• an account or statement describing in detail
an event, situation, or the
like, usually as the result of observation, inqui
ry, etc.
• A document containing information organized
in a narrative, graphic, or tabular form,
prepared on ad hoc, periodic, recurring,
regular, or as required basis.
• Reports may refer to
specific periods, events, occurrences, or
subjects, and may be communicated or
presented in oral or written form.
• A document that presents information
in an organized format for a
specific audience and purpose.
Although summaries of reports may be
delivered orally, complete reports are
almost always in the form of written
documents.
1. Structural Engineers 2. Electrical 3. Demographic 4. Sales
5. Trade 6. Service 7. Operation 8. Periodic
9. Construction 10. Failure 11. Student-Laboratory 12. Work
13. Evaluative 14. Completion 15. Examination 16. Inspection
17. Information 18. Special 19. Case Study 20. Memorandum
21. Incident 22. Accident 23. Feasibility 24. Industrial-Research
25. Recommendation 26. Progress 27. Proposal 28. Oral
H U R T Q E V I T A U L A V E R L T H E
S P O D E M O G R A P H I C E A C X I S
T I N F O R M A T I O N I C S O W N T S
R E X L O V E W H Y H V O O N J D U I E
U A C C I D E N T Q R M P S B U D C N R
C E H E A R T R Z E M O T Z S E M I S G
T X L I Z A A I S E R R Q T N U C N P O
U A M Q W D R M N P U D R T D B L C E R
R M A J E I B D G C F I L N G O E I C P
A I R F O J A Y T H A A A C V N I D T E
L N K E Z T Z I H L B R Y O J I N E I L
E A R D I N O P R O O L O V E J A N O E
N T L O U N I E R M P K S H G K D T N C
G I N A Y T S A E R U L I A F W E R L T
I O Q W R E T M B V C X Z S L G O A T R
N N M O A O P E R A T I O N D E I R Y I
E A P R R Z N O I T E L P M O C S H K C
E E C Y T I L I B I S A E F E L P O U A
R H F C A S E S T U D Y V P K E C I V L
S Z X P E R I O D I C Q S U P E R M A N
Structural Engineers Electrical Demographic Sales
Trade Service Operation Periodic
Construction Failure Student-Laboratory Work
Evaluative Completion Examination Inspection
Information Special Case Study Memorandum
Incident Accident Feasibility Industrial-Research
Recommendation Progress Proposal Oral
• It is a visual property inspection
carried out by a chartered
structural or civil engineer.
• It is a report document that refers to the
in service condition of the electrical
installation of the buildings.
• The purpose of the report is to establish
if the electrical installation is in a
satisfactory condition for safe and
continued service and the financial costs
of electrical works required before the
purchase of a property.
• Demographics are a statistical view of a
population, generally including age, gender,
income, schooling, and occupation and so on.
Demographic Report is not only used for
research purposes, rather it is also a major
factor and contribution in business venture.
• Understanding the demographics of the target
customers is critical for the success of the
business. Not only do the business owner need
to understand them in order to decide exactly
what the product and services mixes will
include, but this information will also affect
pricing, packaging, promotion and place.
• In order to properly evaluate a community or
neighborhood for the best location for the
business, the owner must know the demographic
profile of his potential customers. To see if the
community he’s considering offers a population
with the demographic traits necessary to support
his business, look at the community's:
•
• Purchasing power.
• Residences.
• Means of transportation.
• Age ranges.
• Family status.
• Leisure activities.
• A record of calls made and products sold
during a particular time frame kept by
a salesperson or their management. For
example, a typical sales report
might incorporate data on
(1) sales volume observed per item
or group of items,
(2) how many new and current
accounts were contacted and when, and
(3) any costs that were involved
in promoting and selling products.
• The practice of announcing the trade or
issue of a security to the appropriate
regulator.
•Trade reporting is mandatory and serves
to increase transparency in the market.
It also helps keep the regulator abreast to
what is happening,
which may help it find.
• It reports on the results achieved both operationally
and strategically and on any developments related
to Service Level Agreements such as hitting various
targets, like availability.
• Service Level Agreement (SLA) is a part of a service
contract where a service is formally defined.
Particular aspects of the service – scope, quality
responsibilities – are agreed between the service
provider and the service user.
• Its purpose is to provide information to both the
service provider and the service user in order for
informed decisions to be made.
• Operational reporting is reporting about
operational details that reflects current activity.
Operational reporting is intended to support the
day-to-day activities of the organization.
"Examples of operational reporting include bank
teller end-of-day window balancing reports,
daily account audits and adjustments, daily
production records, flight-by-flight traveler logs
and transaction logs."
Operational Reporting solutions should deliver the following
benefits:
• Real Time Reporting – To be of benefit, Operational Reporting
needs to provide current information to its consumer. For
example, it does not do the shipping dock much good to view
a list of ready-to-be-shipped orders from yesterday.
• Detailed Information – Operational Reporting must present the
data in the lowest level of granularity. For example, if there is
a sales line that is backordered and needs to be filled, the
responsible parties need to know the specifics of the
transaction.
• Flexibility – To limit your dependence on IT, your Operational
Reporting solution should provide flexibility to enable end
users to create their own specific views of the data.
• Summary of events that presents
essentially the same type
of information updated at regular intervals
such as every day, week, month, etc.
Also called recurring report.
• Periodic reports are written by federal
agencies, corporations, non-profits and
other institutions. Periodic reports often
cover the same basic set of information and
rely on numerical data to provide an
overview of a specific time period.
• It is the hourly and daily events on a
worksite. It shows the numbers of
employees and equipment. The time of
start and finish is also recorded.
Accidents are reported as well as
weather and progress.
• It is a logical and systematic
examination of an equipment or
machine and/or documentation to
detect and to analyze the causes,
probabilities, and consequences of
actual or potential failure and to plan
corrective actions in those failure.
• Laboratory reports are written to
describe and analyze a laboratory
experiment that explores a scientific
concept. It provides a formal record of
an experiment. The discussion of
objectives, procedures, and results
should be specific enough that
interested readers could replicate the
experiment.
• They are typically assigned to enable you to:
• Conduct scientific research.
• Formulate a hypothesis about a particular stimulus,
event, and/or behavior.
• Review relevant literature to justify your
hypothesis.
• Allow someone to replicate your study by
providing precise details.
• Apply statistics to test your hypothesis.
• Explore theoretical explanations.
• Evaluate research objectively and methodically.
• Communicate concisely and precisely.
• Also called working draft (sometimes called
a draft document)
• A working draft is a type of technical report that
is a work in progress, a preliminary form of a
possible future document. A working draft
indicates a commitment on the part of the
issuing organization to do further work in the
area outlined in the document. Several revisions
of the working draft may be issued before the
final document is written, or the document may
be made obsolete by future developments.
• These are a useful way to describe
program successes, as well as areas in
need of improvement. When data is
communicated well, it can be used to
maintain current support, garner new
backing, and apply for additional
funding.
• It is written when the work is finished.
• It provides a permanent record of the entire project,
including the circumstances that led to its beginning.
• It serves as immediate documentation.
• It presents recommendations: suggestions about how to
proceed in light of the conclusions.
• It serves as a future reference when there is a personnel
change, a major new project is undertaken and a problem
develops after the project has been completed.
• Examination Report is the report issued by
an IRS (Internal Revenue Service) auditor
after an audit is concluded with its
findings. Audit is an examination of the
financial records of a person, business, or
organization, typically done to correct
careless or improper bookkeeping or to
verify that proper records are being kept.
Businesses and nonprofits often undergo
an annual audit by an independent
accounting firm. The IRS also conducts
audits, mainly to assess taxes owed.
• It is a written report of
the property's condition presented by a
licensed inspection professional.
• It is also a confidential report prepared for a life or
health insurance company on a risk, setting out the
moral and physical hazards that may or may not
be present. Inspection service is usually bought
from companies that specialize in that field. Used
for classifying individuals as standard,
substandard or uninsurable.
• An information report is a factual text,
which means it provides
information about something.
An information report is used as a way
to gain a better understanding about a
living or non-living subject. An
information report: uses facts to explain
something.
• It is a report that is prepared in accordance with Generally
Accepted Auditing Standards.
• Generally Accepted Auditing Standards (GAAS) refers to
broad rules and guidelines in preparing for and
performing audits of a client’s financial statements.
• It attempts to elaborate, explain, or exhibit in a prescribed
fashion certain sections, accounts, or items of a financial
statement.
• Cash receipts/disbursements reports, proposed
acquisitions, and tax basis financial statements are some
examples of a special reports.
• Case studies are in-depth investigations of
a single person, group, event or
community. In a case study, nearly every
aspect of the subject's life and history is
analyzed to seek patterns and causes for
behavior. The hope is that learning gained
from studying one case can be
generalized to many others.
Unfortunately, case studies tend to be
highly subjective and it is difficult to
generalize results to a larger population.
• The case study method often involves simply
observing what happens to, or reconstructing ‘the
case history’ of a single participant or group of
individuals (such as a school class or a specific
social group), i.e. the idiographic approach. Case
studies allow a researcher to investigate a topic in
far more detail than might be possible if they were
trying to deal with a large number of research
participants (homothetic approach) with the aim of
‘averaging’.
• The case study is not itself a research method,
but researchers select methods of data collection
and analysis that will generate material suitable
for case studies
• Explanatory: Used to do causal investigations.
• Exploratory: A case study that is sometimes used as a
prelude to further, more in-depth research. This allows
researchers to gather more information before
developing their research questions and hypotheses.
• Descriptive: Involves starting with a descriptive theory.
The subjects are then observed and the information
gathered is compared to the pre-existing theory.
• Intrinsic: A type of case study in which the researcher has
a personal interest in the case.
• Collective: Involves studying a group of individuals.
• Instrumental: Occurs when the individual or group allows
researchers to understand more than what is initially
obvious to observers.
There are a number of different sources and methods that
researchers can use to gather information about an individual or
group. The six major sources that have been identified by
researchers (Yin, 1994; Stake, 1995) are:
• Direct observation: This strategy involves observing the subject, often
in a natural setting. While an individual observer is sometimes used,
it is more common to utilize a group of observers.
• Interviews: One of the most important methods for gathering
information in case studies. An interview can involve structured
survey-type questions, or more open-ended questions.
• Documents: Letters, newspaper articles, administrative records, etc.
• Archival records: Census records, survey records, name lists, etc.
• Physical artifacts: Tools, objects, instruments and other artifacts often
observed during a direct observation of the subject.
• Participant observation: Involves the researcher actually serving as a
participant in events and observing the actions and outcomes.
• A memorandum (abbrev.: memo) was from
the Latin verbal phrase memorandum est,
the gerundive form of the verb memoro, "to
mention, call to mind, recount, relate", which
means "It must be remembered (that)...".
It is therefore a note, document or
other communication that helps the memory by
recording events or observations on a topic, such
as may be used in a business office.
• Memoranda are often used in diplomacy,
business, and law. Two countries might sign a
memorandum of understanding that they will
equally share use of the river that runs between
them. A member of Congress might publish a
memorandum criticizing the government’s
education policies. You’re probably more
familiar with the word's shortened form, memo,
which means the same thing but is usually used
in informal contexts, such as for messages within
an office.
• it is document, usually confidential
(protected from discovery by a plaintiff
in a lawsuit),describing any accident or
deviation from policies or orders
involving a patient, employee, visitor,
or student on the premises of a health
care facility.
• It is a report that is filled out in order to
record details of an unusual event that
occurs, such as an injury to a patient.
• The purpose of this report is to document
the exact details of the occurrence who
witnessed the event. This information
may be useful when dealing with
liability issues stemming from the
incident.
• A document prepared by an analyst or
strategist who is a part of the investment
research team in a stock
brokerage or investment bank. A research
report may focus on a specific stock or industry
sector, a currency, commodity or fixed-income
instrument, or even on a geographic region or
country. Research reports generally, but not
always, have "actionable" recommendations
(i.e. investment ideas that investors can act
upon).
• It is a presentation of factual information to an audience.
• Informal oral reports are generally characterized by
small-group settings with a high degree of audience
interaction and a relaxed manner of delivery and dress.
An informal oral report might be an impromptu
presentation. Informal oral presentations can foster the
free exchange of ideas and be important for producing
action items.
• A formal oral report is distinguished by its adherence to
an agreed-upon format or outline. Formal oral reports are
usually prepared well in advance of presentation and are
therefore well rehearsed. Your manner of delivery is
extremely important in a formal oral report situation.
Audience interaction is generally limited to the question
and answer period at the conclusion of your report.
• The Manuscript Method. You read a written report to
your audience word for word, glancing up from time
to time to make eye contact. In this method, you will
not miss anything. However, the audience might be
bored if the oral report is done using this method
because of the monotony of the whole process.
• The Memorization Method. You learn by heart and
recite a report you have written. This method, tends
to make you too structured, too formal. You will not
be able to give additional explanation because you
have to present your report verbatim or word for
word. Buf if you have a sharp memory, it is very
likely that you can deliver the report well.
• The Extemporaneous Method. You can write the report
in rough form. You speak spontaneously using an
outline or note cards as guide. You can explain further
as you report. But sometimes you tend to speak
lengthily without considering the time element.
• The Impromptu Method. You talk on the spot with no
prepared draft, outline or note cards. This method is
applied only to brief reports that require little or no
research or presentation. The downside is that you
tend to be disorganized in this method. However, if
you are familiar with the topic, you can, most likely,
discuss it comprehensively.
• A feasibility study, also known as
feasibility analysis, is a preliminary
study undertaken to determine and
document a project’s viability. It comes
from the word feasible which means
“capable of being accomplished;
practicable; or likely.” Feasibility
studies can be used in many ways but
primarily focus on proposed business
ventures.
• The term feasibility study is also used to
refer to the resulting document. The results
of this study are used to make a decision,
whether or not to proceed with the project.
If it indeed leads to a project being
approved, it will — before the real work of
the proposed project starts — be used to
ascertain the likelihood of the project’s
success. It is an analysis of possible
alternative solutions to a problem and a
recommendation on the best alternative. It,
for example, can decide whether an order
processing be carried out by a new system
more efficiently than the previous one.
• A feasible business venture is one where
the business will generate adequate cash-
flow and profits, withstand the risks it will
encounter, remain viable in the long-term
and meet the goals of the founders. The
venture can be either a start-up business,
the purchase of an existing business, an
expansion of current business operations
or a new enterprise for an existing
business. A feasibility study is only one
step in the business idea assessment and
business development process.
• A feasibility study is not a business plan.
The separate roles of the feasibility study
and the business plan are frequently
misunderstood. The feasibility study
provides an investigating function. It
addresses the question of “Is this a viable
business venture?” The business plan
provides a planning function. The business
plan outlines the actions needed to take
the proposal from “idea” to “reality.”
• The feasibility study outlines and analyzes several
alternatives or methods of achieving business
success. The feasibility study helps to narrow the
scope of the project to identify the best business
scenario(s). The business plan deals with only one
alternative or scenario. The feasibility study helps
to narrow the scope of the project to identify and
define two or three scenarios or alternatives. The
person or business conducting the feasibility study
may work with the group to identify the “best”
alternative for their situation. This becomes the
basis for the business plan.
• The feasibility study is conducted before the
business plan. A business plan is prepared only
after the business venture has been deemed to
be feasible. If a proposed business venture is
considered to be feasible, a business plan is
usually constructed next that provides a
“roadmap” of how the business will be
created and developed. The business plan
provides the “blueprint” for project
implementation. If the venture is deemed not to
be feasible, efforts may be made to correct its
deficiencies, other alternatives may be
explored, or the idea is dropped.
• Proposed Project Description
Defining and describing a proposed project
or business venture lays the foundation for
feasibility analysis. If you are analyzing a
project, go into detail about project timelines,
deliverables and resource requirements. If you
are analyzing a business, detail the products
and services that it will offer, the proposed
target market and any extraordinary resource
needs introduced by the business model. Focus
on the requirements of implementing the
venture, rather than details such as business
names and organizational structures.
• Market Analysis Section
Analyze the industry and market targeted by the
proposed venture. Measure the size of the market and its
demographic makeup using census data or other survey
sources. Define a target market segment according its
behaviorist, geographic and psychographic characteristics.
Analyze any competing businesses or projects that are
planned or already at work in the market. With this
information in hand, try to determine whether there is truly a
viable market for the output of the project or business, and
whether it is truly possible to gain market share from existing
competitive forces. In highly saturated markets with
entrenched competitors, for example, it may be less feasible
to build a new brand than to provide contractor services to
the strongest competitors.
• Technical Feasibility Section
Consider the requirements for specialized equipment or
facilities, copyrights, patents, labor and expertise for the
venture in question, and determine whether or not you either
have these resources on hand or are reasonably able to
obtain them. Technical requirements can range from special
permits and licenses from multiple government agencies to
specialized vehicles or professionally licensed specialists.
Obtaining resources, especially highly educated technical
employees, can greatly increase the cost of building a
proposed venture, but moving forward without them can
lead to the quick failure of a project or closure of a new
business. For any resources you do not have on hand,
consider the cost of obtaining and retaining them.
• Financial Feasibility Section
Determine how much the proposed project or
business start-up will cost to implement, as well as how
much it can be expected to earn. Consider all of the
resources and capital investments required up front.
Calculate any financing requirements that will arise, and
analyze the potential sources of financing available,
such as business loans or outside investment. In this
section, try to ascertain whether the project or business
can be expected to earn a consistent profit and whether
you or your business currently has access to the cash or
financing required to get the idea off the ground.
• proposes a solution to a problem
or evaluates possible solutions and
recommends one
• This type starts from a stated need,
a selection of choices, or both and
then recommends one, some, or
none.
• For example, a company might be looking at
grammar-checking software and want a
recommendation on which product is the best. As
the report writer on this project, you could study
the market for this type of application and
recommend one particular product, a couple of
products (differing perhaps in their strengths and
their weaknesses), or none (maybe none of them
are any good). The recommendation report
answers the question "Which option should we
choose?" (or in some cases "Which are the best
options?) by recommending Product B, or maybe
both Products B and C, or none of the products.
• Identification of the problem, an overall comparison
of several solutions, conclusions drawn from study
and comparison of the solutions and a
recommendation.
• A recommendation report should state facts rather
than popular opinions. Additionally, a
recommendation report should include a solution
that is specific to the problem and takes into account
chance and human nature. Also, it should be
supported with research and devised after
consideration of economic factors. By considering
these factors and presenting a solution in the proper
format, a recommendation report can be used to
influence others.
In writing recommendation report here are
some suggestions:
1.Identify a client with a workplace problem,
situation, or opportunity.
2.Develop a plan for investigating the situation
and the means for resolving it.
3.Establish the criteria required for your client to
make an effective decision.
4. Develop and implement a project for
completing your research (investigation)
5.Interpret and present your findings in a
recommendation reports to your clients.
I. Introduction
A. Statement of the need
B. Statement of recommendation
C. Statement of scope and plan of the report
II. Expanded statement, and explanation of the
recommendation
III. Option to be considered
IV. Discussion of each option
V. Summary of conclusion
VI. Restatement of recommendation
Recommendation for Drunken Driving Prevention
At your request the Michigan Safe Driving Committee
investigated the negative effects that drunken driving has
on society. Drunk drivers are making it unsafe for
pedestrians, other drivers, and they also put themselves in
Danger. This problem was discovered when the Michigan
Safe Driving Committee researched the drunken driving
deaths in Michigan in the past couple of years. Last year,
there were 980 drunken driving deaths in the state of
Michigan. In this report, I explain a possible solution
discovered by the Michigan Safe Driving Committee, and
present our findings followed by our comparison of
drunken driving deaths in Michigan. Along with the
Michigan Safe Driving Committee, I considered three
possible solutions:
• Put more Police officers on the streets of Michigan
• Increase the punishment of Driving Under the
Influence (DUI)
• More strict on Breathalyzer Tests
There have been many deaths in Michigan over the
past couple of years. Drunk Driving has been one
the problems. Driving under the influence has
caused many deaths in Michigan over the past
couple of years. Drivers are becoming more
reckless due to a lack of supervision, and a lack of
punishment. There are more drivers every year,
which could increase the deaths caused by Driving
under the Influence in Michigan.
Drunk Driving Statistics Compared
The following stats represent the total Michigan auto
accidents fatalities in 2007 and 2008 and the percentage of
car crash deaths that involved a driver who had .08%
blood alcohol content or higher.
2007 2008
Deaths 1,088 980
Percent 28% 29%
• Put more police officers on streets of Michigan
Training more cops would benefit Michigan. The state of
Michigan Police Department should recruit more police
officers to the police academy. This would make drivers
more cautions and less willing to take the risk of driving
under the influence.
• Increase the punishment of Driving under the influence (DUI)
There are some drivers who drive without a license. This is mostly when you
refuse to take a breathalyzer, blood, or urine test. This results in drivers not
intimidated being by the DUI punishments. Making the punishments more
severe would make the drivers more aware and somewhat fearful to drive
under the influence. Drivers that are charged with DUI should have to pay a
fine for the first offense. For the second offense there should be a fine and a
suspended license. The third time someone gets charged there should be a fine,
a suspended license, and possibly jail time.
• More strict on Breathalyzer test
Breathalyzer test should be used more frequently. The breathalyzer tests are
only used if officers pull you over for reckless driving and ask you to take a
breathalyzer test. There should be a solution where every driver must be tested
to limit some of the deaths caused by drivers driving under the influence. The
State of Michigan should lower the blood alcohol percentage from .08% to .04%.
This would result in a decrease of drivers who drink alcoholic beverages before
they get on the streets of Michigan.
There were 980 deaths in Michigan in 2008. Recruiting more people to come
to the police officer would result in more people wanting to become a
police officer. Putting more police officers on the streets would make
drivers wiser about getting on the road and also make them less risky.
Driving under the influence should be looked at as a major crime. There
should be more punishment involved in DUI crimes. Punishments should
include jail time, paying fines, and suspended license for the drunk drivers.
The State of Michigan should be stricter on the breathalyzer test
conditions. The blood alcohol percentage should be lowered from .08% to
.04% in Michigan. The .08% is proven to be too merciful to people who drive
drunk. There are too many deaths in Michigan that is caused by this one
problem. The comparison of the deaths from 2007 and 2008 are only slightly
different. There were more deaths resulting from DUI in 2007 than in 2008,
but the numbers are still way too high.
On Behalf of the Michigan Safe Driving Committee, we would like to help
the Michigan Safe Driving Department keep drunk drivers off the streets of
Michigan.
The State of Michigan should recruit
more police officers and get them on the
streets of Michigan to keep the drunk
drivers from getting behind the wheel.
The punishment of DUI should be
increased. Drivers should pay a fine for a
1st offense. For a 2nd offense there should
be a fine and a suspended license. A third
offense should result in a fine, a
suspended license, and possible jail time.
– It describes the status of a project that is not yet completed with the
purpose of informing the clients how the work is proceeding.
– It may be in the form of memoranda, letters, short reports, formal
reports, or presentations.
– Most progress report have the following similarities in content:
1. Background on the project itself
2. Discussion of achievements since last reporting
3. Discussion of problems that have arisen
4. Discussion of work that lies ahead
5. Assessment of whether you will meet the
objectives in the proposed schedule and budget
Outline of the progress report
I. Introduction – describes the purpose of the document and the
previous work which includes a brief summary of the document
contents
II. Facts and Discussion: Past Work; Future Work
A. Accounting of work completed – indicates whether the
work is going as planned
B. Accounting of problems encountered with work not
completed
C. Plans for handling problems areas
D. Evaluation of progress to date
III. Conclusions/Recommendations – plans for completing tasks
• A proposal is a plan, a scheme, an offer to be
accepted or rejected: to make proposals for peace.
• Proposals come under many different guises. They
range from casual, one-page memos to multiple-
volumes that are hundreds of pages long. Usually,
a proposal is a document written by a person,
business, or agency who wishes to perform a job
or solve a problem for another person, business or
agency and receive funding or money for the
proposed task. Despite the differences, though a
particular task or project to solve a technical
problem in a particular way, under a specified plan
of management, for a specified compensation.
• The degree of formality of a proposal is in direct proportion
to the situation that gives rise to it. If the proposal is just
within the organization (a business, a government agency,
etc.), it may not include some of the sections of it like
qualification, etc. but if it is external, a proposal written for
other company or agency, it must be complete.
• When writing a proposal, you must be very careful to
write as formal and complete a proposal as the situation
calls for. Proposals differ from most other business and
technical writing in one important way—they deal with the
future. It must convince the reader that there is a situation
or problem and that the proposal writer is the best person
to solve the problem or repair the situation. A final issue
that proposal writers must face is the idea that, more often
than not, proposals are legally binding others.
Proposals have the following characteristics:
• Proposals deal with the future.
• Proposals must convince the reader that
there is a problem and the writer can do
something about it.
• Proposals must convince the reader that
the writer is the best person to fix the
problem.
• Proposals vary in length and formality.
• Proposals are often legally binding offers.
You can improve your proposal by carefully answering the following
questions:
• What do I propose to do?
• Can I do it?
• How do I propose to do it?
• Is this possible or feasible?
• What evidence can I introduce to demonstrate that what I propose to
do will actually get the desired results?
• What evidence can I use to convince my reader that my way is the
best way to obtain the desired results?
• How can I show my ability to do what I propose to do?
• How much will it cost me to do the task?
• How much shall I charge to perform the task?
• What evidence must I show to convince the reader that this cost is
acceptable?
• Is my time schedule appropriate?
• What evidence must I include to convince the reader that the time
schedule is satisfactory?
• Solicited Proposals
Solicited proposals are written in
response to published requirements,
contained in a request for
proposal (RFP), request for
quotation (RFQ), invitation for bid(IFB),
or a request for information (RFI).
• Unsolicited Proposal
An "unsolicited proposal," is a written
proposal for a new or innovative idea that is
submitted to an agency on the initiative of the
offering company (i.e. your company) for the
purpose of obtaining a contract with the
government, and that is not in response to an
RFP, broad agency announcement, or any other
government-initiated solicitation or program.
The unsolicited proposal should be:
 Innovative and unique
 Independently originated and developed by the offering company
 Prepared without government supervision, endorsement, direction
or direct government involvement
 Detailed enough to show that government support could be
worthwhile, and that the proposed work could benefit the
agency's research and development (or other mission
responsibilities)
 Not an advance government proposal for a contract that you
know the agency will need and that could be acquired by
competitive methods
• Internal Proposals
Internal proposals are ideas or projects that are
presented to whoever holds the position of top
management in a company. These types of proposals
can be written by a particular individual, group,
department, or division of a particular company.
Some advantages to this include easier
communication, knowing the client's needs and
making fast decisions.
• Sole-source Contract
These types of proposals are made when a
private firm, government agency, or association will
make a bargain to supply a service or product to a
single company and when a company has an
excellent authenticity and achievement record.
There is no fix format or form of the progress report but most of them
have the following parts.
• Introduction. Indicate the purpose and contents of the proposal.
Mention prior contact with the recipient, or how you found out about
the project. Give an overview of the contents of the proposal.
• Background. Discuss the background of the project – the problem or
opportunity that has brought about this proposal.
• Proposal. State what you propose to do about the problem, how you
plan to help the readers take advantage of the opportunity, how you
intend to help with the situation.
• Benefits. Discuss the benefits of doing the proposed project, the
advantages that come from approving it.
• Procedure. Describe exactly what the completed project would consist
of, what it would like, how it would work—describe the results of the
project.
• Results. Discuss or describe what the finished
product will look like, how it will work (in the
case of the report project, describe the report in
terms of page count, graphics, audience,
contents, etc.).
• Feasibility. Either here or in the benefits section,
discusses the likelihood of the full benefits of
the project – particularly if it’s a business
venture.
• Schedule. Provide a schedule, including major
milestones or checkpoints in the project.
• Qualifications. Briefly list your qualifications for
the project; provide a mini-resume of the
background you have that makes you right for
the project.
• Costs and Fees. List the costs of the project, the
resources you’ll need to do the project.
• Conclusion. Create a closing for the proposal, in
which you urge the reader to contact you,
possibly review the benefits of doing the
project and having your organization to do the
work.
types of reports

types of reports

  • 2.
    • an accountor statement describing in detail an event, situation, or the like, usually as the result of observation, inqui ry, etc. • A document containing information organized in a narrative, graphic, or tabular form, prepared on ad hoc, periodic, recurring, regular, or as required basis. • Reports may refer to specific periods, events, occurrences, or subjects, and may be communicated or presented in oral or written form.
  • 3.
    • A documentthat presents information in an organized format for a specific audience and purpose. Although summaries of reports may be delivered orally, complete reports are almost always in the form of written documents.
  • 4.
    1. Structural Engineers2. Electrical 3. Demographic 4. Sales 5. Trade 6. Service 7. Operation 8. Periodic 9. Construction 10. Failure 11. Student-Laboratory 12. Work 13. Evaluative 14. Completion 15. Examination 16. Inspection 17. Information 18. Special 19. Case Study 20. Memorandum 21. Incident 22. Accident 23. Feasibility 24. Industrial-Research 25. Recommendation 26. Progress 27. Proposal 28. Oral
  • 5.
    H U RT Q E V I T A U L A V E R L T H E S P O D E M O G R A P H I C E A C X I S T I N F O R M A T I O N I C S O W N T S R E X L O V E W H Y H V O O N J D U I E U A C C I D E N T Q R M P S B U D C N R C E H E A R T R Z E M O T Z S E M I S G T X L I Z A A I S E R R Q T N U C N P O U A M Q W D R M N P U D R T D B L C E R R M A J E I B D G C F I L N G O E I C P A I R F O J A Y T H A A A C V N I D T E L N K E Z T Z I H L B R Y O J I N E I L E A R D I N O P R O O L O V E J A N O E N T L O U N I E R M P K S H G K D T N C G I N A Y T S A E R U L I A F W E R L T I O Q W R E T M B V C X Z S L G O A T R N N M O A O P E R A T I O N D E I R Y I E A P R R Z N O I T E L P M O C S H K C E E C Y T I L I B I S A E F E L P O U A R H F C A S E S T U D Y V P K E C I V L S Z X P E R I O D I C Q S U P E R M A N
  • 6.
    Structural Engineers ElectricalDemographic Sales Trade Service Operation Periodic Construction Failure Student-Laboratory Work Evaluative Completion Examination Inspection Information Special Case Study Memorandum Incident Accident Feasibility Industrial-Research Recommendation Progress Proposal Oral
  • 7.
    • It isa visual property inspection carried out by a chartered structural or civil engineer.
  • 8.
    • It isa report document that refers to the in service condition of the electrical installation of the buildings. • The purpose of the report is to establish if the electrical installation is in a satisfactory condition for safe and continued service and the financial costs of electrical works required before the purchase of a property.
  • 9.
    • Demographics area statistical view of a population, generally including age, gender, income, schooling, and occupation and so on. Demographic Report is not only used for research purposes, rather it is also a major factor and contribution in business venture. • Understanding the demographics of the target customers is critical for the success of the business. Not only do the business owner need to understand them in order to decide exactly what the product and services mixes will include, but this information will also affect pricing, packaging, promotion and place.
  • 10.
    • In orderto properly evaluate a community or neighborhood for the best location for the business, the owner must know the demographic profile of his potential customers. To see if the community he’s considering offers a population with the demographic traits necessary to support his business, look at the community's: • • Purchasing power. • Residences. • Means of transportation. • Age ranges. • Family status. • Leisure activities.
  • 11.
    • A recordof calls made and products sold during a particular time frame kept by a salesperson or their management. For example, a typical sales report might incorporate data on (1) sales volume observed per item or group of items, (2) how many new and current accounts were contacted and when, and (3) any costs that were involved in promoting and selling products.
  • 12.
    • The practiceof announcing the trade or issue of a security to the appropriate regulator. •Trade reporting is mandatory and serves to increase transparency in the market. It also helps keep the regulator abreast to what is happening, which may help it find.
  • 13.
    • It reportson the results achieved both operationally and strategically and on any developments related to Service Level Agreements such as hitting various targets, like availability. • Service Level Agreement (SLA) is a part of a service contract where a service is formally defined. Particular aspects of the service – scope, quality responsibilities – are agreed between the service provider and the service user. • Its purpose is to provide information to both the service provider and the service user in order for informed decisions to be made.
  • 14.
    • Operational reportingis reporting about operational details that reflects current activity. Operational reporting is intended to support the day-to-day activities of the organization. "Examples of operational reporting include bank teller end-of-day window balancing reports, daily account audits and adjustments, daily production records, flight-by-flight traveler logs and transaction logs."
  • 15.
    Operational Reporting solutionsshould deliver the following benefits: • Real Time Reporting – To be of benefit, Operational Reporting needs to provide current information to its consumer. For example, it does not do the shipping dock much good to view a list of ready-to-be-shipped orders from yesterday. • Detailed Information – Operational Reporting must present the data in the lowest level of granularity. For example, if there is a sales line that is backordered and needs to be filled, the responsible parties need to know the specifics of the transaction. • Flexibility – To limit your dependence on IT, your Operational Reporting solution should provide flexibility to enable end users to create their own specific views of the data.
  • 16.
    • Summary ofevents that presents essentially the same type of information updated at regular intervals such as every day, week, month, etc. Also called recurring report. • Periodic reports are written by federal agencies, corporations, non-profits and other institutions. Periodic reports often cover the same basic set of information and rely on numerical data to provide an overview of a specific time period.
  • 17.
    • It isthe hourly and daily events on a worksite. It shows the numbers of employees and equipment. The time of start and finish is also recorded. Accidents are reported as well as weather and progress.
  • 18.
    • It isa logical and systematic examination of an equipment or machine and/or documentation to detect and to analyze the causes, probabilities, and consequences of actual or potential failure and to plan corrective actions in those failure.
  • 19.
    • Laboratory reportsare written to describe and analyze a laboratory experiment that explores a scientific concept. It provides a formal record of an experiment. The discussion of objectives, procedures, and results should be specific enough that interested readers could replicate the experiment.
  • 20.
    • They aretypically assigned to enable you to: • Conduct scientific research. • Formulate a hypothesis about a particular stimulus, event, and/or behavior. • Review relevant literature to justify your hypothesis. • Allow someone to replicate your study by providing precise details. • Apply statistics to test your hypothesis. • Explore theoretical explanations. • Evaluate research objectively and methodically. • Communicate concisely and precisely.
  • 21.
    • Also calledworking draft (sometimes called a draft document) • A working draft is a type of technical report that is a work in progress, a preliminary form of a possible future document. A working draft indicates a commitment on the part of the issuing organization to do further work in the area outlined in the document. Several revisions of the working draft may be issued before the final document is written, or the document may be made obsolete by future developments.
  • 22.
    • These area useful way to describe program successes, as well as areas in need of improvement. When data is communicated well, it can be used to maintain current support, garner new backing, and apply for additional funding.
  • 23.
    • It iswritten when the work is finished. • It provides a permanent record of the entire project, including the circumstances that led to its beginning. • It serves as immediate documentation. • It presents recommendations: suggestions about how to proceed in light of the conclusions. • It serves as a future reference when there is a personnel change, a major new project is undertaken and a problem develops after the project has been completed.
  • 24.
    • Examination Reportis the report issued by an IRS (Internal Revenue Service) auditor after an audit is concluded with its findings. Audit is an examination of the financial records of a person, business, or organization, typically done to correct careless or improper bookkeeping or to verify that proper records are being kept. Businesses and nonprofits often undergo an annual audit by an independent accounting firm. The IRS also conducts audits, mainly to assess taxes owed.
  • 25.
    • It isa written report of the property's condition presented by a licensed inspection professional. • It is also a confidential report prepared for a life or health insurance company on a risk, setting out the moral and physical hazards that may or may not be present. Inspection service is usually bought from companies that specialize in that field. Used for classifying individuals as standard, substandard or uninsurable.
  • 26.
    • An informationreport is a factual text, which means it provides information about something. An information report is used as a way to gain a better understanding about a living or non-living subject. An information report: uses facts to explain something.
  • 27.
    • It isa report that is prepared in accordance with Generally Accepted Auditing Standards. • Generally Accepted Auditing Standards (GAAS) refers to broad rules and guidelines in preparing for and performing audits of a client’s financial statements. • It attempts to elaborate, explain, or exhibit in a prescribed fashion certain sections, accounts, or items of a financial statement. • Cash receipts/disbursements reports, proposed acquisitions, and tax basis financial statements are some examples of a special reports.
  • 28.
    • Case studiesare in-depth investigations of a single person, group, event or community. In a case study, nearly every aspect of the subject's life and history is analyzed to seek patterns and causes for behavior. The hope is that learning gained from studying one case can be generalized to many others. Unfortunately, case studies tend to be highly subjective and it is difficult to generalize results to a larger population.
  • 29.
    • The casestudy method often involves simply observing what happens to, or reconstructing ‘the case history’ of a single participant or group of individuals (such as a school class or a specific social group), i.e. the idiographic approach. Case studies allow a researcher to investigate a topic in far more detail than might be possible if they were trying to deal with a large number of research participants (homothetic approach) with the aim of ‘averaging’. • The case study is not itself a research method, but researchers select methods of data collection and analysis that will generate material suitable for case studies
  • 30.
    • Explanatory: Usedto do causal investigations. • Exploratory: A case study that is sometimes used as a prelude to further, more in-depth research. This allows researchers to gather more information before developing their research questions and hypotheses. • Descriptive: Involves starting with a descriptive theory. The subjects are then observed and the information gathered is compared to the pre-existing theory. • Intrinsic: A type of case study in which the researcher has a personal interest in the case. • Collective: Involves studying a group of individuals. • Instrumental: Occurs when the individual or group allows researchers to understand more than what is initially obvious to observers.
  • 31.
    There are anumber of different sources and methods that researchers can use to gather information about an individual or group. The six major sources that have been identified by researchers (Yin, 1994; Stake, 1995) are: • Direct observation: This strategy involves observing the subject, often in a natural setting. While an individual observer is sometimes used, it is more common to utilize a group of observers. • Interviews: One of the most important methods for gathering information in case studies. An interview can involve structured survey-type questions, or more open-ended questions. • Documents: Letters, newspaper articles, administrative records, etc. • Archival records: Census records, survey records, name lists, etc. • Physical artifacts: Tools, objects, instruments and other artifacts often observed during a direct observation of the subject. • Participant observation: Involves the researcher actually serving as a participant in events and observing the actions and outcomes.
  • 32.
    • A memorandum(abbrev.: memo) was from the Latin verbal phrase memorandum est, the gerundive form of the verb memoro, "to mention, call to mind, recount, relate", which means "It must be remembered (that)...". It is therefore a note, document or other communication that helps the memory by recording events or observations on a topic, such as may be used in a business office.
  • 33.
    • Memoranda areoften used in diplomacy, business, and law. Two countries might sign a memorandum of understanding that they will equally share use of the river that runs between them. A member of Congress might publish a memorandum criticizing the government’s education policies. You’re probably more familiar with the word's shortened form, memo, which means the same thing but is usually used in informal contexts, such as for messages within an office.
  • 34.
    • it isdocument, usually confidential (protected from discovery by a plaintiff in a lawsuit),describing any accident or deviation from policies or orders involving a patient, employee, visitor, or student on the premises of a health care facility.
  • 35.
    • It isa report that is filled out in order to record details of an unusual event that occurs, such as an injury to a patient. • The purpose of this report is to document the exact details of the occurrence who witnessed the event. This information may be useful when dealing with liability issues stemming from the incident.
  • 36.
    • A documentprepared by an analyst or strategist who is a part of the investment research team in a stock brokerage or investment bank. A research report may focus on a specific stock or industry sector, a currency, commodity or fixed-income instrument, or even on a geographic region or country. Research reports generally, but not always, have "actionable" recommendations (i.e. investment ideas that investors can act upon).
  • 37.
    • It isa presentation of factual information to an audience. • Informal oral reports are generally characterized by small-group settings with a high degree of audience interaction and a relaxed manner of delivery and dress. An informal oral report might be an impromptu presentation. Informal oral presentations can foster the free exchange of ideas and be important for producing action items. • A formal oral report is distinguished by its adherence to an agreed-upon format or outline. Formal oral reports are usually prepared well in advance of presentation and are therefore well rehearsed. Your manner of delivery is extremely important in a formal oral report situation. Audience interaction is generally limited to the question and answer period at the conclusion of your report.
  • 38.
    • The ManuscriptMethod. You read a written report to your audience word for word, glancing up from time to time to make eye contact. In this method, you will not miss anything. However, the audience might be bored if the oral report is done using this method because of the monotony of the whole process. • The Memorization Method. You learn by heart and recite a report you have written. This method, tends to make you too structured, too formal. You will not be able to give additional explanation because you have to present your report verbatim or word for word. Buf if you have a sharp memory, it is very likely that you can deliver the report well.
  • 39.
    • The ExtemporaneousMethod. You can write the report in rough form. You speak spontaneously using an outline or note cards as guide. You can explain further as you report. But sometimes you tend to speak lengthily without considering the time element. • The Impromptu Method. You talk on the spot with no prepared draft, outline or note cards. This method is applied only to brief reports that require little or no research or presentation. The downside is that you tend to be disorganized in this method. However, if you are familiar with the topic, you can, most likely, discuss it comprehensively.
  • 40.
    • A feasibilitystudy, also known as feasibility analysis, is a preliminary study undertaken to determine and document a project’s viability. It comes from the word feasible which means “capable of being accomplished; practicable; or likely.” Feasibility studies can be used in many ways but primarily focus on proposed business ventures.
  • 41.
    • The termfeasibility study is also used to refer to the resulting document. The results of this study are used to make a decision, whether or not to proceed with the project. If it indeed leads to a project being approved, it will — before the real work of the proposed project starts — be used to ascertain the likelihood of the project’s success. It is an analysis of possible alternative solutions to a problem and a recommendation on the best alternative. It, for example, can decide whether an order processing be carried out by a new system more efficiently than the previous one.
  • 42.
    • A feasiblebusiness venture is one where the business will generate adequate cash- flow and profits, withstand the risks it will encounter, remain viable in the long-term and meet the goals of the founders. The venture can be either a start-up business, the purchase of an existing business, an expansion of current business operations or a new enterprise for an existing business. A feasibility study is only one step in the business idea assessment and business development process.
  • 43.
    • A feasibilitystudy is not a business plan. The separate roles of the feasibility study and the business plan are frequently misunderstood. The feasibility study provides an investigating function. It addresses the question of “Is this a viable business venture?” The business plan provides a planning function. The business plan outlines the actions needed to take the proposal from “idea” to “reality.”
  • 44.
    • The feasibilitystudy outlines and analyzes several alternatives or methods of achieving business success. The feasibility study helps to narrow the scope of the project to identify the best business scenario(s). The business plan deals with only one alternative or scenario. The feasibility study helps to narrow the scope of the project to identify and define two or three scenarios or alternatives. The person or business conducting the feasibility study may work with the group to identify the “best” alternative for their situation. This becomes the basis for the business plan.
  • 45.
    • The feasibilitystudy is conducted before the business plan. A business plan is prepared only after the business venture has been deemed to be feasible. If a proposed business venture is considered to be feasible, a business plan is usually constructed next that provides a “roadmap” of how the business will be created and developed. The business plan provides the “blueprint” for project implementation. If the venture is deemed not to be feasible, efforts may be made to correct its deficiencies, other alternatives may be explored, or the idea is dropped.
  • 46.
    • Proposed ProjectDescription Defining and describing a proposed project or business venture lays the foundation for feasibility analysis. If you are analyzing a project, go into detail about project timelines, deliverables and resource requirements. If you are analyzing a business, detail the products and services that it will offer, the proposed target market and any extraordinary resource needs introduced by the business model. Focus on the requirements of implementing the venture, rather than details such as business names and organizational structures.
  • 47.
    • Market AnalysisSection Analyze the industry and market targeted by the proposed venture. Measure the size of the market and its demographic makeup using census data or other survey sources. Define a target market segment according its behaviorist, geographic and psychographic characteristics. Analyze any competing businesses or projects that are planned or already at work in the market. With this information in hand, try to determine whether there is truly a viable market for the output of the project or business, and whether it is truly possible to gain market share from existing competitive forces. In highly saturated markets with entrenched competitors, for example, it may be less feasible to build a new brand than to provide contractor services to the strongest competitors.
  • 48.
    • Technical FeasibilitySection Consider the requirements for specialized equipment or facilities, copyrights, patents, labor and expertise for the venture in question, and determine whether or not you either have these resources on hand or are reasonably able to obtain them. Technical requirements can range from special permits and licenses from multiple government agencies to specialized vehicles or professionally licensed specialists. Obtaining resources, especially highly educated technical employees, can greatly increase the cost of building a proposed venture, but moving forward without them can lead to the quick failure of a project or closure of a new business. For any resources you do not have on hand, consider the cost of obtaining and retaining them.
  • 49.
    • Financial FeasibilitySection Determine how much the proposed project or business start-up will cost to implement, as well as how much it can be expected to earn. Consider all of the resources and capital investments required up front. Calculate any financing requirements that will arise, and analyze the potential sources of financing available, such as business loans or outside investment. In this section, try to ascertain whether the project or business can be expected to earn a consistent profit and whether you or your business currently has access to the cash or financing required to get the idea off the ground.
  • 50.
    • proposes asolution to a problem or evaluates possible solutions and recommends one • This type starts from a stated need, a selection of choices, or both and then recommends one, some, or none.
  • 51.
    • For example,a company might be looking at grammar-checking software and want a recommendation on which product is the best. As the report writer on this project, you could study the market for this type of application and recommend one particular product, a couple of products (differing perhaps in their strengths and their weaknesses), or none (maybe none of them are any good). The recommendation report answers the question "Which option should we choose?" (or in some cases "Which are the best options?) by recommending Product B, or maybe both Products B and C, or none of the products.
  • 52.
    • Identification ofthe problem, an overall comparison of several solutions, conclusions drawn from study and comparison of the solutions and a recommendation. • A recommendation report should state facts rather than popular opinions. Additionally, a recommendation report should include a solution that is specific to the problem and takes into account chance and human nature. Also, it should be supported with research and devised after consideration of economic factors. By considering these factors and presenting a solution in the proper format, a recommendation report can be used to influence others.
  • 53.
    In writing recommendationreport here are some suggestions: 1.Identify a client with a workplace problem, situation, or opportunity. 2.Develop a plan for investigating the situation and the means for resolving it. 3.Establish the criteria required for your client to make an effective decision. 4. Develop and implement a project for completing your research (investigation) 5.Interpret and present your findings in a recommendation reports to your clients.
  • 54.
    I. Introduction A. Statementof the need B. Statement of recommendation C. Statement of scope and plan of the report II. Expanded statement, and explanation of the recommendation III. Option to be considered IV. Discussion of each option V. Summary of conclusion VI. Restatement of recommendation
  • 55.
    Recommendation for DrunkenDriving Prevention At your request the Michigan Safe Driving Committee investigated the negative effects that drunken driving has on society. Drunk drivers are making it unsafe for pedestrians, other drivers, and they also put themselves in Danger. This problem was discovered when the Michigan Safe Driving Committee researched the drunken driving deaths in Michigan in the past couple of years. Last year, there were 980 drunken driving deaths in the state of Michigan. In this report, I explain a possible solution discovered by the Michigan Safe Driving Committee, and present our findings followed by our comparison of drunken driving deaths in Michigan. Along with the Michigan Safe Driving Committee, I considered three possible solutions:
  • 56.
    • Put morePolice officers on the streets of Michigan • Increase the punishment of Driving Under the Influence (DUI) • More strict on Breathalyzer Tests There have been many deaths in Michigan over the past couple of years. Drunk Driving has been one the problems. Driving under the influence has caused many deaths in Michigan over the past couple of years. Drivers are becoming more reckless due to a lack of supervision, and a lack of punishment. There are more drivers every year, which could increase the deaths caused by Driving under the Influence in Michigan.
  • 57.
    Drunk Driving StatisticsCompared The following stats represent the total Michigan auto accidents fatalities in 2007 and 2008 and the percentage of car crash deaths that involved a driver who had .08% blood alcohol content or higher. 2007 2008 Deaths 1,088 980 Percent 28% 29% • Put more police officers on streets of Michigan Training more cops would benefit Michigan. The state of Michigan Police Department should recruit more police officers to the police academy. This would make drivers more cautions and less willing to take the risk of driving under the influence.
  • 58.
    • Increase thepunishment of Driving under the influence (DUI) There are some drivers who drive without a license. This is mostly when you refuse to take a breathalyzer, blood, or urine test. This results in drivers not intimidated being by the DUI punishments. Making the punishments more severe would make the drivers more aware and somewhat fearful to drive under the influence. Drivers that are charged with DUI should have to pay a fine for the first offense. For the second offense there should be a fine and a suspended license. The third time someone gets charged there should be a fine, a suspended license, and possibly jail time. • More strict on Breathalyzer test Breathalyzer test should be used more frequently. The breathalyzer tests are only used if officers pull you over for reckless driving and ask you to take a breathalyzer test. There should be a solution where every driver must be tested to limit some of the deaths caused by drivers driving under the influence. The State of Michigan should lower the blood alcohol percentage from .08% to .04%. This would result in a decrease of drivers who drink alcoholic beverages before they get on the streets of Michigan.
  • 59.
    There were 980deaths in Michigan in 2008. Recruiting more people to come to the police officer would result in more people wanting to become a police officer. Putting more police officers on the streets would make drivers wiser about getting on the road and also make them less risky. Driving under the influence should be looked at as a major crime. There should be more punishment involved in DUI crimes. Punishments should include jail time, paying fines, and suspended license for the drunk drivers. The State of Michigan should be stricter on the breathalyzer test conditions. The blood alcohol percentage should be lowered from .08% to .04% in Michigan. The .08% is proven to be too merciful to people who drive drunk. There are too many deaths in Michigan that is caused by this one problem. The comparison of the deaths from 2007 and 2008 are only slightly different. There were more deaths resulting from DUI in 2007 than in 2008, but the numbers are still way too high. On Behalf of the Michigan Safe Driving Committee, we would like to help the Michigan Safe Driving Department keep drunk drivers off the streets of Michigan.
  • 60.
    The State ofMichigan should recruit more police officers and get them on the streets of Michigan to keep the drunk drivers from getting behind the wheel. The punishment of DUI should be increased. Drivers should pay a fine for a 1st offense. For a 2nd offense there should be a fine and a suspended license. A third offense should result in a fine, a suspended license, and possible jail time.
  • 61.
    – It describesthe status of a project that is not yet completed with the purpose of informing the clients how the work is proceeding. – It may be in the form of memoranda, letters, short reports, formal reports, or presentations. – Most progress report have the following similarities in content: 1. Background on the project itself 2. Discussion of achievements since last reporting 3. Discussion of problems that have arisen 4. Discussion of work that lies ahead 5. Assessment of whether you will meet the objectives in the proposed schedule and budget
  • 62.
    Outline of theprogress report I. Introduction – describes the purpose of the document and the previous work which includes a brief summary of the document contents II. Facts and Discussion: Past Work; Future Work A. Accounting of work completed – indicates whether the work is going as planned B. Accounting of problems encountered with work not completed C. Plans for handling problems areas D. Evaluation of progress to date III. Conclusions/Recommendations – plans for completing tasks
  • 63.
    • A proposalis a plan, a scheme, an offer to be accepted or rejected: to make proposals for peace. • Proposals come under many different guises. They range from casual, one-page memos to multiple- volumes that are hundreds of pages long. Usually, a proposal is a document written by a person, business, or agency who wishes to perform a job or solve a problem for another person, business or agency and receive funding or money for the proposed task. Despite the differences, though a particular task or project to solve a technical problem in a particular way, under a specified plan of management, for a specified compensation.
  • 64.
    • The degreeof formality of a proposal is in direct proportion to the situation that gives rise to it. If the proposal is just within the organization (a business, a government agency, etc.), it may not include some of the sections of it like qualification, etc. but if it is external, a proposal written for other company or agency, it must be complete. • When writing a proposal, you must be very careful to write as formal and complete a proposal as the situation calls for. Proposals differ from most other business and technical writing in one important way—they deal with the future. It must convince the reader that there is a situation or problem and that the proposal writer is the best person to solve the problem or repair the situation. A final issue that proposal writers must face is the idea that, more often than not, proposals are legally binding others.
  • 65.
    Proposals have thefollowing characteristics: • Proposals deal with the future. • Proposals must convince the reader that there is a problem and the writer can do something about it. • Proposals must convince the reader that the writer is the best person to fix the problem. • Proposals vary in length and formality. • Proposals are often legally binding offers.
  • 66.
    You can improveyour proposal by carefully answering the following questions: • What do I propose to do? • Can I do it? • How do I propose to do it? • Is this possible or feasible? • What evidence can I introduce to demonstrate that what I propose to do will actually get the desired results? • What evidence can I use to convince my reader that my way is the best way to obtain the desired results? • How can I show my ability to do what I propose to do? • How much will it cost me to do the task? • How much shall I charge to perform the task? • What evidence must I show to convince the reader that this cost is acceptable? • Is my time schedule appropriate? • What evidence must I include to convince the reader that the time schedule is satisfactory?
  • 67.
    • Solicited Proposals Solicitedproposals are written in response to published requirements, contained in a request for proposal (RFP), request for quotation (RFQ), invitation for bid(IFB), or a request for information (RFI).
  • 68.
    • Unsolicited Proposal An"unsolicited proposal," is a written proposal for a new or innovative idea that is submitted to an agency on the initiative of the offering company (i.e. your company) for the purpose of obtaining a contract with the government, and that is not in response to an RFP, broad agency announcement, or any other government-initiated solicitation or program.
  • 69.
    The unsolicited proposalshould be:  Innovative and unique  Independently originated and developed by the offering company  Prepared without government supervision, endorsement, direction or direct government involvement  Detailed enough to show that government support could be worthwhile, and that the proposed work could benefit the agency's research and development (or other mission responsibilities)  Not an advance government proposal for a contract that you know the agency will need and that could be acquired by competitive methods
  • 70.
    • Internal Proposals Internalproposals are ideas or projects that are presented to whoever holds the position of top management in a company. These types of proposals can be written by a particular individual, group, department, or division of a particular company. Some advantages to this include easier communication, knowing the client's needs and making fast decisions. • Sole-source Contract These types of proposals are made when a private firm, government agency, or association will make a bargain to supply a service or product to a single company and when a company has an excellent authenticity and achievement record.
  • 71.
    There is nofix format or form of the progress report but most of them have the following parts. • Introduction. Indicate the purpose and contents of the proposal. Mention prior contact with the recipient, or how you found out about the project. Give an overview of the contents of the proposal. • Background. Discuss the background of the project – the problem or opportunity that has brought about this proposal. • Proposal. State what you propose to do about the problem, how you plan to help the readers take advantage of the opportunity, how you intend to help with the situation. • Benefits. Discuss the benefits of doing the proposed project, the advantages that come from approving it. • Procedure. Describe exactly what the completed project would consist of, what it would like, how it would work—describe the results of the project.
  • 72.
    • Results. Discussor describe what the finished product will look like, how it will work (in the case of the report project, describe the report in terms of page count, graphics, audience, contents, etc.). • Feasibility. Either here or in the benefits section, discusses the likelihood of the full benefits of the project – particularly if it’s a business venture. • Schedule. Provide a schedule, including major milestones or checkpoints in the project.
  • 73.
    • Qualifications. Brieflylist your qualifications for the project; provide a mini-resume of the background you have that makes you right for the project. • Costs and Fees. List the costs of the project, the resources you’ll need to do the project. • Conclusion. Create a closing for the proposal, in which you urge the reader to contact you, possibly review the benefits of doing the project and having your organization to do the work.