condition 10 5 10 4 8 5 10 Accessibility of Utility and Service Needs (Electricity, Water, Communication Service, Waste Management) 10 4 8 4 8 5 10 Vulnerabilities to Natural Hazards (Flooding, Site Erosion, Seismologic Activity) 10 4 8 4 8 4 8 Site Drainage 5 5 5 5 5 5 5 Topography 10 5 10 5 10 5 10 Climate 10 5 10 5 10 5 10 Orientation 5 4 4 4 4 5 5 Existing Vegetation 5 1 1 2 2 2 2 Future Expansion Plan 5 5 5 5 5 5 5 TOTAL 100 87 88 94
  • 26. Socio-Economic and Cultural Factor CRITERIA % SITES A Makati B Ortigas C Taguig Criteria Ranking Ave. per Criteria Ranking x % Criteria Ranking Ave. per Criteria Ranking x % Criteria Ranking Ave. per Criteria Ranking x % Site Potential 20 3 20 3 20 3 20 Accessibility to major roads 30 5 30 4 21 4 24 Must be within urban area 20 5 20 5 20 4 16 Accessibility to important existing facilities 15 4 12 5 1 5 4 12 Pedestrian Access and Circulation 15 4 12 4 12 5 15 TOTAL 100 94 88 87 Legal, Institutional, Administrative, and Aesthetic Factor CRITERIA % SITES A Makati B Ortigas C Taguig Criteria Ranking Equivalent Percentage Criteria Ranking Equivalent Percentage Criteria Ranking Equivalent Percentage Proper Land Use & Zoning 20 5 20 5 20 5 20 Ease of Ownership 25 4 25 3 18.75 4 25 Land Cost 35 2 17.5 3 21 3 21 Compatibility with Adjacent Land Use 20 4 16 5 20 4 16 TOTAL 100 78.5 79.75 82
  • 27. SELECTION ELEMENTS SITES Natural, Environmental, Physical Factors 87 88 94 Legal, Institutional, Administrative, and Aesthetic Factor 78.5 79.75 82 Socio-Economic and Cultural Factor 94 88 87 GRAND TOTAL 259.5 255.75 263
  • 28.  Conclusion The site selection table shows that points added from the three major factors, summarizes the highest and most suitable site for the proposed project is Site C in Fort Bonifacio, Taguig City.