Using Datums for Economic
Process Planning
Dr. R. A. Wysk
IE550
Fall 2008
Process Planning
• Single datum planning
• Multiple datum plans
Process Tolerance Chart
Values in Process Tolerance Charts
typically represent the BEST attainable
values. They also represent single-feature
relationships. We refer to these intra-
feature process planning.
•Process Boundary Matrices
A 2” piece or bar stock needs to be “faced” so
that the required length and surface finish can be
obtained.
4.0
+ .005
- .0
2.0 + .005
- .005
A
Example #1 - The simplest case; single datum, single feature
Solution:
In checking the work piece, datum -A-
becomes the reference plan for the
length, 4.0 . The OD accuracy is
obtained at the rolling mill, and no OD
turning is required. The length needs
to be faced to final dimension.
+ 0.005
- 0.0
Oper. Description Machine Tool
10 Retrieve 2’’ Bar Warehouse --
20 Cut to 4.25’’ length Cut-off saw --
30 Face backside (remove
1/8 ‘’ stock)
Lathe Facing tool
40 Flip and face front-side Lathe Facing tool
50 Remove and inspect -- --
Process Plan-Example #1
1.0  .005
4 + .005
- 0
2.0 + 0.01
- 0
A
5  .005
Sort of like Example #1 but with a 2nd feature related
to the same datum -A-.
Example #2 -- Single datum; 2 features.
Solution:
- 4” segment is the same as in Example #1
-Addition segment requires that:
-OD is reduced to 1”
-Length needs to be reduced to 5  .005
Process Plan for Example #2
OP# Description Machine Tool Time
10 Retrieve 2” bar Warehouse
20 Cut to 5.25” Cut-off saw
30 Face backside and
invert
Lathe Facing
40 Turn 1” Dia. @ .25 in
depth
Lathe Turning
(2 passes)
50 Face to 4” Lathe Facing
60 Face to 5” Lathe Facing
70 Remove and Inspect
A
C12
C23
C4
M12
M13
Cij is part specification or
Constraints
Mij is Manufacturing method were
i is the datum feature, and
j is the surface produced
The General Case and Notation.
From the part, you can see that
C12 @ M12
This reads, “C12 comes directly from process
M12 (our facing operation).”
Also from the drawing, one can see that
TC23 = TM12 + TM13
This reads, “the tolerance for feature C23 can be
as large as the sum of the tolerance for
producing M12 and the tolerance for producing
M13”  Tolerance Stacking
Notation: subscript m implies minimum
M implies maximum
C23m = -M12M + M13m
Let’s suppose
0
005
.
4 

12
C 005
.
005
.
1

23
C
Then
TM12 = .005
TC23 = TM12 + TM13
.010 = .005 + TM13
TM13 = .005
If a negative value results then the process
specification is unfeasible
Since C23m = - M12M + M13m
.995 = -4.005 + M13m
5.000 = M13m
 Set the process specifications for M13 at
5.000 - 5.005
.750  .010
All hole features are specified with respect to
datums A-B-C and can be treated as intra-feature
entities.
 Ø .01  C A B
M
Example #4
+ +
+
4 .008
2 holes
.250  .010
 Ø .008 C A B
M
2.0  .01
A
1 1 1
B
1
.5  .01
C
Raw Material 4’’ x 2’’ x .5’’
Process Plan for Example #4
OP# Description Machine Tool
10 Load part in vise Fadal CNC
20 Drill 1st
small hole Fadal CNC .25  drill
30 Drill 2nd
small hole Fadal CNC .25  drill
40 Drill large hole Fadal CNC .25  drill
50 Unload and inspect
Example #5
 

B
.5 1 1
.750  .010
  .01  C D E
M
+
.25  MAX
.75
D
.25± .01 A
.5 ±
.01
E
2 holes
.250  .010
  .008 C D E
M
.50 ±.01
C
M12
M13
C23
M14 M15
.25±.01
Raw Material 4’’ x 2’’ x
.5’’
C12 @ M12
TC12 = ± .01
TC23 = TM12 + TM13
C23m = -M12M + M13m
.008 = -.51 + M13m
From 
.518 = M13m
TC23 = TM12 + TM13
.008 = .01 + TM13
TM13 < 0  infeasible
We need to position w.r.t -E-

More Related Content

Similar to using datums for economic process planning

Industrial training report
Industrial training reportIndustrial training report
Industrial training report
kiransuresh7
 
SHEET METAL PART QUALITY IMPROVEMENT THROUGH DIE OPTIMIZATION USING AUTOFORM
SHEET METAL PART QUALITY IMPROVEMENT THROUGH DIE OPTIMIZATION USING AUTOFORMSHEET METAL PART QUALITY IMPROVEMENT THROUGH DIE OPTIMIZATION USING AUTOFORM
SHEET METAL PART QUALITY IMPROVEMENT THROUGH DIE OPTIMIZATION USING AUTOFORM
Farhad ZHalehfar
 

Similar to using datums for economic process planning (20)

tech paper -- Intro
tech paper -- Introtech paper -- Intro
tech paper -- Intro
 
Design, Analysis and Manufacturing of Hydro-pneumatic Press Machine
Design, Analysis and Manufacturing of Hydro-pneumatic Press MachineDesign, Analysis and Manufacturing of Hydro-pneumatic Press Machine
Design, Analysis and Manufacturing of Hydro-pneumatic Press Machine
 
IRJET- Development of Mathematical Models to Predict Weld Bead Geometry of Bu...
IRJET- Development of Mathematical Models to Predict Weld Bead Geometry of Bu...IRJET- Development of Mathematical Models to Predict Weld Bead Geometry of Bu...
IRJET- Development of Mathematical Models to Predict Weld Bead Geometry of Bu...
 
CNC Machining of Face Cam on a Cylindrical Sector
CNC Machining of Face Cam on a Cylindrical SectorCNC Machining of Face Cam on a Cylindrical Sector
CNC Machining of Face Cam on a Cylindrical Sector
 
Simulation of Deep-Drawing Process of Large Panels
Simulation of Deep-Drawing Process of Large PanelsSimulation of Deep-Drawing Process of Large Panels
Simulation of Deep-Drawing Process of Large Panels
 
IRJET- Optimal Riser Design for Sand Casting of Drop Ball using Constraint Op...
IRJET- Optimal Riser Design for Sand Casting of Drop Ball using Constraint Op...IRJET- Optimal Riser Design for Sand Casting of Drop Ball using Constraint Op...
IRJET- Optimal Riser Design for Sand Casting of Drop Ball using Constraint Op...
 
IRJET- Experimental Investigation of Aluminum 7075 using Dry, Wet and MQL...
IRJET-  	  Experimental Investigation of Aluminum 7075 using Dry, Wet and MQL...IRJET-  	  Experimental Investigation of Aluminum 7075 using Dry, Wet and MQL...
IRJET- Experimental Investigation of Aluminum 7075 using Dry, Wet and MQL...
 
EDM wirecut report
EDM wirecut reportEDM wirecut report
EDM wirecut report
 
Die design optimization and die stress analysis of control arm by simulation
Die design optimization and die stress analysis of control arm by simulation Die design optimization and die stress analysis of control arm by simulation
Die design optimization and die stress analysis of control arm by simulation
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
Modeling and Machining of Sheet Metal Dies and Inspection Fixtures.
Modeling and Machining of Sheet Metal Dies and Inspection Fixtures.Modeling and Machining of Sheet Metal Dies and Inspection Fixtures.
Modeling and Machining of Sheet Metal Dies and Inspection Fixtures.
 
DESIGN AND ANALYSIS OF MULTIFACE HYDRAULIC BENDING MACHINE DIE
DESIGN AND ANALYSIS OF MULTIFACE HYDRAULIC BENDING MACHINE DIEDESIGN AND ANALYSIS OF MULTIFACE HYDRAULIC BENDING MACHINE DIE
DESIGN AND ANALYSIS OF MULTIFACE HYDRAULIC BENDING MACHINE DIE
 
IRJET- Design and Development of Jig and Fixture for Tacho Bracket
IRJET- Design and Development of Jig and Fixture for Tacho BracketIRJET- Design and Development of Jig and Fixture for Tacho Bracket
IRJET- Design and Development of Jig and Fixture for Tacho Bracket
 
Turning Parameter Optimization for Material Removal Rate of AISI 4140 Alloy S...
Turning Parameter Optimization for Material Removal Rate of AISI 4140 Alloy S...Turning Parameter Optimization for Material Removal Rate of AISI 4140 Alloy S...
Turning Parameter Optimization for Material Removal Rate of AISI 4140 Alloy S...
 
IRJET- A Case Study: In-Situ Weld Repair of Steel Casting of Grade C12A AST...
IRJET- 	 A Case Study: In-Situ Weld Repair of Steel Casting of Grade C12A AST...IRJET- 	 A Case Study: In-Situ Weld Repair of Steel Casting of Grade C12A AST...
IRJET- A Case Study: In-Situ Weld Repair of Steel Casting of Grade C12A AST...
 
IRJET- Prediction of Angular Distortion in TIG Welded Stainless Steel 202 She...
IRJET- Prediction of Angular Distortion in TIG Welded Stainless Steel 202 She...IRJET- Prediction of Angular Distortion in TIG Welded Stainless Steel 202 She...
IRJET- Prediction of Angular Distortion in TIG Welded Stainless Steel 202 She...
 
Department of Mechanical Engineering Technology
Department of Mechanical Engineering TechnologyDepartment of Mechanical Engineering Technology
Department of Mechanical Engineering Technology
 
Study of Manufacturing of Multi-Saddle Clamp
Study of Manufacturing of Multi-Saddle ClampStudy of Manufacturing of Multi-Saddle Clamp
Study of Manufacturing of Multi-Saddle Clamp
 
SHEET METAL PART QUALITY IMPROVEMENT THROUGH DIE OPTIMIZATION USING AUTOFORM
SHEET METAL PART QUALITY IMPROVEMENT THROUGH DIE OPTIMIZATION USING AUTOFORMSHEET METAL PART QUALITY IMPROVEMENT THROUGH DIE OPTIMIZATION USING AUTOFORM
SHEET METAL PART QUALITY IMPROVEMENT THROUGH DIE OPTIMIZATION USING AUTOFORM
 

Recently uploaded

Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networks
IJECEIAES
 
Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualFinal DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manual
BalamuruganV28
 

Recently uploaded (20)

Diploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfDiploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdf
 
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
 
Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networks
 
handbook on reinforce concrete and detailing
handbook on reinforce concrete and detailinghandbook on reinforce concrete and detailing
handbook on reinforce concrete and detailing
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded Systems
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
 
analog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxanalog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptx
 
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and ToolsMaximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
 
Artificial Intelligence in due diligence
Artificial Intelligence in due diligenceArtificial Intelligence in due diligence
Artificial Intelligence in due diligence
 
Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsFilters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility Applications
 
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
 
Insurance management system project report.pdf
Insurance management system project report.pdfInsurance management system project report.pdf
Insurance management system project report.pdf
 
15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon
 
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...
 
Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualFinal DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manual
 
History of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & ModernizationHistory of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & Modernization
 
Working Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdfWorking Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdf
 
Passive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptPassive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.ppt
 

using datums for economic process planning

  • 1. Using Datums for Economic Process Planning Dr. R. A. Wysk IE550 Fall 2008
  • 2. Process Planning • Single datum planning • Multiple datum plans
  • 3. Process Tolerance Chart Values in Process Tolerance Charts typically represent the BEST attainable values. They also represent single-feature relationships. We refer to these intra- feature process planning. •Process Boundary Matrices
  • 4. A 2” piece or bar stock needs to be “faced” so that the required length and surface finish can be obtained. 4.0 + .005 - .0 2.0 + .005 - .005 A Example #1 - The simplest case; single datum, single feature
  • 5.
  • 6.
  • 7. Solution: In checking the work piece, datum -A- becomes the reference plan for the length, 4.0 . The OD accuracy is obtained at the rolling mill, and no OD turning is required. The length needs to be faced to final dimension. + 0.005 - 0.0
  • 8. Oper. Description Machine Tool 10 Retrieve 2’’ Bar Warehouse -- 20 Cut to 4.25’’ length Cut-off saw -- 30 Face backside (remove 1/8 ‘’ stock) Lathe Facing tool 40 Flip and face front-side Lathe Facing tool 50 Remove and inspect -- -- Process Plan-Example #1
  • 9. 1.0  .005 4 + .005 - 0 2.0 + 0.01 - 0 A 5  .005 Sort of like Example #1 but with a 2nd feature related to the same datum -A-. Example #2 -- Single datum; 2 features.
  • 10. Solution: - 4” segment is the same as in Example #1 -Addition segment requires that: -OD is reduced to 1” -Length needs to be reduced to 5  .005
  • 11. Process Plan for Example #2 OP# Description Machine Tool Time 10 Retrieve 2” bar Warehouse 20 Cut to 5.25” Cut-off saw 30 Face backside and invert Lathe Facing 40 Turn 1” Dia. @ .25 in depth Lathe Turning (2 passes) 50 Face to 4” Lathe Facing 60 Face to 5” Lathe Facing 70 Remove and Inspect
  • 12. A C12 C23 C4 M12 M13 Cij is part specification or Constraints Mij is Manufacturing method were i is the datum feature, and j is the surface produced The General Case and Notation.
  • 13. From the part, you can see that C12 @ M12 This reads, “C12 comes directly from process M12 (our facing operation).” Also from the drawing, one can see that TC23 = TM12 + TM13 This reads, “the tolerance for feature C23 can be as large as the sum of the tolerance for producing M12 and the tolerance for producing M13”  Tolerance Stacking
  • 14. Notation: subscript m implies minimum M implies maximum C23m = -M12M + M13m Let’s suppose 0 005 . 4   12 C 005 . 005 . 1  23 C Then TM12 = .005 TC23 = TM12 + TM13 .010 = .005 + TM13 TM13 = .005
  • 15. If a negative value results then the process specification is unfeasible Since C23m = - M12M + M13m .995 = -4.005 + M13m 5.000 = M13m  Set the process specifications for M13 at 5.000 - 5.005
  • 16. .750  .010 All hole features are specified with respect to datums A-B-C and can be treated as intra-feature entities.  Ø .01  C A B M Example #4 + + + 4 .008 2 holes .250  .010  Ø .008 C A B M 2.0  .01 A 1 1 1 B 1 .5  .01 C Raw Material 4’’ x 2’’ x .5’’
  • 17. Process Plan for Example #4 OP# Description Machine Tool 10 Load part in vise Fadal CNC 20 Drill 1st small hole Fadal CNC .25  drill 30 Drill 2nd small hole Fadal CNC .25  drill 40 Drill large hole Fadal CNC .25  drill 50 Unload and inspect
  • 18. Example #5    B .5 1 1 .750  .010   .01  C D E M + .25  MAX .75 D .25± .01 A .5 ± .01 E 2 holes .250  .010   .008 C D E M .50 ±.01 C M12 M13 C23 M14 M15 .25±.01 Raw Material 4’’ x 2’’ x .5’’
  • 19. C12 @ M12 TC12 = ± .01 TC23 = TM12 + TM13 C23m = -M12M + M13m .008 = -.51 + M13m From  .518 = M13m TC23 = TM12 + TM13 .008 = .01 + TM13 TM13 < 0  infeasible We need to position w.r.t -E-