Roshan Kumar Patel
M.Tech, Mining Engineering
Roll No. 16152015
Use of
“INTEGRATED
LOADER
DUMPER”
over
“SHOVEL
DUMPER
COMBINATION”
INDIAN INSTITUTE OF TECHNOLOGY(BHU), VARANASI
Model Interpretation
Integrated loader dumper machine is designed to perform both loading and hauling
operation where it loads the dump onto itself and then hauls it to dump-yard.
For showing cost benefit analysis of INTEGRATED LOADER DUMPER
over SHOVEL DUMPER COMBINATION , calculation is done by the
company XYZ:
of the numbers of dumper and shovels required per face per year to
complete the excavation
and
also the number of ILD required to complete the same task
Step 1
Step 2
Cost benefit analysis in complete life of mine
Assumptions for Calculation
Swell factor of coal = 1 (There is no increase in the
volume of rock mass after blasting)
Working days in a year = 300
Cost of fuel = 55 ₹/ ltr
CALCULATION OF NO OF
SHOVELS & DUMPERS REQUIRED
Actual struck capacity of dumper = struck capacity * swell factor = 60.1 * 1
= 60.1 m3
Solid bucket capacity of shovel = bucket capacity * bucket fill factor * swell factor
= 12 * 0.85 * 1 = 10.2 m3
Avg. working hours in a year = 300 * 18 = 5400 hours
No. of passes required to fill dumper = 60.1/10.2 = 5.89 (approx. 6)
Loading time of shovel = swing time * no of passes = 0.50 * 6 = 3.0 min
CALCULATION
 Hourly productivity of shovel = 60 * bucket capacity*bucket fill factor * no of passes
loading time of shovel
= 60 * 10.2* 6 / 3.0 = 1224 m3
Annual productivity of shovel = Hourly productivity in m3 * effective hours in a year * density
= 1224* 1800 * 1.67
= 3679344 tons
= 3.6793 MT
Hauling time of dumper (unloaded) = dump yard distance * 60 / speed
= 1.5* 60 /25 = 3.6 min
Cycle time of dumper = loading time + haul time (to & fro) + dumping time+ spotting time
= 3.0 + (4.5+3.6) + 2+ 2 = 15.1 min
No of dumper required in 1 cycle time = cycle time of dumper / loading time of shovel
= 15.1 / 3.0 = 5.01 (approx. 5)
Productivity of dumper = Annual productivity of shovel
no. of dumper required per shovel
= 3.6793/5 = 0.736 MT
CALCULATION
No. of shovel required = annual estimated rate of production per year
annual production by shovel in 1 year
= 25 MT / 3.6793 MT = 7 (approx.)
No. of dumpers required = annual estimated rate of production per year
annual production by dumper in 1 year
= 25 MT / 0.736 MT = 34 (approx.)
CALCULATION
Actual capacity of integrated dumper = bucket capacity * swell factor
= 78 * 1 = 78 m3
Bucket capacity of integrated shovel = bucket capacity * bucket fill factor * swell factor
= 8 * 0.85 * 1 = 6.8 m3
Average effective working hours = 300 * 18 = 5400 hours
No of times shovel load into integrated dumper = 78/6.8 = 12 (approx.)
CALCULATION
Loading time of shovel of ILD = No of times loaded * loading time + spotting time
= 12 * 0.5 + 1 = 7.0 min
 Hauling time of ILD = dump yard distance * 60 / speed
= 1.5* 60 /25 = 3.6 min
Cycle time of dumper = loading time + haul time (to & fro) + dumping time+ spotting time
= 7.0 + (4.5+3.6) + 2 + 1 = 18.1 min
CALCULATION
Hourly productivity of ILD = 60 * bucket capacity * no of passes
Cycle time of ILD
= 60* 6.8 *12 / 18.1 = 270.5 m3
Annual productivity of shovel = Hourly productivity in m3 * effective hours in a year * density
= 270.5 * 2700 * 1.67 = 1219684.5 tons
= 1.219684 MT
Total no of ILD required = annual estimated rate of production per year
annual production by ILD in 1 year
= 25 MT / 1.219684 MT = 20.49 (approx. 21)
CALCULATION
Cost Benefit Analysis
1. Capital Cost
Shovel Dumper Combination
Shovel Cost = 7 * 8 crore
= 56 crore ₹
Dumper Cost = 34* 3 crore
= 102 crore ₹
Total Cost = 158 crore ₹
Integrated loader dumper
Total ILD Cost = 21* 6.5 crore
= 136.5 crore ₹
BENEFIT : 21.5 CRORE ₹
Cost Benefit Analysis
2. Maintenance Analysis
Shovel Dumper Combination
Maintenance requirement is 1 hour (in each 250
working hours) for shovel & 1 hour (in each 250
working hours) for dumper.
Maintenance hours for shovel = 22 hours
Cost of maintenance for shovel= 22* 1200* 7
= 1,84,800 ₹
Maintenance hours for dumper = 22 hours
Cost of maintenance of dumper = 22 * 800* 34
= 5,98,400 ₹
Total Cost per year per face = 7,83,200 ₹
Integrated loader dumper
Maintenance requirement for ILD is 1 hour
(in each 100 working hours)
Maintenance hours for ILD = 54 hours
Cost of maintenance of ILD = 54* 1600*21
= 86,400 ₹* 21
= 18,14,400 ₹
Total cost = 18,14,400 ₹
LOSS : 10,31,200 * 25 years = 2,57,80,000 ₹
Cost Benefit Analysis
3. Fuel Consumption
Shovel Dumper Combination
For shovel: (30 litres/hour)
Total litres of fuel = 30*7*5400
= 1134000 litres
For dumper: (65 litres/hour)
Total litres of fuel = 65*5400 *34
= 11934000 litres
Total fuel = 13068000 litres
Integrated loader dumper
Fuel economy is 115 litres/hour
Total litres of fuel = 115 * 5400 * 21
= 13041000 litres
BENEFIT : 27000* 55 * 25 years = 3,71,25,000 ₹
Cost Benefit Analysis
4. Manpower Requirement
Shovel Dumper Combination
Manpower required = 7 (for shovel) +
34 (for dumper)
= 41
Salary = 7 * 45,000 * 12+ 34*40000*12
= 2,01,00,000 ₹
Integrated loader dumper
Manpower required = 12 (multi skilled)
Salary = 21* 55,000*12
=1,38,60,000 ₹
BENEFIT : 62,40,000* 25 years = 15,60,00,000 ₹
Capital = + 21,50,00,000 ₹
Maintenance = - 2,57,80,000 ₹
Fuel = + 3,71,25,000 ₹
Manpower = + 15,60,00,000 ₹
Total = 38,23,45,000 ₹
Total benefit
According to cost benefit analysis & model
interpretation, use of ILD is far beneficial than shovel
dumper combination in many aspects.
Conclusion

More Related Content

What's hot

In pit crusher conveyour system
In pit crusher conveyour systemIn pit crusher conveyour system
In pit crusher conveyour systemKotesh Bhukya
 
Haul road design
Haul road designHaul road design
Haul road designVR M
 
Bucket wheel excavator ppt
Bucket wheel excavator pptBucket wheel excavator ppt
Bucket wheel excavator pptknowledge
 
Blast design in opencast mining
Blast design in opencast miningBlast design in opencast mining
Blast design in opencast mininggopal karmakar
 
Haulage system in Mines
Haulage system in MinesHaulage system in Mines
Haulage system in Minesajeetkm
 
Surface miner and its performance
Surface miner and its performanceSurface miner and its performance
Surface miner and its performanceSafdar Ali
 
Bord and pillar working with LHD/SDL
Bord and pillar working with LHD/SDLBord and pillar working with LHD/SDL
Bord and pillar working with LHD/SDLAnkit Narain
 
Surface Mining dozer
Surface Mining dozerSurface Mining dozer
Surface Mining dozerVIJAY KUMAR
 
Optimization of Blasting Parameters in open cast mines
Optimization of Blasting Parameters in open cast minesOptimization of Blasting Parameters in open cast mines
Optimization of Blasting Parameters in open cast minesAnurag Jha
 
The productivity of lhd in underground coal mines
The productivity of   lhd in underground coal minesThe productivity of   lhd in underground coal mines
The productivity of lhd in underground coal minesSafdar Ali
 
Balancing Diagram ppt
Balancing Diagram pptBalancing Diagram ppt
Balancing Diagram pptArunKumar6667
 
Selection of longwall powered roof support
Selection of longwall powered roof supportSelection of longwall powered roof support
Selection of longwall powered roof supportUlimella Siva Sankar
 
Transportation in underground mines
Transportation  in underground mines Transportation  in underground mines
Transportation in underground mines vanam mareswara rao
 

What's hot (20)

In pit crusher conveyour system
In pit crusher conveyour systemIn pit crusher conveyour system
In pit crusher conveyour system
 
CONTINUOUS MINERS
CONTINUOUS MINERSCONTINUOUS MINERS
CONTINUOUS MINERS
 
Haul road design
Haul road designHaul road design
Haul road design
 
Bucket wheel excavator ppt
Bucket wheel excavator pptBucket wheel excavator ppt
Bucket wheel excavator ppt
 
Blast design in opencast mining
Blast design in opencast miningBlast design in opencast mining
Blast design in opencast mining
 
Haulage system in Mines
Haulage system in MinesHaulage system in Mines
Haulage system in Mines
 
Surface miner and its performance
Surface miner and its performanceSurface miner and its performance
Surface miner and its performance
 
Bord and pillar working with LHD/SDL
Bord and pillar working with LHD/SDLBord and pillar working with LHD/SDL
Bord and pillar working with LHD/SDL
 
Oc mechanical excavation
Oc mechanical excavationOc mechanical excavation
Oc mechanical excavation
 
Road Header and Bolter Miner
Road Header and Bolter MinerRoad Header and Bolter Miner
Road Header and Bolter Miner
 
Surface Mining dozer
Surface Mining dozerSurface Mining dozer
Surface Mining dozer
 
Dragline ppt
Dragline pptDragline ppt
Dragline ppt
 
Optimization of Blasting Parameters in open cast mines
Optimization of Blasting Parameters in open cast minesOptimization of Blasting Parameters in open cast mines
Optimization of Blasting Parameters in open cast mines
 
Surface miner
Surface minerSurface miner
Surface miner
 
Underground Mining System Question Pattern and Answer
Underground Mining System Question Pattern and AnswerUnderground Mining System Question Pattern and Answer
Underground Mining System Question Pattern and Answer
 
The productivity of lhd in underground coal mines
The productivity of   lhd in underground coal minesThe productivity of   lhd in underground coal mines
The productivity of lhd in underground coal mines
 
Balancing Diagram ppt
Balancing Diagram pptBalancing Diagram ppt
Balancing Diagram ppt
 
Selection of longwall powered roof support
Selection of longwall powered roof supportSelection of longwall powered roof support
Selection of longwall powered roof support
 
Continuous miner
Continuous minerContinuous miner
Continuous miner
 
Transportation in underground mines
Transportation  in underground mines Transportation  in underground mines
Transportation in underground mines
 

Similar to Use of Integrated loader dumper over Shovel dumper combination

Master Student Presentation in Construction Technology Course
Master Student Presentation in Construction Technology CourseMaster Student Presentation in Construction Technology Course
Master Student Presentation in Construction Technology CourseSevar Dilkhaz
 
Joint Operation Mining Plan (28 Ha) - PT Jagad Rayatama.pptx
Joint Operation Mining Plan (28 Ha) - PT Jagad Rayatama.pptxJoint Operation Mining Plan (28 Ha) - PT Jagad Rayatama.pptx
Joint Operation Mining Plan (28 Ha) - PT Jagad Rayatama.pptxHafidzQadli1
 
IRJET- Design and Fabrication of Material Handling Trolley
IRJET- Design and Fabrication of Material Handling TrolleyIRJET- Design and Fabrication of Material Handling Trolley
IRJET- Design and Fabrication of Material Handling TrolleyIRJET Journal
 
TRACTOR TYPES ,COST ANALYSIS OF TRACTOR POWER AND Attached implements
TRACTOR TYPES ,COST ANALYSIS OF TRACTOR POWER AND Attached implementsTRACTOR TYPES ,COST ANALYSIS OF TRACTOR POWER AND Attached implements
TRACTOR TYPES ,COST ANALYSIS OF TRACTOR POWER AND Attached implementsRahul Bhaktani
 
Ongc drilling services introduction
Ongc drilling services introductionOngc drilling services introduction
Ongc drilling services introductionDeepak Chandak
 
PPT on Sugercane bud chipper
PPT on Sugercane bud chipperPPT on Sugercane bud chipper
PPT on Sugercane bud chipperShiva Nand
 
ZBC in commodities.ppt
ZBC in commodities.pptZBC in commodities.ppt
ZBC in commodities.pptSoulmananIndia
 
Maintainance of farm machinery
Maintainance of farm machineryMaintainance of farm machinery
Maintainance of farm machineryRione Drevale
 
Design improvements and costing analysis
Design improvements and costing analysisDesign improvements and costing analysis
Design improvements and costing analysisASHISH MENKUDALE
 
LOGISTIC SOLUTIONS FOR ITC
LOGISTIC SOLUTIONS FOR ITCLOGISTIC SOLUTIONS FOR ITC
LOGISTIC SOLUTIONS FOR ITCSaurav Mann
 
Powerscreen- 1000SR Autosand.pptx
Powerscreen- 1000SR Autosand.pptxPowerscreen- 1000SR Autosand.pptx
Powerscreen- 1000SR Autosand.pptxARVIND NAGRI
 
S3 Semi Final Submission - Submitted By : Ayushi Gupta - From Team Sarabhai
S3 Semi Final Submission - Submitted By : Ayushi Gupta - From Team SarabhaiS3 Semi Final Submission - Submitted By : Ayushi Gupta - From Team Sarabhai
S3 Semi Final Submission - Submitted By : Ayushi Gupta - From Team SarabhaiNational Management Olympiad
 
S3 Semi Final Submission - Submitted By : Omkar Dashetwar - From Team Sarabhai
S3 Semi Final Submission - Submitted By : Omkar Dashetwar - From Team SarabhaiS3 Semi Final Submission - Submitted By : Omkar Dashetwar - From Team Sarabhai
S3 Semi Final Submission - Submitted By : Omkar Dashetwar - From Team SarabhaiNational Management Olympiad
 
IRJET- Design and Development of a Hand Guided Motorised Rice Harvester
IRJET- Design and Development of a Hand Guided Motorised Rice HarvesterIRJET- Design and Development of a Hand Guided Motorised Rice Harvester
IRJET- Design and Development of a Hand Guided Motorised Rice HarvesterIRJET Journal
 
PV AND OTHER RENEWABLE ENERGY
 PV AND OTHER RENEWABLE ENERGY PV AND OTHER RENEWABLE ENERGY
PV AND OTHER RENEWABLE ENERGYH Janardan Prabhu
 
IRJET- A Case Study and Design Approach for Sewage Treatment Plant in Kakuman...
IRJET- A Case Study and Design Approach for Sewage Treatment Plant in Kakuman...IRJET- A Case Study and Design Approach for Sewage Treatment Plant in Kakuman...
IRJET- A Case Study and Design Approach for Sewage Treatment Plant in Kakuman...IRJET Journal
 
Case Study of Designing a Special Purpose Machine
Case Study of Designing a Special Purpose Machine Case Study of Designing a Special Purpose Machine
Case Study of Designing a Special Purpose Machine ijiert bestjournal
 

Similar to Use of Integrated loader dumper over Shovel dumper combination (20)

Master Student Presentation in Construction Technology Course
Master Student Presentation in Construction Technology CourseMaster Student Presentation in Construction Technology Course
Master Student Presentation in Construction Technology Course
 
Joint Operation Mining Plan (28 Ha) - PT Jagad Rayatama.pptx
Joint Operation Mining Plan (28 Ha) - PT Jagad Rayatama.pptxJoint Operation Mining Plan (28 Ha) - PT Jagad Rayatama.pptx
Joint Operation Mining Plan (28 Ha) - PT Jagad Rayatama.pptx
 
IRJET- Design and Fabrication of Material Handling Trolley
IRJET- Design and Fabrication of Material Handling TrolleyIRJET- Design and Fabrication of Material Handling Trolley
IRJET- Design and Fabrication of Material Handling Trolley
 
TRACTOR TYPES ,COST ANALYSIS OF TRACTOR POWER AND Attached implements
TRACTOR TYPES ,COST ANALYSIS OF TRACTOR POWER AND Attached implementsTRACTOR TYPES ,COST ANALYSIS OF TRACTOR POWER AND Attached implements
TRACTOR TYPES ,COST ANALYSIS OF TRACTOR POWER AND Attached implements
 
Ongc drilling services introduction
Ongc drilling services introductionOngc drilling services introduction
Ongc drilling services introduction
 
PPT on Sugercane bud chipper
PPT on Sugercane bud chipperPPT on Sugercane bud chipper
PPT on Sugercane bud chipper
 
ZBC in commodities.ppt
ZBC in commodities.pptZBC in commodities.ppt
ZBC in commodities.ppt
 
ECONOMICS Silkworm
ECONOMICS SilkwormECONOMICS Silkworm
ECONOMICS Silkworm
 
Maintainance of farm machinery
Maintainance of farm machineryMaintainance of farm machinery
Maintainance of farm machinery
 
B012420715
B012420715B012420715
B012420715
 
Design improvements and costing analysis
Design improvements and costing analysisDesign improvements and costing analysis
Design improvements and costing analysis
 
LOGISTIC SOLUTIONS FOR ITC
LOGISTIC SOLUTIONS FOR ITCLOGISTIC SOLUTIONS FOR ITC
LOGISTIC SOLUTIONS FOR ITC
 
Powerscreen- 1000SR Autosand.pptx
Powerscreen- 1000SR Autosand.pptxPowerscreen- 1000SR Autosand.pptx
Powerscreen- 1000SR Autosand.pptx
 
Ch21
Ch21Ch21
Ch21
 
S3 Semi Final Submission - Submitted By : Ayushi Gupta - From Team Sarabhai
S3 Semi Final Submission - Submitted By : Ayushi Gupta - From Team SarabhaiS3 Semi Final Submission - Submitted By : Ayushi Gupta - From Team Sarabhai
S3 Semi Final Submission - Submitted By : Ayushi Gupta - From Team Sarabhai
 
S3 Semi Final Submission - Submitted By : Omkar Dashetwar - From Team Sarabhai
S3 Semi Final Submission - Submitted By : Omkar Dashetwar - From Team SarabhaiS3 Semi Final Submission - Submitted By : Omkar Dashetwar - From Team Sarabhai
S3 Semi Final Submission - Submitted By : Omkar Dashetwar - From Team Sarabhai
 
IRJET- Design and Development of a Hand Guided Motorised Rice Harvester
IRJET- Design and Development of a Hand Guided Motorised Rice HarvesterIRJET- Design and Development of a Hand Guided Motorised Rice Harvester
IRJET- Design and Development of a Hand Guided Motorised Rice Harvester
 
PV AND OTHER RENEWABLE ENERGY
 PV AND OTHER RENEWABLE ENERGY PV AND OTHER RENEWABLE ENERGY
PV AND OTHER RENEWABLE ENERGY
 
IRJET- A Case Study and Design Approach for Sewage Treatment Plant in Kakuman...
IRJET- A Case Study and Design Approach for Sewage Treatment Plant in Kakuman...IRJET- A Case Study and Design Approach for Sewage Treatment Plant in Kakuman...
IRJET- A Case Study and Design Approach for Sewage Treatment Plant in Kakuman...
 
Case Study of Designing a Special Purpose Machine
Case Study of Designing a Special Purpose Machine Case Study of Designing a Special Purpose Machine
Case Study of Designing a Special Purpose Machine
 

More from Roshan Kumar Patel

Rock instrumentation for performance study of fill material in an underground...
Rock instrumentation for performance study of fill material in an underground...Rock instrumentation for performance study of fill material in an underground...
Rock instrumentation for performance study of fill material in an underground...Roshan Kumar Patel
 
Rock fragmentation control in opencast mines
Rock fragmentation control in opencast minesRock fragmentation control in opencast mines
Rock fragmentation control in opencast minesRoshan Kumar Patel
 
Planning and deployment of CSM at moderate depth opencast mines-a blast free ...
Planning and deployment of CSM at moderate depth opencast mines-a blast free ...Planning and deployment of CSM at moderate depth opencast mines-a blast free ...
Planning and deployment of CSM at moderate depth opencast mines-a blast free ...Roshan Kumar Patel
 
Necessity of GPS-based 'Proximity Warning System' in mining industry – a tool...
Necessity of GPS-based 'Proximity Warning System' in mining industry – a tool...Necessity of GPS-based 'Proximity Warning System' in mining industry – a tool...
Necessity of GPS-based 'Proximity Warning System' in mining industry – a tool...Roshan Kumar Patel
 
Dynamic Analysis of Slope Stability
Dynamic Analysis of Slope StabilityDynamic Analysis of Slope Stability
Dynamic Analysis of Slope StabilityRoshan Kumar Patel
 
Personnel management: Job Analysis, Job description, Induction and training P...
Personnel management: Job Analysis, Job description, Induction and training P...Personnel management: Job Analysis, Job description, Induction and training P...
Personnel management: Job Analysis, Job description, Induction and training P...Roshan Kumar Patel
 
Solving linear programming model by simplex method
Solving linear programming model by simplex methodSolving linear programming model by simplex method
Solving linear programming model by simplex methodRoshan Kumar Patel
 

More from Roshan Kumar Patel (8)

Rock instrumentation for performance study of fill material in an underground...
Rock instrumentation for performance study of fill material in an underground...Rock instrumentation for performance study of fill material in an underground...
Rock instrumentation for performance study of fill material in an underground...
 
Rock fragmentation control in opencast mines
Rock fragmentation control in opencast minesRock fragmentation control in opencast mines
Rock fragmentation control in opencast mines
 
Planning and deployment of CSM at moderate depth opencast mines-a blast free ...
Planning and deployment of CSM at moderate depth opencast mines-a blast free ...Planning and deployment of CSM at moderate depth opencast mines-a blast free ...
Planning and deployment of CSM at moderate depth opencast mines-a blast free ...
 
Necessity of GPS-based 'Proximity Warning System' in mining industry – a tool...
Necessity of GPS-based 'Proximity Warning System' in mining industry – a tool...Necessity of GPS-based 'Proximity Warning System' in mining industry – a tool...
Necessity of GPS-based 'Proximity Warning System' in mining industry – a tool...
 
Dynamic Analysis of Slope Stability
Dynamic Analysis of Slope StabilityDynamic Analysis of Slope Stability
Dynamic Analysis of Slope Stability
 
Eco Friendly Mining
Eco Friendly MiningEco Friendly Mining
Eco Friendly Mining
 
Personnel management: Job Analysis, Job description, Induction and training P...
Personnel management: Job Analysis, Job description, Induction and training P...Personnel management: Job Analysis, Job description, Induction and training P...
Personnel management: Job Analysis, Job description, Induction and training P...
 
Solving linear programming model by simplex method
Solving linear programming model by simplex methodSolving linear programming model by simplex method
Solving linear programming model by simplex method
 

Recently uploaded

main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 

Recently uploaded (20)

main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 

Use of Integrated loader dumper over Shovel dumper combination

  • 1. Roshan Kumar Patel M.Tech, Mining Engineering Roll No. 16152015 Use of “INTEGRATED LOADER DUMPER” over “SHOVEL DUMPER COMBINATION” INDIAN INSTITUTE OF TECHNOLOGY(BHU), VARANASI
  • 2. Model Interpretation Integrated loader dumper machine is designed to perform both loading and hauling operation where it loads the dump onto itself and then hauls it to dump-yard.
  • 3. For showing cost benefit analysis of INTEGRATED LOADER DUMPER over SHOVEL DUMPER COMBINATION , calculation is done by the company XYZ: of the numbers of dumper and shovels required per face per year to complete the excavation and also the number of ILD required to complete the same task Step 1 Step 2 Cost benefit analysis in complete life of mine
  • 4. Assumptions for Calculation Swell factor of coal = 1 (There is no increase in the volume of rock mass after blasting) Working days in a year = 300 Cost of fuel = 55 ₹/ ltr
  • 5. CALCULATION OF NO OF SHOVELS & DUMPERS REQUIRED Actual struck capacity of dumper = struck capacity * swell factor = 60.1 * 1 = 60.1 m3 Solid bucket capacity of shovel = bucket capacity * bucket fill factor * swell factor = 12 * 0.85 * 1 = 10.2 m3 Avg. working hours in a year = 300 * 18 = 5400 hours No. of passes required to fill dumper = 60.1/10.2 = 5.89 (approx. 6) Loading time of shovel = swing time * no of passes = 0.50 * 6 = 3.0 min
  • 6. CALCULATION  Hourly productivity of shovel = 60 * bucket capacity*bucket fill factor * no of passes loading time of shovel = 60 * 10.2* 6 / 3.0 = 1224 m3 Annual productivity of shovel = Hourly productivity in m3 * effective hours in a year * density = 1224* 1800 * 1.67 = 3679344 tons = 3.6793 MT Hauling time of dumper (unloaded) = dump yard distance * 60 / speed = 1.5* 60 /25 = 3.6 min
  • 7. Cycle time of dumper = loading time + haul time (to & fro) + dumping time+ spotting time = 3.0 + (4.5+3.6) + 2+ 2 = 15.1 min No of dumper required in 1 cycle time = cycle time of dumper / loading time of shovel = 15.1 / 3.0 = 5.01 (approx. 5) Productivity of dumper = Annual productivity of shovel no. of dumper required per shovel = 3.6793/5 = 0.736 MT CALCULATION
  • 8. No. of shovel required = annual estimated rate of production per year annual production by shovel in 1 year = 25 MT / 3.6793 MT = 7 (approx.) No. of dumpers required = annual estimated rate of production per year annual production by dumper in 1 year = 25 MT / 0.736 MT = 34 (approx.) CALCULATION
  • 9. Actual capacity of integrated dumper = bucket capacity * swell factor = 78 * 1 = 78 m3 Bucket capacity of integrated shovel = bucket capacity * bucket fill factor * swell factor = 8 * 0.85 * 1 = 6.8 m3 Average effective working hours = 300 * 18 = 5400 hours No of times shovel load into integrated dumper = 78/6.8 = 12 (approx.) CALCULATION
  • 10. Loading time of shovel of ILD = No of times loaded * loading time + spotting time = 12 * 0.5 + 1 = 7.0 min  Hauling time of ILD = dump yard distance * 60 / speed = 1.5* 60 /25 = 3.6 min Cycle time of dumper = loading time + haul time (to & fro) + dumping time+ spotting time = 7.0 + (4.5+3.6) + 2 + 1 = 18.1 min CALCULATION
  • 11. Hourly productivity of ILD = 60 * bucket capacity * no of passes Cycle time of ILD = 60* 6.8 *12 / 18.1 = 270.5 m3 Annual productivity of shovel = Hourly productivity in m3 * effective hours in a year * density = 270.5 * 2700 * 1.67 = 1219684.5 tons = 1.219684 MT Total no of ILD required = annual estimated rate of production per year annual production by ILD in 1 year = 25 MT / 1.219684 MT = 20.49 (approx. 21) CALCULATION
  • 12. Cost Benefit Analysis 1. Capital Cost Shovel Dumper Combination Shovel Cost = 7 * 8 crore = 56 crore ₹ Dumper Cost = 34* 3 crore = 102 crore ₹ Total Cost = 158 crore ₹ Integrated loader dumper Total ILD Cost = 21* 6.5 crore = 136.5 crore ₹ BENEFIT : 21.5 CRORE ₹
  • 13. Cost Benefit Analysis 2. Maintenance Analysis Shovel Dumper Combination Maintenance requirement is 1 hour (in each 250 working hours) for shovel & 1 hour (in each 250 working hours) for dumper. Maintenance hours for shovel = 22 hours Cost of maintenance for shovel= 22* 1200* 7 = 1,84,800 ₹ Maintenance hours for dumper = 22 hours Cost of maintenance of dumper = 22 * 800* 34 = 5,98,400 ₹ Total Cost per year per face = 7,83,200 ₹ Integrated loader dumper Maintenance requirement for ILD is 1 hour (in each 100 working hours) Maintenance hours for ILD = 54 hours Cost of maintenance of ILD = 54* 1600*21 = 86,400 ₹* 21 = 18,14,400 ₹ Total cost = 18,14,400 ₹ LOSS : 10,31,200 * 25 years = 2,57,80,000 ₹
  • 14. Cost Benefit Analysis 3. Fuel Consumption Shovel Dumper Combination For shovel: (30 litres/hour) Total litres of fuel = 30*7*5400 = 1134000 litres For dumper: (65 litres/hour) Total litres of fuel = 65*5400 *34 = 11934000 litres Total fuel = 13068000 litres Integrated loader dumper Fuel economy is 115 litres/hour Total litres of fuel = 115 * 5400 * 21 = 13041000 litres BENEFIT : 27000* 55 * 25 years = 3,71,25,000 ₹
  • 15. Cost Benefit Analysis 4. Manpower Requirement Shovel Dumper Combination Manpower required = 7 (for shovel) + 34 (for dumper) = 41 Salary = 7 * 45,000 * 12+ 34*40000*12 = 2,01,00,000 ₹ Integrated loader dumper Manpower required = 12 (multi skilled) Salary = 21* 55,000*12 =1,38,60,000 ₹ BENEFIT : 62,40,000* 25 years = 15,60,00,000 ₹
  • 16. Capital = + 21,50,00,000 ₹ Maintenance = - 2,57,80,000 ₹ Fuel = + 3,71,25,000 ₹ Manpower = + 15,60,00,000 ₹ Total = 38,23,45,000 ₹ Total benefit